Split compose foundation lazy tests into a separate project

This splits about 30% (18 minutes) of tests into a separate project so
it is run separately outside of the rest of foundation tests

Test: ./gradlew compose:foundatio:foundation:integration-tests:lazy-tests:connectedCheck
Change-Id: If206456f3de0922fc8605d24001b33c7241ee72f
diff --git a/settings.gradle b/settings.gradle
index 1452ce5..ee9d646 100644
--- a/settings.gradle
+++ b/settings.gradle
@@ -504,6 +504,7 @@
 includeProject(":compose:foundation:foundation-layout:foundation-layout-samples", "compose/foundation/foundation-layout/samples", [BuildType.COMPOSE])
 includeProject(":compose:foundation:foundation-lint", [BuildType.COMPOSE])
 includeProject(":compose:foundation:foundation:integration-tests:foundation-demos", [BuildType.COMPOSE])
+includeProject(":compose:foundation:foundation:integration-tests:lazy-tests", [BuildType.COMPOSE])
 includeProject(":compose:foundation:foundation:foundation-samples", "compose/foundation/foundation/samples", [BuildType.COMPOSE])
 includeProject(":compose:integration-tests", [BuildType.COMPOSE])
 includeProject(":compose:integration-tests:demos", [BuildType.COMPOSE])