Valorizados - Junio
Valorizados - Junio
A. GENERALIDADES
ENTIDAD : PROVIAS DESCENTRALIZADO
OBRA
: "REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL HV - 105 (CHANCAHUAYCCO) - EMP., HV - 644 (ROSARIO), DISTRITO DE
ROSARIO, PROVINCIA DE ACOBAMBA, REGIÓN HUANCAVELICA"
: "REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL HV - 105 (CHANCAHUAYCCO) - EMP., HV - 644 (ROSARIO), DISTRITO
OBRA
DE ROSARIO, PROVINCIA DE ACOBAMBA, REGIÓN HUANCAVELICA"
: "REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL HV - 105 (CHANCAHUAYCCO) - EMP., HV - 644 (ROSARIO), DISTRITO
OBRA
DE ROSARIO, PROVINCIA DE ACOBAMBA, REGIÓN HUANCAVELICA"
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
01 TRABAJOS PRELIMINARES 553,332.00 103,005.23 7,195.21 6,652.87 29,002.28 155,095.41 8,264.19 54,473.97 76,496.31 52,839.24 60,307.29
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUPOS glb 1.00 230,890.99 230,890.99 53,104.93 0.00 0.00 9,235.64 16,162.37 0.00 36,942.56 57,722.75 57,722.74 230,890.99
01.02 TOPOGRAFIA Y GEOREFERENCIACION km 11.98 1,032.33 12,367.31 8,258.64 0.00 0.00 505.84 1,538.17 1,486.56 0.00 356.49 221.61 12,367.31
01.03 TOPOGRAFIA Y GEOREFERENCIACION (OBRAS DE ARTE) m2 3,362.45 2.93 9,851.98 0.00 767.66 225.32 5,259.35 0.00 168.33 2,344.00 515.98 571.34 9,851.98
01.04 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL gb 1.00 58,432.26 58,432.26 8,180.52 6,427.55 6,427.55 0.00 0.00 0.00 3,781.68 8,764.84 23,061.26 1,788.86 58,432.26
01.05 ACCESO A CANTERAS. DME Y FUENTES DE AGUA km 4.45 3,217.64 14,318.50 965.29 0.00 0.00 13,288.85 0.00 0.00 32.18 29.44 2.74 14,318.50
01.06 CAMPAMENTO glb 1.00 227,470.96 227,470.96 32,495.85 0.00 0.00 712.60 137,394.87 6,609.30 11,373.55 10,008.72 28,876.07 227,470.96
02 MOVIMENTO DE TERRAS 2,160,812.54 34,131.95 503,656.01 417,149.40 41,648.88 192,952.97 58,781.59 139,880.29 8,836.35 439,320.33 305,200.56
02.01 DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS ha 1.79 2,662.53 4,765.93 476.59 0.00 0.00 0.00 0.00 0.00 0.00 1,224.76 2,645.09 419.49 4,765.93
02.02 EXCAVACION EN MATERIAL SUELTO m3 57,708.63 6.03 347,983.04 33,655.36 185,264.14 82,426.57 38,503.30 8,133.66 0.00 0.00 0.00 0.01 0.00 347,983.04
02.03 EXCAVACION EN ROCA FRACTURADA (SUELTA) m3 30,603.23 18.61 569,526.11 0.00 201,805.70 248,919.71 0.00 107,410.16 0.00 0.00 0.00 7,024.17 4,366.37 569,526.11
02.04 EXCAVACION EN ROCA FIJA m3 6,065.65 30.75 186,518.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60,843.75 125,674.99 186,518.74
02.05 PERFILADO Y COMPACTADO EN ZONAS DE CORTE m2 49,092.17 1.84 90,329.59 0.00 12,764.98 0.00 0.00 8,479.32 39,497.97 0.00 0.00 18,245.51 11,341.81 90,329.59
02.06 CONFORMACION DE TERRAPLENES 55,314.17 0.00 0.00 0.00
02.06.01 CONFORMACION DE TERRAPLEN CON MATERIAL PROPIO m3 6,059.56 8.66 52,475.79 0.00 0.00 0.00 0.00 19,254.21 0.00 0.00 0.00 20,486.64 12,734.94 52,475.79
02.06.02 CONFORMACION DE TERRAPLEN CON MATERIAL DE PRESTAMO m3 81.68 34.75 2,838.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,750.33 1,088.05 2,838.38
02.07 MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE m3 13,539.25 40.78 552,130.62 0.00 0.00 0.00 0.00 13,049.60 18,868.50 139,880.29 7,611.59 263,464.39 109,256.25 552,130.62
02.08 CONFORMACION DE TERRAPLENES EN BANQUETAS m3 1,331.83 57.23 76,220.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47,002.72 29,217.91 76,220.63
02.09 DEMOLICION DE ESTRUCTURAS EXISTENTES m3 50.50 103.78 5,240.89 0.00 0.00 0.00 3,145.57 0.00 415.12 0.00 0.00 1,036.12 644.08 5,240.89
02.10 CONFORMACION DE MATERIAL EXCEDENTE A DME'S m3 85,780.76 3.18 272,782.82 0.00 103,821.19 85,803.12 0.01 55,880.23 0.00 0.00 0.00 16,821.60 10,456.67 272,782.82
03 PAVIMENTOS 1,884,363.55 0.00 0.00 0.00 0.00 0.00 0.00 93,417.93 0.00 290,506.06 1,500,439.56
03.01 MATERIAL GRANULAR ESTABILIZADO m3 10,922.66 91.65 1,001,061.79 0.00 0.00 0.00 0.00 0.00 0.00 93,417.93 0.00 154,330.36 753,313.50 1,001,061.79
03.02 RIEGO DE LIGA m2 75,625.15 2.50 189,062.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29,147.20 159,915.68 189,062.88
03.03 SLURRY SEAL m2 75,625.15 9.18 694,238.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 107,028.50 587,210.38 694,238.88
04 OBRAS DE ARTE Y DRENAJE 1,055,936.26 0.00 23,377.59 9,735.66 32,727.49 22,872.01 73,280.51 73,152.61 6,311.04 504,171.77 310,307.58
04.01 CUNETAS 350,409.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 216,085.82 134,323.63
CONFORMACION DE CUNETA TRIANGULAR NO REVESTIDA -
04.01.01
TIPO I m 11,314.00 1.98 22,401.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,814.39 8,587.33 22,401.72
CONFORMACION DE CUNETA RECTANGULAR REVESTIDA - TIPO
04.01.02
II m 1,793.47 182.89 328,007.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 202,271.43 125,736.30 328,007.73
04.02 ALCANTARILLAS TMC 217,446.32 0.00 0.00 0.00 0.00 0.00 41,860.73 43,729.98 6,311.04 87,535.97 38,008.60
04.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,922.51 4.65 8,939.67 0.00 0.00 0.00 0.00 0.00 2,939.54 5,320.39 0.00 29.59 650.15 8,939.67
04.02.02 ENCOFRADO Y DESENCOFRADO m2 783.26 50.74 39,742.61 0.00 0.00 0.00 0.00 0.00 898.61 0.00 6,311.04 23,953.80 8,579.16 39,742.61
04.02.03 CONCRETO CICLOPEO CLASE 1 (f'c=175 kg/cm2 + 30%PM) m3 274.00 294.98 80,824.52 0.00 0.00 0.00 0.00 0.00 1,643.04 5,840.60 0.00 48,828.58 24,512.30 80,824.52
04.02.04 ALCANTARILLA TMC D=36" m 144.99 409.85 59,424.15 0.00 0.00 0.00 0.00 0.00 27,886.19 17,594.86 0.00 12,448.41 1,494.69 59,424.15
04.02.05 RELLENO CON MATERIAL GRANULAR DE PRESTAMO m3 307.89 68.55 21,105.86 0.00 0.00 0.00 0.00 0.00 8,493.35 8,234.91 0.00 1,925.45 2,452.15 21,105.86
04.02.06 RELLENO CON MATERIAL PROPIO m3 336.49 22.02 7,409.51 0.00 0.00 0.00 0.00 0.00 0.00 6,739.22 0.00 350.14 320.15 7,409.51
04.03 ALCANTARILLA TIPO MARCO 185,186.62 0.00 23,377.59 9,735.66 32,727.49 22,872.01 31,419.78 29,422.63 0.00 13,765.48 21,865.98
04.03.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 500.05 4.65 2,325.23 0.00 673.41 198.32 473.18 97.14 401.16 356.88 0.00 49.89 75.25 2,325.23
04.03.02 PERFILADO Y COMPACTADO MANUAL m2 209.88 5.76 1,208.91 0.00 331.55 79.43 285.18 0.00 80.41 264.38 0.00 42.84 125.12 1,208.91
04.03.03 SOLADO m3 22.23 292.82 6,509.39 0.00 1,718.85 0.00 1,979.46 0.00 1,774.49 93.70 0.00 639.23 303.66 6,509.39
04.03.04 ENCOFRADO Y DESENCOFRADO m2 761.40 50.74 38,633.44 0.00 5,587.49 2,557.30 8,173.71 3,991.21 6,602.29 6,338.95 0.00 2,132.37 3,250.12 38,633.44
04.03.05 CONCRETO CLASES D (f'c=210 kg/cm2) m3 128.04 412.95 52,874.12 0.00 7,598.28 3,477.04 10,790.38 5,624.38 11,013.38 6,900.39 0.00 2,218.02 5,252.25 52,874.12
04.03.06 CONCRETO CICLOPEO CLASE 1 (f'c= 175 kg/cm2 + 30%PM) m3 45.24 294.98 13,344.90 0.00 0.00 0.00 0.00 0.00 0.00 5,171.00 0.00 1,920.78 6,253.12 13,344.90
04.03.07 ACERO DE REFUERZO kg 10,940.19 5.07 55,466.76 0.00 7,468.01 3,423.57 11,025.58 6,490.36 11,067.51 7,707.57 0.00 2,029.80 6,254.36 55,466.76
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA 2023 ACTUALIZADO
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
04.03.08 RELLENO CON MATERIAL GRANULAR DE PRESTAMO m3 188.63 68.55 12,930.59 0.00 0.00 0.00 0.00 5,478.52 480.54 2,454.78 0.00 4,299.11 217.64 12,930.59
04.03.09 RELLENO CON MATERIAL PROPIO m3 85.98 22.02 1,893.28 0.00 0.00 0.00 0.00 1,190.40 0.00 134.98 0.00 433.44 134.46 1,893.28
04.04 CONSTRUCCION Y ADECUACION DE BUZONES A NIVEL DE RASANTE 23,285.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,359.42 8,926.17
04.04.01 DEMOLICION DE ESTRUCTURAS EXISTENTES m3 9.14 103.78 948.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 584.93 363.62 948.55
04.04.02 ENCOFRADO Y DESENCOFRADO CON MOLDE METALICO m2 38.38 58.76 2,255.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,390.71 864.50 2,255.21
04.04.03 ENCOFRADO Y DESENCOFRADO m2 44.91 50.74 2,278.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,405.21 873.52 2,278.73
04.04.04 ACERO DE REFUERZO kg 1,105.86 5.07 5,606.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,457.47 2,149.24 5,606.71
04.04.05 CONCRETO CLASES D (f'c=210 kg/cm2) m3 10.47 412.95 4,323.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,666.21 1,657.38 4,323.59
04.04.06 MARCO Y TAPA F°F° P. BUZON und 26.00 302.80 7,872.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,854.89 3,017.91 7,872.80
04.05 SUELOS REFORZADO 268,698.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 165,697.34 103,001.09
04.05.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,609.09 4.65 7,482.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,614.07 2,868.20 7,482.27
04.05.02 PERFILADO Y COMPACTADO MANUAL m2 1,908.00 5.76 10,990.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,777.21 4,212.87 10,990.08
04.05.03 GEOTEXTIL NO TEJIDO CLASE 1 m2 847.00 6.17 5,225.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,222.69 2,003.30 5,225.99
04.05.04 SUMNISTRO E INSTALACION DE GEOCOMPUESTO DE DRENAJE m2 382.40 28.09 10,741.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,623.99 4,117.63 10,741.62
04.05.05 TUBERIA HDPE 4" m 160.25 16.25 2,604.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,605.83 998.23 2,604.06
04.05.06 SISTEMA MURO TIPO TERRAMESH 1X2X4 M und 211.00 557.90 117,716.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72,592.09 45,124.81 117,716.90
04.05.07 SISTEMA MURO TIPO TERRAMESH 0.5X2X4 M und 54.00 398.07 21,495.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,255.73 8,240.05 21,495.78
04.05.08 RELLENO CON MATERIAL GRANULAR DE PRESTAMO m3 1,348.53 68.55 92,441.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57,005.73 35,436.00 92,441.73
04.06 ZANJA DE CORONACION 10,909.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,727.74 4,182.11
04.06.01 ZANJA DE CORONACION SIN REVESTIR m 245.00 44.53 10,909.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,727.74 4,182.11 10,909.85
05 TRANSPORTE 1,262,645.58 27,300.41 272,595.39 246,046.55 113,845.89 90,153.41 12,659.04 99,805.93 0.00 308,361.01 91,877.95
05.01 TRANSPORTE DE MATERIAL GRANULAR HASTA 1KM m3k 27,984.53 7.82 218,839.02 0.00 0.00 0.00 0.00 0.00 6,125.56 37,407.60 0.00 131,173.30 44,132.56 218,839.02
05.02 TRANSPORTE DE MATERIAL GRANULAR > 1KM m3k 155,118.48 1.64 254,394.31 0.00 0.00 0.00 0.00 0.00 6,533.48 62,398.33 0.00 152,847.51 32,614.99 254,394.31
05.03 TRANSPORTE DE MATERIAL EXCEDENTE < 1KM m3k 75,613.63 8.42 636,666.76 24,147.83 210,899.19 202,151.57 90,892.64 76,742.20 0.00 0.00 0.00 19,630.55 12,202.78 636,666.76
05.04 TRANSPORTE DE MATERIAL EXCEDENTE > 1KM m3k 89,324.85 1.71 152,745.49 3,152.58 61,696.20 43,894.98 22,953.25 13,411.21 0.00 0.00 0.00 4,709.65 2,927.62 152,745.49
06 SEÑALIZACION 169,948.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 104,801.72 65,147.06
06.01 SEÑALES INFORMATIVAS 30,576.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18,855.46 11,720.98
06.01.01 PANELES DE SEÑALES INFORMATIVAS m2 11.74 570.15 6,693.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,127.69 2,565.87 6,693.56
06.01.02 ESTRUCTURA DE SOPORTE DE SEÑALES TIPO E-1 und 14.00 1,705.92 23,882.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,727.77 9,155.11 23,882.88
06.02 SEÑALES PREVENTIVAS und 74.00 518.18 38,345.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23,646.28 14,699.04 38,345.32
06.03 SEÑALES REGLAMENTARIAS und 24.00 577.24 13,853.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,543.15 5,310.61 13,853.76
06.04 POSTES DE KILOMETRAJE und 12.00 101.32 1,215.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 749.77 466.07 1,215.84
06.05 SEÑALIZACION AMBIENTAL 1,342.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 827.71 514.53
06.05.01 PANELES DE SEÑALES AMBIENTALES m2 3.00 78.98 236.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 146.11 90.83 236.94
06.05.02 ESTRUCTURA DESOPORTE DE SEÑALES TIPO E-3 und 5.00 221.06 1,105.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 681.60 423.70 1,105.30
06.06 GUARDAVIAS m 290.00 139.67 40,504.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24,977.65 15,526.65 40,504.30
06.07 POSTES DELINEADORES DE CONCRETO und 291.00 83.07 24,173.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,906.91 9,266.46 24,173.37
06.08 MARCAS PERMANENTES EN EL PAVIMENTO m2 2,424.29 7.46 18,085.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,152.54 6,932.66 18,085.20
06.09 PINTADO DE PARAPETOS DE ALCANTARILLAS m2 71.27 25.99 1,852.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,142.25 710.06 1,852.31
07 PROTECCION AMBIENTAL Y SOCIAL 50,354.62 0.00 0.00 0.00 0.00 0.00 0.00 5,285.00 0.00 26,322.76 18,746.86
07.01 PROGRAMA DE MONITOREO AMBIENTAL 10,570.00 0.00 0.00 0.00 0.00 0.00 0.00 5,285.00 0.00 1,788.93 3,496.07
07.01.01 MONITOREO DE CALIDAD DE AIRE pto 10.00 607.00 6,070.00 0.00 0.00 0.00 0.00 0.00 0.00 3,035.00 0.00 502.88 2,532.12 6,070.00
07.01.02 MONITOREO DE CALIDAD DE AGUA pto 6.00 210.00 1,260.00 0.00 0.00 0.00 0.00 0.00 0.00 630.00 0.00 504.65 125.35 1,260.00
07.01.03 MONITOREO DE CALIDAD DE RUIDO pto 10.00 60.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 86.75 213.25 600.00
07.01.04 MONITOREO DE CALIDAD DE SUELO pto 8.00 330.00 2,640.00 0.00 0.00 0.00 0.00 0.00 0.00 1,320.00 0.00 694.65 625.35 2,640.00
07.02 PROGRAMA DE CIERRE DE OBRA 39,784.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24,533.83 15,250.79
07.02.01 RECUPERACION AMBIENTAL DE AREAS AFECTADAS: CAMPAMENT m2 3,414.50 2.66 9,082.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,600.91 3,481.66 9,082.57
07.02.02 RECUPERACION AMBIENTAL DE AREAS AFECTADAS: CANTERAS m2 4,372.50 2.06 9,007.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,554.53 3,452.82 9,007.35
07.02.03 REVEGETACION DE AREAS AUXILIARES (DME) m2 13,148.30 1.65 21,694.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,378.39 8,316.31 21,694.70
08 PLAN DE PREVENCION, VIGILANCIA Y CONTROL DEL COVID-19 39,317.28 3,276.45 6,552.88 6,552.88 6,552.88 6,552.88 6,552.88 1,855.22 90.19 694.44 636.58
08.01 LIMPIEZA Y DESINFECCION DE AMBIENTES Y MOBILIARIOS mes 6.00 1,106.59 6,639.54 553.30 1,106.59 1,106.59 1,106.59 1,106.59 1,106.59 221.32 0.00 105.62 226.35 6,639.54
08.02 EQUIPOS DE PROTECCION PERSONAL CONTRA EL COVID-19 mes 6.00 3,798.25 22,789.50 1,899.13 3,798.25 3,798.25 3,798.25 3,798.25 3,798.25 1,139.48 75.97 393.52 290.15 22,789.50
08.03 HIGIENE PERSONAL Y CONTROL DE INFECCIONES mes 6.00 710.82 4,264.92 355.41 710.82 710.82 710.82 710.82 710.82 213.25 14.22 70.01 57.93 4,264.92
08.04 VESTUARIOS, DUCHAS Y SERVICIOS HIGIENICOS mes 6.00 937.22 5,623.32 468.61 937.22 937.22 937.22 937.22 937.22 281.17 0.00 125.29 62.15 5,623.32
COSTO DIRECTO 7,176,710.61 167,714.04 813,377.08 686,137.36 223,777.31 486,880.89 159,538.21 467,870.95 91,733.88 1,727,017.33 2,352,663.44 7,176,710.61
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA 2023 ACTUALIZADO
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
GASTOS GENERALES 8.00% 574,136.85 13,417.12 65,070.17 54,890.99 17,902.18 38,950.47 12,763.06 37,429.68 7,338.71 138,161.39 188,213.08 574,136.85
UTILIDAD 4.00% 287,068.42 6,708.56 32,535.08 27,445.49 8,951.09 19,475.24 6,381.53 18,714.84 3,669.36 69,080.69 94,106.54 287,068.42
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA 2023 ACTUALIZADO
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
SUB TOTAL 8,037,915.88 187,839.72 910,982.33 768,473.84 250,630.59 545,306.60 178,682.80 524,015.47 102,741.95 1,934,259.41 2,634,983.06 8,037,915.88
IGV (18.00%) 18.00% 1,446,824.86 33,811.15 163,976.82 138,325.29 45,113.51 98,155.19 32,162.90 94,322.79 18,493.55 348,166.69 474,296.95 1,446,824.86
TOTAL DEL PRESUPUESTO 9,484,740.74 221,650.88 1,074,959.15 906,799.13 295,744.10 643,461.79 210,845.70 618,338.26 121,235.50 2,282,426.10 3,109,280.01 9,484,740.74
PORCENTAJE DE AVANCE MENSUAL 2.34% 11.33% 9.56% 3.12% 6.78% 2.22% 6.52% 1.28% 24.06% 32.78%
PORCENTAJE ACUMULADO DE AVANCE MENSUAL 2.34% 13.67% 23.23% 26.35% 33.13% 35.36% 41.88% 43.15% 67.22% 100.00%
RESUMEN CRONOGRAMA JUNIO 2023
OBRA : "REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL HV - 105 (CHANCAHUAYCCO) - EMP., HV - 644 (ROSARIO), DISTRITO DE ROSARIO, PROVINCIA DE ACOBAMBA, REGIÓN HUANCAVELICA"
COSTO DIRECTO 7,176,710.61 167,714.04 813,377.08 686,137.36 223,777.31 486,880.89 159,538.21 467,870.95 91,733.88 1,727,017.33 2,352,663.44
GASTOS GENERALES 8.00% 574,136.85 13,417.12 65,070.17 54,890.99 17,902.18 38,950.47 12,763.06 37,429.68 7,338.71 138,161.39 188,213.08
UTILIDAD 4.00% 287,068.42 6,708.56 32,535.08 27,445.49 8,951.09 19,475.24 6,381.53 18,714.84 3,669.36 69,080.69 94,106.54
SUB TOTAL 8,037,915.88 187,839.72 910,982.33 768,473.84 250,630.59 545,306.60 178,682.80 524,015.47 102,741.96 1,934,259.41 2,634,983.05
FACTOR DE RELACION 100.00%
SUB TOTAL x FACTOR DE RELACION 8,037,915.88 187,839.72 910,982.33 768,473.84 250,630.59 545,306.60 178,682.80 524,015.47 102,741.96 1,934,259.41 2,634,983.05
IGV (18.00%) 18.00% 1,446,824.86 33,811.15 163,976.82 138,325.29 45,113.51 98,155.19 32,162.90 94,322.79 18,493.55 348,166.69 474,296.95
TOTAL DEL PRESUPUESTO 9,484,740.74 221,650.88 1,074,959.15 906,799.13 295,744.10 643,461.79 210,845.70 618,338.26 121,235.50 2,282,426.10 3,109,280.01
PORCENTAJE DE AVANCE MENSUAL 2.34% 221,650.88 11.33% 1,074,959.15 9.56% 906,799.13 3.12% 295,744.10 6.78% 643,461.79 2.22% 210,845.70 6.52% 618,338.26 1.28% 121,235.50 24.06% 2,282,426.10 32.78% 3,109,280.01
PORCENTAJE ACUMULADO DE AVANCE MENSUAL 2.34% 221,650.88 13.67% 1,296,610.03 23.23% 2,203,409.16 26.35% 2,499,153.26 33.13% 3,142,615.05 35.36% 3,353,460.75 41.88% 3,971,799.01 43.15% 4,093,034.51 67.22% 6,375,460.61 100.00% 7,202,314.51
.
HOJA DE RESUMEN DE METRADOS JUNIO 2023
VALORIZACION N° 09 - JUNIO 2023
ENTIDAD : PROVIAS DESCENTRALIZADO
: "REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL HV - 105 (CHANCAHUAYCCO) - EMP., HV - 644 (ROSARIO), DISTRITO DE ROSARIO, PROVINCIA DE
OBRA
ACOBAMBA, REGIÓN HUANCAVELICA"
CONTRATISTA : REPRESENTACIONES FLORES SRL.
SUPERVISOR : CONSORCIO SUPERVISOR ACOBAMBA
JEFE SUPERV. : ING. JUSTO ABILIO CARDENAS PRESENTACIÓN
RESIDENTE : ING. JOSE CARLOS MERMA SORIA
PERIODO : 01-06-2023 AL 30-06-2023
ACUMULADO AL MES DE
PARTIDA DESCRIPCION UNID. CONTRACTUAL ACUMULADO SALDO
ANTERIOR JUNIO
01 TRABAJOS PRELIMINARES
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUPOS glb 1.00 0.75 0.05 0.80 0.20
01.04 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL glb 1.00 0.57 0.13 0.70 0.30
01.06 CAMPAMENTO glb 1.00 0.87 0.04 0.92 0.08
02 MOVIMENTO DE TERRAS
02.01 DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS ha 1.79 0.64 0.37 1.01 0.78
02.04 EXCAVACION EN ROCA FIJA m3 6,065.65 0.00 360.00 360.00 5,705.65
02.07 MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE m3 13,539.25 4,399.46 2,886.83 7,286.29 6,252.96
02.09 DEMOLICION DE ESTRUCTURAS EXISTENTES m3 50.50 34.31 16.19 50.50 0.00
04 OBRAS DE ARTE Y DRENAJE
04.01 CUNETAS
04.01.01 CONFORMACION DE CUNETA TRIANGULAR NO REVESTIDA - TIPO I m 11,314.00 0.00 1,235.00 1,235.00 10,079.00
04.02 ALCANTARILLAS TMC
04.02.02 ENCOFRADO Y DESENCOFRADO m2 783.26 142.09 240.41 382.50 400.76
04.02.03 CONCRETO CICLOPEO CLASE 1 (f'c=175 kg/cm2 + 30%PM) m3 274.00 25.37 70.86 96.23 177.77
04.02.06 RELLENO CON MATERIAL PROPIO m3 336.49 306.05 26.02 332.07 4.42
04.03 ALCANTARILLA TIPO MARCO
04.03.03 SOLADO m3 22.23 19.01 2.14 21.15 1.08
04.03.04 ENCOFRADO Y DESENCOFRADO m2 761.40 655.32 67.10 722.42 38.98
04.03.05 CONCRETO CLASES D (f'c=210 kg/cm2) m3 128.04 109.95 11.52 121.47 6.57
04.03.07 ACERO DE REFUERZO kg 10,940.19 9,306.23 1,038.28 10,344.51 595.68
04.03.08 RELLENO CON MATERIAL GRANULAR DE PRESTAMO m3 188.63 122.74 122.74 65.89
04.03.09 RELLENO CON MATERIAL PROPIO m3 85.98 60.19 60.19 25.79
04.04 CONSTRUCCION Y ADECUACION DE BUZONES A NIVEL DE RASANTE
04.04.01 DEMOLICION DE ESTRUCTURAS EXISTENTES m3 9.14 0.00 0.00 9.14
04.04.02 ENCOFRADO Y DESENCOFRADO CON MOLDE METALICO m2 38.38 0.00 0.00 38.38
HOJA DE RESUMEN DE METRADOS JUNIO 2023
VALORIZACION N° 09 - JUNIO 2023
ENTIDAD : PROVIAS DESCENTRALIZADO
: "REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL HV - 105 (CHANCAHUAYCCO) - EMP., HV - 644 (ROSARIO), DISTRITO DE ROSARIO, PROVINCIA DE
OBRA
ACOBAMBA, REGIÓN HUANCAVELICA"
CONTRATISTA : REPRESENTACIONES FLORES SRL.
SUPERVISOR : CONSORCIO SUPERVISOR ACOBAMBA
JEFE SUPERV. : ING. JUSTO ABILIO CARDENAS PRESENTACIÓN
RESIDENTE : ING. JOSE CARLOS MERMA SORIA
PERIODO : 01-06-2023 AL 30-06-2023
ACUMULADO AL MES DE
PARTIDA DESCRIPCION UNID. CONTRACTUAL ACUMULADO SALDO
ANTERIOR JUNIO
ACUMULADO AL MES DE
PARTIDA DESCRIPCION UNID. CONTRACTUAL ACUMULADO SALDO
ANTERIOR JUNIO
1 P S/. 493,024.71
% 89.10%
TRABAJOS PRELIMINARES
R S/. 469,334.93
553,332.00 % 84.82%
ATRASADO -4.28%
2 P S/. 1,836,357.77
% 84.98%
MOVIMIENTO DE TIERRAS
R S/. 1,547,751.94
2,160,812.54 % 71.63%
ATRASADO -13.36%
3 P S/. 383,923.99
% 20.37%
PAVIMENTOS
R S/. 93,417.93
1,884,363.55 % 4.96%
ATRASADO 15.42%
4 P S/. 745,628.68
OBRAS DE ARTE Y % 70.61%
DRENAJE R S/. 291,628.37
1,055,936.26 % 27.62%
ATRASADO -43.00%
5 P S/. 1,170,767.63
% 92.72%
TRANSPORTES
R S/. 926,277.70
1,262,645.58 % 73.36%
ATRASADO -19.36%
6 P S/. 104,801.72
% 61.67%
SEÑALIZACIÓN
R S/. 0.00
169,948.78 % 0.00%
ATRASADO -61.67%
7 P S/. 31,607.76
PROTECCION AMBIENTAL Y % 62.77%
SOCIAL R S/. 10,570.00
50,354.62 % 20.99%
ATRASADO -41.78%
8 P S/. 38,680.70
PLAN DE PREVENCION, % 98.38%
VIGILANCIA Y CONTROL
R S/. 38,076.45
DEL COVID-19
39,317.28 % 96.84%
ATRASADO -1.54%
( A ) P S/. 4,824,047.05
COSTO % 67.22%
DIRECTO R S/. 3,377,057.33
7,176,710.61 % 47.06%
( B ) P S/. 578,885.65
GASTOS GENERALES % 67.22%
+ UTILILIDAD R S/. 405,246.88 0.00
861,205.27 % 47.06%
( A+ B ) P S/. 6,375,460.59
+ % 67.22%
I.G.V R S/. 4,463,118.97
% 47.06%
9,484,740.74
ATRASADO -20.16%
R= AVANCE REAL
VALORIZACIÓN DE OBRA N° 09 JUNIO 2023 - SUPERVISION
: 01-06-2023 AL 30-06-2023
ENTIDAD : PROVIAS DESCENTRALIZADO
CONTRATISTA : REPRESENTACIONES FLORES SRL.
OBRA : "REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL HV - 105 (CHANCAHUAYCCO) - EMP., HV - 644 (ROSARIO), DISTRITO DE ROSARIO, PROVINCIA DE ACOBAMBA, REGIÓN HUANCAVELICA"
SUPERVISOR : CONSORCIO SUPERVISOR ACOBAMBA
JEFE SUPERV. : ING. JUSTO ABILIO CARDENAS PRESENTACIÓN
RESIDENTE : ING. JOSE CARLOS MERMA SORIA
PERIODO : 01-06-2023 AL 30-06-2023
PRESUPUESTO CONTRACTUAL AVANCE ACUMULADO ANTERIOR VALORIZACIÓN ACTUAL/ JUNIO-2023 AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCIÓN
UND CANT. P.U. PARCIAL METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. %
PRESUPUESTO CONTRACTUAL AVANCE ACUMULADO ANTERIOR VALORIZACIÓN ACTUAL/ JUNIO-2023 AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCIÓN
UND CANT. P.U. PARCIAL METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. %
04.02.03 CONCRETO CICLOPEO CLASE 1 (f'c=175 kg/cm2 + 30%PM) m3 274.00 294.98 80,824.52 25.37 7,483.64 9.26% 70.86 20,902.28 25.86% 96.23 28,385.92 35.00% 177.77 52,438.59 65.00%
04.02.04 ALCANTARILLA TMC D=36" m 144.99 409.85 59,424.15 110.97 45,481.05 76.54% 0.00 0.00 0.00% 110.97 45,481.05 77.00% 34.02 13,943.10 23.00%
04.02.05 RELLENO CON MATERIAL GRANULAR DE PRESTAMO m3 307.89 68.55 21,105.86 244.03 16,728.26 79.26% 0.00 0.00 0.00% 244.03 16,728.26 79.00% 63.86 4,377.60 21.00%
04.02.06 RELLENO CON MATERIAL PROPIO m3 336.49 22.02 7,409.51 306.05 6,739.22 90.95% 26.02 572.96 7.73% 332.07 7,312.18 99.00% 4.42 97.33 1.00%
04.03 ALCANTARILLA TIPO MARCO - - 185,186.62
04.03.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 500.05 4.65 2,325.23 473.14 2,200.10 94.62% 473.14 2,200.10 95.00% 26.91 125.13 5.00%
04.03.02 PERFILADO Y COMPACTADO MANUAL m2 209.88 5.76 1,208.91 180.72 1,040.94 86.11% 180.72 1,040.94 86.00% 29.16 167.96 14.00%
04.03.03 SOLADO m3 22.23 292.82 6,509.39 19.01 5,566.51 85.52% 2.14 626.63 9.63% 21.15 6,193.14 95.00% 1.08 316.25 5.00%
04.03.04 ENCOFRADO Y DESENCOFRADO m2 761.40 50.74 38,633.44 655.32 33,250.94 86.07% 67.10 3,404.65 8.81% 722.42 36,655.59 95.00% 38.98 1,977.85 5.00%
04.03.05 CONCRETO CLASES D (f'c=210 kg/cm2) m3 128.04 412.95 52,874.12 109.95 45,403.85 85.87% 11.52 4,757.18 9.00% 121.47 50,161.03 95.00% 6.57 2,713.08 5.00%
04.03.06 CONCRETO CICLOPEO CLASE 1 (f'c= 175 kg/cm2 + 30%PM) m3 45.24 294.98 13,344.90 17.53 5,171.00 38.75% 17.53 5,171.00 39.00% 27.71 8,173.90 61.00%
04.03.07 ACERO DE REFUERZO kg 10,940.19 5.07 55,466.76 9306.23 47,182.59 85.06% 1038.28 5,264.08 9.49% 10,344.51 52,446.67 95.00% 595.68 3,020.10 5.00%
04.03.08 RELLENO CON MATERIAL GRANULAR DE PRESTAMO m3 188.63 68.55 12,930.59 122.74 8,413.83 65.07% 122.74 8,413.83 65.00% 65.89 4,516.76 35.00%
04.03.09 RELLENO CON MATERIAL PROPIO m3 85.98 22.02 1,893.28 60.19 1,325.38 70.00% 60.19 1,325.38 70.00% 25.79 567.90 30.00%
04.04 CONSTRUCCION Y ADECUACION DE BUZONES A NIVEL DE RASANTE - - 23,285.59
04.04.01 DEMOLICION DE ESTRUCTURAS EXISTENTES m3 9.14 103.78 948.55 0.00 0.00 0.00% 0.00 0.00 0.00% 9.14 948.55 100.00%
04.04.02 ENCOFRADO Y DESENCOFRADO CON MOLDE METALICO m2 38.38 58.76 2,255.21 0.00 0.00 0.00% 0.00 0.00 0.00% 38.38 2,255.21 100.00%
04.04.03 ENCOFRADO Y DESENCOFRADO m2 44.91 50.74 2,278.73 0.00 0.00 0.00% 0.00 0.00 0.00% 44.91 2,278.73 100.00%
04.04.04 ACERO DE REFUERZO kg 1,105.86 5.07 5,606.71 0.00 0.00 0.00% 0.00 0.00 0.00% 1,105.86 5,606.71 100.00%
04.04.05 CONCRETO CLASES D (f'c=210 kg/cm2) m3 10.47 412.95 4,323.59 0.00 0.00 0.00% 0.00 0.00 0.00% 10.47 4,323.59 100.00%
04.04.06 MARCO Y TAPA F°F° P. BUZON und 26.00 302.80 7,872.80 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 7,872.80 100.00%
04.05 SUELOS REFORZADO - - 268,698.43
04.05.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,609.09 4.65 7,482.27 0.00 0.00 0.00% 0.00 0.00 0.00% 1,609.09 7,482.27 100.00%
04.05.02 PERFILADO Y COMPACTADO MANUAL m2 1,908.00 5.76 10,990.08 0.00 0.00 0.00% 0.00 0.00 0.00% 1,908.00 10,990.08 100.00%
04.05.03 GEOTEXTIL NO TEJIDO CLASE 1 m2 847.00 6.17 5,225.99 0.00 0.00 0.00% 0.00 0.00 0.00% 847.00 5,225.99 100.00%
04.05.04 SUMNISTRO E INSTALACION DE GEOCOMPUESTO DE DRENAJE m2 382.40 28.09 10,741.62 0.00 0.00 0.00% 0.00 0.00 0.00% 382.40 10,741.62 100.00%
04.05.05 TUBERIA HDPE 4" m 160.25 16.25 2,604.06 0.00 0.00 0.00% 0.00 0.00 0.00% 160.25 2,604.06 100.00%
04.05.06 SISTEMA MURO TIPO TERRAMESH 1X2X4 M und 211.00 557.90 117,716.90 0.00 0.00 0.00% 0.00 0.00 0.00% 211.00 117,716.90 100.00%
04.05.07 SISTEMA MURO TIPO TERRAMESH 0.5X2X4 M und 54.00 398.07 21,495.78 0.00 0.00 0.00% 0.00 0.00 0.00% 54.00 21,495.78 100.00%
04.05.08 RELLENO CON MATERIAL GRANULAR DE PRESTAMO m3 1,348.53 68.55 92,441.73 0.00 0.00 0.00% 0.00 0.00 0.00% 1,348.53 92,441.73 100.00%
04.06 ZANJA DE CORONACION - - 10,909.85 0.00 0.00 0.00%
04.06.01 ZANJA DE CORONACION SIN REVESTIR m 245.00 44.53 10,909.85 0.00 0.00 0.00% 0.00 0.00 0.00% 245.00 10,909.85 100.00%
05 TRANSPORTE - - 1,262,645.58
05.01 TRANSPORTE DE MATERIAL GRANULAR HASTA 1KM m3k 27,984.53 7.82 218,839.02 5566.90 43,533.16 19.89% 3175.58 24,833.04 11.35% 8,742.48 68,366.20 31.00% 19,242.05 150,472.83 69.00%
05.02 TRANSPORTE DE MATERIAL GRANULAR > 1KM m3k 155,118.48 1.64 254,394.31 42031.59 68,931.81 27.10% 23803.68 39,038.04 15.35% 65,835.27 107,969.85 42.00% 89,283.21 146,424.46 58.00%
05.03 TRANSPORTE DE MATERIAL EXCEDENTE < 1KM m3k 75,613.63 8.42 636,666.76 71832.95 604,833.43 95.00% 71,832.95 604,833.43 95.00% 3,780.68 31,833.33 5.00%
05.04 TRANSPORTE DE MATERIAL EXCEDENTE > 1KM m3k 89,324.85 1.71 152,745.49 84858.61 145,108.22 95.00% 84,858.61 145,108.22 95.00% 4,466.24 7,637.27 5.00%
06 SEÑALIZACION - - 169,948.78
VALORIZACIÓN DE OBRA N° 09 JUNIO 2023 - SUPERVISION
: 01-06-2023 AL 30-06-2023
ENTIDAD : PROVIAS DESCENTRALIZADO
CONTRATISTA : REPRESENTACIONES FLORES SRL.
OBRA : "REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL HV - 105 (CHANCAHUAYCCO) - EMP., HV - 644 (ROSARIO), DISTRITO DE ROSARIO, PROVINCIA DE ACOBAMBA, REGIÓN HUANCAVELICA"
SUPERVISOR : CONSORCIO SUPERVISOR ACOBAMBA
JEFE SUPERV. : ING. JUSTO ABILIO CARDENAS PRESENTACIÓN
RESIDENTE : ING. JOSE CARLOS MERMA SORIA
PERIODO : 01-06-2023 AL 30-06-2023
PRESUPUESTO CONTRACTUAL AVANCE ACUMULADO ANTERIOR VALORIZACIÓN ACTUAL/ JUNIO-2023 AVANCE ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCIÓN
UND CANT. P.U. PARCIAL METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. %
06.01 SEÑALES INFORMATIVAS - - 30,576.44
06.01.01 PANELES DE SEÑALES INFORMATIVAS m2 11.74 570.15 6,693.56 0.00 0.00 0.00% 0.00 0.00 0.00% 11.74 6,693.56 100.00%
06.01.02 ESTRUCTURA DE SOPORTE DE SEÑALES TIPO E-1 und 14.00 1,705.92 23,882.88 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 23,882.88 100.00%
06.02 SEÑALES PREVENTIVAS und 74.00 518.18 38,345.32 0.00 0.00 0.00% 0.00 0.00 0.00% 74.00 38,345.32 100.00%
06.03 SEÑALES REGLAMENTARIAS und 24.00 577.24 13,853.76 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 13,853.76 100.00%
06.04 POSTES DE KILOMETRAJE und 12.00 101.32 1,215.84 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 1,215.84 100.00%
06.05 SEÑALIZACION AMBIENTAL - - 1,342.24
06.05.01 PANELES DE SEÑALES AMBIENTALES m2 3.00 78.98 236.94 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 236.94 100.00%
06.05.02 ESTRUCTURA DESOPORTE DE SEÑALES TIPO E-3 und 5.00 221.06 1,105.30 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 1,105.30 100.00%
06.06 GUARDAVIAS m 290.00 139.67 40,504.30 0.00 0.00 0.00% 0.00 0.00 0.00% 290.00 40,504.30 100.00%
06.07 POSTES DELINEADORES DE CONCRETO und 291.00 83.07 24,173.37 0.00 0.00 0.00% 0.00 0.00 0.00% 291.00 24,173.37 100.00%
06.08 MARCAS PERMANENTES EN EL PAVIMENTO m2 2,424.29 7.46 18,085.20 0.00 0.00 0.00% 0.00 0.00 0.00% 2,424.29 18,085.20 100.00%
06.09 PINTADO DE PARAPETOS DE ALCANTARILLAS m2 71.27 25.99 1,852.31 0.00 0.00 0.00% 0.00 0.00 0.00% 71.27 1,852.31 100.00%
07 PROTECCION AMBIENTAL Y SOCIAL - - 50,354.62
07.01 PROGRAMA DE MONITOREO AMBIENTAL - - 10,570.00
07.01.01 MONITOREO DE CALIDAD DE AIRE pto 10.00 607.00 6,070.00 5.00 3,035.00 50.00% 5.00 3,035.00 50.00% 10.00 6,070.00 100.00% 0.00 0.00 0.00%
07.01.02 MONITOREO DE CALIDAD DE AGUA pto 6.00 210.00 1,260.00 3.00 630.00 50.00% 3.00 630.00 50.00% 6.00 1,260.00 100.00% 0.00 0.00 0.00%
07.01.03 MONITOREO DE CALIDAD DE RUIDO pto 10.00 60.00 600.00 5.00 300.00 50.00% 5.00 300.00 50.00% 10.00 600.00 100.00% 0.00 0.00 0.00%
07.01.04 MONITOREO DE CALIDAD DE SUELO pto 8.00 330.00 2,640.00 4.00 1,320.00 50.00% 4.00 1,320.00 50.00% 8.00 2,640.00 100.00% 0.00 0.00 0.00%
07.02 PROGRAMA DE CIERRE DE OBRA - - 39,784.62
07.02.01 RECUPERACION AMBIENTAL DE AREAS AFECTADAS: CAMPAMENTO Y PATI m2 3,414.50 2.66 9,082.57 0.00 0.00 0.00% 0.00 0.00 0.00% 3,414.50 9,082.57 100.00%
07.02.02 RECUPERACION AMBIENTAL DE AREAS AFECTADAS: CANTERAS DE CERR m2 4,372.50 2.06 9,007.35 0.00 0.00 0.00% 0.00 0.00 0.00% 4,372.50 9,007.35 100.00%
07.02.03 REVEGETACION DE AREAS AUXILIARES (DME) m2 13,148.30 1.65 21,694.70 0.00 0.00 0.00% 0.00 0.00 0.00% 13,148.30 21,694.70 100.00%
08 PLAN DE PREVENCION, VIGILANCIA Y CONTROL DEL COVID-19 - - 39,317.28
08.01 LIMPIEZA Y DESINFECCION DE AMBIENTES Y MOBILIARIOS mes 6.00 1,106.59 6,639.54 5.70 6,307.57 95.00% 5.70 6,307.57 95.00% 0.30 331.98 5.00%
08.02 EQUIPOS DE PROTECCION PERSONAL CONTRA EL COVID-19 mes 6.00 3,798.25 22,789.50 5.82 22,105.83 97.00% 0.02 75.97 0.33% 5.84 22,181.80 97.00% 0.16 607.72 3.00%
08.03 HIGIENE PERSONAL Y CONTROL DE INFECCIONES mes 6.00 710.82 4,264.92 5.82 4,136.98 97.00% 0.02 14.22 0.33% 5.84 4,151.20 97.00% 0.16 113.73 3.00%
08.04 VESTUARIOS, DUCHAS Y SERVICIOS HIGIENICOS mes 6.00 937.22 5,623.32 5.80 5,435.88 96.67% 5.80 5,435.88 97.00% 0.20 187.44 3.00%
COSTO DIRECTO 7,176,710.61 3,097,029.85 280,027.48 3,377,057.33 3,799,653.28 ###
GASTOS GENERALES 8.00% 574,136.85 247,762.39 22,402.20 270,164.59 303,972.26 ###
UTILIDAD 4.00% 287,068.42 123,881.19 11,201.10 135,082.29 151,986.13 ###
SUBTOTAL 8,037,915.88 3,468,673.43 313,630.78 3,782,304.21 4,255,611.67
FACTOR DE RELACION 100.00%
TOTAL 9,484,740.74 4,093,034.65 43.15% 370,084.32 3.90% 4,463,118.97 47.06% 5,021,621.77 52.94%
|
1.1. VAL MENSUAL N° 01 2022 S/. 221,650.88 2.34% S/. 221,650.88 2.34% S/. 221,650.88 2.34% S/. 221,650.88 2.34%
1.2. VAL MENSUAL N° 02 2022 S/. 1,074,959.15 11.33% S/. 1,074,959.15 11.33% S/. 1,296,610.03 13.67% S/. 1,296,610.03 13.67%
1.3. VAL MENSUAL N° 03 2022 S/. 906,799.13 9.56% S/. 906,799.13 9.56% S/. 2,203,409.16 23.23% S/. 2,203,409.16 23.23%
1.4. VAL MENSUAL N° 04 2022 S/. 295,744.10 3.12% S/. 295,744.10 3.12% S/. 2,499,153.26 26.35% S/. 2,499,153.26 26.35%
1.5. VAL MENSUAL N° 05 2022 S/. 643,461.79 6.78% S/. 643,461.79 6.78% S/. 3,142,615.05 33.13% S/. 3,142,615.05 33.13%
1.6. VAL MENSUAL N° 06 2022 S/. 210,845.70 2.22% S/. 210,845.70 2.22% S/. 3,353,460.75 35.36% S/. 3,353,460.75 35.36%
1.7. VAL MENSUAL N° 07 2022 S/. 618,338.26 6.52% S/. 618,338.26 6.52% S/. 3,971,799.15 41.88% S/. 3,971,799.01 41.88%
1.8. VAL MENSUAL N° 08 2023 S/. 121,235.50 1.28% S/. 121,235.50 1.28% S/. 4,093,034.65 43.15% S/. 4,093,034.65 43.15%
1.9. VAL MENSUAL N° 09 2023 S/. 2,282,426.10 24.06% S/. 370,084.32 3.90% S/. 6,375,460.75 67.22% S/. 4,463,118.97 47.06%
2.0. VAL MENSUAL N° 10 2023 S/. 3,109,280.01 32.78% S/. 0.00 100.00%
TOTAL EXPEDIENTE S/.9,484,740.74 100.00% S/.4,463,118.95 47.06% S/.9,484,740.74 67.22% S/.4,463,118.97 47.06%
120.00%
100.00%
100.00%
% ACUMULAD
80.00%
67.22%
60.00%
47.06%
41.88% 41.88% 43.15% 43.15%
33.13% 33.13%35.36% 35.36%
40.00%
26.35% 26.35%
23.23% 23.23%
13.67% 13.67%
20.00%
2.34% 2.34%
0.00%
MESES
VAL MEN...
VAL MEN...
VAL MEN...
VAL MEN...
VAL MEN...
VAL MEN...
VAL MEN...
VAL MEN...
VAL MEN...
VAL MEN...
GRÁFICO DE CURVA S
105% 100.00%
95%
85%
75%
65% 67.22%
55% 47.06%
43.15%
% ACUMULADO
41.88%
45%
33.13% 35.36%
35% 26.35% 41.88% 43.15%
23.23%
25% 33.13% 35.36%
13.67%
15% 0.00% 2.34% 26.35%
23.23%
0.00% 2.34%
5% 13.67%
INICIO VAL MEN- VAL MEN- VAL MEN- VAL MEN- VAL MEN- VAL MEN- VAL MEN- VAL MEN- VAL MEN- VAL MEN-
SUAL N° 01 SUAL N° 02 SUAL N° 03 SUAL N° 04 SUAL N° 05 SUAL N° 06 SUAL N° 07 SUAL N° 08 SUAL N° 09 SUAL N° 10
Progra- 0.00% 2.34% 13.67% 23.23% 26.35% 33.13% 35.36% 41.88% 43.15% 67.22% 100.00%
mado
Ejecutado 0.00% 2.34% 13.67% 23.23% 26.35% 33.13% 35.36% 41.88% 43.15% 47.06% #FMT
MESES
DEDUCCION POR ADELANTO DIRECTO
(REINTEGRO QUE NO CORRESPONDE)
ENTIDAD : PROVIAS DESCENTRALIZADO
CONTRATISTA : REPRESENTACIONES FLORES SRL.
OBRA
Err:509
SUPERVISOR : CONSORCIO SUPERVISOR ACOBAMBA
JEFE SUPERV. : ING. JUSTO ABILIO CARDENAS PRESENTACIÓN
RESIDENTE : ING. JOSE CARLOS MERMA SORIA
PERIODO : 01-06-2023 AL 30-06-2023
MONTO CONTRACTUAL Err:509 (SIN IGV)
MONTO CONTRACTUAL : S/. 9,484,740.74 (CON IGV)
ADELANTO DIRECTO 10.00% Err:509 (SIN IGV)
ADELANTO DIRECTO 10.00% NO SOLICITO (CON IGV)
D = V * A/C * (K / Ka-1)
GASOLINA 90 OCTANOS gal 11.04 222.42 2,455.52 0.10 1.10 6.32 69.77 9.74 107.53 78.95 871.61 83.29 919.52 44.02 485.98
PETROLEO gal 12.16 1.54 18.73 1.54 18.73
EMULSION CSS-1HP gal 7.27 49,156.35 357,366.66 49,156.35 357,366.66
EMULSION PARA IMPRIMACION gal 8.93 13,983.09 124,868.99 13,983.09 124,868.99
ALAMBRE NEGRO # 8 kg 3.10 527.74 1,635.99 76.33 236.62 105.31 326.46 141.41 438.37 75.86 235.17 128.83 399.37
ALAMBRE NEGRO N° 16 kg 3.53 1,804.12 6,368.54 296.82 1,047.77 250.19 883.17 382.87 1,351.53 436.97 1,542.50 437.27 1,543.56
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 2.84 37,243.27 105,770.89 16.18 45.95 6,130.63 17,410.99 5,168.68 14,679.05 7,903.43 22,445.74 9,016.89 25,607.97 9,007.46 25,581.19
CLAVOS DE CONSTRUCCION (PROMEDIO) kg 3.31 542.33 1,795.11 0.62 2.05 76.95 254.70 105.87 350.43 142.03 470.12 76.52 253.28 140.34 464.53
PLATINA DE FIERRO 3/16'X2" m. 3.48 2.80 9.74 2.80 9.74
PLATINA DE FIERRO 3/16"X3' m. 7.46 8.40 62.66 8.40 62.66
PLANCHA DE FIERRO DE 16 MM x 1.22 x 2.40 M pza 916.30 0.20 183.26 0.20 183.26
PLANCHA DE FIERRO DE 9.5 MM x 1.22 x 2.40 M pza 496.46 0.22 109.22 0.22 109.22
PLANCHA DE FIERRO GALVANIZADO DE 1716'x1.22x2.40 M. m2 38.58 19.19 740.35 19.19 740.35
GUARDAVIAS m. 60.36 290.00 17,504.40 31.72 1,914.62 258.28 15,589.78
POSTE und 109.14 118.00 12,878.52 12.91 1,409.00 105.09 11,469.52
TERMINAL DE SALIDA und 79.86 4.99 398.50 0.55 43.92 4.44 354.58
TERMINAL DE ENTRADA und 120.25 4.99 600.05 0.55 66.14 4.44 533.91
CAPTAFARO ROJO/BLANCO und 16.45 58.99 970.39 6.45 106.10 52.54 864.28
PERNO DE CABEZA DE COCHE DE 5/8" x 1 1/2" und 1.23 590.01 725.71 64.53 79.37 525.48 646.34
TUERCA GALVANIZADA 5/8" und 0.40 590.01 236.00 64.53 25.81 525.48 210.19
ALCANTARILLA TMC D=36" m. 265.51 144.99 38,496.29 144.99 38,496.29
ELEMENTO DE SUELO REFORZADO 1X2X4 M. und 273.58 211.00 57,725.38 211.00 57,725.38
ELEMENTO DE SUELO REFORZADO 0.5X2X4 M. und 223.54 54.00 12,071.16 54.00 12,071.16
TUBERIA HDPE DE 4" m. 11.12 24.84 276.22 24.84 276.22
UNION SPLIT COUPLER 4" und 4.38 27.55 120.67 27.55 120.67
TUBERIA HDPE DE 4" PERFORADA m. 11.16 143.42 1,600.57 143.42 1,600.57
PIEDRA CHANCADA 1/2" m3 60.00 540.06 32,403.60 0.25 15.00 15.37 922.20 23.66 1,419.60 191.75 11,505.00 202.29 12,137.40 106.74 6,404.40
PIEDRA MEDIANA DE 4" A 6" m3 30.00 939.59 28,187.70 20.68 620.40 94.40 2,832.00 19.62 588.60 804.89 24,146.70
ARENA GRUESA ZARANDEADA m3 15.00 427.17 6,407.55 46.10 691.50 10.85 162.75 16.70 250.50 135.35 2,030.25 142.79 2,141.85 75.38 1,130.70
ARENA CHANCADA DE 3/8" (SLURRY SEAL) m3 50.00 907.50 45,375.00 907.50 45,375.00
GEOTEXTIL NO TEJIDO CLASE 1 m2 4.02 931.70 3,745.43 931.70 3,745.43
GEOCOMPUESTO PARA DRENAJE m2 22.06 401.52 8,857.53 394.35 8,699.36 7.17 158.17
PLANCHA TIPO TECNOPOR DE 1.2 x 2.4m e=1cm und 7.87 67.43 530.67 23.11 181.88 22.45 176.68 21.87 172.12
CEMENTO PORTLAND TIPO I (42.5 kg) bol 24.98 28,319.41 707,418.86 2.38 59.45 102.43 2,558.70 260.64 6,510.79 2,164.98 54,081.20 7,056.17 176,263.13 18,732.81 467,945.59
YESO EN BOLSAS DE 25 KG. bol 8.49 168.12 1,427.34 74.15 629.53 67.25 570.95 26.72 226.85
TUBO DE FIERRO NEGRO DE D=3" x 2mm m. 10.52 131.60 1,384.43 131.60 1,384.43
PEGAMENTO EPOXICO gal 176.23 6.98 1,230.09 6.98 1,230.09
DESMOLDADOR PARA ENCOFRADO gal 72.97 92.46 6,746.81 13.36 974.88 18.43 1,344.84 24.75 1,806.01 13.27 968.31 22.65 1,652.77
SELLANTE ELASTICO DE POLIURETANO und 21.81 243.02 5,300.27 83.38 1,818.52 81.02 1,767.05 78.62 1,714.70
DINAMITA AL 65% kg 13.34 4,576.74 61,053.71 832.95 11,111.55 1,530.16 20,412.33 1,042.13 13,902.01 770.63 10,280.20 400.87 5,347.61
ACCESORIO %MT 0.00 -
MADERA TORNILLO p2 5.07 2,872.02 14,561.14 410.26 2,080.02 566.03 2,869.77 760.11 3,853.76 407.73 2,067.19 727.89 3,690.40
ESTACA DE MADERA p2 0.83 280.49 232.81 23.13 19.20 97.38 80.83 88.22 73.22 49.94 41.45 21.82 18.11
TRIPLAY 4'x8'x18mm pln 90.88 113.72 10,334.87 16.53 1,502.25 22.80 2,072.06 30.62 2,782.75 17.47 1,587.67 26.30 2,390.14
MADERA EUCALIPTO D=4" (LONG.= 2.40) und 6.52 5.00 32.60 5.00 32.60
LIJA PARA CONCRETO hja 1.65 109.74 181.07 6.45 10.64 103.29 170.43
DETERGENTE kg 4.91 648.00 3,181.68 24.85 122.01 130.41 640.31 117.79 578.35 130.41 640.31 126.21 619.69 118.33 581.00
TERMOMETRO INFRARROJO (RANGO 32 A43 °C; ERROR +/- 0.2 °C) und 414.93 0.11 45.64 1.23 510.36 1.11 460.57 1.23 510.36 1.19 493.77 1.13 468.87
6.00 2,489.58
LEJIA (3.3 LITROS) und 3.68 288.00 1,059.84 11.74 43.20 57.82 212.78 52.22 192.17 57.82 212.78 55.95 205.90 52.45 193.02
PAPEL TOALLA (PAQUETE 12 UND) pqt 3.46 288.00 996.48 23.73 82.11 55.31 191.37 49.96 172.86 55.31 191.37 53.52 185.18 50.17 173.59
TRAPEADOR MICROFIBRA (50*75CM) und 3.47 42.00 145.74 4.3 14.92 7.89 27.38 7.13 24.74 7.89 27.38 7.64 26.51 7.15 24.81
MASCARILLA QUIRURGICA KN 95 und 8.64 600.00 5,184.00 83.28 719.54 108.14 934.33 97.67 843.87 108.14 934.33 104.65 904.18 98.12 847.76
GORRO QUIRURGICO DESCARTABLE und 0.33 156.00 51.48 21.65 7.14 28.12 9.28 25.4 8.38 28.12 9.28 27.21 8.98 25.5 8.42
LENTES PROTECTORES CON VENTOSA und 12.99 156.00 2,026.44 21.65 281.23 28.12 365.28 25.4 329.95 28.12 365.28 27.21 353.46 25.5 331.25
GUANTES DE LATEX DESCARTABLES und 0.17 180.00 30.60 24.99 4.25 32.44 5.51 29.3 4.98 32.44 5.51 31.4 5.34 29.43 5.00
MANDILON DESCARTABLE und 10.37 156.00 1,617.72 21.65 224.51 28.12 291.60 25.4 263.40 28.12 291.60 27.21 282.17 25.5 264.44
DISPENSADOR PERSONAL und 6.09 90.00 548.10 12.49 76.06 16.22 98.78 14.65 89.22 16.22 98.78 15.7 95.61 14.72 89.64
MASCARILLA und 1.90 5,460.00 10,374.00 757.89 1,439.99 984.07 1,869.73 888.84 1,688.80 984.07 1,869.73 952.33 1,809.43 892.8 1,696.32
BALDE DE 20 LT. und 25.99 84.00 2,183.16 9.21 239.37 15.65 406.74 14.14 367.50 15.65 406.74 15.15 393.75 14.2 369.06
JABON LIQUIDO und 8.59 144.00 1,236.96 12.96 111.33 27.42 235.54 24.77 212.77 27.42 235.54 26.54 227.98 24.89 213.81
MASCARILLA QUIRUGICA N 95 und 21.61 24.00 518.64 3.33 71.96 4.33 93.57 3.91 84.50 4.33 93.57 4.19 90.55 3.91 84.50
FUENTE METALICA PARA ZAPATOS und 17.33 42.00 727.86 4.3 74.52 7.89 136.73 7.13 123.56 7.89 136.73 7.64 132.40 7.15 123.91
BOLSA DE BASURA COLOR ROJO (CIENTO) pqt 20.01 36.00 720.36 3.68 73.64 6.76 135.27 6.11 122.26 6.76 135.27 6.55 131.07 6.14 122.86
BOLSA DE BASURA COLOR NEGRO (CIENTO) pqt 20.01 36.00 720.36 3.68 73.64 6.76 135.27 6.11 122.26 6.76 135.27 6.55 131.07 6.14 122.86
PAPEL HIGIENICO (24 UND) pqt 15.63 144.00 2,250.72 9 140.67 28.25 441.55 25.52 398.88 28.25 441.55 27.34 427.32 25.64 400.75
CAMPAMENTO, DEPOS., ALMACENES, TALLERES, ETC. und 227,470.96 1.00 227,470.96 0.14 31,845.93 0.18 40,944.77 0.16 36,395.35 0.18 40,944.77 0.17 38,670.06 0.17 38,670.06
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL glb 58,432.26 1.00 58,432.26 0.11 6,427.55 0.19 11,102.13 0.18 10,517.81 0.19 11,102.13 0.19 11,102.13 0.14 8,180.52
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 230,890.99 1.00 230,890.99 0.17 39,251.47 0.17 39,251.47 0.16 36,942.56 0.17 39,251.47 0.17 39,251.47 0.16 36,942.56
MONITOREO DE CALIDAD DE AIRE pto 607.00 10.00 6,070.00 0.39 236.73 2.04 1,238.28 1.84 1,116.88 2.04 1,238.28 1.97 1,195.79 1.72 1,044.04
MONITOREO DE CALIDAD DE AGUA pto 210.00 6.00 1,260.00 0.24 50.40 1.24 260.40 1.12 235.20 1.24 260.40 1.2 252.00 0.96 201.60
MONITOREO DE CALIDAD DE RUIDO pto 60.00 10.00 600.00 0.39 23.40 2.04 122.40 1.84 110.40 2.04 122.40 1.97 118.20 1.72 103.20
MONITOREO DE CALIDAD DE SUELO pto 330.00 8.00 2,640.00 0.31 102.30 1.63 537.90 1.47 485.10 1.63 537.90 1.58 521.40 1.38 455.40
SEMILLA FORESTAL kg 121.08 7.89 955.32 7.89 955.32
PAGO POR DERECHO DE CANTERA m3 3.00 34,649.67 103,949.01 5,356.70 16,070.10 7,646.08 22,938.24 3,696.05 11,088.15 2,999.05 8,997.15 3,586.53 10,759.59 11,365.26 34,095.78
PLANCHA DE ACERO 1.5mm X1.22 m X 2.40 m. pza 126.68 8.73 1,105.92 8.73 1,105.92
COSTO TOTAL: 2,486,210.65 S/.164,099.40 S/.200,232.85 S/.169,766.86 S/.244,106.07 S/.371,297.87 S/.1,336,707.57
GASTOS GENERALES: 8.00% 198,896.85 S/.13,127.95 S/.16,018.63 S/.13,581.35 S/.19,528.49 S/.29,703.83 S/.106,936.61
UTILIDAD: 4.00% 99,448.43 S/.6,563.98 S/.8,009.31 S/.6,790.67 S/.9,764.24 S/.14,851.91 S/.53,468.30
OBRA
: "REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL HV - 105 (CHANCAHUAYCCO) - EMP., HV - 644 (ROSARIO), DISTRITO DE
ROSARIO, PROVINCIA DE ACOBAMBA, REGIÓN HUANCAVELICA"
CONTRATISTA : REPRESENTACIONES FLORES SRL.
FECHA VALOR REFERENCIAL :
#REF!
1 Sep-19 Err:504 BOL 21.61 Err:504 #REF! #REF! Err:504 #REF! #REF!
2 Oct-19 Err:504 BOL 21.61 Err:504 Err:504 #REF!
3 Nov-19 Err:504 BOL 21.61 Err:504 Err:504 #REF!
4 Dec-19 Err:504 BOL 21.61 Err:504 Err:504 #REF!
5 Jan-20 Err:504 BOL 21.61 Err:504 Err:504 #REF!
6 Feb-20 Err:504 BOL 21.61 Err:504 Err:504 #REF!
7 Jul-20 #REF! BOL 21.61 #REF! #REF! #REF!
Err:504 Err:504
PARCIAL Err:504
#REF!
#REF!
1 Sep-19 Err:504 M3 127.11 Err:504 #REF! #REF! Err:504 #REF! #REF!
2 Oct-19 Err:504 M3 127.11 Err:504 Err:504 #REF!
3 Nov-19 Err:504 M3 127.11 Err:504 Err:504 #REF!
4 Dec-19 Err:504 M3 127.11 Err:504 Err:504 #REF!
5 Jan-20 Err:504 M3 127.11 Err:504 Err:504 #REF!
6 Feb-20 Err:504 M3 127.11 Err:504 Err:504 #REF!
7 Jul-20 #REF! M3 127.11 #REF! #REF! #REF!
Err:504 Err:504
#REF!
1 Sep-19 Err:504 M3 110.16 Err:504 #REF! #REF! Err:504 #REF! #REF!
2 Oct-19 Err:504 M3 110.16 Err:504 Err:504 #REF!
3 Nov-19 Err:504 M3 110.16 Err:504 Err:504 #REF!
4 Dec-19 Err:504 M3 110.16 Err:504 Err:504 #REF!
5 Jan-20 Err:504 M3 110.16 Err:504 Err:504 #REF!
6 Feb-20 Err:504 M3 110.16 Err:504 Err:504 #REF!
7 Jul-20 #REF! M3 110.16 #REF! #REF! #REF!
Err:504 Err:504
PARCIAL Err:504
#REF!
#REF!
1 Sep-19 Err:504 KG 4.20 Err:504 #REF! #REF! Err:504 #REF! #REF!
2 Oct-19 Err:504 KG 4.20 Err:504 Err:504 #REF!
3 Nov-19 Err:504 KG 4.20 Err:504 Err:504 #REF!
4 Dec-19 Err:504 KG 4.20 Err:504 Err:504 #REF!
5 Jan-20 Err:504 KG 4.20 Err:504 Err:504 #REF!
6 Feb-20 Err:504 KG 4.20 Err:504 Err:504 #REF!
7 Jul-20 #REF! KG 4.20 #REF! #REF! #REF!
Err:504 Err:504
PARCIAL Err:504
TOTAL Err:504
MONTO SALDO
VALORIZACION
DESCRIPCION CONTRATO POR
(s/IGV) ANTERIOR ACTUAL ACUMULADO VALORIZAR
A: VALORIZACION CONTRACTUAL
MONTO VALORIZADO SIN IGV 8,037,915.88 3,468,673.43 313,630.78 3,782,304.21 4,255,611.67
B: REAJUSTES
01: REINTEGROS 0.00 0.00 0.00 0.00
C: AMORTIZACIONES
AMORTIZACION DEL ADELANTO DIRECTO 0.00 0.00 0.00 0.00
ENTIDAD
: PROVIAS DESCENTRALIZADO
CONTRATISTA : REPRESENTACIONES FLORES SRL.
OBRA
Err:509
SUPERVISOR : CONSORCIO SUPERVISOR ACOBAMBA
JEFE SUPERV. : ING. JUSTO ABILIO CARDENAS PRESENTACIÓN
RESIDENTE : ING. JOSE CARLOS MERMA SORIA
PERIODO : 01-06-2023 AL 30-06-2023
FECHA DE APROBACION DEL
EXPEDIENTE TECNICO Err:509
MONTO CONTRACTUAL Err:509 (SIN IGV)
MONTO CONTRACTUAL : S/. 9,484,740.74 (CON IGV)
ADELANTO MATERIALES 20.00% Err:509 (SIN IGV)
ADELANTO MATERIALES 20.00% Err:509 (CON IGV)
D = Coef.*V*(Ir-Ia)/Io
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO ADELANTO
DEDUCCION
MONTO MONTO COEF.INCID. INCID. NOV 2016 DIC 2016 DEFLAC. UTILIZADO
No. MES FECHA Imr
V A C % Imo Ima AD=A*Io/Ia AU=C*%*V D
#REF!
19/11/16 104,640.30 0.086 100.000% 398.48 405.27
1.00 Dec-16 #REF!
2.00 Jan-17
3.00 Jan-17 408.40 102,887.13 0.00 0.00
4.00 Mar-17 408.40 102,887.13 0.00 0.00
5.00 Apr-17 408.40 102,887.13 0.00 0.00
6.00 May-17 408.40 102,887.13 0.00 0.00
102,887.13 0.00
#REF!
19/11/16 136,039.00 0.122 100.000% 497.61 468.66
1.00 Dec-16 #REF!
2.00 Jan-17
3.00 Jan-17 408.40 144,442.38 0.00 0.00
4.00 Mar-17 408.40 144,442.38 0.00 0.00
5.00 Apr-17 408.40 144,442.38 0.00 0.00
6.00 May-17 408.40 144,442.38 0.00 0.00
7.00 Dec-99 144,442.38 144,442.38 -136,039.00
144,442.38 144,442.38
#REF!
19/11/16 124,081.52 0.105 100.000% 389.65 389.65
1.00 Dec-16 #REF!
2.00 Jan-17
3.00 Jan-17 408.40 124,081.52 0.00 0.00
4.00 Mar-17 408.40 124,081.52 0.00 0.00
5.00 Apr-17 408.40 124,081.52 0.00 0.00
6.00 May-17 408.40 124,081.52 0.00 0.00
7.00 Dec-99 408.40 124,081.52 124,081.52 5,970.82
124,081.52 124,081.52
#REF!
19/11/16 67,147.39 0.054 100.000% 802.02 850.76
1.00 Dec-16 #REF!
2.00 Jan-17
3.00 Jan-17 408.40 63,300.52 0.00 0.00
4.00 Mar-17 408.40 63,300.52 0.00 0.00
5.00 Apr-17 408.40 63,300.52 0.00 0.00
6.00 May-17 408.40 63,300.52 0.00 0.00
7.00 Dec-99 408.40 63,300.52 63,300.52 -34,913.87
63,300.52 63,300.52
#REF!
19/11/16 67,147.39 0.054 100.000% 802.02 850.76
1.00 Dec-16 #REF!
2.00 Jan-17
3.00 Jan-17 408.40 63,300.52 0.00 0.00
4.00 Mar-17 408.40 63,300.52 0.00 0.00
5.00 Apr-17 408.40 63,300.52 0.00 0.00
6.00 May-17 408.40 63,300.52 0.00 0.00
7.00 Dec-99 408.40 63,300.52 63,300.52 -34,913.87
63,300.52 63,300.52
SUB TOTAL 499,055.60
TOTAL DEL MES -199,895.92
ACUMULADO ANTERIOR 0.00
TOTAL DEL MES -199,895.92