Value Optimization for Project and Performance Management
()
About this ebook
Showing readers how to apply value optimization techniques to project and performance management, dramatically increasing results and efficiency, Value Optimization for Project and Performance Management is written to compliment the Project Management Body of Knowledge, the guidance published by the Project Management Institute (PMI®), making it readily applicable for any project manager.
- Presents methodology applied with hundreds of clients across a range of industries
- Filled with practical facilitation and implementation tips
- Presents a cohesive theory, structured framework, and diverse toolset
- Walks you through the value optimization process, showing you how to transform the way a product or process is perceived
Brimming with examples, Value Optimization for Project and Performance Management provides a link to a free software demo for you to get started in applying value optimization in your own organization.
(PMI is a registered mark of Project Management Institute, Inc.)
Robert B. Stewart
Robert B. Stewart is Professor of Philosophy and Theology and the Greer-Heard Chair of Faith and Culture at New Orleans Baptist Theological Seminary. Stewart has authored or edited twelve books, ten of which were debates or dialogues, which include numerous contributing essays by other highly respected scholars, such as John Dominic Crossan, Alister McGrath, Craig Evans, and others.
Read more from Robert B. Stewart
Can We Trust the Bible on the Historical Jesus? Rating: 0 out of 5 stars0 ratingsWhen Did Jesus Become God?: A Christological Debate Rating: 0 out of 5 stars0 ratingsWhat Did the Cross Accomplish?: A Conversation about the Atonement Rating: 0 out of 5 stars0 ratingsResurrection of Jesus: Jhn Dominic Crossan and N.T. Wright in Dialogue Rating: 3 out of 5 stars3/5The Message of Jesus: John Dominic Crossan and Ben Witherington III in Dialogue Rating: 0 out of 5 stars0 ratings
Related to Value Optimization for Project and Performance Management
Related ebooks
Values-Driven Change: Strategies and Tools for Long-Term Success Rating: 0 out of 5 stars0 ratingsValue Creation Principles: The Pragmatic Theory of the Firm Begins with Purpose and Ends with Sustainable Capitalism Rating: 0 out of 5 stars0 ratingsThe Wise Enterprise: Reshape your organisation for the age of uncertainty Rating: 0 out of 5 stars0 ratingsThink Beyond Value: Building Strategy to Win Rating: 0 out of 5 stars0 ratingsFinding Insight: Discovering the Non-Obvious Obvious Connection to Why People Do What They Do Rating: 0 out of 5 stars0 ratings12 Steps to Flow Rating: 0 out of 5 stars0 ratingsRe-designing the smart future: How new technologies are transforming businesses and the 2020 world we live in Rating: 0 out of 5 stars0 ratingsThe 7-Minute Prioritizer: The Art of Discernment Rating: 0 out of 5 stars0 ratingsWhat You Need to Know about Strategy Rating: 0 out of 5 stars0 ratingsUnlock Your Leadership: Secrets & Straight Answers on Standing Out, Moving Up, and Getting Ahead as the Leader You Really Are Rating: 0 out of 5 stars0 ratingsEconomorphics: The Trends Turning Today into Tomorrow Rating: 0 out of 5 stars0 ratingsPositioning for Professionals: How Professional Knowledge Firms Can Differentiate Their Way to Success Rating: 0 out of 5 stars0 ratingsValuable Change: What You Need to Know to Ensure Your Change Pays Off Rating: 0 out of 5 stars0 ratingsManagement- No Fears: Through Training & Development Rating: 0 out of 5 stars0 ratingsStrategy: Achieving Outcomes That Add Value Rating: 0 out of 5 stars0 ratingsRedesigning CapEx Strategy: A Groundbreaking Systems Approach to Sustainably Maximize Company Cash Flow Rating: 0 out of 5 stars0 ratingsLecture #1 - Value Grid: From Fear to Curiosity Rating: 0 out of 5 stars0 ratingsThe Four-Way Fit Rating: 0 out of 5 stars0 ratingsThe Diagrams Book: 100 ways to solve any problem visually Rating: 0 out of 5 stars0 ratingsYour Path to Doubling Your Business's Value: What is Holding You Back and How to Change It Rating: 0 out of 5 stars0 ratingsFrom "No" to "How?": Get Buy-in and Lead Change Rating: 0 out of 5 stars0 ratingsThe ‘business’ of Running a Business Rating: 0 out of 5 stars0 ratingsBE Agile Rating: 0 out of 5 stars0 ratingsCollege Mentoring Handbook: The Way of the Self-Directed Learner Rating: 0 out of 5 stars0 ratingsProve It!: How to Create a High-Performance Culture and Measurable Success Rating: 0 out of 5 stars0 ratingsKnow Your Capabilities Rating: 0 out of 5 stars0 ratingsFaster, Better, Cheaper Rating: 0 out of 5 stars0 ratingsPrimary Greatness: The 12 Levers of Success Rating: 3 out of 5 stars3/5The Service Organization: How to Deliver and Lead Successful Services, Sustainably Rating: 0 out of 5 stars0 ratingsThe Competent Company - Third Edition Rating: 0 out of 5 stars0 ratings
Business For You
Collaborating with the Enemy: How to Work with People You Don't Agree with or Like or Trust Rating: 4 out of 5 stars4/5The Art Of Critical Thinking: How To Build The Sharpest Reasoning Possible For Yourself Rating: 4 out of 5 stars4/5The Book of Beautiful Questions: The Powerful Questions That Will Help You Decide, Create, Connect, and Lead Rating: 4 out of 5 stars4/5Company Rules: Or Everything I Know About Business I Learned from the CIA Rating: 4 out of 5 stars4/5The ChatGPT Millionaire Handbook: Make Money Online With the Power of AI Technology Rating: 4 out of 5 stars4/5Super Learning: Advanced Strategies for Quicker Comprehension, Greater Retention, and Systematic Expertise Rating: 4 out of 5 stars4/5Your Next Five Moves: Master the Art of Business Strategy Rating: 5 out of 5 stars5/5Becoming Bulletproof: Protect Yourself, Read People, Influence Situations, and Live Fearlessly Rating: 4 out of 5 stars4/5The Richest Man in Babylon: The most inspiring book on wealth ever written Rating: 4 out of 5 stars4/5Emotional Intelligence: Exploring the Most Powerful Intelligence Ever Discovered Rating: 4 out of 5 stars4/5The Five Dysfunctions of a Team: A Leadership Fable, 20th Anniversary Edition Rating: 4 out of 5 stars4/5The Catalyst: How to Change Anyone's Mind Rating: 4 out of 5 stars4/5How to Get Ideas Rating: 4 out of 5 stars4/5High Conflict: Why We Get Trapped and How We Get Out Rating: 4 out of 5 stars4/5Robert's Rules Of Order: QuickStudy Laminated Reference Guide Rating: 5 out of 5 stars5/5Financial Words You Should Know: Over 1,000 Essential Investment, Accounting, Real Estate, and Tax Words Rating: 4 out of 5 stars4/5Capitalism and Freedom Rating: 4 out of 5 stars4/5Strategy Skills: Techniques to Sharpen the Mind of the Strategist Rating: 4 out of 5 stars4/5A More Beautiful Question: The Power of Inquiry to Spark Breakthrough Ideas Rating: 4 out of 5 stars4/5
Reviews for Value Optimization for Project and Performance Management
0 ratings0 reviews
Book preview
Value Optimization for Project and Performance Management - Robert B. Stewart
CHAPTER 1
Introduction
© Magixl 2009, www.magixl.com
002Poor value is a people problem.
—Larry Miles
Lawrence Delos Miles was born in 1904 to Delos Miles, a public school superintendent, and Vinetta Miles, an elementary school teacher in Harvard, Nebraska. Miles was very bright, and he graduated from high school in three years rather than the usual four. He attended Nebraska Wesleyan University in Lincoln, Nebraska, with a degree in education. In 1925, he was a teacher and high school principal in Winnebago, Nebraska. In 1926, he made a career change and moved into banking. Dissatisfied with this, he returned to college to study engineering. In 1931, Miles graduated from the College of Engineering at the University of Nebraska with a degree in electrical engineering.
In 1932, Miles began a long and productive career at General Electric Co. in Schenectady, New York. His first assignment at GE was that of a design engineer in the Vacuum Tube Engineering Department. Over a six-year period in this position, he earned 12 patents for vacuum tubes and related circuitry. During this time, Miles developed awareness for unnecessary costs and began seeing the need for developing better ways of doing things.
This sensitivity to cost earned him a transfer to GE’s purchasing department, and in 1938 he was promoted to the position of purchasing engineer. During this time, Miles worked closely with vendors to reduce costs associated with electronic components, eventually moving on to precision-machined parts. In 1944, Miles was transferred to a subsidiary of GE called Locke Insulator. While at Locke, he began the development of the process that has now evolved into the function-oriented problem solving methodology known today as Value Methodology.
Miles was instrumental in the initial development and spread of Value Methodology. In 1959, he helped create the Society of American Value Engineers and served as its first president between 1960 and 1962. He was the author of the first book on the subject, Techniques of Value Analysis and Engineering, which was published in 1961. He taught seminars and lectured extensively throughout the United States and the rest of the world.
Larry Miles received many accolades and awards during his career, but none were greater than the honor bestowed on him by Japan. In 1984, he was posthumously awarded the Third Order of Merit with Cordon of Sacred Treasure by the emperor of Japan. The Japanese bestowed this honor on Miles due to the major impact that the use of Value Methodology had on making Japan an industrial and economic powerhouse. In addition, he received international recognition from Germany and South Africa for his contributions.
The story of Larry Miles is a fitting introduction to this book. Without him, the writing of this book would not have been possible. ¹ Larry Miles also exemplified the role that Value Leadership can play in improving the value of products, services, and facilities. While other leaders in business improvement, like Dr. W. Edwards Deming and Phillip Crosby, have received greater notoriety, the work of Larry Miles has created a quiet legacy that endures today.
Today’s Challenges
Most people today would agree that long-term profitability is the main objective of private enterprise, while the timely delivery of needed services would describe the goal of public bodies. They would also quickly point out that the products and services these entities produce should be competitively priced and/or efficiently provided while meeting or exceeding the performance expectations of their customers. In order to adapt to an ever-changing environment, organizations are challenged to make better use of their most important resource, their people.
This idea has been demonstrated through the innovations introduced by the quality movement and by the evolution of program and project management that has been experienced in recent years. Executive management has learned that through the emphasis of programs and projects and by ingraining a culture of quality improvement, the effectiveness of an organization can realize significant gains. Despite the benefits of these innovations, they will amount to little unless the organization possesses an active understanding of the value that its customers place on its products and services, and is capable of defining, measuring, and improving it.
In late 2008, the world was confronted with the sudden end to the unbridled growth that the global economy had experienced earlier in the decade. At the heart of our irrational exuberance
² was the delusion that the market could only go up; that growth would be perpetual; that the uncertainty posed by risks could be completely avoided; and that value could be created from nothing. Looking back, it is remarkable to think that at least tacitly, the majority of us held these beliefs to be true. Like the laws of physics, the laws of value cannot be circumvented. Value is grounded in reality. It demands honesty. It does not suffer fools or charlatans.
One need only look at the following recent phenomenon to see how easily we can be led astray when we lack a means to anchor value to reality:
• The overvaluations of Internet companies during the growth of the dot-com
bubble were fueled by wildly optimistic speculation on fast-growing Internet businesses. One Internet company spent $135 million in capital over its 18-month life span while never once generating a profit.³ Too great an emphasis was placed on rapid growth and not enough on the actual value of the service it provided.
• The development in the 1990s of the financial instruments known as collateral debt obligations (CDOs) and credit default swaps (CDSs) were touted by their creators as ways to essentially eliminate all investment-related risk. These instruments ran completely contrary to one of the basic tenants of the free market system, namely, the concept of risk and reward.
What is all the more ironic is that the risk experts
on Wall Street are the ones who concocted these schemes and drove the market into the ground, with many of them collecting huge bonuses for our pains. This proves the point that you cannot sweep uncertainty under the rug or hide it in the closet. It will most surely destroy value if it is not addressed in a rational, responsible manner.
• The proliferation of CDOs and CDSs in turn led banks to lower their lending requirements based on the false belief that the financial risks had been diluted to such an extent that they couldn’t possibly lose money on a bad loan. The availability of cheap adjustable-rate loans and the demand for housing led to the boom in house construction during this same period. Between 1997 and 2006, the price of the typical American house increased by 124 percent.⁴ During this same period, average U.S. incomes remained virtually flat. Inevitably, borrowers on the riskier loans began to default, which began increasing the supply of homes available and eventually burst the housing bubble. I can remember watching the value of homes in my neighborhood going up and up during this period while my income remained pretty constant. Chatting with my neighbors, we all agreed it couldn’t go on forever—and sure enough, it didn’t. Between 2006 and 2008, home prices fell an average of 20 percent nationwide and were still falling at the time of this writing. ⁵ Despite the fact that many of us, at a gut level, felt that something was terribly wrong, we all just went along with it, thinking that the market must be right. Many of us even further leveraged our overvalued homes with home equity loans to buy other things we couldn’t afford. When we do not have a clear yardstick for measuring value, we lack the information needed to make critical decisions.
While these examples apply to the general economy at a macro level, they are a reflection of the inability of both individuals and organizations to understand and measure value.
Dan Ariely, in his brilliant book on behavioral economics, Predictably Irrational, discusses at length his thoughts on the subprime mortgage crisis. He argues that individuals, organizations, and indeed the global market behave in a manner that is completely irrational with respect to economic decision making. If even only a few of the compelling points he makes are true, then it only further reinforces the importance of developing a rational framework that allows us to assess value.⁶
Lacking the compass of value, an organization is in danger of losing its way. Further, if it can find its compass, it must become fluent in its use in order to interpret its meaning. All of this first requires an acknowledgment that the organization lacks the tools, training, and necessary attitude by its leaders. Developing this insight is the first step, and the greatest hurdle, to overcome.
Managing the change that is necessary for an organization to stay competitive is a difficult challenge. However, the more successful it can become at managing change, the better it can become in meeting its customer’s needs, reducing inefficiencies, improving the performance of functions, and managing costs and risks. These changes not only result in improved profits and better efficiency in the present, but continue to pay dividends for years to come. In today’s economic environment, maintaining a focus on performance while controlling costs and managing risk are essential for long-term survival and sustainable growth.
In presenting the concept of value optimization, the author challenges the reader to look beyond the traditional indicators of value: price and customer satisfaction, and instead consider value from the perspective of functions and how they are performed relative to cost, time, and risk. This book presents a practical and proven approach, known as Value Methodology, which provides organizations with a cohesive theory, structured framework, and diverse toolset to identify, quantify, and optimize the real value they deliver by transforming the way it is perceived.
Value Methodology
This book is aimed at those new to the discipline with emphasis placed on the practical application of Value Methodology techniques to optimize the value of facilities, products, services, and processes. Value Methodology (VM) has existed under several different names over the years, such as Value Engineering (VE), Value Analysis (VA), and Value Management. There are no essential differences between these designations and they are, for all practical purposes, interchangeable. The term value engineering has been traditionally used whenever the Value Methodology is applied to industrial design or to the construction industry; the term value analysis for concept planning or process applications; and the term value management for administration or management applications. Value Methodology is the term most commonly used today and refers to the comprehensive body of knowledge related to improving value regardless of the area of application. Value Methodology is formally defined as:
A systematic process used by a multidisciplinary team to improve the value of projects through the analysis of functions.⁷
Value Methodology is an organized process that has been effectively used within a wide range of private enterprises and public entities to achieve their continuous improvement goals, and in government agencies to better manage their limited budgets. The success of the VM is due to its capacity to identify opportunities to remove unnecessary costs from projects, products, and services while assuring that performance, and other critical factors, meet or exceed the customer’s expectations.
The improvements are the result of recommendations made by multidiscipline teams under the guidance of a skilled facilitator, commonly referred to as a value specialist. The multidisciplined teams can comprise those that were involved in the design and development of the project, technical experts that were not involved with the project, or a combination of the two. There are two essential elements that set the Value Methodology apart from other techniques, methodologies, and processes:
1. The application of the unique method of function analysis and its relation to cost and performance
2. The organization of the concepts and techniques into a specific job plan
These factors differentiate Value Methodology from other analytical or problem-solving methodologies.
Value Methodology can be applied to products, manufacturing processes, administrative procedures, and the design and construction of facilities. The VM process is applied in basically the same way for each type of study; however, there are some differences in how preparations are made for the different types of studies and how some of the VM techniques are applied.
VM is often confused with cost reduction; however, cost reduction and VM are distinctly different. Cost reduction activities are component-oriented. This often involves the act of cheapening
the item. In other words, reducing cost at the expense of performance. Examples of typical cost reduction measures include eliminating components or elements, substituting less expensive systems, relaxing tolerances, and/or the thinning or changing of material. At best, such an approach creates a stripped-down, less expensive version of the original item. At worst, it results in the wholesale degradation of value by forsaking performance in the zeal to reduce cost.
Value Methodology, conversely, is concerned with how things function rather than what they are. This function-driven mind-set demands a radical transformation in our perception, in the way we approach challenges, both old and new. This functional way of thinking is, by its nature, predisposed to lead us to innovative solutions by opening our eyes and deepening our understanding of how things work. This concept of function is the very essence of Value Methodology.
Why Use Value Methodology?
The economic health of an organization relates to the efficient use that is made of available resources. As our society evolves we are confronted with increasing awareness that resources appear to be shrinking. We do not have unlimited choices in materials, types of energy, or sources of labor. The availability of capital is also limited, especially when we consider that the cost of borrowing capital is ever fluctuating and the purchasing power of the dollar seems to be steadily diminishing. Further, the quickening pace of technological advances may find us using designs or methods that are far behind the leading edge of progress. The owner, whether an individual, a corporation, or a tax-supported public body, cannot afford the luxury of paying for design or performance features that contribute nothing to the basic function of the object being acquired. Such unneeded features are often introduced into designs either because there is inadequate communication between the owner, who controls the budget, the user, who identifies the requirements, and the project team, who transform these requirements into plans and specifications.
To achieve maximum benefits from our limited resources we must make full use of our only unlimited resource—our ability to think creatively. By taking advantage of technological advances in materials and methods of production, and by applying our creative ability to each project, we can in some measure offset the rapid rise in the cost of acquiring goods and services. These costs have risen sharply in the past decade, and in almost any year the rise in costs exceeds that of the preceding year. For example, within the construction industry, the cost of building materials has spiked sharply over the last decade for essentials such as steel, concrete, and lumber, as shown in Figure 1.1.⁸
FIGURE 1.1 Construction Cost Index History
003In order to acquire the desired projects, products, and processes with the limited funds available, we must use every possible means to attain the required functions at minimum cost. This is precisely what Value Methodology attempts to accomplish through a systematic, organized approach. It is also worth noting that Value Methodology is currently mandated in the United States by federal law. These laws generally apply to the design and construction of facilities, but are also applied for the procurement of some types of equipment and supplies. These laws and regulations include:
• The Defense Authorization Act (Public Law 104-106) states that each executive agency must establish and maintain cost-effective VM procedures and processes.
• The 1995 National Highway System Designation Act requires states to carry out a value study for all federal-aid highway projects with an estimated total cost of $25 million or more.
• The 1986 Water Resources Development Act (Public Law 99-662) requires a review of costs (i.e., value study) on all federally funded water and wastewater treatment projects with a total cost in excess of $10 million.
• The Office of Management and Budget’s Circular A131 requires federal agencies to use Value Methodology as a management tool to reduce program and acquisition costs.
As a result, not only is VM required at a federal level, but also at the state and local levels due to the fact that federal funding is an integral part of most major capital improvement projects. In addition, many state and local governments have enacted legislative policy of their own that mandates the application of VM for a wide variety of projects at various budget thresholds.
Project Management and Value Methodology
Value Methodology, as a body of knowledge, is concerned with improving the value of things, whether it is a new facility, a manufactured item, or a management procedure. The application of Value Methodology typically occurs within the context of a program at an organizational level and within a value study, at a project level.
Experienced project managers, especially those with a thorough understanding of the Project Management Institute’s Project Management Body of Knowledge (PMBOK), will appreciate the similarities between the management of a value study and the management of a project. In fact, a value study, in and of itself, is a project. It meets all of the criteria⁹ of a project:
• Is it unique? Yes, a value study is a unique endeavor having the goal of improving the value of a product, regardless of whether it is a new product or an existing one.
• Is it temporary in nature and have a definite beginning and end? Yes, a value study typically involves an intense expenditure of resources within a very short time, usually occurring over a few weeks or months.
• Is there a way to determine when it is completed? Yes, the value study is completed when the formal study process has been completed and oral and written reports have been submitted detailing the specific value improvements developed by the value team.
• Is there a way to determine stakeholder satisfaction? Yes, stakeholder satisfaction is determined by holding a formal implementation meeting. This allows the project team and vested stakeholders to determine the acceptability of the value improvements recommended by the value team.
Value studies can be conducted as a part of an ongoing project, or they may be completely free-standing projects in and of themselves. Project managers have a special role to play in the application of Value Methodology.
Project managers are generally positioned within an organization where they may take either a direct or indirect role in the performance of value studies. In projectized and matrix-based organizations, there may be a VM department where value specialists are assigned to facilitate value studies for specific projects. This involvement of a project manager in a value study may take on a variety of forms:
• The project manager may act as a value specialist in facilitating a value study for some projects and organizations. This approach may be preferable if the project is still in the initiation phase.
• The project manager may request and/or sponsor a value study to be performed for a project he or she is actively managing. In this case, the value study may be led by a value specialist from a different department within the organization, by a consultant value specialist, or by a value specialist from an external project stakeholder.
• The project manager may be the recipient of a value study on a project he or she is actively managing. Another entity within the organization, or perhaps an external stakeholder, will have requested that a value study be conducted for the project. In this case, the project manager may be an unwilling
participant and will be required by the organization to cooperate with the value specialist in participating on the value team directly or in a supporting role.
• The project manager may be a primary decision maker with respect to the acceptance of value alternatives developed as part of a value study.
It is not uncommon for some project managers to take on more than one of the roles identified above. Regardless of which role they will play, it will be an important one in determining the success of the value study. Project managers in all organizations should have a fundamental understanding of VM and be aware of how it can improve the cost, performance, risk, and value of their projects.
It is important to understand that Value Methodology, unlike many management fads, is more than just a concept. VM provides an actual means of achieving improved value. The universality of its application to any project makes it an ideal project management tool. No project manager should be without it.
Value Methodology and Teamwork
The successful application of Value Methodology, as originally conceived by Larry Miles, has always focused on the importance of multidiscipline teams. In fact, VM was one of the first disciplines to recognize the value of drawing upon the group synergism of individuals representing different technical backgrounds. VM is therefore a team process and, as such, requires that members of the value team work together harmoniously and in unison if its output is to exceed the sum of the individual efforts.
Genuine teamwork should always be value-based. In other words, it should be behaviorally rooted in mutually shared values. The value specialist will exert considerable influence over the values that will fundamentally affect teamwork. It must be further emphasized that the value specialist’s sphere of influence must extend beyond the boundaries of the value team. The value specialist should think of the value team as an extension of the project team. Further expanding on this idea, the value specialist must seek to include the customer or user, the project team, and the project stakeholders as part of the total team effort, as illustrated in Figure 1.2.
A number of values and principles must be followed in creating successful teams. These include:
• Innovation requires an open discussion about things that are wrong
about the current project. This is achieved by validating assumptions, strengthening the understanding of the problems that are trying to be solved, and improving communication among team members. Therefore, it is important to establish a basic level of trust among the team members that is based upon the understanding that the goal of the value effort is the overall improvement of the project. It is not about criticizing team members for perceived shortcomings.
• No one individual must ever intentionally be praised or rewarded for looking good at the expense of another. When team members sense that such behavior is rewarded, they will use information about the project in ways that will subvert the value effort and prevent teamwork. Team players are committed to the success of the project, which in turn will make everyone a success.
• Large organizations and bureaucracies tend to shield individuals from conflict through policies and procedures. Discomfort with conflict runs higher in these environments for this reason. Therefore, the value specialist needs to develop strong facilitation skills in order to make people more comfortable with resolving conflicts in a team or group setting. The value effort by nature should be a process of consensus rather than an autocratic one.
FIGURE 1.2 Teamwork and Value Methodology
004• Managers within a bureaucracy generally understand that clarifying responsibility is necessary in order to prevent the paralysis that can develop when there is uncertainty within a team about who is responsible. Within the context of the value effort, teams, rather than individuals, must be empowered to solve problems.
• Individuals must have respect for data and objective analysis in order to foster teamwork. Members of a team are more willing to create interdependencies involving trust and vulnerability when they feel that facts and neutral data are valued.
• All members of the team that are part of the value effort must be valued equally, no matter how far down within an organization’s hierarchy they are. The value specialist should seek to solicit information and ideas from everyone. Often, those within the lower echelons of an organization hold important information that is usually overlooked.
• It is not at all unusual for there to be both superiors and subordinates from the same organization participating simultaneously within the context of the value effort. The value specialist must emphasize the importance that team members demonstrate tolerance in the acceptance of constructive criticism of their own ideas. Teamwork improves when people feel that they have the freedom to constructively criticize and evaluate the group’s efforts without fear of reprisal, and when superiors become more hands on
and less authoritarian.
A teamwork culture
must acknowledge interdependencies that exist in a complex organization. Values about fairness and equality must support the interdependencies within the total team comprising the value effort; otherwise, teamwork is undermined and the outcome will be compromised. Teambuilding is further discussed in Chapter 4, Preparation.
History of Value Methodology
The genesis of the Value Engineering methodology was during the period of World War II, from 1938 to 1945. Lawrence Delos Miles, regarded as the father of Value Analysis/Engineering, was an engineer for General Electric Company.¹⁰ During this time, every facility was scheduled to the hilt and prioritized to AAA and higher. Steel of all types was totally scheduled. All vital products and materials were heavily controlled including copper, bronze, tin, nickel, ball bearings, roller bearings, electrical resistors, and capacitors. Miles was assigned the task of fi nding, negotiating for and getting
a number of these vital materials, such as materials to expand production of turbo-superchargers from 50/week to 1,000/week for B-24s, capacitors and resistors for skyrocketing military electronic needs, armament parts for expanding production of B-29s, and so forth. In this environment, it was not possible to stop short of achieving the essential results.
Frequently, suppliers, already overextended, said no to increased schedules or new necessary products. In this desperate situation Miles was forced to basics. If I can’t get the product, I’ve got to get the function. How can you provide the function by using some machine or labor or material that you can get?
Time and again there was a way to do it. Engineering tests and approvals were rushed and schedules met. Thus function
grew in vitality and was to later mature into the development of the VA techniques.
To assure materials for these and other vital programs, Miles usually worked two days in the vendors’ plants, one to two days in GE plants, one day in the Pentagon keeping priorities suitable, and Saturdays and Sundays in his own office. One particular incident will illustrate the function emphasis that pressed itself upon him.
A production manager gave Miles a schedule calling for thousands of a few dozen types of resistors and capacitors to be delivered weekly starting in one week. Manufacturing schedules at the time were nine months out, with six months firm. He was told it was an absolute requirement. Miles asked, Who agrees with you that this must be secured regardless?
The manager said, Tom Garahan, overall production manager of GE.
Miles asked, Does Harry Erlicher [vice president of purchasing] agree?
The manager said yes.
The resistors and capacitors were secured. They were for Oak Ridge, Tennessee. Much later it was learned they were for atomic bomb research and development. Their priority overrode everything; still the others were vital too. Miles went to vendors and made schedule changes, but told each he would find some way to provide the essential functions of resistance and capacitance through a different shape or type or material or equipment, which would keep other vital electronic equipment on schedule for the military. The function approach proved to be so effective that he would never abandon it.
Critical years passed. In 1944, Erlicher asked Miles to become Purchasing Agent of a GE plant. Miles experienced more benefits from the functional approach in buying.
In March 1944, he was transferred to Locke Insulator in Baltimore, Maryland, a subsidiary of GE, as manager of purchasing. He took line responsibility for delivery and cost of millions of dollars worth of materials and products per year. During nearly the next four years, he developed patterns of engineering, laboratory, and purchasing teamwork that limited costs and improved products. He learned firsthand both the productive and the destructive force of human attitudes and practices, and their effect on appropriate designs and appropriate costs. His thinking was becoming more and more "What function am I buying? rather than
What material am I buying?"
In 1947, Miles wrote a letter to Erlicher saying that he believed that much good could come to GE if he were relieved of line operation responsibilities and assigned full-time to cost reduction work in the central purchasing office. Mr. Erlicher bought the idea and moved him back to Schenectady in late 1947, where his activity was named the Purchasing Department Cost Reduction Section, PDCRS.
In late 1947, back in Purchasing on Mr. Erlicher’s staff, his schedule was cleared so that he could research and develop workable techniques, which would secure more cost effective achievement by the decision-making employees in a plant or business.
Larry Miles described the early technique:
To an exceptional degree it focuses on what is important, develops knowledge about it, and then causes great creativity in that area. You select from the creative approaches, answers that may not have come in years with other thinking methods. When the system was put to work the first time, it resulted in replacing a bronze clip holding a cover on a refrigerator control (that could flex millions of times without breaking) with a lower cost brass clip (that would flex thousands of times). Quality was not sacrificed because the clip would be flexed only about six times in the lifetime of the refrigerator. The $7,000 per year savings may seem like nothing, but when the same technique was applied to everything in the control box, the yearly savings jumped to $1.25 million.
The new functional approach was introduced to Mr. Winne, vice president of engineering. Mr. Winne listened, understood, and said, "This is the best method I have seen to get competitive costs and retain quality. What are you going to call it? Proper quality at proper costs equals value. Why not call it value analysis? Thus the new methodology was named. Then he said,
The vice president of manufacturing, Mr. DuChemin, will be most interested in this. Mr. DuChemin set up a 20-minute appointment with Miles. After two hours of listening and learning, he said,
Train 1,000 people per year." With the support of these people, Miles set up training programs that were available to GE’s plants. He accepted people and products from different plants, applied the techniques, and showed them how they could increase earnings and maintain competitive positions. He learned that great benefits were derived when technical people used the VA system and geared training to them.
For the next three years, Larry continued training personnel and doing work for the plants. He did this using a revolving team of six to eight people. Training was moved into plant locations with a goal of 1,000 per year to be trained. Later, GE often exceeded that number. Larry and his training team learned that greatest benefits come when customers and vendors also know and use the VA functional and methodical thinking