0% found this document useful (0 votes)
188 views

Pour Card

RTS-Construction was pouring concrete for an east zone structure at Rakhiyal. The concrete pour card documented the project name, location, grade of concrete, quantity, levels being poured, slump, number of test cubes taken, start and end time of the pour, and confirmations that shuttering, reinforcement, cover blocks, access, safety, lighting, conveying equipment and curing arrangements were all approved and in place. Sign off was provided by both the contractor Saumya Construction and project management consultant FMPL.

Uploaded by

parthusharma
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views

Pour Card

RTS-Construction was pouring concrete for an east zone structure at Rakhiyal. The concrete pour card documented the project name, location, grade of concrete, quantity, levels being poured, slump, number of test cubes taken, start and end time of the pour, and confirmations that shuttering, reinforcement, cover blocks, access, safety, lighting, conveying equipment and curing arrangements were all approved and in place. Sign off was provided by both the contractor Saumya Construction and project management consultant FMPL.

Uploaded by

parthusharma
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

RTS-Construction for East Zone at Rakhiyal

FOR AMC Concrete pour card: Date: 1. Name of structure: 2. Location: 3. Concrete grade: 4. Qty of concrete: 5. Level from _____ to _____: 6. Slump: 7. No of cubes taken at site: 8. Concrete start time: 9. Concrete completion time: YES. NO. NOT APPLICABLE. 10. 11. 12. 13. 14. 15. 16. 17. Shuttering approved Reinforcement approved Cover blocks used Access provided Safety arrangements adequate Lighting provided Concreting equipment in working order Concrete conveying arrangement (including Transit mixers. 18. Curing arrangement made 19. Remarks:

For contractor (SAUMYA CONSTRUCTION)

For PMC (FMPL)

You might also like