P5 - Gate Estimate:-: Description L B D/H Quantity Unit Rate Amount For One Gate Nos
P5 - Gate Estimate:-: Description L B D/H Quantity Unit Rate Amount For One Gate Nos
Description
For One Gate
8" X 8"
Earth work
Sand Filling
PCC
Concrete
Steel
Shuttering
Plastering
M.S gate
12mm Sq Solid bar
25mm sq Box
Fixing Charges
Mason
MC
SC
Material For Holes
Packing
OHC 20%
Add Service Tax 4.08%
Nos
2.00
2.00
2.00
1.75
0.67
1
1
1
1
1
1
1
1
1
1
2.00
2.00
2.00
1.75
0.67
1
1
1
4
4
1
0.67
1.75
2.68
D/H
2.00
0.33
0.33
0.67
6.67
6.67
0.67
7.34
Quantity
Unit
Rate
Amount
8.00
1.32
1.32
2.05
2.99
20.00
17.88
4.69
19.67
Cft
Cft
Cft
Cft
Cft
Kg
Sft
Sft
Sft
5.00
36.00
77.00
114.00
114.00
50.00
19.00
19.00
18.00
40
48
102
234
341
1000
340
89
1604
159.81
kg
90
14383
65.98
kg
90
5938
4.00
4.00
3.00
Nos
Nos
Nos
Ls
500
300
350
2000
1200
1050
500
950
1217
Total
31035
Length
Nos
36
Total
Wt.Per meter
Length in
length Kg
m
0.3048
10.97
0.61
2.5
16
40
0.3048
12.19
12mm Sq Solid
bar
6
5
64
16
384
80
0.3048
0.3048
25mm sq Box
6
5
8
8
48
40
0.3048
0.3048
Si.NoDescription
1 Main rod (10mm)
2 Stirrups (8mm)
Total Length
in Ft
Total in Kgs
Rate
Amount
6.69
50
334.5
0.39
4.76
50
237.9
117.04
24.38
1.13
1.13
132.26
27.55
14.63
12.19
2.46
2.46
35.99
29.99
Gate
26.8224