Quality Manual: TGM Incorporated
Quality Manual: TGM Incorporated
Revision 1
TGM Incorporated
299 Old Forks Road, Hammonton, NJ 08037 (609) 561-0022 fax (609) 561-2972
OUR MISSION
1. 2. 3. 4. 5. 6. 7. 8.
To provide our customers with the highest levels of service; before, during, and after the sale. To produce new and innovative methods and services that are the envy of our competition. To measure our success through our customer's satisfaction. To provide the best training for our employees. To provide creative leadership which will open channels of communication for all employees to contribute their ideas for improving the process. To provide the proper environment, methods, tools, and material, for our employees to accomplish their tasks most efficiently. To develop the proper relationships with our suppliers to aid us in our quest for excellence. To furnish the company with a reasonable profit to enable all the employees to be compensated for their efforts, and also provide financial means to invest in modern equipment that will keep our company on the cutting edge.
SCOPE
1.1 - This manual covers the establishment of an effective and economical quality control program for manufacturing.
1.2 - The control of quality of contract performance covering all supplies and services purchased.
1.4 - To inspect as prescribed in attached Instructions for Inspection Procedure Section 1 and 2.
INDEX
SCOPE................................................................................................................... 3 ORGANIZATION CHART, QUALITY CONTROL...............................................6
SECTION 1
PART 1 RECEIVING INSPECTION................................................................... PART 2 IN PROCESS INSPECTION ................................................................ PART 3 FINAL INSPECTION .......................................................................... PART 4 CHANGE CONTROL AND PURCHASING CONTROL .................. PART 5 STAMPS AND FORMS ...................................................................... INCOMING INSPECTION REPORT ................................................................. PROCESS CARD.................................................................................................. INSPECTION REPORT........................................................................................ TOOL AND GAUGE RECORD............................................................................ ACCEPT - REJECT TAGS.................................................................................... X & Y COORDINATE FORM.............................................................................. INVENTORY CARD............................................................................................ WELDING CERTIFICATION FORM................................................................... INSPECTION DISCREPANCY REPORT............................................................ MATERIAL REVIEW BOARD............................................................................. INSPECTION PROCEDURE REPORT................................................................ CHANGE NOTICE............................................................................................... 8 8 9 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Revision History
Rev 0 1 2 3 4 5 6 7 8 9 10 Decription of Change Intial Release Correct page references, add Revision History, add org chart Author TG Effective Date 01/01/1999 08/14/2003
TGM Inc.
Organization Chart
Tom Garvey President Tom Garvey VP / General Manager Assistant
Susan Garvey A/P Manager Brian King Scheduler Brian King Processor Brian King CNC Programmer Kevin Hansen Shift Manager 1st Shift Steve Tarado Shearing Dept Mgr Steve Tarado Punching Dept Mgr Kevin Hansen Bending Dept Mgr Tom Sr. Assy Dept Mgr Rich Voso Welding Dept Mgr Jim Wise Machining Dept Mgr Geoff Gurney Mulling Plate Mgr Geoff Gurney Shipping Manager Shift Manager 2nd Shift
Shipping Manager
Section 1
1. SECTION 1 PART 1
1. Purpose
RECEIVING INSPECTION
1.1 - To inspect all incoming materials, hardware, finishes, services, and parts. 1.2 - To use signature and report approval on receiver. See Section on forms #1000, page 11. 1.3 - To inspect all items to applicable drawings and Purchase Order specifications. 1.4 - To withhold any rejected material for disposition of material review board. 1.5 - To check for Government or Customer Source inspection when required. 1.6 - To check for verification Certificates where applicable. 1.7 - To perform inspection as outlined in Section 2, Part 1 of inspection Procedures.
SECTION 1 PART 2
1. Purpose
IN PROCESS INSPECTION
1.1 - To efficiently establish an economical and adequate control of inspection of parts and services to insure contract requirements during process of contract. 1.2 - To make all 1st piece inspection and record stamp of approval on process card, form 1005. See Section 2, Part 2, page 25 on 1st piece inspection. 1.3 - To continue the inspection during manufacture by sampling inspection during process of contract by operator and or designated inspector. 1.4 - To stop production in event of rejection or discrepancies from drawing requirements. 1.5 - To withhold rejected parts for material review. 1.6 - To inspect all gages, tools, jigs, etc. and record on tool and gage card. See Section 2, Page 28. Samples of Form #1015, Personal Tool Record, and Form #1020, Tool and Gage Record, are shown on Page 14 of Section 1. 1.7 - To perform inspection as outlined in Section 2 of Inspection Procedures.
SECTION 1 PART 3
1. Purpose
FINAL INSPECTION
1.1 To inspect and insure quality of finished parts and assemblies to control requirements. 1.2 To inspect where applicable, services, finishes, etc., to applicable Government specifications. 1.3 To maintain and make readily available all data on Purchase Orders, Inspection Forms, Certifications, etc., for contractor or government inspection.
SECTION 1 PART 4
1. Responsibility
1.1 Production Control and Estimating Department are responsible for latest revisions on drawings, specifications, etc. 1.2 Production Control and Estimating Department are responsible for issuance of change orders received while orders are in process. Issuance of paperwork, and reinspection of material affected.
2. Purchasing
2.1 All Purchase Orders for materials and services issued shall contain all specifications for such material or service as required by contract. 2.2 All Purchase Orders issued for Government Contracts shall contain when applicable, Government Contract Number, Government Specifications, Certification and when required, Government Source Inspection. 2.3 When applicable, Purchase Order should specify which of the following types of certification is required. 1. Certification 2. Certificate of Compliance 10
SECTION 1 PART 5
1. The following stamps shall be used by each inspector with his number. The determination as to whether to use stamps of tags is the responsibility of the Quality Control Mgr. The responsibility of security of stamps lies with each inspector. The Quality Control Mgr. has the responsibility of appointing qualified inspectors.
a.
approved
b.
c.
rejected material
d.
2. Tags - To be used where stamping is not permissable or advisable. a. (Green Tags) #1030 Inspected and Approved. b. (Red Tags) #1040 Rejected 3. Forms a. No. 1000 Incoming Inspection b. No. 1005 Sample of Process Card c. No. 1010 Complete layout form d. No. 1015 Personal tool record card e. No. 1020 Tool and gage record card f. No. 1030 Green approval tag g. No. 1040 Red rejection tag h. No. 1050 X & Y coordinate sheet i. No. 1060 Inventory card j. No. 1084 Welding Cert. Forms k. No. 1081 Purchasing Incoming Discrepancy Form l. No. 1082 Material Review Board Form m. No. 1086 Change Notice Form
Page 11 Page 12 Page 13 Page 14 Page 14 Page 15 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 22
11
12
13
14
15
16
17
18
19
20
21
22
23
24
SECTION 2
25
SECTION 2 PART 1
1. Weight check of shipment, measure size of sheets, estimate weight per sheet, multiply weight of sheet by quantity and compare with shipment weight. 2. Check thickness, dimensions, etc. to order or drawings. 3. Check quality of both sides of sheet or strip material for cinders in Aluminum, or marks, scratches and distortions. 4. Report approval on Receiver. Form #1000, see Section 1, page 11. For sample. 5. Report discrepancies or reason for rejection on Form #1081. See Section 1, page 19. 6. If any discrepancies appear, material is held by inspection department in withhold area until released or rejected by Material Review Board. 7. After clearing or rejection by Material Review Board, Inspection will stamp form 1081 either approved of rejected and send to office, for filing. Cleared material will be sent to stock room. Rejected material returned to Shipping or scrap. 8. After receiver is sent to office and checked against inventory records--No. 1060, Section 1, Page 17, and master P.O. List Receiver Copy is Forwarded to Accounts Payable. 9a. Laboratory chemical and physical analysis verification report when required for any purchased materials is filed in active certification file by material type, and size. After using up each lot of material, inventory card, No. 1060, is attached to Certification Copy and filed in inactive file. b. Purchasing Department is responsible for receipt of any required certifications and their approval by quality control.
26
SECTION 2 PART 2
1. Programming of Parts
a. Have Program written by Processing department. b. Inspection department to check development and layout of Program Form No. 1050 and Form No. 1020, Section 1, Page 14. When applicable to special Tools or Fixtures. c. Revision of drawing and process layout is reviewed by processing department to customers order.
3. Shearing
a. Check 1st Piece and Stamp Process Card where indicated. 1. Check development of blank against approved development on process card. 2. Check squareness, and size of blank. 3. Check for excessive burrs and die breaks. b. In Process Inspection. 1. Check in process production parts by roving inspector at prescribed intervals 27
as explained in Part 2. 2. All parts on each order held in Withhold shall be scrapped or disposition made of after completion of each order.
4. Notching
a. b. c. d. e. f. g. Have notching print drawn. Have inspection department check notching print and stamp approval thereof. Use stamping ink that will copy. Inspection department will inspect first piece to approve notching print. Check in process production as in Part 2. Check for excessive burrs. Check for excessive die breaks on edges.
7. Brake Bending
a. b. c. d. Check dimensions taken from bend. Check for excess die marks. Check for correct radii. Parts with free state dimensions are to be held square or squared while checking.
28
8. Piercing
a. After Program is made part must be pierced and then every dimension must be inspected on both X and Y axis, where applicable reported on Form 1050. b. Check for dents or marks caused by pills sticking to dies. c. Check for misaligned punch holes. d. Check for burrs on holes. e. Check for flatness of blanks before and after piercing. f. Check for excessive scratches and digs caused by piercing. g. Check hole diameters.
11. Assembly
a. Check that all required parts have been assembled to Purchase Order and Print. b. Check for scratches and marks due to handling during assembly.
30
16. Shop Tools and Gages Etc. Frequency of Check, Form 1020 Page 11, Section 1
a. b. c. d. e. f. g. h. i. j. Gage Blocks, Angle Plates, Parallel, Surface Plates, V Blocks - - 1 year. Protractors, Squares - - 6 months. Vernier, Height Gages, Calipers, Depth Gages - - 4 months. Thread Gages, Ring Gages, Plug Gages - - 6 month. Micrometers, Comparators, Hite Check - - daily when in use or 2 months. Inspection department to have custody of all tools and gages and should inspect and record when released or used on Tool Record #1020. Master Gage Block should be certified against U.S. Bureau of Standards every 3 years. Certification to be filed by inspection department. Rejected tools or gages should be withheld for disposition to Material Review Board and Management. Drill fixtures and tools used in the process of parts to be checked by inspection prior to starting new jobs. Approval stamped on Tool and Gage Card # 1020. Form No. 1050, Page 16, Section 1, is used for layout of new Programs and tools stamped and filed for future reference.
31
k. Each tool and gage to be labeled with an instrument calibration sticker. This label contains the date of the last calibration, due date for next calibration, and the inspectors name that performed the calibration.
SECTION 2 PART 3
1. 2. 3. 4.
Tag with red reject tag or mark with felt pen. Place in withhold area pending disposition from Material Review Board. Q.C. department to send inspection report Form #1082 to Material Review Board. Material Review Board will determine the corrective action to be taken, then send inspection report back to Q.C. department with disposition. 5. Q.C. department will release, hold, or scrap at this time 6. Members of Material Review Board are: a. Vice President b. Quality Control Manager c. Production Manager
SECTION 2 PART 4
1. When a customer change order is received, it is sent to the estimating department, and fills out Form 1086. See Section 1, Page 22
a. Estimating department calls production control department and has job stopped immediately. b. Production control department pulls job immediately off floor and into production office until proper changes have been made. c. Estimating department notifies customer of delivery and price change if any. d. Estimating department revises original quote card.
33