Change Estimate Summary: Project Manager

This change estimate summary provides a cost breakdown for additional work on a job. It lists the estimated costs of materials, labor, equipment, subcontracts, overhead, profit, bonds and reserves. The total estimated cost is provided along with exclusions and notes on the quotation expiration, required additional time, and request for a confirming change order.

Uploaded by

tukarammali
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views

Change Estimate Summary: Project Manager

This change estimate summary provides a cost breakdown for additional work on a job. It lists the estimated costs of materials, labor, equipment, subcontracts, overhead, profit, bonds and reserves. The total estimated cost is provided along with exclusions and notes on the quotation expiration, required additional time, and request for a confirming change order.

Uploaded by

tukarammali
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Change Estimate Summary

Quotation to

Date

Address

Change Order Number

Address

Job Number

City, ST, ZIP


Attention
Job Name
Reference

A.

Material and equipment:

$ ____________________

B.

Sales tax:

$ ____________________

C.

Direct labor:

$ ____________________

D.

Indirect costs:

$ ____________________

E.

Equipment and tools:

$ ____________________

F.

Subtotal: ............................................................. $_____________________

G.

Overhead at _____ % of line F:

$ ____________________

H.

Subcontracts:

$ ____________________

I.

Overhead at _____ % of line H:

$ ____________________

J.
K.
L.

Subtotal .............................................................. $_____________________


Profit at _____ % of line J:

$_____________________

Subtotal: ............................................................. $ _____________________

M.

Bond premium at _____ % of line L:

$ ____________________

N.

Service reserve at _____ % of line L:

$ ____________________

O.

Total cost estimate, lines L thru N:

[ ] Add

[ ] Deduct

P.
Exclusions from this estimate:_____________________________________________________
___________________________________________________________________________________
Q.

[ ] This quotation is valid for _____ days.

R.

[ ] We require _____ days extension of the contract time.

S.

[ ] We are proceeding with this work per your authorization.

T.

[ ] Please forward your confirming change order.

Signed by _____________________________________________
Project Manager