0% found this document useful (0 votes)
469 views

Overhauling Procedure and Report of Generator 12

The document summarizes the preventive maintenance and overhauling of Generator 12MKA. Key activities included removing various components like the brush gear assembly, end shield, and rotor for inspection. Testing was performed during disassembly and reassembly. Some minor insulation damage and oil leakage were found and addressed. The generator was then reassembled and tested before being returned to service.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
469 views

Overhauling Procedure and Report of Generator 12

The document summarizes the preventive maintenance and overhauling of Generator 12MKA. Key activities included removing various components like the brush gear assembly, end shield, and rotor for inspection. Testing was performed during disassembly and reassembly. Some minor insulation damage and oil leakage were found and addressed. The generator was then reassembled and tested before being returned to service.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Overhauling procedure and report of Generator 12 12MKA

1. System: GT-12 Main Power Block system 2. Name of Equipment: 12MKA - Generator - 12 3. Observations:
a) Oil found on over hang support at turbine side. b) Insulation damage of the overhang winding found at some places at turbine side. c) Friction dust found on the exciter end.

4. Major Activities: Preventive Maintenance of the Generator carried out. The major overhauling work carried out as follows: RSO test done during coasting down at 3000RPM and Impedance test at turning speed. Brush gear assembly removal and cable connection removal Generator flexi link removal End shield removal Bearing dismantling Removal of Rotor Inspection of Rotor and stator done. DPT done for retaining ring, Bearings and for fan blades Testing of Generator done. Initial report for the testing is attached herewith. Rotor inserted Insulation resistance measurement done at every step during assembly of bearing pedestal.

5. Corrective actions taken:


a) Oil cleaned with acetone. Photographs:

b) No severe damage found and varnish sprayed over it so that further damage, if any, can be known in future inspections. Photographs:

Resources utilized: