INSPECTION CERTIFICATE
Conforming to EN 10204-3.1 Inspection Cert. No. Customer Name Purchase Order No. Project Name Work Order No. Part Description Part No. Drawing No. Marking : : : : : : : : :
IC/LNT/E10/013 M/S. L&T ELECTRICAL & AUTOMATION FZE 4130001570 ---EXP/10 4 VALVE MANIFOLD B TYPE, 2 ISOLATION & 2 DRAIN, 1/4" NPT(F) PROCESS X 1/4" NPT(F) DRAIN S6-4-VMB-4I2-4D2 4-VMB-4I2-4D2 MATERIAL TYPE, LOT NO., BRAND NAME, SIZE.
Part No.
4-VMB-4I2-4D2 SNV-22-02-F SNV-22-04-F SNV-22-03A-F A.T-22-02-F A.T-22-04-F A.T-22-03A-F
Part Description
Body Bonnet Pusher Spindle Bonnet Pusher Spindle
Batch No.
L81P I99SF I160B H50P J120B I160B H50P
CHEMICAL ANALYSIS: As per test certificates attached with inspection report. MECHANICAL PROPERTIES: As per test certificates attached with inspection report. DIMENSIONAL & VISUAL CHECK RESULT: Parameters / Dimensions
THREAD MOUNTING HOLE CTC HOLE CTC HOLE THICKNESS
Specification / Tolerance
1/4 NPT(F) 12.0 1.0 54.0 1.0 41.0 1.0 38.0 1.0
Instrument Used
A/TPG/129 A/VRC/07 A/VRC/07 A/VRC/07 A/VRC/07
Results 1
OK 12.12 54.16 40.92 38.36
2
OK 12.16 53.70 41.26 38.20
3
OK 12.02 54.04 41.38 38.0
Result / Remark *
------
HYDRO / PNEUMATIC TEST RESULT: Type of Testing Hydraulic Test Pneumatic Test Test Pressure (Seat & Body)
6000 Psig 1000 Psig
Duration in minutes
10 05
F/QC/05 REV. 01
Date :
09-10-2012
5 STROKE PRODUCTION SEAL LEAK TEST RESULT: Type of Testing Hydraulic Test Pneumatic Test REMARKS:
100% OF VALVES WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS PER 5 STROKE PRODUCTION SEAL LEAK TEST MENTIONED IN THE ABOVE TABLE. NO LEAKAGE FOUND & HENCE ALL VALVES PASSES THE TEST.
Duration in minutes
10 05
DELIVERY CONDITION:
THE VALVES WERE THROUGHLY CLEANED. THE THREAD ARE CAPPED AND PACKED IN ASTEC CARTONS.
F/QC/05 REV. 01
Part No.
S6-2VMS3 SNV-22-02-F SNV-22-04-F SNV-22-03A-F
Part Description
Body Bonnet Pusher Spindle
Batch No.
L203P K91PS K34P H50P
CHEMICAL ANALYSIS: As per test certificates attached with inspection report. MECHANICAL PROPERTIES: As per test certificates attached with inspection report. DIMENSIONAL & VISUAL CHECK RESULT: Parameters / Dimensions
THREAD THREAD MOUNTING HOLE CTC HOLE THICKNESS
Specification / Tolerance
1/2 NPT(F) 1/4 NPT(F) 7.0 1.0 51.0 1.0 31.50 1.0
Instrument Used
A/TPG/127 A/TPG/129 A/VRC/07 A/VRC/07 A/VRC/07
Results 1
OK OK 7.08 51.28 31.64
2
OK OK 7.0 51.36 31.60
3
OK OK 7.04 51.16 31.76
Result / Remark *
------
HYDRO / PNEUMATIC TEST RESULT: Type of Testing Hydraulic Test Pneumatic Test Test Pressure (Seat & Body)
6000 Psig 1000 Psig
Duration in minutes
10 05
5 STROKE PRODUCTION SEAL LEAK TEST RESULT: Type of Testing Hydraulic Test Pneumatic Test REMARKS:
100% OF VALVES WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS PER 5 STROKE PRODUCTION SEAL LEAK TEST MENTIONED IN THE ABOVE TABLE. NO LEAKAGE FOUND & HENCE ALL VALVES PASSES THE TEST.
Duration in minutes
10 05
F/QC/05 REV. 01
IC/LNT/E10/014
Date :
09-10-2012
F/QC/05 REV. 01