The material receiving inspection report summarizes the inspection of received stock or parts. It documents checking that identification markings meet specifications, certificates of compliance are complete and traceable, material test reports are traceable and tests are reported as required. Dimensions like length, width, thickness and roundness are recorded. The finish is checked for defects and vendor markings are recorded, along with any Fisher Welding coded markings assigned. The report concludes that upon completing all the inspections, the material is ready to release for further code work.

Uploaded by

Josh Rathburn
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
11K views

Receiving Inspection Report

The material receiving inspection report summarizes the inspection of received stock or parts. It documents checking that identification markings meet specifications, certificates of compliance are complete and traceable, material test reports are traceable and tests are reported as required. Dimensions like length, width, thickness and roundness are recorded. The finish is checked for defects and vendor markings are recorded, along with any Fisher Welding coded markings assigned. The report concludes that upon completing all the inspections, the material is ready to release for further code work.

Uploaded by

Josh Rathburn
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Material Receiving Inspection Report

Stock/Part No

Rev:

Vendor:

Material Spec No:

Qty:

Job Work Order No:

P.O. No:

P.O. Item:

Issue / Addenda Date:

Grade:

Date:

Complete
Incomplete
Type:

Class:

Release
Column
Initial/Date

Description:

1. Check identification markings of parts or material to applicable material specification or


purchase order marking requirements. Spec/Doc: _________________________
2.

Check Certificate of Compliance for completeness, signature and traceability to parts or


material

3. Check Material Test Report for (if supplied):


a. Traceability of MTR to parts or materials.
b. All tests reported as required by P.O.
4. Check and record the following dimensions:
a. Length: ________
d. OD/ID: ________

b. Width: ___________
c. Thickness: ___________
e. Roundness: __________
f. Other_________________

5. Check finish (dents, burns, seams, laps, cracks, flaws)


Spec/Doc: _________________________
6.. Record vendor material markings: ______________________________________
______________________________________________________________________
7

Fisher Welding, Inc. coded marking assigned:


__________________________________

Comments:

All inspections above complete and ready to release for Code Work