Instrument Location Transmittal

This document is a drawing/document register and transmittal for the Zero Reformer Project for a 5800 TPD DRI, HYL III DR Plant. It lists 38 drawings being transmitted, including instrument locations for process equipment like the process gas heater, heat recuperator, steam drum, and natural gas system. The drawings cover areas like general arrangement, piping, and instrumentation. They are being sent from Tenova PT. KE Cilegon in Banten, Indonesia to the project located there.

Uploaded by

zat572000
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views1 page

Instrument Location Transmittal

This document is a drawing/document register and transmittal for the Zero Reformer Project for a 5800 TPD DRI, HYL III DR Plant. It lists 38 drawings being transmitted, including instrument locations for process equipment like the process gas heater, heat recuperator, steam drum, and natural gas system. The drawings cover areas like general arrangement, piping, and instrumentation. They are being sent from Tenova PT. KE Cilegon in Banten, Indonesia to the project located there.

Uploaded by

zat572000
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Drawing/Document Register and Transmittal

Project Title Project No

Zero Reformer Project for 5800 TPD DRI, HYL III DR Plant

4040
Tenova PT. KE Cilegon - Banten - Indonesia MR .Miguel Day Month Year
Dwg No.

Date : 19 Juli 2010 Our Ref. : 4040-T-ZERO/KE-I08 Your Ref.: Sheet : 1


Reference Information Preliminary For As Built
Date

To

Attention

Comment Review Final CONSTRUCTION

Approval Record Revision

We enclose copies of drawings listed under

Area

General
INSTRUMENT LOCATIONS SECTION C-C FOR N2 AND CLEANING OF PROCESS GAS HEATER INSTRUMENT LOCATIONS SECTION B-B FOR N2 AND CLEANING OF PROCESS GAS HEATER INSRUMENT LOCATIONS SECTION A-A FOR N2 AND CLEANING OF PROCESS GAS HEATER INSTRUMENT LAY-OUT DETAIL AND CLEANING OF PROCESS GAS HEATER INSTRUMENT LAY- OUT FOR NATURAL GAS TO BOILER INSTRMENT GENERAL LAYOUT REDUCING GAS AND CLEANING OF PROCESS GAS HEATER INSTRUMENT LOCATIONS FOR HEAT RECUPERATOR & STEAM DRUM VIEW ( UNIT 2 ) INSTRUMENT LOCATIONS FOR HEAT RECUPERATOR & STEAM DRUM VIEW C ( UNIT 1 ) INSTRUMENT LOCATIONS FOR HEAT RECUPERATOR & STEAM DRUM VIEW C ( UNIT 1) INSTRUMENT LOCATIONS FOR HEAT RECUPERATOR & STEAM DRUM VIEW B ( UNIT 2 ) INSRUMENT LOCATIONS FOR HEAT RECUPERATOR AND STEAM DRUM VIEW B ( UNIT 2 ) INSTRUMENT LOCATIONS FOR STEAM DRUM 1 & 2 INSTRUMENT LOCATIONS TOP VIEW FOR NEW AND EXISISTING REACTOR 1 INSTRUMENT LOCATIONS TOP VIEW FOR FROM NEW AND EXISISTING SKID NOZLE 1&2 REACTOR 2 INSTRUMENT LOCATONS FOR NEW AND EXISISTING REACTOR 1&2 NOZZLE 1&2 INSTRUMENT LOCATIONS SECTION B-B AND C-C FROM NEW AND EXISISTING SKID REACTOR 1 AND 2 INSTRUMENT LOCATIONS FOR NOZZLE 3 & 4 REACTOR 1 & 2 INSTRUMENT LOCATIONS FOR MODIFICATION OF PCW & PROCESS GAS PIPING IN QUENCH DUMMY AREA INSTRUMENT LOCATIONS MODIFICATION OF PCW & PROCESS GAS PIPING IN QUENCH DUMMY AREA UNIT 2 INSTRUMENT LOCATIONS OF MODIFICATION OF PCW & PROCESS GAS PIPING IN QUENCH DUMMY AREA UNIT 2 INSTRUMENT LOCATIONS FOR MODIFICATION OF PCW & PROCESS GAS PIPING IN QUENCH DUMMY AREA 1 UNIT 1 INSTRUMENT LOCATIONS OF MODIFICATION OF PCW & PROCESS GAS PIPING QUENCH DUMMY AREA UNIT 1 INSTRUMENT LOCATIONS NATURAL GAS SYSTEM TOP VIEW FOR REACTOR UNIT 1&2 INSTRUMENT LAYOUT TO KO DRUM AREA FOR NATURAL GAS INSRUMENT LOCATIONS FOR TIE-IN NATURAL GAS IN KO DRUM AREA INSTRUMENT LOCATIONS TOP VIEW OF NATURAL GAS TO CLUSTER BREAKER AREA INSTRUMENT LOCATIONS OF NATURAL GAS FOR CLUSTER BREAKER REACTOR 1&2 INSTRUMENT LOCATIONS SECTION D-D & E-E FOR NATURAL GAS INSTRUMENT LOCATIONS OF NATURAL GAS FOR SECTION F-F & G-G INSTRUMENT LOCATIONS FOR TIE-IN NATURAL GAS IN KO DRUM AREA INSTRUMENT LAYOUT CH4, CO2 & N2 ANALYZER INSTRUMENT LAYOUT MATERIAL HANDLING CONVEYOR 407-V1 / 2 INSTRUMENT LAYOUT & SECTION MOD. LINE8" FOR LCV 4204 PCW COOLING TOWER 243-U2 INSTRUMENT LAYOUT & SECTION MOD. LINE10" FOR LCV 4200 PCW COOLING TOWER 243-U2 INSTRUMENT LAYOUT NEW ECW 402- U2 DETAIL "Z" INSTRUMENT LAYOUT NEW ECW 402- U2 DETAIL "Y" INSTRUMENT LAYOUT NEW ECW 402-U2 DETAIL "X' INSTRUMENT LAYOUT NEW ECW 402-U2 INSTRUMENT LAYOUT CO2 ABSORBER

19 07 10
A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A

CD-EA-10-201 CD-EA-10-202 CD-EA-10-203 CD-EA-10-204 CA-GB-10-205 CD-EA-10-206 CD-EA-10-301 CD-EA-10-302 CD-EA-10-303 CD-EA-10-304 CD-EA-10-305 CD-EA-10-306 CD-EA-10-401 CD-EA-10-402 CD-EA-10-403 CD-EA-10-404 CD-EA-10-405 CG-EA-10-101 CG-EA-10-102 CG-EA-10-103 CG-EA-10-104 CG-EA-10-105 CD-EA-10-501 CD-EA-10-502 CD-EA-10-503 CD-EA-10-504 CD-EA-10-505 CD-EA-10-506 CD-EA-10-507 CD-EA-10-508 CA-EA-10-509 CK-EA-10-510 CG-EA-10-201 CG-EA-10-202 CG-EA-10-301 CG-EA-10-302 CG-EA-10-303 CG-EA-10-304 CF-EA-10-550