For Tender Purpose Only Preliminary Alternate Scheme: SILO-1 Intermediate SILO-2 Intermediate

This document provides a flow diagram for a high capacity sludge drying (HCSD) system. It shows the layout of various components including two intermediate silos, three agitator tanks, and connections for feeding, draining, and transporting ash slurry and water. Piping is indicated for high pressure water, low pressure water, seal water, cooling water, instrument air, and slurry ash. Valves of various types are also shown controlling the flow. The diagram is a preliminary alternate scheme for tender purposes and is one of six sheets in the design for a 2x850 MW thermal power plant.

Uploaded by

pkguptaqaqc
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

For Tender Purpose Only Preliminary Alternate Scheme: SILO-1 Intermediate SILO-2 Intermediate

This document provides a flow diagram for a high capacity sludge drying (HCSD) system. It shows the layout of various components including two intermediate silos, three agitator tanks, and connections for feeding, draining, and transporting ash slurry and water. Piping is indicated for high pressure water, low pressure water, seal water, cooling water, instrument air, and slurry ash. Valves of various types are also shown controlling the flow. The diagram is a preliminary alternate scheme for tender purposes and is one of six sheets in the design for a 2x850 MW thermal power plant.

Uploaded by

pkguptaqaqc
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

8

INTERMEDIATE SILO-1

INTERMEDIATE SILO-2

FOR TENDER PURPOSE ONLY PRELIMINARY ALTERNATE SCHEME

FEEDING ARRANGEMENT

FEEDING ARRANGEMENT

FEEDING ARRANGEMENT

FEEDING ARRANGEMENT

AGITATOR TANK

AGITATOR TANK

AGITATOR TANK

TO DRAIN

TO DRAIN

TO DRAIN

TO ASH POND AREA

FROM LP WATER

B
CLIENT:

M/S TOSHIBA THERMAL AND HYDRO POWER SYSTEM


PROJECT

2X850 MW THERMAL POWER PLANT


AT ANGUL (ODISHA)

SHEET 6 OF 6
LEGEND:SLURRY ASH LINE H.P. WATER LINE L.P. WATER LINE SEAL WATER LINE COOLING WATER LINE INST. AIR LINE SAFETY VALVE NON RETURN VALVE PLUG VALVE
S

SOLENOID OPERATED VALVE BUTTERFLY VALVE (CYL. OPERATED) BUTTERFLY VALVE (MANUALLY OPERATED) GLOBE VALVE (NORMALLY OPEN) GLOBE VALVE (NORMALLY CLOSED) GATE VALVE (NORMALLY OPEN) GATE VALVE (NORMALLY CLOSED) KNIFE GATE VALVE (MANUALLY OPERATED) KNIFE GATE VALVE (CYL. OPERATED) BALL VALVE (NORMALLY CLOSED)

BALL VALVE (NORMALLY OPEN) ORIFICE PLATE "Y" TYPE STRAINER WIRE MESH STRAINER PRESSURE INDICATOR PRESSURE SWITCH LEVEL SWITCH

MACAWBER BEEKAY PRIVATE LIMITED


MACAWBER

NEW DELHI

A
REF. DRG. No.

DESIGNED DRAWN CHECKED

VKS Hariom VKS RL


SCALE DATE

FLOW DIAGRAM
(FOR HCSD SYSTEM)
DRG No.

R.No.

DATE

DESCRIPTION

BY

CHKD. APPD.

REVISIONS

NTS

07.12.11

MB/P-5610/079678