Construction Method

This document provides information on resources and costs for various construction projects in 2012 for the Cairo Sama project. It lists 30 construction tasks needed for building foundations, walls, columns, floors, stairs and roofs. For each task it specifies the required equipment, materials, labor and their daily rental or labor costs. The document estimates daily productivity rates for excavation, concrete pouring and steel fixing for each construction stage.

Uploaded by

mihominn
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views

Construction Method

This document provides information on resources and costs for various construction projects in 2012 for the Cairo Sama project. It lists 30 construction tasks needed for building foundations, walls, columns, floors, stairs and roofs. For each task it specifies the required equipment, materials, labor and their daily rental or labor costs. The document estimates daily productivity rates for excavation, concrete pouring and steel fixing for each construction stage.

Uploaded by

mihominn
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

2012

Cairo sama project

Chapter 4.0

6
7

:
2.0 excavator + 5.0 trucks
P.R === 200 m3 / day

excavator
=1000/
400 = truck /
:
Loader + 2 jack hammer +
4 trucks

P.R === 300 m3/day
640= loader/
1300 = jack/
:
Truck + roller + excavator

P.R == 400 m3/day


700 = roller/
4.0 4.0 +

P.R == 200.0 m3/day

= 100/

= 70/
Concrete ready mix
1.0 vibrator
= 150/
1.0 1.0 + 1.0 +

= 80/
=70/
=/70
2.0 unskilled labor

= 35.0/
7.0 7.0 +

1

2012

Cairo sama project

10
11

12

13

14
15
16
17

P.R == 200.0 m3/day


4
4commando+3worker+assistant
85= commando/
60= assistant/
50 = worker/
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
= 150/
2.0 4.0 +
7.0 7.0 +
P.R == 20.0 m3/day

4 commando +4 assistant
85= commando/
60= assistant/

50 = worker/
Concrete ready mix
1.0 vibrator

1.0 1.0 + 1.0 +

1.0 + 1.0+
P.R = 320 m3/day

2.0 4.0 +

7.0 7.0 +

P.R == 20.0 m3/day

4.0 commando + 4.0 assistant

P.R = 5.0 ton/day
Concrete ready mix
1.0 vibrator

1.0 1.0 + 1.0 +

1.0 + 1.0+
2

2012

18
19
20

Cairo sama project

21


22
23
24

25

26
27
28

29

30

P.R =320 m3/day


2.0 4.0 +
2.0 4.0 +
4.0 commando +4.0 assistant
P.R = 5.0 ton/day
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
P.R =320 m3/day
2.0 4.0 +
7.0 7.0 +
4.0 commando +8.0 assistant
P.R = 2.3 ton/day
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
P.R =320 m3/day
2.0 4.0 +
7.0 7.0 +
4.0 commando +8.0 assistant
P.R = 2.3 ton/day
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
P.R =320 m3/day
2.0 4.0 +
3

2012

31
32

Cairo sama project

33

34
35
36

37

38
39
40
41
42
43
44
45




12.0

7.0 7.0 +
4.0 commando +8.0 assistant
P.R = 2.3 ton/day
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
P.R =320 m3/day
2.0 4.0 +
7.0 7.0 +
4.0 commando +8.0 assistant
P.R = 2.3 ton/day
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
P.R =320 m3/day
2.0 4.0 +
2.0 1.0 +
Sub-contractor
Sub-contractor
Sub-contractor
Sub-contractor
Sub-contractor
2.0 2.0 + 2.0 +
1.0 +
P.R = 40.0 m2/day
4

2012

46

47

48

49
50
51
52
53
54

Cairo sama project

= 120/
= 80 /
= 60 /
= 50 /
2.0 2.0 + 2.0 +
25.0
1.0 +
P.R = 6.0 m3/day
3.0 6.0 +
P.R = 600.0 m2/day

= 60/
= 40/
3.0 3.0 + 2.0 +
P.R = 310.0 m2/day
= 100/

= 50/
= 40/
3.0 3.0 + 2.0 +

P.R = 310.0 m2/day


Sub-contractor

Sub-contractor

Sub-contractor

Sub-contractor

Sub-contractor