Construction Method
Construction Method
Chapter 4.0
6
7
:
2.0 excavator + 5.0 trucks
P.R === 200 m3 / day
excavator
=1000/
400 = truck /
:
Loader + 2 jack hammer +
4 trucks
P.R === 300 m3/day
640= loader/
1300 = jack/
:
Truck + roller + excavator
= 80/
=70/
=/70
2.0 unskilled labor
= 35.0/
7.0 7.0 +
1
2012
10
11
12
13
14
15
16
17
4 commando +4 assistant
85= commando/
60= assistant/
50 = worker/
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
P.R = 320 m3/day
2.0 4.0 +
7.0 7.0 +
P.R == 20.0 m3/day
4.0 commando + 4.0 assistant
P.R = 5.0 ton/day
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
2
2012
18
19
20
21
22
23
24
25
26
27
28
29
30
2012
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
12.0
7.0 7.0 +
4.0 commando +8.0 assistant
P.R = 2.3 ton/day
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
P.R =320 m3/day
2.0 4.0 +
7.0 7.0 +
4.0 commando +8.0 assistant
P.R = 2.3 ton/day
Concrete ready mix
1.0 vibrator
1.0 1.0 + 1.0 +
1.0 + 1.0+
P.R =320 m3/day
2.0 4.0 +
2.0 1.0 +
Sub-contractor
Sub-contractor
Sub-contractor
Sub-contractor
Sub-contractor
2.0 2.0 + 2.0 +
1.0 +
P.R = 40.0 m2/day
4
2012
46
47
48
49
50
51
52
53
54
= 120/
= 80 /
= 60 /
= 50 /
2.0 2.0 + 2.0 +
25.0
1.0 +
P.R = 6.0 m3/day
3.0 6.0 +
P.R = 600.0 m2/day
= 60/
= 40/
3.0 3.0 + 2.0 +
P.R = 310.0 m2/day
= 100/
= 50/
= 40/
3.0 3.0 + 2.0 +