0% found this document useful (0 votes)
72 views

Aduan

The document is a complaint form for reporting issues at a building. It requests information such as the complainant's name, department, date, IC number, and contact number. It includes a list of areas in the building that may have issues to check off, such as windows, doors, lighting, toilets, and parking. Space is provided to give details of the complaint and for signatures of the complainant and the person receiving the complaint.

Uploaded by

fozihpa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

Aduan

The document is a complaint form for reporting issues at a building. It requests information such as the complainant's name, department, date, IC number, and contact number. It includes a list of areas in the building that may have issues to check off, such as windows, doors, lighting, toilets, and parking. Space is provided to give details of the complaint and for signatures of the complainant and the person receiving the complaint.

Uploaded by

fozihpa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Version 1.

0 Complaint Form HPAic


Report No:-___________________(date/time: 021010/1200) Name / Nama Department/Jabata n Date/Tarikh IC No / No. Kad Pengenalan
Structure Building (Stuktur Banggunan) Level:__________ Issue Air Condition (Penghawa Dingin) Level:__________
Please ( ) in the box

Time/Masa Contact No/ No Untuk Dihubungi Complaint


Window (Tingkap) Level:_________ Parking (Letak Kenderaan) Level:________ Level:______ Door (Pintu) Level:_______ Cleaning (Kebersihan) Level:_______ Stair (Tangga) Level:______ _ Safety/Secu rity (Keselamata n) Lift (Lif) Level:___ _ Other (Lain-Lain) Level:__________ Lamp (Lampu) Level:____ _ Toilet (Bilik Air) Level:____ _

Detail Complaints

On Call Complaints
If received complaint on call no need to signature by complement

Signature ___________________________ ________________________________ Name:

Receiving By

Name:
HPA INTERNATIONAL CENTRE LAMAN SERI BUSINESS PARK, PERSIARAN SUKAN, SEKSYEN 13, 40100 SHAH ALAM SELANGOR HPAIC/FAS/OP/F02

You might also like