SIMULATION DATA
ENERGY CONSUMPTION FOR ROTATING EQUIPMENT
MECHANICAL EFFICIENCY DATA THERMODYNAMIC EFFICIENCY DATA APPROACH TEMPERATURES TRANSFER COEFFICIENTS STAGE EFFICIENCIES CAPACITIES MINIMUM/MAXIMUM FLOW VELOCITIES AND/OR PRESSURE DROPS TOTAL HEAD LOSS ESTIMATES
http://www.mcnallyinstitute.co m/06-html/6-01.html
CAPITAL EQUIPMENT
TO ESTIMATE EQUIPMENT CAPITAL COSTS (REFER TO APPENDIX E HUERISTICS FOR PROCESS EQUIPMENT DESIGN DIMENSIONAL DATA
MASS AREA
TYPES OF EQUIPMENT
HEAT EXCHANGE PUMPS REACTION INVENTORY
PROCESS DATA
DESIGN PROCESS CONDITIONS http://www.geeco.co.uk/storage UTILITY REQUIREMENTS tanks.php MATERIALS OF CONSTRUCTION DATA
INSTALLATION COSTS
SEE DETAILS IN CHAPTER 6 RANGE OF COSTS TYPICALLY RUN FROM 4.7 TO 5.9 TIME EQUIPMENT (SEE TABLE 69)
COSTS DEPEND ON:
TYPE OF PROCESS, FLUID, SOLID OR MIX MATERIALS OF CONSTRUCTION LOCATION OF FACILITIES SIZE OF PLANT
http://www.heatexchangersonline.com/images/i ndex.jpg
VESSEL DESIGNS
SEE CHAPTER 12 FOR DETAILS NOZZLE DIMENSIONS & LOCATIONS DESCRIPTION OF INTERNALS SURFACE FINISHES INSULATION REQUIREMENTS CODE REQUIREMENTS - ASME OR API FABRICATION & TESTING DATA
http://www.ubh.co.uk/procve s.htm
VESSEL DESIGNS
TYPICAL LIMITS
PROCESS TANKS - 20% FREEBOARD STORAGE TANKS - 10% FREEBOARD PUMP TANKS - 5-10 MIN. SURGE
ACCESS NOZZLES FOR ALL INTERNALS MINIMUM NUMBER OF WELDED SEAMS MAXIMUM DIAMETER - 4 m FOR SHOP FABRICATION HOLD POINTS AT FAB DRAWINGS, INSPECTION OF SHOP FAB STANDARDS, REVIEW OF NDE, PRESSURE TEST PRIOR TO PAINTING
ROTATING EQUIPMENT
MOTOR OR TURBINE DRIVEN CHAP. 12 TOTAL PACKAGE - DRIVEN UNIT, DRIVERS, GEARS, COUPLINGS, SHAFTS, BELTS, BASES & SUPPORTS GUARANTEE PERFORMANCE POINT - TO BE TESTED IN SHOP PRIOR TO SHIPMENT TYPES OF BEARINGS & LUBRICATION TYPES OF SEALS NOISE LIMITS
http://www.hydrocarbonstechnology.com/contractors/compress ors/elliott/
PUMPS
LOW HEAD/HIGH FLOW - RADIAL, CENTRIFUGAL, NOT SELF-PRIMING HIGH HEAD/LOW FLOW - TURBINE, POSITIVE DISPLACEMENT INSTALLATION CONFIGURATION HORIZONTAL, VERTICAL, INLINE, SUBMERGED, JACKETED, SINGLE OR MULTI-STAGE
MINIMUM NPSH NORMAL DISCHARGE P STANDARD CASINGS MACHINED IMPELLERS
http://www.arrowengine.com/chemical.htm
COMPRESSORS
SMALL UNITS ARE TREATED LIKE PUMPS DYNAMIC AND TORSIONAL ANALYSES FOR THE TRAIN
1ST CRITICAL - SEVERE STRESS 2ND CRITICAL - NOT AS BAD 3RD CRITICAL - RELATED TO 1ST BUT NOT AS BAD HIGHER VALUES - NOT NORMALLY CONSIDERED
http://usdidactic.com/refpdf/g unt/04062000%202.pdf.
COMPRESSORS
FOR LARGER UNITS VIBRATION MONITORS ALARMS SHUTDOWN CIRCUITS LOCAL CONTROL PANELS
http://www.nt.ntnu.no/users/lovlan d/SIK3035/pictures/compress.htm
COST CALCULATIONS
DETAIL AND SOURCE DEPEND ON LEVEL OF ESTIMATE REQUIRED (FIGURE 6-4)
FEASIBILITY - OUTLINE SPECIFICATION QUOTATION - COMPLETE SPECIFICATION BUDGET - AWARDED CONTRACT COSTS IN TEXT ARE BASED ON 2002 DATA COST ESTIMATES ON WEB SITE MAY BE MORE CURRENT COSTS IN SUPERPRO ARE MORE CURRENT VENDOR DATA IS CURRENT BUT MUST BE VERIFIED WRITTEN OR E-MAIL QUOTE
COST ADJUSTMENTS
SCALE-UP FACTORS DEPEND ON
TYPE OF EQUIPMENT SIZE OF EQUIPMENT CATALOG VERSUS CUSTOM EQUIPMENT
EXAMPLE FOR SOLID OXIDE FUEL CELL STACK IS ON THE NEXT SLIDE
http://www.iit.edu/~smart/garrear/fuelcells.htm
www.netl.doe.gov/publications/proceedings/06/seca/pdf/Thijssen.pdf
VALUES ARE AVAILABLE IN CHEMICAL ENGINEERING MAGAZINE SEE TABLE 6-2 FOR INDICES THROUGH 2002
10
11
VENDOR SUPPORT
PROJECT EVALUATION
EXAMPLES OF SIMILAR EQUIPMENT INSTALLATIONS ACCURATE COST DATA FOR ESTIMATE ACCURATE UTILITY DATA FOR DESIGN ACCURATE OUTLINE DRAWINGS
12
VENDORS AS CLIENTS
PROJECT AUTHORIZATION AND FINANCING
HARD MONEY QUOTATION ALL DESIGN DATA NEEDED FOR INSTALLATION ALL INTERFACE DATA DETAILED FABRICATION, TESTING & DELIVERY SCHEDULE DETAILED CASH FLOW SCHEDULE QUALITY CONTROL DATA
WITH AWARD
13