BIS Application Form
BIS Application Form
[See Regulation 3]
BUREAU OF INDIAN STANDARDS
Product Certification Scheme
Address
Tel.
Fax.
OFFICE
City District State Country Pin
Address
Tel.
Fax.
FACTORY
City District State Country Pin
2. 2.
MANAGEMENT 3. 3.
4. 4.
1 of 2
CORRESPONDENCE Office SCALE Large SECTOR Public
ADDRESS
✔ Factory ✔ Small ✔ Private
This application is being made to use the BIS Standard Mark on:
PRODUCT
IS :
INDIAN STANDARD Part : GRADE/TYPE/
Sec : CLASS
PRESENT
INSTALLED
CAPACITY
(Production per annum)
DETAILS OF PREVIOUS
CANCELLATION/CONVICTIONS
IF ANY UNDER BIS ACT
Signature _______________________________________
Seal of Firm
Name __________________________________________
Designation _____________________________________
Important: 1. Application should be signed by CEO of the firm, or in his absence by authorized representative.
2. Application from Foreign Manufacturers should be countersigned by Authorized Indian
Representative.
3. Please inform whether you are holding BIS licence(s) for any product(s).
2 of 2
SECTION A
BUREAU OF INDIAN STANDARDS
(SELF EVALUATION-CUM-VERIFICATION REPORT)
1. GENERAL INFORMATION
a) Applicant’s Name
2. RAW MATERIALS
a) Raw Materials Used (Separate sheet, duly authenticated, may also be used, if
required):
LIST ENCLOSED
c) Methods of disposal of
sub-standard raw materials
3.1 Machinery & Equipment (Separate sheet, duly authenticated, may also be used, if
required)
LIST ENCLOSED
I hereby declare that the machinery of which details are given above is owned by me
and are actually installed in the premises.
I also declare that in case of grant of licence, I will send prior intimation to BIS
whenever any equipment is taken out of the premises of the firm due to any reason.
(2)
3.2 Process & Production
d) Units of production
a) Nature of packing
c) Marking on article
(3)
5. LABORATORY AND INSPECTION
(Separate sheet, duly authenticated, may also be used, if required)
LIST ENCLOSED
I hereby declare that the test equipments of which details are given above are owned by me
and are actually installed in the premises.
I also declare that in case of grant of licence, I will send intimation to BIS whenever any
equipment is taken out of the premises of the firm due to any reason.
(4)
b) Details of Quality Control Staff:
.
d) Stage of processing where
laboratory reports are made
available
6. OTHER INFORMATION
b) Storage facilities
(5)
d) DECLARATION AND ACCEPTANCES:
We hereby agree to pay marking fee to Bureau of Indian Standards after grant of licence
to use the Standard Mark on
according to IS at the following
rates and in the manner stipulated as under:
a) Minimum marking fee for one operative year payable in advance which will be
carried over to next renewal(s).
b) Actual marking fee for the first nine months of the operative period calculated on the
unit rate on the production marked or the minimum fee whichever is higher shall be
payable to BIS at the time of the first renewal of the licence . For subsequent
renewals, the actual marking fee for 12 months period consisting of last three months
of previous operative year and the first nine months of the current operative year or
the minimum fee whichever is higher, shall be payable.
(6)
2. Scheme of testing and inspection (STI)
(The relevant STI is available on BIS Website. The acceptance of STI is mandatory
for grant of licence)
Signature:
Name:
Designation:
Seal:
Place:
Date:
(7)
3. Brand Name(s)
b)
c)
d)
c). Other Brand Names/Trademark(s) used for the same product marketed without
BIS Standard Mark. Give reasons.
e). I/We undertake to inform BIS in advance as and when we propose to use any
other Brand Names/ Trademark(s) in conjunction with the operation of the BIS
Certification Scheme.
f). I/We also undertake that, as far as possible, the entire production which
conforms to the specification shall be marked with the BIS Mark, irrespective of the
Brand Names/Trademark(s) used.
g). I/We understand that the above has been given only as information to BIS, that
BIS has no role in permitting/approving of any Brand Name or Trade Mark, that
this is not in anyway be interpreted to mean that BIS has permitted/approved the
use of the Brand Names and Trade Marks listed above, and that the responsibility is
entirely mine/ours.
4. Any other declaration/undertaking
5. The intended manner of putting Standard Mark
(8)
DECLARATION
The information given in this report are true to the best of my knowledge and belief. I
further declare that the sample(s) for which the test report(s) are enclosed have been
manufactured in my factory premises at the address mentioned in the application. I shall
be responsible if any misleading information has been given in this report and the
application shall be liable for rejection if wrong information has been given. If the licence
is granted on the basis of information which is found to be incorrect later, the licence
shall be liable for cancellation.
Date: (Signature)
(9)
VERIFICATION BY BIS INSPECTING OFFICER
(if verified by BIS)
SECTION B
Date of verification:
Persons Contacted:
1. Factory Testing: Test results for the possible tests done on sample(s) tested in the
factory during the day(s) of inspection (enclose Test Report in the format given below):
Product detail:
IS No. with applicable amendments:
Sr. No. Requirements Specified Value Observed Value Remarks
( with Clause Ref.)
REMARKS:
Sample code
Lab sent
Nature of tests
(Chem./ Mech/
Elect)
Remarks
Observation of
the IO
Manufacturing Facilities Complete/ Not complete
Signature
Name
Designation
Date
List of Enclosures:
Date of verification:
Persons Contacted:
1. This is to certify that the information contained in Self Evaluation Report (as
enclosed) furnished by
M/s____________________________________________________________ (give
complete factory address) has been verified by me and found in order. The following
parameters have specifically been examined and my observations are given below:
Observation of
the Chartered
Engineer
Manufacturing Facilities Complete/ Not complete
(12)
ii) All the samples tested (the details of which are given above) conform to all the
requirements of related Indian Standards: YES/NO
(If no, give details)
Signature
Name
Registration No.
Seal
Date
Note:
1. Each page of the Self Evaluation Report shall be verified and signed by the Chartered
Engineer.
2. A copy of registration certificate of the Chartered Engineer shall be enclosed with the
verification report.
3. Each page of all the test reports enclosed with the application shall be certified by the
Chartered Engineer.
(13)