Checklist For Pre-Pour

This precast component pre-pour inspection form is used to inspect reinforcement, dimensions, markings, and other attributes of precast concrete components before they are poured. The inspection checks items like continuity bar and spiral placement, block-out size and position, reinforcement anchorage and lapping, total component height and position, concrete surface treatment, grout and backer-rod installation, reinforcement sizes and spacings, concrete cover, strand elongation, openings, and cleanliness. The form is signed by the precast manufacturer and inspector to verify compliance.

Uploaded by

Min Min Soe
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
596 views

Checklist For Pre-Pour

This precast component pre-pour inspection form is used to inspect reinforcement, dimensions, markings, and other attributes of precast concrete components before they are poured. The inspection checks items like continuity bar and spiral placement, block-out size and position, reinforcement anchorage and lapping, total component height and position, concrete surface treatment, grout and backer-rod installation, reinforcement sizes and spacings, concrete cover, strand elongation, openings, and cleanliness. The form is signed by the precast manufacturer and inspector to verify compliance.

Uploaded by

Min Min Soe
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PRECAST COMPONENT PRE-POUR INSPECTION FORM

NEW COMPONENT INITIAL INSPECTION* JOINT-INSPECTION*

Contract/Plant Product Type

: : Splice Bar & Sleeve Continuity bar & Spiral Connector Chamber Block-out Dimension & position of block-out

Consultant Date

: :

Component

Mould

Reinforcement

Strand

Others

Jointly -Inspected By

Anchorage & Lapping (+/-25mm)

Total height of component (+/2mm)

Position (Manufacturer's tolerance)

Concrete surface retarder

Sizes (Manufacturer's specs)

Backer-rod & NS grout

Spacings (+/- 10mm)

Cover (0 to +10mm)

Position (+/-2mm)

Opening (+6mm)

Marking Nos. & sizes Accessories Dimensions

Elongation (+/-5%)

Precaster RTO QC/RE (Name & (Name & Signature) Signature) Cleanliness

REMARKS RE / QP (Name & Signature)

NOTE :

ticked where applicable All items are checked & ticked ( ) to conform compliance (as at Jan 2011)

Tile placing

Size of bar

Openings

Condition