(Main - Aux. & Luff Hoist Drums) : Quality Assurance Plan

This quality assurance plan outlines inspections for main, auxiliary, and luff hoist drums during manufacturing. Key steps include: 1. Dimensional checks at cutting layout and before/after machining stages at 100% frequency and recording results in Measurement Test Reports. 2. Visual weld inspections and non-destructive testing like liquid penetrant and ultrasonic testing of long seams per AWS D1.1 standards. 3. Records of raw material test certificates, inspection reports, and non-destructive testing reports will be maintained in specified formats.

Uploaded by

kanha15102003
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views

(Main - Aux. & Luff Hoist Drums) : Quality Assurance Plan

This quality assurance plan outlines inspections for main, auxiliary, and luff hoist drums during manufacturing. Key steps include: 1. Dimensional checks at cutting layout and before/after machining stages at 100% frequency and recording results in Measurement Test Reports. 2. Visual weld inspections and non-destructive testing like liquid penetrant and ultrasonic testing of long seams per AWS D1.1 standards. 3. Records of raw material test certificates, inspection reports, and non-destructive testing reports will be maintained in specified formats.

Uploaded by

kanha15102003
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

RE-QA-INT-04

DOCUMENT NO

REV

QUALITY ASSURANCE PLAN [MAIN.AUX. & LUFF HOIST DRUMS]


Type of Check
MTCs Correlation Lamination Measure Dimensions & Stamp Transfer Measure Dimensions Weld Visual

Sr. No.

Component

Stage

Characteristics Category
Chemical & Physical Test UT

Quantum of Check
One sample per Lot. 100 %

Reference Documents
Component drawing ASTM A 578

Acceptance Norms
ONGC Spec. 6001F ASTM A 578

Format of Record
MTCs ,Lab Reports & MIR UT Reports

RE
R

TPI
R

Raw Material

1.

Main, Aux. & Luff Hoist Drums

Cutting Layout

Dimensional Semi Critical

100 %

Component drawing

Component drawing

MTR

Dimensional Final Inspection [Before Machining] Visual

W 100 % Component drawing Component drawing FIR W 100 % LPT & UT of Long Seam LPT & UT Report

NDT

LPT & UT

AWS D 1.1

AWS D 1.1

QA-INT-04

20.02.2013

AK

AK

DOCUMENT ID

PREPARED DATE

PREPARED BY

CHECKED BY

APPROVED BY

RE-QA-INT-04

DOCUMENT NO

REV

QUALITY ASSURANCE PLAN [MAIN.AUX. & LUFF HOIST DRUMS]

Sr. No.

Component

Stage

Characteristics Category

Type of Check

Quantum of Check

Reference Documents

Acceptance Norms

Format of Record

RE

TPI

1.

Main, Aux. & Luff Hoist Drums

Final Inspection [After Machining]

Dimensional

Semi Critical

Measure Dimensions & Groove Details

100 %

Component drawing

Component drawing

FIR

QA-INT-04

20.02.2013

AK

AK

DOCUMENT ID

PREPARED DATE

PREPARED BY

CHECKED BY

APPROVED BY