Request of Inspection Notice (RIN)

This document is a Request for Inspection Notice (RIN) submitted by a contractor requesting inspection of a Magnetic Particle Test Report for overhead crane rail clamp stud bolts. It provides details of the item to be inspected, the inspection date and time, reference documents, and confirmation that the work is ready for inspection and complies with specifications. Sections are included for acknowledgment and results of the inspection by the consultant.

Uploaded by

t.mohammed
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
273 views

Request of Inspection Notice (RIN)

This document is a Request for Inspection Notice (RIN) submitted by a contractor requesting inspection of a Magnetic Particle Test Report for overhead crane rail clamp stud bolts. It provides details of the item to be inspected, the inspection date and time, reference documents, and confirmation that the work is ready for inspection and complies with specifications. Sections are included for acknowledgment and results of the inspection by the consultant.

Uploaded by

t.mohammed
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Request of Inspection Notice (RIN)

TO BE FILLED - IN BY CONTRACTOR Date of Req.: 19 Dec. 2012 Check the box if this is a request for re-inspection Site Name & Location : BLG # 6 Inspection Category & Application (Check Appropriate Box) : Civil/Architectural Mechanical Electrical/Instrument Communication Safety Others (Specify) Contractor Request No. : KOTC-PP(AG)-

Magnetic Particle Test Report

1. Item for Inspection: MT Report Review For OverHead Crane No. 101 , 102 Rail Clamp Stud Bolt . 2. Inspection Date : 3. Inspection Time : 4. ITP Reference & Phase : TTP-PN-001 Work is ready for inspection and complies with the Scope of Work and Technical Specifications. From originator (Subcontractor) Civill Electrical Mechanical Instrument Piping Subcontractor Name: Date: Signature: ___________________

Confirmed Ready & Checked by Contractor Construction Dept Civil and Building Dept : N/A Electrical/Instrument Dept : Mechanical/PipingDept.:_________________ Checked by Contractor QA/QC Dept Name: Date: Signature: __________________ FOR CONSULTANT ACKNOWLEDGMENT Received by consultant to conduct inspection of the work covered by this Inspection Notice. Name: Date: Signature: ___________________ Approved Approved as noted Rejected N/A

INSPECTION RESULTS AND COMMENTS : 1. Inspection Date and Time 2. Results and Comments : : See Below

ACCEPTED BY CONSULTANT: Name: Date : Signature: C.C.: KOTC