Hydraulic Calculation of Box Culvert
Hydraulic Calculation of Box Culvert
Canal Name:
Structure No.
Chainage
Type
WLu
Box Single
WLi
WLd
WLo
H
Hu
NAME
Hc
BLi
BLd
Inlet Transition
Li
Conduit
Lc
2.50 m
1 nos
Upstream Canal
Bottom Width
Side Slope 1:m
Water Depth
Water Surface Width
Flow Area
Velocity
Velocity Head
Energy Head
Inlet loss in the transition (hi)
dE = Eu - (Ei + hi)
Wetted Perimeter P = B + 2H(m^2+1)^0.5
Hydraulic Radius R = A/P
Roughness Coefficient
Roughness Coefficient K
Hydraulic Gradient I =[n V/R ^(2/3)]^2
note:
Design Discharge Q=
Conduit length Lc =
Conduit
Qi=Q/N =
N. NAGAI
DATE
/
/
/
/
/
/
BLo
Length of Transition
INITIAL
Hd
BLu
Upstream
Canal
PREPARED BY
CHECKED BY
REVIEWED BY
Bu =
m=
Hu =
Wu =
Au =
Vu =
hvu =
Eu =
3.00
1
1.040
5.08
4.2016
13.59958111
9.436153389
10.47615339
Bc =
m=
Hc =
Wc =
Ac =
Vc =
hvc =
Ec =
hi =
Pu =
Ru =
n=
K=
Iu =
5.94156421
0.707153849
0.014285714
70
0.059910522
Pc =
Rc =
n=
Ic =
1)
Downstream Canal
57.14
2.50
0
1.7602
2.500
4.400431138
12.98509128
8.602683448
10.3628559
0.113740155
-0.000442669
6.02034491
0.73092675
0.014285714
70
0.052263135
Bd =
m=
Hd=
Wd =
Ad=
Vd=
hvd=
Ed =
check
Pd =
dd =
n=
Id =
57.14 m3/sec
23.50 m
3.00
1
1.040
5.08
4.2016
13.59958111
9.436153389
10.47615339
2)
3)
5.94156421
0.707153849
0.014285714
70
0.059910522
3.1143309
4.00 m
5.75 m
Inlet transition
Friction hif=Li(Iu+Ic)/2 =
0.28043 m
Convergence hic =x in.(hvc-hvu) =
-0.1667 m
x in.=
0.2
Energy loss factor x in.is depend on shape
Culvert conduit
Friction hf = LcIc =
1.22818 m
Outlet transition
Friction hof=Lo(Ic+Id)/2 =
0.3225 m
Divergence hod = x out(hvc-hvd) =
-0.3334 m
x out.=
0.4
sub-total
1.33104 m
Transition Angle
o
U/stream 27 30'
o
D/stream 22 30'
H = Hc/0.83 =
say
Design
2.12069
2.250 m
2.500 m
1/1
141317659.xls.ms_officeBBK1a