Co Contractor Cor Summary

This contractor change order request summary provides details for a change to the project, including: 1) Additive and deductive direct costs for the general contractor's labor, materials, and equipment. 2) Markup percentages that are applied to the direct costs according to the contract. 3) Total direct costs for any subcontractors working on the change, along with their markup amounts. 4) The total cost of the change request, which combines the general contractor's and subcontractors' direct costs and markups.

Uploaded by

Ailyn O. Dungog
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Co Contractor Cor Summary

This contractor change order request summary provides details for a change to the project, including: 1) Additive and deductive direct costs for the general contractor's labor, materials, and equipment. 2) Markup percentages that are applied to the direct costs according to the contract. 3) Total direct costs for any subcontractors working on the change, along with their markup amounts. 4) The total cost of the change request, which combines the general contractor's and subcontractors' direct costs and markups.

Uploaded by

Ailyn O. Dungog
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

CONTRACTOR CHANGE ORDER REQUEST SUMMARY

PROJECT NAME: PROJECT NO: GENERAL CONTRACTOR: DESCRIPTION OF CHANGE:

C.O.R. NO.: CRB/FI REF.: DATE:

General Contractor Direct Costs


Additive Costs
A Labor B Material C Equipment D

Subtotal of Additive Cost Deductive Costs (use minus sign to denote negative figures)

$0.00

E Labor F Material G Equipment H Subtotal of Deductive Cost I J $0.00 $0.00 $0.00

Contractor's Total Direct Cost (D+H) General Contractor's Mark-up


Line "J" mark-up is calculated in accordance with Article 6.01-b of the Contract General Conditions. Mark-up percentages applied to the line "I" subtotal are as follows: 15% on first $50,000, 10% on balance beyond $50,000, 6% for credits.

K L

Total General Contractor Direct Costs + Mark-up (Line I + J) Total Subcontractor Direct Costs
(Note: If there are two or more subcontractors for this change item, then use a separate form for each subcontractor.) Sum of Lines "I" and "L" from Subcontractor Change Order Request Summary Forms (703.34S)

$0.00

M Subcontractor Mark-up Sum of Lines "J","M","N" and "O" from Subcontractor Change Order Request Summary Forms (703.34S) N

General Contractor's Mark-up on Subcontractor Direct Costs


Line "N" mark-up is calculated in accordance with Article 6.01c of the Contract General Conditions. Mark-up percentages applied to the line "L" subtotal are as follows: 10% on first $50,000, 7% on balance beyond $50,000, 6% for credits.

$0.00

O Total General Contractor Change Request (Line K + L + M + N)


Note: Include detailed breakdown of material, labor and equipment cost for each trade. Refer to Contract General Conditions Article 6.00.

$0.00

To the best of my knowledge and belief, I certify that all costs listed above are correct.

Contractor Signature

Date

Construction Mgmt. 703.34 12/08