Pipe Testing of Navdhenu Swift

This 3-page report documents pressure testing for various pipe systems on the vessel Navdhenu Swift. It lists 20 pipe systems by job code and owner's code, including sea water systems, ballast systems, and engine cooling systems. For each system, it records the test date and pressure in kgf/cm^2. Representatives from the ship staff, quality control, and pipe and boiler department signed off on the testing.

Uploaded by

frenskiran
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views3 pages

Pipe Testing of Navdhenu Swift

This 3-page report documents pressure testing for various pipe systems on the vessel Navdhenu Swift. It lists 20 pipe systems by job code and owner's code, including sea water systems, ballast systems, and engine cooling systems. For each system, it records the test date and pressure in kgf/cm^2. Representatives from the ship staff, quality control, and pipe and boiler department signed off on the testing.

Uploaded by

frenskiran
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT:NAVDHENU SWIFT VESSEL CODE: V-544

ABG-WESTERN INDIA SHIPYARD LTD PIPE AND BOILER DEPARTMENT PIPE LINE PRESSURE TESTING REPORT

5/2/2013 1 of 3

SL NO 1

JOB CODE EN -031

OWNERS CODE 610.1

2 3 4 5 6 7 8 9 10

EN -032 EN -033 EN -034 EN -035 EN -036 EN -037 EN -038 EN -039 EN -040

610.2 610.3 610.4 610.5 610.6 610.7 610.8 610.9 610.10

SYSTEM DESCRIPTION AIRCON COOLING SEA WATER PUMP DISCGARGE LINE AUX ENGINE SW COOLING PUMP DISCHARGE PIPE BALLAST PUMP DISCHARGE PIPE BALLAST PUMP No 1 DISCHARGE PIPE TWEEN DECK DRAIN PIPE ENGINE ROOM FRESH WATER LINE FIRE PUMP SUCTION LINE REDUCERS EJECTOR SUCTION INLET PIPE AUX ENGINE SEA WATER COOLING INLET LINE MAIN SEA WATER LINE

DATE OF TEST

PRESURRE 10 Kgf/cm

SHIP STAFF REP

QC REP

P&B REP

REMARKS

7 Kgf/cm

10 Kgf/cm 10 Kgf/cm

7 Kgf/cm 7 Kgf/cm 7 Kgf/cm 7 Kgf/cm

PIPE AND BOILER DEPARTMENT REPRESENTATIVE

CHIEF ENGINEER NAVDHENU SWIFT QUALITY CONTROL REPRESENTATIVE

PROJECT:NAVDHENU SWIFT VESSEL CODE: V-544

ABG-WESTERN INDIA SHIPYARD LTD PIPE AND BOILER DEPARTMENT PIPE LINE PRESSURE TESTING REPORT

5/2/2013 2 of 3

SL NO 11 12

JOB CODE EN -041 EN -042

OWNERS CODE 610.11 610.12

13

EN -043

610.14

SYSTEM DATE OF TEST DESCRIPTION SEA WATER OBD MAIN MAIN SEA WATER RECIRCULATION LINE ME INLET/OUTLET PIPE TO MAIN ENGINE AIR COOLER (LT) SMALL USER COOLING SEA WATER PUMP LINE SMALL USER PLATE ECHANGER OUTLET PIPE SMALL USER SEA WATER PUMP 1 INLET LINE TRIM PUMP SEA WATER PIPE TRIM PUMP OUTLET TURBO CHARGER DRAIN

PRESURRE 7 Kgf/cm 7 Kgf/cm

SHIP STAFF REP

QC REP

P&B REP

REMARKS

14

EN -044

610.15

10 Kgf/cm

15

EN -045

610.16

7 Kgf/cm

16 17 18 19

EN -046 EN -047 EN -048 EN -049 610.18 610.19 610.20

7 Kgf/cm
7 Kgf/cm

PIPE AND BOILER DEPARTMENT REPRESENTATIVE

CHIEF ENGINEER NAVDHENU SWIFT QUALITY CONTROL REPRESENTATIVE

PROJECT:NAVDHENU SWIFT VESSEL CODE: V-544

ABG-WESTERN INDIA SHIPYARD LTD PIPE AND BOILER DEPARTMENT PIPE LINE PRESSURE TESTING REPORT

5/2/2013 3 of 3

SL NO 20

JOB CODE EN -050

OWNERS CODE 610.21

SYSTEM DESCRIPTION AUX ENGINE HEAT EXCHANGER SEA WATER INLET PIPE

DATE OF TEST

PRESURRE 7 Kgf/cm

SHIP STAFF REP

QC REP

P&B REP

REMARKS

PIPE AND BOILER DEPARTMENT REPRESENTATIVE

CHIEF ENGINEER NAVDHENU SWIFT QUALITY CONTROL REPRESENTATIVE