100% found this document useful (1 vote)
1K views

UMTS UTRAN Call Flow Scenarios - CS and PS

The document outlines 6 parts of call flow scenarios in UMTS networks: 1) Node B initialization 2) Cell camping/location update 3) Circuit switched call setup 4) Circuit switched call tear-down 5) Packet switched call setup and 6) Packet switched call tear-down. It provides the key steps that must be executed for mobile originating calls to be completed and torn down for both circuit switched and packet switched domains.

Uploaded by

Mohtadi Yassin
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views

UMTS UTRAN Call Flow Scenarios - CS and PS

The document outlines 6 parts of call flow scenarios in UMTS networks: 1) Node B initialization 2) Cell camping/location update 3) Circuit switched call setup 4) Circuit switched call tear-down 5) Packet switched call setup and 6) Packet switched call tear-down. It provides the key steps that must be executed for mobile originating calls to be completed and torn down for both circuit switched and packet switched domains.

Uploaded by

Mohtadi Yassin
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

1.

For ease of understanding the Call Flow Scenarios will be split into 6 parts. 1. Node B Initialisation 2. Cell Camp-on / Location Update 3. Circuit Switched Call set-up The following steps need to be executed in order for a mo call to complete RRC Connection Setup Service Request Security Procedures (Identity / Authentication / Security mode) Call Setup Request Radio Link and RAB Configuration Call Connection 4. Circuit Switched Call tear-down The following steps need to be executed in order for the mobile to tear-down the call. Initiate Call Release Initiate Iu Release Procedure Release Iu Connection to MSC for UE Release RRC Connection to UE Delete Radio Link Resources in UTRAN Delete Radio Link Resources in UTRAN 5. Packet Switched Call set-up The following steps need to be executed in order for a mo call to complete. Establish an RRC connection to the UTRAN Establish an Iu connection to the CN Make an Attach Request Carry out Security Procedures Complete the Attach Request PDP context activation Set-up RABs for the connection Create GTP connections and activate PDP Context at the GGSN Data Transfer 6. Packet Switched Call tear-down The following steps need to be executed in order for a mo call tear down to complete. PDP Context Deactivate request from UE Radio Link Setup Iub Transport Bearer Setup DCH-FP Synchronization Connection Setup Attach Procedure Authentication and Security Procedures PDP Context Activation Procedure Radio Link and RAB Configuration Data Transfer Download to read more....

UMTS_UTRAN Call Flow-CS and PS.zip


Similar Threads: What is Hand over scenario while UE moving from UMTS cell to GSM cell with call flow. UMTS-UTRAN Signalling Call flow comparison gsm & umts LTE Deployment Scenarios Gsm call flow

Ask Our WCDMA Expert Join the Facebook's Biggest Group of RF Engineers
Reply With Quote

You might also like