Non Conformance Report Form

The document appears to be a non-conformance report form related to a contract for upgrading approximately 104km of the Chipata-Mfuwe road in Zambia. The form collects information about location and description of problems, responsible supervisor, date and time of non-conformance, effect on project/quality, instructions from the resident engineer, corrective measures taken, date corrected, preventive measures to avoid reoccurrence.

Uploaded by

Sidney Musonda
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
677 views

Non Conformance Report Form

The document appears to be a non-conformance report form related to a contract for upgrading approximately 104km of the Chipata-Mfuwe road in Zambia. The form collects information about location and description of problems, responsible supervisor, date and time of non-conformance, effect on project/quality, instructions from the resident engineer, corrective measures taken, date corrected, preventive measures to avoid reoccurrence.

Uploaded by

Sidney Musonda
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Contract For the Upgrading of Approximately 104Km of Chipata-Mfuwe Road

Contract No. TB/CE/003/09

Non Conformance Report Form


Location:
Description of Problem

Ref. .

Responsible Supervisors Name: Non Conformance Observed by: Date : Non Conformance appearing 1st time

2nd time

Time: 3rd time

More than 3times

Describe the Effect of the Non Conformance on the Project/Quality

REs Comments/Instructions

Remedial/Corrective Measures Taken by Contractor

Date Corrected Approved by

Witnessed By Date

Contractor s Preventive Measure(To avoid Re-occurrence)