The document provides details of a proposed multifunctional building project in Suceava, Romania. It includes: 1) An overview of the building design which is an 11-level reinforced concrete structure for residential and commercial use. 2) Descriptions of the site location and characteristics, general building specifications, architectural plans, and structural design of the building. 3) Tables outlining the building materials and their properties to be used for construction.

Uploaded by

Stefan Lucian
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
210 views

Proiect Final Complet

The document provides details of a proposed multifunctional building project in Suceava, Romania. It includes: 1) An overview of the building design which is an 11-level reinforced concrete structure for residential and commercial use. 2) Descriptions of the site location and characteristics, general building specifications, architectural plans, and structural design of the building. 3) Tables outlining the building materials and their properties to be used for construction.

Uploaded by

Stefan Lucian
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 155

"Gh.

Asachi" Technical University of Iasi Faculty of Civil Engineering CIVIL ENGINEERING -Training in English

QUALITY MANAGEMENT
Project
STUDENTS: APREUTESEI Mircea Bogdan 3409 COJOCARIU Claudiu 3409 GIOSAN Cosmin 3408 LAZAR Gheorghe 3409

PROJECT ADVISOR: DR. ING. RADU LUPASTEANU

13

QUALITY MANAGEMENT PROJECT

1.

DEVELOPMENT OF TECHNICAL CONSTRUCTION PROJECT

DOCUMENTATION

(DESIGN)

FOR

Observaion: The Design Documentation (D.T.A.C. + P.Th.) should meet the legal requirements, and will include the following minimum set of requirements: 2. 3. 4. Estimation of Category of importance for the building; Will incloude Technical Reports describing the building reffering both Architectural component, and Structural component; Technical specifications should reffer to minimum 2 construction processes/student; The Documentation should reffer to Instruction for monitorizing the building during Operation stage, and the Quality plan for the structural works; Drawings will be sufficient to describe the constructed facility (min 3 A + min 5 R) DEVELOPMENT OF TWO TECHNICAL PROCEDURES/student DEVELOPMENT OF RECORDS to be produced during Construction stage, in order to validate the quality of the structural works. DEVELOPMENT OF RECORDS to be produced during Hand-over stage..

1. TECHNICAL REPORT

1. GENERAL DATA
NAME OF OBJECTIVE: MULTIFUNCTIONAL BUILDING MADE OF REINFORCED CONCRETE 2B+GF+8F PROJECT DEVELOPER: APREUTESEI Mircea Bogdan COJOCARIU Claudiu GIOSAN Cosmin Constantin LAZAR Gheorghe 1.3.CLIENT: SUCEAVA CITY HALL

2. SITE DESCRIPTION
PLACEMENT
The building is placed on a field situated within the built-up areas of Suceava municipality. The lands destination, according to PUG, is: residential estate, with dwellings of medium and big height, together with the required facilities. The area has access to urbanistic facilities (water, draining pipes, natural gas, telephony, electricity).

SPECIFIC CLIMATE AND NATURAL PHENOMENA


Climatic area IV with Te= -21C, according to C107/3-2005; Frost depth: -1.10 meters, according to STAS 6054/77;

Snow load: sk=2.5 kN/m IMR=50 years;

, according to CR 1-1-3/2012, having

Wind speed: vb,0=38 m/s, according to CR 1-1-4/2012, having IMR=50 years;

SEISMIC CHARACTERISTICS ACCORDING TO P100-2006 Peak ground acceleration: ag=0.16 g, having IMR=100 years; The corner period: Tc=0.7 s;

GEOLOGICAL CHARACTERISTICS After the interpretation of the geotechnical values resulted from din laboratory analysis of the samples taken from the drillings and also from consulting the geotechnical values from the unitary profile of stratification, on the site the following stratification resulted along the depth of the borehole: Layer I argillaceous sandy silt, h = 5.5 m Layer II silty sandy clay, h = 1.2 m Layer III silty sandy clay, h = 4.9 m Layer IV marl, h = 1.1 m The geotechnical characteristics of each layer are presented in the following table:
Layer Soil type Unit weight 3 [kN/m ] 18.68 19.36 18.76 21.26 Internal friction angle [ @ 22 21 21 21 Cohesion 2 [kN/m ] 30 34 27 54

I II III IV

argillaceous sandy silt silty sandy clay silty sandy clay marl

3. GENERAL BUILDING CHARACTERISTICS


Construction type:- new, authorized Destination:- multifunctional building Height regime:- B+S+GF+8F Importance category, according to HG766/97- C - normal nd Importance class, according to P100-2006 -II Fire resistance degree- I Authorized areas: 2 Total land surface:=545.00 m 2 Built surface:=458.35 m Developed 2 surface:=5,247.95 m P.O.T.=84.10% C.U.T.=9.62

4. ARCHITECTURAL REPORT
The building is developed on 11 levels basement, semi-basement, ground floor and I-VIII

floor.
Most of the buildings surface is intended for dwellings, having apartments with 1, 2 and 3 rooms. Also, commercial spaces and parking lots are found, placed in the following manner:

At the basement, the spaces will be intended for parking lots, lodges and spaces for vertical transportation (stairs and elevator).

At the semi-basement, beside the spaces intended for parking lots and those intended for storage, a space with different destination is to be found, which will have a separated entrance from the exterior. The majority of the ground floor surface will be used for commercial purposes (spaces with different destination) and for vertical access to the upper level dwellings (staircase and elevators). The commercial spaces will be found on two levels: ground floor and first floor, having different access points for the staircase than those intended for the inhabitants. The first floor will have the same spaces as the ground floor spaces with different destination.
At II-VIII floors, spaces only for dwelling will be realized, having apartments with 3, 2 and 1 room. On each level there is to be found 2 apartments with 1 room, 3 apartments with 2 rooms and one apartment with 3 rooms. On all the 7 levels intended for dwelling spaces, the building will gather a number of 42 apartments (with 1, 2 and 3 rooms). All the spaces, both those from the ground floor and those from the upper level, are oriented in such a manner that normal conditions in what concerns ventilation, sunlight and natural light are insured. The surfaces occupied by the apartments and the building are presented in the following table:

Nr. crt. 1. 2. 3.

Component 1 room apartment 2 rooms apartment 3 rooms apartment TOTAL

No. of apartments 7 7 7 7 7 7 42

Developed surface 2 [m ] Apartment 43.45 47.15 83.25 74.15 59.30 107.15 Total building 304.15 330.05 582.75 519.05 415.10 750.05 2,901.15

Useful surface 2 [m ] Apartment 32.80 33.35 58.70 54.90 51.75 82.60 Total building 229.60 410.90 410.90 384.30 362.25 578.20 2,198.70

Surfaces obtained on levels: Basement (parking lots)=574.95 m


2 2

Semi-basement (parking lots + commercial spaces access)=574.95 m Ground 2 floor (commercial spaces)=444.75 m 2 First floor (commercial spaces)=444.75 m Floors 2 II-VIII=458.35 m
The building, having basement, semi-basement, ground floor and floor I-VIII, will have a reinforced concrete frame structure and exterior closures of GVP 25 cm brick. Above basement, semi-basement, ground floor and floors, the slab will be realized from monolith reinforced concrete.

Both the apartments and the other spaces inside the building will be endowed with modern, high-quality interior and exterior finishing, as it follows: Interior finishing: Washable lime paintings; Faience plies; Plasterboard plies; Sandstone paving; Laminated parquet deal; Timber interior woodwork. Exterior finishing: CAPAROL exterior thermo-system (10 cm polystyrene); LINDAB ditches and downpipes; PVC woodwork; Walled parapets with stainless steel hand rail.

5. STRUCTURAL REPORT
From the structural point of view, the building, situated on the Narciselor Street, in Suceava city, can be described as being composed from monolith reinforced concrete frames, with raft foundation, 80 cm thick, C20/25 concrete class, PC52 steel.

The bedding underneath the raft is composed of 15 cm of compacted gravel, levelling concrete C4/5 10 cm, hydro-insulation. The columns will be made from C20/25 concrete and PC52 reinforcement (longitudinal and stirrups). At the base, the columns cross-section is 80x80 cm, with a 5 cm reduction of the cross-section at each 1 or 2 floors. At the basement and semi-basement level, C20/25 monolith reinforced concrete walls, reinforced on the vertical and horizontal direction with 8 or 10 at each 20 cm, the reinforcement being anchored at least 40 cm inside the column. The girders of the slab above the basement and semi-basement have the crosssection of 30x55 cm, being realized of concrete, C20/25 class, PC52 steel. The slab above the semi-basement will be 18 cm thick and made of C16/20 concrete.
The super-structures girders have the cross-sections dimensions of 25x50 cm, being reinforced in a different manner in the case of the slabs over the ground floor and first level.

The elevators stand will be made of C20/25 concrete. At the terrace level, the attic will be provided with 25x25 cm columns, anchored in the marginal columns and beams. The girdle found at the attics superior part (25x25 cm) will be reinforced with 4 bars of 8 mm in diameter.

The mechanical properties of the materials used for the structural system are presented in the next tables: = 78.5 kN/m Unit weight, Young modulus, E = 210000 MPa Reinforcement PC52 S235 Poissons ratio, = 0.3 Shear modulus, G = 81000 MPa Thermal expansion coefficient, = 0.000012 1/C 'DPSLQ UDWLR Characteristic yielding strength, fy = 345 MPa Characteristic ultimate strength for tension, fu = 510 MPa
3

Unit weight, = 24.00 kN/m Young modulus, E = 30000 MPa Concrete C20/25 Poissons ratio, = 0.2 Shear modulus, G = 1250 MPa

Thermal expansion coefficient, = 0.000010 1/C 'DPSLQ UDWLR Characteristic compressive strength, fck = 25 MPa Characteristic tensile strength, ftk = 2.2 MPa
3

Unit weight, = 24.00 kN/m Young modulus, E = 29000 MPa Concrete C16/20 Poissons ratio, = 0.2 Shear modulus, G = 1160 MPa

Thermal expansion coefficient, = 0.000010 1/C 'DPSLQ UDWLR Characteristic compressive strength, fck = 20 MPa Characteristic tensile strength, ftk = 1.9 MPa

6. CHECKING THE PROJECT. ACTIVE NORMS


During the design process of the building, all active norms for concrete and steel structures have been respected. In order to assure a proper system of quality in construction, the checking criteria of the project is A1 according to H.G.R. 925/95 and Law no. 10/1995. The quality requirement for the minimum level of performance is: A.4.1. assuring the strength capacity and stability on static and dynamic actions; B.2.1. safety in service stage; D. health and environment protection. During the erection of the building, there will be taken measures for: Respecting the provision of Law no. 50/1991 regarding the permits for executing construction works and also regarding the O.U.G. no. 231/2000; Protecting the neighbour buildings without affecting their strength capacity and stability and, also, respecting the provisions of the Civil Code regarding the evacuation of the pluvial waters. An identification signage will be installed in a place with good visibility according to the order of M.L.P.A.T. 63/N 11.08.1998. When the erection of the building starts, the contractor will be aware of all underground supply networks that cross the site and he is responsible for diverting them during the erection process.

7. WORK SAFETY MEASURES


All the present work safety norms will be followed during the execution of the project especially from: Law no. 319/2006 and Norme specifice de protective a muncii pentru diferite categorii de lucrari. Other special measures: Signalling of dangerous working zones; Special arrangements (parapets, working passages); Providing qualified work force knowledgeable of the current provisions. Excavations: Timbering of trench sides or battering the sides to a safe angle; Ladder access should be provided at reasonable intervals; During excavation, no person should be allowed near the machine. Providing safety measures for working at height (> 2m):
The preliminary technological organization of the works at height by the collective insurance of all working conditions during the entire period of works development. The endowment with

individual protection equipment according to the conditions from the working place, so that the safety of executor to be insured.

Nivelul apreciat al influentei criteriului Inexistent Redus Mediu Apreciabil Ridicat

Punctajul P(i), P(ii), P(iii) 0 1 2 4 6

2.Estimation of Category of importance for the building


FACTORI DETERMINANTI 1 IMPORTANTA VITALA Criterii asociate i. oameni implicati direct in cazul unor disfunctii ale constructiei. ii. 2 ii. Punctaj 2 i. 2 IMP. SOCIAL-ECONOMICA SI CULTURALA Criterii asociate marimea comunitatii care apeleaza la functiunile constructiei si/sau valoare a bunurilor adapostite de constructie ponderea pe care functiunile constructiei o au in comunitatea respectiva natura si importanta functiunilor respective Kn Pn 4 NEC. LUARII IN CONSID. A DURATEI DE UTILIZ. Punctaj 1 i. durata de utilizare preconizata 1 gradul de influenta nefavorabila asupra mediului natural si construit. iii. 1 iii. ii. 4 Criterii asociate Punctaj 2 Punctaj 4

oameni implicati indirect in cazul unei disfunctii ale constructiei. caracterul evolutiv al efectelor periculoase in cazul unor disfunctii ale constructiei. Kn Pn 3 IMPLICAREA ECOLOGICA Criterii asociate

iii.

iii.

1 1.67

1 2.33

i.

masura in care realizarea si exploatarea constructiei intervine in perturbarea mediului natural si a mediului construit.

ii.

masura de utilizare in care performante alcatuirilor constructive depind de cunoasterea evolutiei actiunilor pe durata de utilizare masura in care performantele functionale depind de evolutia cerintelor pe durata de utilizare Kn Pn 6 IMP. SOCIAL-ECONOMICA SI CULTURALA

rolul activ in protejare/refacerea mediului natural si construit Kn Pn 5

1 1.00

1 3.33

NEC. ADAPT. LA COND. LOCALE DE TEREN SI MEDIU

Criterii asociate i. masura in care asigurarea solutiilor constructive este dependenta de conditiile de teren si de mediu

Punctaj 4 i.

Criterii asociate ponderea volumului de munca si de materiale inglobate

Punctaj 1

ii. masura in care conditiile locale de teren si de mediu evolueaza defavorabil in timp iii.

ii.

volumul si complexitatea activitatilor necesare pentru mentinerea constructiei pe durata existenta a aceseia activitati deosebite in exploatarea constructiei impuse de functiunile acesteia Kn Pn 11.3 Normala (C)

masura in care conditiile locale de teren si de mediu determina activitati/masuri deosebite pentru exploatarea constructiei Kn Pn TOTAL CATEGORIA DE IMPORTANTA A CONSTRUCTIEI Category of importance is C , because PT=15. CATEGORIA DE IMPORTANTA A CONSTRUCTIEI - Exceptionala - Deosebita - Normala - Redusa

iii.

1 2.00

1 2.00

GRUPA DE VALORI A PUNCTAJULUI TOTAL >30 1829 617 <5

rezisten$3
CAIETE DE SARCINI SPTURI I UMPLUTURI R.01

R.01 - CAIET DE SARCINI - SPTURI I UMPLUTURI

1. GENERALITI Spturile generale se vor executa mecanizat. Spturile pentru fundaii se vor executa n gropi izolate i spaii limitate cu mijloace manuale. 2. STANDARDE, NORMATIVE I PRESCRIPII CARE GUVERNEAZ EXECUIA DE ANSAMBLU A LUCRRII NORMATIVE: C56-85 C169-88 C16-84 C83-75 STAS-uri: STAS 9824/0-74 Trasarea pe teren a construciilor. STAS 9824/1-87 Trasarea pe teren a construciilor civile, industriale i agrozootehnice. STAS 5091-71 Terasamente, prescripii generale. 3. MATERIALE I STANDARDE CARE TREBUIE RESPECTATE Nu este cazul. 4. TESTE, VERIFICRI I PROBE CARE TREBUIE RESPECTATE Lucrrile de spturi trebuie recepionate conform normativului C56-85. Calitatea lucrrilor de umpluturi se va verifica n baza greutii volumetrice realizate n stare uscat de 1,8 to/mc. Normativ pentru verificarea calitii i recepia lucrrilor de construcii i Normativ pentru executarea lucrrilor de terasamente pentru realizarea fundaiilor construciilor civile i industriale. Normativ pentru realizarea pe timp friguros a lucrrilor de construcii i a instalaiilor aferente. ndrumtor privind executarea trasrii de detaliu n construcii. instalaii aferente.

Faz de proiectare:

P.Th. + D.E.

Data:

25.09.2007

pagina 1 din 4

5. PREPARARE, CONFECIONARE Nu este cazul. 6. EXECUIA LUCRRILOR 6.1. Descrierea lucrrilor 6.1.1. Lucrrile de sptur i umpluturi nu prezint dificulti deosebite. Spturile pentru fundaiile izolate se vor executa n gropi izolate, iar cele pentru fundaii continue sub ziduri se vor executa n anuri continue. Umpluturile de pmnt se vor compacta cu maiul broasc, iar cele de pietri se vor compacta cu plac vibrant. 6.1.2. Trasarea axelor i a conturului pe teren se va executa cu teodolitul i cu panglica. Axele principale ale construciei se materializeaz pe teren cu ajutorul reperelor marcate pe borne de beton, care se toarn pe loc. Bornele vor fi paralelipipedice i vor avea la partea superioar o plcu metalic pe care se va imprima cu dalta i ciocanul punctul respectiv. Pentru bornele de nivel, pe plcua metalic se va imprima nivelul reperului. Protejarea acestor borne se va face cu bolovani. Dup trasarea conturului cldirii se va trece n continuare la executarea unei mprejmuiri ajuttoare, alctuit din scnduri btute pe cant, pe piloi nfipi prin batere n teren. Laturile mprejmuirii se vor bate la o distan de 1,5-2,0 m de conturul construciei i vor fi paralele cu axele principale ale construciei. Transmiterea axelor principale de pe borne pe scndurile mprejmuirii ajuttoare se va face cu teodolitul. 6.1.3. Trasarea pe teren a limitelor gropilor de fundaie se face cu ajutorul axelor principale i secundare duse pe mprejmuire, cu firul cu plumb. Se va materializa cu rui pe direcia axei respective. Se va msura de o parte i de alta a axei jumtatea limii gropii de fundaie i se fixeaz cu rui, ntre care se ntinde o srm. Srma marcheaz marginile gropii de fundaie. Pentru a se indica unghiul taluzului (cnd este cazul) dup care urmeaz a se executa sptura, se vor fixa ipci-ablon din loc n loc. 6.1.4. Trasarea umpluturilor (cnd este cazul) se va face fixnd din distan n distan abloane, care indic forma umpluturii. Dup ce umplutura ajunge la cota respectiv, abloanele se scot. 6.2. Protecia lucrrilor n perioada de execuie Pentru a nu se degrada fundul spturilor datorit ploilor sau depunerilor de deeuri, fundaia se va executa ntr-un timp ct mai scurt posibil de la executarea spturii respective (1-3 zile). Se va amenaja platforma din jurul cldirii, astfel meat apele de precipitaie s fie colectate i ndeprtate de cldire n timp ct mai scurt. 6.3. Prescripii, recomandri, standarde, normative pentru execuia de detaliu Lucrrile de spturi se vor ncepe numai dup identificarea pe teren a tuturor reelelor i devierea lor. n cazul n care n timpul execuiei lucrrilor apar ntmpltor reele de instalaii subterane neprevzute n proiectele de specialitate se vor opri lucrrile i se va chema proiectantul i organele de exploatare a reelelor. 6.4. Abateri, tolerane i verificrile acestora 6.4.1. Beneficiarul mpreun cu executantul va semna un proces verbal de trasare i un proces verbal al cotei de spare.

6.4.2. Spturile se vor executa pn la cotele din proiect dar nu mai sus dect cota terenului natural nederanjat. 6.4.3. n principiu cota de fundare este cea prevzut n proiect. Coborrea cotei de fundare (coborrea fundului spturii) sub cota din proiect se stabilete cu ocazia recepiei naturii terenului de fundare de ctre geolog, dac se constat c terenul nu are caracteristicile avute n vedere la proiectare. 6.5. Defecte admise i neadmise Nu este cazul. 7. VERIFICRI N VEDEREA RECEPIEI Lucrrile de fundaie vor fi ncepute numai dup verificarea i recepionarea naturii terenului, a spturilor i dup retrasarea elementelor geometrice a tuturor fundaiilor, respectndu-se abaterile admisibile prevzute n anexa 2.1 la normativul pentru verificarea calitii lucrrilor de construcii i de instalaii aferente (indicativ C56-85). Procesul verbal de recepie a naturii terenului de fundare se va ncheia ntre geolog, beneficiar i executant. n vederea recepiei se vor prezenta geologului procesele verbale de trasare i a cotei de fundare. Umpluturile se vor recepiona de ctre geolog n baza buletinelor de analiz privitor la greutatea volumetric n stare uscat. Nu se va trece la lucrrile pentru realizarea plcii de la cota 0,00 pn nu se recepioneaz umpluturile. Se vor respecta strict cele prevzute n "Sistemul de eviden n activitatea de control tehnic al calitii construciilor" elaborat de IGSIC i publicat n BC nr.2/1981. 8. MSURTORI I DECONTRI Spturile i umpluturile se vor plti la mc., conform planelor din proiect. 9. MSURI PRIVIND TEHNICA SECURITII MUNCH 1 PREVENIREA INCENDIILOR La executarea lucrrilor se vor respecta prevederile din urmtoarele prescripii: Legea nr. 319/2006 - Legea securitii i sntii n munc HGR nr. 1425/2006 pentru aprobarea Normelor metodologice de aplicare a HGR nr. 1091/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 971/2006 privind cerinele minime pentru semnalizarea de securitate HGR nr. 1028/2006 privind cerinele minime de securitate i sntate n munc HGR nr. 1051/2006 privind cerinele minime de securitate i sntate pentru

prevederilor Legii securitii i snii n munc nr. 319/2006 locul de munc i/sau de sntate la locul de munc referitoare la utilizarea echipamentelor cu ecran de vizualizare manipularea manual a maselor care prezint riscuri pentru lucrtori, n special cu afeciuni dorsolombare HGR nr. 1048/2006 privind cerinele minime de securitate i sntate pentru utilizarea de ctre lucrtori a echipamentelor individuale de protecie la locul de munc

HGR nr. 1146/2006 privind cerinele minime de securitate i sntate pentru Ordinul ministrului muncii, solidaritii sociale i familiei nr. 753/2006 privind Ordinul ministrului muncii, solidaritii sociale i familiei nr. 755/2006 pentru

utilizarea n munc de ctre lucrtori a echipamentelor de munc protecia tinerilor n munc aprobarea formularului pentru nregistrarea accidentului de munc - FIAM i a instruciunilor de completare a acestuia munc Norme republicane de protecia muncii, aprobate de Ministerul Muncii i Ministerul Sntii cu ordinele nr.34/1975 i respectiv 60/1975, cu modificrile aduse prin Ordin nr.39/77 i 110/30/77 (b.d.i. 3 - 4/77 i 5 -6/79); Normele de protecia muncii n activitatea de construcii -montaj, aprobate de Ordinul MMPS 57/1996 privind norme generale de protecia muncii; Regulamentul MLPAT 9/N/15.03.1993 privind protecia i igiena muncii n construc Ordinul MMPS 235/1995 privind normele specifice de securitatea muncii la nlime; Ordinul MMPS 255/1995 - normativ cadru privind acordarea echipamentului de Normativele generale de prevenirea i stingerea incendiilor aprobate prin Ordinul MI Legea nr. 53/2003 - Codul Muncii; Decretul nr. 466/1979 privind regimul produselor i substanelor toxice; Legea nr. 126/1995 privind regimul materiilor explozive; Alte acte normative n vigoare n domeniu la data executrii propriu-zise a lucrrilor. Legea nr. 307/2006 privind aprarea mpotriva incendiilor Ordinul ministrului administraiei i internelor nr. 1435/2006 pentru aprobarea M.C.Ind. cu Ordinul nr.1233/D.1980. Directiva Consiliului Comunitilor Europene 89/391/CEE privind introducerea de msuri pentru promovarea mbuntirii securitii i sntii lucrtorilor la locul de

- ed. 1995;

protecie individual; nr. 775/22.07.1998;

Normelor metodologice privind avizarea i autorizarea privind securitatea la incendiu i protecia civil P 118-1999 - Normativ privind sigurana la foc a construct Nor NP 086-2005 - Normativ pentru proiectarea, executarea i exploatarea instalaiilor C 300 - 1994 - Normativ de prevenirea i stingerea incendiilor pe durata executrii

de stingerea incendiilor lucrrilor de construcii i instalaii aferente acestora NOT: n momentul execuiei se vor aplica normele n vigoare.

rezisten
CAIETE DE SARCINI TRANSPORT PMNT

R.02

R.02 - CAIET DE SARCINI - TRANSPORT PMNT

1. GENERALITI
Pmntul din spturi i pentru umpluturi se va transporta cu autobasculanta, n depozite amenajate, respectndu-se prevederile primriei referitoare la pstrarea cureniei oraului (de ex.: splarea roilor i a exteriorului basculantei la ieirea din antier sau din depozit cu jet de ap sub presiune pe platforme special amenajate etc.). 2. MSURI PRIVIND TEHNICA SECURITII MUNCII I PREVENIREA

INCENDIILOR La executarea lucrrilor se vor respecta prevederile din urmtoarele prescripii: Legea nr. 319/2006 - Legea securitii i sntii n munc HGR nr. 1425/2006 pentru aprobarea Normelor metodologice de aplicare a HGR nr. 1091/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 971/2006 privind cerinele minime pentru semnalizarea de securitate HGR nr. 1028/2006 privind cerinele minime de securitate i sntate n munc HGR nr. 1051/2006 privind cerinele minime de securitate i sntate pentru

prevederilor Legii securitii i snii n munc nr. 319/2006 locul de munc i/sau de sntate la locul de munc referitoare la utilizarea echipamentelor cu ecran de vizualizare manipularea manual a maselor care prezint riscuri pentru lucrtori, n special cu afeciuni dorsolombare HGR nr. 1048/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 1146/2006 privind cerinele minime de securitate i sntate pentru utilizarea de ctre lucrtori a echipamentelor individuale de protecie la locul de munc utilizarea n munc de ctre lucrtori a echipamentelor de munc
Faz de proiectare: P.Th. + D.E. Data: 25.09.2007 pagina 1 din 2

Ordinul ministrului muncii, solidaritii sociale i familiei nr. 753/2006 privind Ordinul ministrului muncii, solidaritii sociale i familiei nr. 755/2006 pentru

protecia tinerilor n munc aprobarea formularului pentru nregistrarea accidentului de munc - FIAM i a instruciunilor de completare a acestuia munc Norme republicane de protecia muncii, aprobate de Ministerul Muncii i Ministerul Sntii cu ordinele nr.34/1975 i respectiv 60/1975, cu modificrile aduse prin Ordin nr.39/77 i 110/30/77 (b.d.i. 3-4/77 i 5-6/79); Normele de protec ia muncii n activitatea de construc ii-montaj, aprobate de Ordinul MMPS 57/1996 privind norme generale de protecia muncii; Regulamentul MLPAT 9/N/15.03.1993 privind protecia i igiena muncii n construcii Ordinul MMPS 235/1995 privind normele specifice de securitatea muncii la nlime; Ordinul MMPS 255/1995 - normativ cadru privind acordarea echipamentului de Normativele generale de prevenirea i stingerea incendiilor aprobate prin Ordinul MI Legea nr. 53/2003 - Codul Muncii; Decretul nr. 466/1979 privind regimul produselor i substanelor toxice; Legea nr. 126/1995 privind regimul materiilor explozive; Alte acte normative n vigoare n domeniu la data executrii propriu-zise a lucrrilor. Legea nr. 307/2006 privind aprarea mpotriva incendiilor Ordinul ministrului administra iei i internelor nr. 1435/2006 pentru aprobarea M.C.Ind. cu Ordinul nr.1233/D.1980. Directiva Consiliului Comunitilor Europene 89/391/CEE privind introducerea de msuri pentru promovarea mbuntirii securitii i sntii lucrtorilor la locul de

- ed. 1995;

protecie individual; nr. 775/22.07.1998;

Normelor metodologice privind avizarea i autorizarea privind securitatea la incendiu i protecia civil P 118-1999 - Normativ privind sigurana la foc a construciilor NP 086-2005 - Normativ pentru proiectarea, executarea i exploatarea instalaiilor C 300 - 1994 - Normativ de prevenirea i stingerea incendiilor pe durata executrii

de stingerea incendiilor lucrrilor de construcii i instalaii aferente acestora NOT : n momentul execu iei se vor aplica normele n vigoare.

rezisten
CAIETE DE SARCINI PERNE DE BALAST

R.03

R.03 - CAIET DE SARCINI - PERNE DE BALAST

1. PREVEDERI GENERALE Pernele de balast care fac obiectul prezentului caiet de sarcini au grosimea limitat, pn la cca 1,0 - 1,5m i nlocuiesc de regul umpluturi sau alte pmnturi slabe situate deasupra nivelului apei subterane, aplicndu-se de obicei pentru obinerea unor condiii de fundare favorabile, similare cu acelea luate n considerare n proiectele tip sau refolosibile. Execu ia pernelor din balast constituie lucr ri preliminare realiz rii funda iilor propriu-zise, astfel nct execuia, verificarea i recepionarea acestora se face naintea termenului planificat pentru nceperea obiectelor de construcii. Constructorul va respecta cu strictee toate condiiile tehnice de execuie stabilite prin proiect i n cadrul prezentului caiet de sarcini. n acest scop, la ntocmirea proiectului de organizare coordonator, se vor meniona explicit toate lucrrile specifice executrii pernelor de balast ct i succesiunea lor, precum i necesarul de utilaje i mijloace de transport. Unitatea executant a lucrrilor va organiza verificarea compactrii materialului din pern cu personal calificat pe baza prevederilor legale n vigoare. 2. MATERIALUL DIN PERN Granulozitatea materialului trebuie s fie continu, iar coeficientul de neuniformitate Un 15. Pentru aceeai pern se va urmri aprovizionarea de material extras dintr-o singur carier. Nu este acceptat prezena resturilor vegetale vizibile, buci de lemn, deeuri industriale, gunoaie etc. Umiditatea balastului pus n oper se recomand a fi egal cu 6 - 8% n cazul balastului nisipos i de 4 - 6% pentru balast.

Faz de proiectare:

P.Th. + D.E.

Data:

25.09.2007

pagina 1 din 8

n cazul cnd terenul de baza pernei este de consisten sczut (moale) se recomand ca primul strat al pernei s fie realizat dintr-un material cu fragmente mari, de exemplu bolovni, piatr spart etc. 3. CONDI II DE CALITATE n mod curent, pe antier, verificarea compactrii realizate se face prin determinarea greutii volumice n stare uscat ( d ) i a gradului de ndesare (I D ) pentru fiecare strat elementar admis. n tabelul nr.1 se indic orientativ, valorile medii i minime ale parametrilor de compactare. Tabelul nr.1 Parametri de compactare Greutatea uscat ( d ) Gradul de ndesare
(ID)

U/M

Balast nisipos mediu minim 18,5 19,0 0,70 6- 8

Balast mediu 20,5 21,0 0,85 4 6

minim 19,520,0 0,70

volumic

kN/m3

19,5 - 20 0 0,80

Umiditatea optim

Dup realizarea pernei, verificarea compactrii pe toat grosimea acesteia, se face prin determinarea rezistenei la penetrare dinamic cu con de tip PDU, conform datelor de la pct.7.9 i a celor din anexa nr.2. Modulul de deformaie al pernei poate fi apreciat pe baza corelaiei recomandatn anexa nr.2. 4. UTILAJE DE COMPACTARE Pentru compactarea materialului din pern se pot folosi utilaje terasiere din indicatorul de norme Ts/1981, specifice materialelor granulare i anume: Compactor vibrator cu rulouri netede, tractat, de 55KN; Compactor pe pneuri static, autopropulsat, de 100KN; Compactor cu rulouri netede, autopropulsat, de 100 - 120KN, utilizat n mod excepional cnd lipsesc primele dou utilaje. Aternerea la grosimea stabilit a straturilor elementare, amestecarea i omogenizarea materialului se face cu buldozerul. Buldozerul i utilajul de compactare se folosesc combinat pentru realizarea succesiv a operaiilor specificate mai jos.

5. PROCESUL TEHNOLOGIC DE COMPACTARE


Executarea umpluturii din pern const din urmtoarele operaiuni succesive: Aprovizionarea balastului n zona amplasamentului construciei;

mprtierea balastului cu buldozerul; Umezirea balastului, dac este cazul, cu furtunul sau autocisterna; Amestecarea, omogenizarea i nivelarea stratului elementar cu buldozerul, la grosimea optim rezultatn urma compactrii de prob (vezi i tabelul nr.2); Compactarea propriu-zis a stratului elementar cu unul din utilajele de la pct.4.1. n vederea realiz rii condi iilor generale de calitate din cap.3, se indic orientativ n tabelul nr.2, grosimile stratului elementar (di, dc) ct i numrul minim de treceri suprapuse cu utilajul. di = grosime strat elementar nainte de compactare; dc = grosime strat elementar dup compactare; n = numr minim de treceri suprapuse cu utilajul Tabelul nr.2
Nr

Utilajul

di

dc

(cm)

(cm)

crt

1.

Compactor vibrator cu rulouri netede, tractat de 55KN

50 60

35 45

4-6

2.

Compactor de pneuri static auto 100KN

30 35

25 30

6- 8

3.

Compactor cu rulouri netede autopropulsat de 100 - 120KW

20 25

15 20

10 14

Cantitatea de balast necesar pentru fiecare strat elementar necompactat se stabilete cu ajutorul greutii volumice n stare uscat a balastului afnat determinat pe antier. Cantitatea de ap ce trebuie adugatn cazul cnd balastul are umiditate redus, sub 4 - 5%, rezult orientativ din tabelul nr.3 n funcie de grosimea stratului elementar nainte de compactare (di) i umiditatea balastului pus n oper. Tabelul nr.3 Umiditatea balastului [%] (nainte de compactare) Cantitatea ap [litri/m2 ] de di = 60 cm 50 cm 40 cm 30 cm 20 cm
60 50 50 42 40 33 30 25 20 16 10 8 O 1 2 3 4 5

40 30 20

34 25 16

27 20 13

21 15 10

14 10 7

7 5 3

6. COMPACTAREA DE PROB Compactarea de prob se execut pe poligoane experimentale care pot fi ncadrate chiar i n cuprinsul pernei, cu scopul de a stabili pentru utilajul cu care urmeaz a se lucra, grosimea optim a stratului elementar i numrul minim de treceri prin care se realizeaz condiiile de compactare indicate n tabelele nr.1, 2 i 3. Determinrile pe sectoarele de prob se efectueazn prezena proiectantului. Balastul utilizat respectiv, utilajul de compactare vor fi acelea care urmeaz a fi folosite efectiv n lucrare. Pentru fiecare serie de compactri de prob constructorul prin C.T.C. va efectua determinrile indicate n cap.7.2, pe minim 3 probe control. Determin rile astfel efectuate vor fi naintate proiectantului pentru definitivarea proiectului de execuie a pernei, cu referire la utilaje, proces tehnologic i condiiile de calitate a umpluturilor. 7. VERIFICAREA CALIT II UMPLUTURILOR Avnd stabilite tipul utilajului, numrul de treceri ale utilajului, grosimea stratului elementar i umiditatea optim de compactare, se va trece la compactarea efectiv a straturilor pn la realaizarea grosimii pernei. Controlul pe antier al calitii umpluturilor din pern constn efectuarea urmtoarelor determinri pentru fiecare strat elementar: granulozitatea balastului prin metoda cernerii conform STAS 1913/5-85 sau STAS 4606-80; coeficientul de neuniformitate al materialului:

U =
unde:

%60

d60%= diametrul particulelor corespunztoare coninutului de 60% pe curba de granulozitate; d 10 % = diametrul particulelor corespunztoare coninutului de 10% pe curba de granulozitate. Greutatea volumic a balastului pe teren (KN/ m 3 ) dup compactare conform STAS 1913/15-75 folosind metoda determinrii volumului cu api cu folie de material plastic.

Umiditatea balastului W(%) conform STAS 1913/1-82 sau STAS 4606-80. Greutatea volumicn stare uscat (KN/ m3) a balastului compactat cu relaia:

n =

(kN/m3)

100

Gradul de ndesare al balastului (STAS 9850-83), cu relaia:

_ ' rfmax \i d

i dmin)

~
i d

1
\i dmax ' d m

unde: dmin = greutatea volumic a balastului uscat, n starea cea mai afnat dmax = greutatea volumic a balastului uscat, n starea cea mai ndesat Pentru determinarea greutilor volumice dmin i dmax se poate aplica metodologia din STAS 4606-80 prin asimilare, folosind acelai balast extras din groapa executatn pern compactat pentru determinarea greut ii volumice. Se va acorda deosebit aten ie determinrii acestor dou valori i cu deosebire lui dmax pentru care procesul de compactare n laborator trebuie s asigure condiia:
amax
>

Probele pentru controlul compactrii se recolteaz din gropi cu diametrul minim 0,30m i adncimea 0,30m sau egal cu grosimea stratului elementar compactat. Numrul probelor de control rezult cte una pentru fiecare strat elementar i cel puin una la fiecare 20 - 30 m3 de material compactat. n zonele n care condiiile de compactare sunt dificile se vor recolta probe suplimentare. Abaterea admisibil fa de gradul de ndesare prevzut n proiect este de -5% pentru valoarea medie i de -8% pentru cea minim, urmnd a fi definitivate de proiectant pe baza rezultatelor obinute prin compactarea de prob. Poziia punctelor de control se stabilete de ctre proiectant n planul spturilor, iar pe antier, cnd beneficiarul consider necesar, numrul acestora poate fi sporit, respectiv poziia poate fi modificat. Unitatea executant a pernelor din balast va organiza verificarea compactrii acestora cu personal calificat, laboratorul trebuind s respecte prevederile "Nomenclatorului ncercrilor de laborator" i instruciunile de aplicare a acestuia, n conformitate cu Ordinul IGSIC nr.8/noiembrie 1981. Controlul va avea caracter operativ (pe fiecare strat elementar) pentru a se putea lua din timp msurile necesare, n cazul cnd se constat c umplutura din pern nu este corespunztoare. Toate buletinele de ncercri i rezultatele verificrilor se consemneazntr-un registru denumit"Registru de procese verbale pentru verificarea calitii lucrrilor ce devin ascunse" (formular 9-13-107). n cazul n care condiiile de calitate nu sunt ndeplinite, se preleveaz cte dou probe din imediata vecintate a punctelor cu rezultate slabe, fcndu-se astfel o verificare a datelor obinute la prima serie de probe.

Dac nici aceast serie de determinri nu ndeplinete condiiile de calitate prescrise, compactarea stratului respectiv se va considera insuficient, n care caz se vor lua, cu avizul proiectantului, msurile corespunztoare. Controlul pe antier al calitii umpluturilor din perna de balast se face n final, dup realizarea pernei, prin penetrri dinamice cu con de tip PDU, dup metodologia indicatn "Instruciuni tehnice C176-75". n anexa nr.2 se prezint spre exemplificare o diagram de penetrare etalon obinutn cazul unei perne din balast compactat corespunztor. Prin comparaia diagramelor de penetrare cu diagrama etalon obinut la compactarea de prob, se evideniaz zonele insuficient compactate fa de cele compactate corespunztor. n cazul cnd, att probele de control al calitii umpluturilor din pern ct i ncercrile de penetrare dinamic cu con au dat rezultate nesatisfctoare, urmeaz a se executa ncercri de ncrcare pe plac (STAS 8942/3-84). Frecvena cu care se vor executa aceste ncercri va fi stabilit de proiectant n funcie de extinderea zonelor stabilite ca necorespunztoare. 8. RECEPIA LUCRRILOR Recepionarea lucrrilor de umpluturn perna de balast compactat se va face n conformitate cu prevederile "Instruciunilor pentru verificarea calitii i recepia lucrrilor ascunse la construcii i instalaii aferente" i a Normativului C56-85. Ca operaiuni specifice se vor controla i procesele verbale de lucrri ascunse precum i documentaia de antier privind prevederile din Normativul C169-88 cap.7.3. Umpluturile din perna de balast vor fi recepionate pe parcurs i anume pe fiecare strat elementar pentru a se evita refaceri costisitoare. 9. EXECUTAREA LUCRRILOR PE TIMP FRIGUROS La executarea pernelor din balast pe timp friguros se vor respecta msurile generale i cele specifice lucrrilor de terasamente prevzute n Normativul C16-74. 10. MSURI PRIVIND TEHNICA SECURITII MUNCII I PREVENIREA

INCENDIILOR La executarea lucrrilor se vor respecta prevederile din urmtoarele prescripii: Legea nr. 319/2006 - Legea securitii i sntii n munc HGR nr. 1425/2006 pentru aprobarea Normelor metodologice de aplicare a HGR nr. 1091/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 971/2006 privind cerinele minime pentru semnalizarea de securitate HGR nr. 1028/2006 privind cerinele minime de securitate i sntate n munc

prevederilor Legii securitii i snii n munc nr. 319/2006 locul de munc i/sau de sntate la locul de munc referitoare la utilizarea echipamentelor cu ecran de vizualizare

HGR nr. 1051/2006 privind cerinele minime de securitate i sntate pentru

manipularea manual a maselor care prezint riscuri pentru lucrtori, n special cu afeciuni dorsolombare HGR nr. 1048/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 1146/2006 privind cerinele minime de securitate i sntate pentru Ordinul ministrului muncii, solidaritii sociale i familiei nr. 753/2006 privind Ordinul ministrului muncii, solidaritii sociale i familiei nr. 755/2006 pentru utilizarea de ctre lucrtori a echipamentelor individuale de protecie la locul de munc utilizarea n munc de ctre lucrtori a echipamentelor de munc protecia tinerilor n munc aprobarea formularului pentru nregistrarea accidentului de munc - FIAM i a instruciunilor de completare a acestuia munc Norme republicane de protecia muncii, aprobate de Ministerul Muncii i Ministerul Sntii cu ordinele nr.34/1975 i respectiv 60/1975, cu modificrile aduse prin Ordin nr.39/77 i 110/30/77 (b.d.i. 3-4/77 i 5-6/79); Normele de protec ia muncii n activitatea de construc ii-montaj, aprobate de Ordinul MMPS 57/1996 privind norme generale de protecia muncii; Regulamentul MLPAT 9/N/15.03.1993 privind protecia i igiena muncii n construcii Ordinul MMPS 235/1995 privind normele specifice de securitatea muncii la nlime; Ordinul MMPS 255/1995 - normativ cadru privind acordarea echipamentului de Normativele generale de prevenirea i stingerea incendiilor aprobate prin Ordinul MI Legea nr. 53/2003 - Codul Muncii; Decretul nr. 466/1979 privind regimul produselor i substanelor toxice; Legea nr. 126/1995 privind regimul materiilor explozive; Alte acte normative n vigoare n domeniu la data executrii propriu-zise a lucrrilor. Legea nr. 307/2006 privind aprarea mpotriva incendiilor Ordinul ministrului administra iei i internelor nr. 1435/2006 pentru aprobarea M.C.Ind. cu Ordinul nr.1233/D.1980. Directiva Consiliului Comunitilor Europene 89/391/CEE privind introducerea de msuri pentru promovarea mbuntirii securitii i sntii lucrtorilor la locul de

- ed. 1995;

protecie individual; nr. 775/22.07.1998;

Normelor metodologice privind avizarea i autorizarea privind securitatea la incendiu i protecia civil P 118-1999 - Normativ privind sigurana la foc a construciilor NP 086-2005 - Normativ pentru proiectarea, executarea i exploatarea instalaiilor

de stingerea incendiilor

C 300 - 1994 - Normativ de prevenirea i stingerea incendiilor pe durata executrii

lucrrilor de construcii i instalaii aferente acestora 11. MSURI DE PAZ CONTRA INCENDIILOR Att pentru prevenirea ct i pentru stingerea incendiilor ce se pot produce pe antierele unde se execut lucrri de realizare a pernelor din balast se vor respecta prevederile normelor n vigoare referitoare la terasamente. 12. ALTE PREVEDERI Cu ocazia executrii, verificrii i recepiei lucrrilor conexe pernei (spturi, sprijiniri etc) se vor respecta prevederile generale i cele specifice din Normativul C. 169-88 i Normativul C.56-85. Dup executarea spturii generale pn la cota prevzutn proiect va fi chemat geotehnicianul n vederea verific rii naturii i calit ii terenului de la baza pernei, n conformitate cu prevederile legale n vigoare.

NOT : n momentul execu iei se vor aplica normele n vigoare.

rezisten
CAIETE DE SARCINI ARMAREA BETONULUI

R.04

R.04 - CAIET DE SARCINI - ARMAREA BETONULUI

1. GENERALITI Acest capitol cuprinde specifica ii pentru lucr rile de confec ionare i montare a armturilor. 2. STANDARDE DE REFERIN NE012-2010 - Normativ pentru executarea lucrrilor din beton i beton armat C.56-89 - Normativ pentru verificarea calitii i recepia lucrrilor de construcii C.28-83 - Instruciuni tehnice pentru sudarea armturilor de oel beton STAS 438/1-80 - Oel beton laminat la cald P130-99 - Normativ privind urmrirea comportrii n timp a construciilor 3. MATERIALE I PRODUSE Oel beton rotund, neted OB.37 - STAS 437/1-80; Oel beton cu profil periodic PC.52 - STAS 438/1-80; Srm moale - STAS 880-80; Srm tras pentru beton armat - STAS 438/2-80; Plase sudate pentru beton armat - STAS 438/3-80; 4. LIVRARE, DEPOZITARE, MANIPULARE Livrarea oelului beton se face numai conform prevederilor n vigoare i nso it de certificate de calitate care vor cuprinde: - valorile proprietilor mecanice rezultate din ncercri; - rezultatele ndoirii la rece; - rezultatele analizei chimice.

Faz de proiectare:

P.Th. + D.E.

Data:

25.09.2007

pagina 1 din 12

Livrarea oelului beton se face n legturi de bare sau colaci, masa minim a unui colac este de 40kg, iar masa maxim este de 600kg. - colacii vor fi legai strns n trei sau mai multe locuri; - marcarea se va face prin vopsire; - depozitarea oelurilor pentru armturi se va face astfel nct s se evite: a) condiiile care favorizeaz corodarea oelului; b) murdrirea acestuia cu pmnt sau alte materiale. 5. EXECUIA LUCRRILOR DE ARMARE A BETONULUI 5.1. Cur irea i ndreptarea barelor sunt opera ii care trebuie efectuate naintea t ierii i fason rii acestora. La curire se va ndeprta: 1. pmntul, urmele de ulei, vopsea sau alte impuriti; 2. rugina readerent care se desprinde prin lovire cu ciocanul; 3. rugina aderent, prin frecare cu peria de srmn zona de sudare a barelor care urmeaz s fie ndoite prin sudur. Dupndeprtarea ruginei neaderente sau a ruginei aderente, reducerea dimensiunilor seciunii barei nu trebuie s depeasc abaterile limit la diametru prevzute n anexa III.1 din Normativul NE012-99 i anume: - pentru bare cu D 25mm abatere limit de -0,5mm; - pentru bare cu D 25mm abatere limit de -0,75mm Oelul beton livrat n colaci sau bare ndoite, trebuie s fie ndreptat nainte de a se proceda la tiere i fasonare, fr a se deteriora ns profilul. La ntinderea cu troliul, alungirea maxim nu va dep i 2mm/m. Nu se admite ruperea nervurilor sau a proeminenelor n cursul operaiei de ndreptare. 5.2. Fasonarea barelor, confecionarea i montarea carcaselor de armturse va face n strict conformitate cu prevederile proiectului. Barele tiate i fasonate vor fi depozitate n pachete etichetate, n aa fel nct s se evite confruntarea lor i s se asigure pstrarea formei i cureniei n momentul montrii. Armturile sevor termina cu sau fr ciocuri, conform prevederilor din proiect. n cazul arm turilor netede, ciocul se ndoaie la 180 cu raza interioar de min.2,5 d i por iunea dreapt de la capt de 3 d. n cazul armturilor cu profil periodic, ciocul se ndoaie la 90 , cu raza interioar de minimum 2,5 d i poriunea dreapt de la capt de 7 d completate cu prevederi suplimentare din STAS 10107/0-90, cap.6.4, 6.5, 6.,2, 6.3. ndoirea barelor nclinate, a celor de trecere din stlpi n grinzi sau a celor de trecere peste colul unui cadru se va face dup un arc de cerc cu raza de cel puin 10 d. Capetele barelor nclinate trebuie s aib o poriune dreapt cu lungimea de cel puin 20 d n zonele ntinse cu cel puin 10 d n zone comprimate.

n cazul etrierilor care se ndoaie dup un unghi drept, cercul de ndoire va fi de minimum 2 d (D = diametrul etrierului). Fasonarea ciocurilor i ndoirea armturilor se execut cu o micare lent, frocuri. La mainile de ndoit cu dou viteze, nu se admite curbarea barelor din oeluri cu profil periodic la viteza mare a mainii. Fasonarea barelor cu diametre mai mari de 25mm se face la cald. Se recomand s nu se execute fasonarea armturilor la temperaturi sub -10 C. 5.3. Legarea armturilor trebuie efectuat la ncruciarea barelor, prin legturi cu srm neagr sau prin sudur electric prin puncte. Cnd legarea se face cu srm, se vor utiliza 2 fire de srm de 1...1,5mm diametru. Reelele de armturi din plci i din perei vor avea legate n mod obligatoriu dou rnduri de ncruciri marginale, pe ntreg conturul. Restul ncrucirilor, din mijlocul reelelor, vor fi legate din 2 n 2 n ambele sensuri (ah). La grinzi i stlpi, vor fi legate toate ncrucirile barelor armturii cu colurile etrierilor, sau cu ciocurile agrafelor. Restul ncrucirilor acestor bare, cu poriunile drepte ale etrierilor pot fi legate numai n ah (cel puin din 2 n 2). Barele nclinate vor fi legate, n mod obligatoriu, de primii etrieri cu care se ncrucieaz. Etrierii i agrafele montate nclinat fa de armturile longitudinale vor lega de regul de toate barele longitudinale cu care se ncrucieaz. 5.4. Plasele sudate se vor folosi ca arm turi pentru elemente din beton armat, monolite sau prefabricate (plci pentru planee i acoperiuri etc) solicitate de regul numai de ncrcri statice. Utilizarea plaselor sudate se va face n conformitate cu prevederile Normativului NE012-99 (pct.3, 25...3.30) a Instruciunilor P 59-80 i Catalogul MIM ISPS Buzu 1978. Plasele sudate se vor depozita n locuri acoperite fr contact direct cu pmntul pe loturi de aceleai tipuri i notate corespunztor. ncrcarea, descrcarea i transportul plaselor sudate se vor face cu grij, evitndu-se izbirile i deformarea lor sau desfacerea sudurii. Calitatea sudurilor sau a plaselor sudate se verific prin ncercri pe epruvete, precum i prin ncercri pe plase conform prescripiilor menionate n anexa I.1 la Normativul NE012-99. n cazul n care plasele sunt acoperite cu rugin se va proceda la nlturarea prin periere n cel puin 5 zone de cte minimum 20cm, pentru fiecare armtur care intrn alctuirea plasei. 5.5. nndirea barelor se face n conformitate cu prevederile proiectului. n cazurile n care prin proiect nu se indic locul i modul de nndire a barelor, se vor respecta urmtoarele reguli: - poziia nndirii se va stabili de ctre conducctorul de lot care conduce direct execuia lucrrilor respective, n zonele cu cele mai reduse solicitri; - nndirea se efectueazinnd seama de prevederile din cap. II "Caiet de sarcini" din prezentul material.

5.6. Montarea armturilor se poate face bar la bar (bare flotante) sau sub form de subansambluri (carcase sau plase sudate) realizate n ateliere centralizate sau organizate n apropierea obiectivului. Utilizarea subansamblurilor realizate n condiii industriale, asigur o cretere a productivitii muncii. La terminarea montrii armturilor, datorit importanei deosebite a calitii execuiei acestora ct i a faptului c dup turnarea betonului ele nu mai pot fi verificate cu mijloace simple, acestea vor fi obligatoriu recep ionate, ncheindu-se procese verbale de lucr ri ascunse. Pentru a se putea face o comparaie cu cantitatea de armtur prevzutn devize, este necesar s se in o eviden a consumurilor pe obiect sau pri de obiecte. 5.6.1. Montarea barelor flotante dei nu constituie un procedeu recomandabil se utilizeaz la fundaii, grinzi (n special la cele continue), perei i plci. Executarea lucrrilor se va face cu grij pentru a nu introduce n cofraj pmnt, murdrii sau alte corpuri care ar duna calitii betonului. La executarea fundaiilor, pe stratul de beton de egalizare se aeaz barele fasonate conform proiectului, legndu-se ntre ele i montnd distanierii pentru asigurarea stratului de acoperire cu beton. Se introduc de asemenea mustile pentru stlpi sau perei i se fixeaz de armtura fundaiei. Radierele se realizeaz prin introducerea nti a barelor plasei inferioare (drepte sau ridicate) pe locurile nsemnate anterior. Peste ele se aeaz barele pe direcie perpendiculari se leag. Se aeaz caprele de rezemare a plasei superioare i se fixeaz, dup care se introduc barele plasei superioare, mai nti pe o direcie i apoi pe cealalt, legndu-se interseciile conform prevederilor constructive. Urmeaz introducerea distanierilor pentru realizarea stratului de acoperire cu beton. Stlpiise realizeaz prin urmtoarele operaii: - introducerea barelor verticale i legarea lor de musti; - ridicarea etrierilor i legarea lor de sus n jos la distane conform proiectului; - verificarea verticalitii carcasei realizate i ancorarea ei pn la realizarea cofrajului. Grinzilese monteaz dup execuia stlpilor, respectndu-se ordinea operaiilor de mai jos: - nsemnarea pe marginea cofrajului a poziiei etrierilor; - introducerea etrierilor n cofraj cu partea deschisn sus; - introducerea barelor drepte de la partea interioar a grinzii i legarea lor; - aezarea i legarea restului barelor (ridicate, drepte de la partea superioar etc); - nchiderea etrierilor i legarea barelor cu srm. Pereii. Armtura se monteaz de regul dup ce cofrajul unei fee a peretelui este gata executat. - se realizeaz prima reea de bare (orizontal) i vertical;

- se fixeaz de cofraj prin simple crlige sau dispozitive; - se realizeaz a doua reea de bare; - se fixeaz prin distanieri de prima reea i se leag toate barele; - se monteaz al doilea panou al cofrajului. Plcile. Se armeazn urmtoarea ordine a operaiilor: - nsemnarea pe cofraj a poziiei barelor; - aezarea barelor drepte i legarea lor cu srm de armtura grinzilor sau centurilor; - se monteaz apoi barele ridicate (care pot fi aduse fasonate de la banc sau pot fi fasonate cu dispozitivul reglabil special); - se aeaz deasupra armtura de repartiie i se leag cu srm. n cazul plcilor armate pe dou direcii care nu au bare de repartiie, se monteaz mai nti barele drepte i ridicate din rndul de jos pe direcia indicatn proiect, pe care se aeaz al doilea rnd i se leag. Se monteaz de asemenea barele de montaj i clreii. Meninerea distanei fa de cofraj se face cu distanieri (pentru primul rnd) i cu capra (pentru al doilea rnd). Circulaia pe poriunea montat se face pe o podin special sau pe dulapi, sprijinite de asemenea, pe capre. 5.6.2. Montarea carcaselor se face de regul cu ajutorul mijloacelor mecanice de ridicat, dotate cu dispozitive adecvate care permit montarea f r a le deforma sau deteriora. Efectuarea montajului carcaselor necesit o serie de pregtiri printre care: - partea de construcie n care se face montarea s fie degajat de alte elemente sau materiale de construcii; - elementele de cofraj s fie deschise; - cofrajul s fie curat de murdrii, moloz, rumegu, capete de scndur, zpad etc; - verificarea dimensiunilor geometrice ale cofrajului. Aezarea n cofraj a carcaselor trebuie fcut cu grij pentru a nu produce deformarea acestora sau chiar a cofrajului. Montarea carcaselor pentru stlpi se face prin legarea la partea de jos de barele fundaiei sau ale stlpului inferior. Carcasele grinzilor se duc la locul de montaj i se aeaz cu un capt pe cofraj, pe un suport, iar al doilea capt se lasn jos pe cofraj. Dup aceasta, se scoate suportul i se las ntreaga carcas, dup care se verific acoperirea cu beton, fixndu-se definitiv carcasa. Operaiunile necesare montrii carcaselor sunt: - prinderea carcasei de dispozitivul de ridicat care este legat de crligul macaralei; - ridicarea carcasei spre locul de montaj i legarea ei de mustile lsate n acest scop pentru a o fixa; - desfacerea dispozitivului de ridicat al carcasei.

5.6.3. Montarea plaselor sudate comport o anumit operaiune pregtitoare ce are ca scop scurtarea timpului de armare i obinerea unei caliti superioare, aceste operaii sunt: verificarea dimensionali calitativ a plaselor; remedierea defectelor constatate (noduri slabe sau desfcute); prelucrarea propriu-zis prin tieri, decupri, legri de bare suplimentare etc. 5.6.4. Montarea armturii se poate face n dou moduri: - la sol, cu introducerea ulterioarn cofraj, soluie ce permite realizarea cofrajului i armturii n paralel. Pe o platform din raza de aciune a mijlocului de ridicare se realizeaz armtura (inferioar, superioar, distanieri etc) dup care cu un dispozitiv cadru se ia i se monteazn cofraj. - montarea directn cofraj, plas cu plas, care necesitnsemnarea cu cret a poziiei plaselor pe cofraj. Productivitatea muncii este mai sczut dar se limiteaz posibilitatea erorii. Plasele ancorate pe reazeme se monteaz prin tierea ultimei bare transversale i introducerea prelungirii barelor longitudinale ntre etrierii reazemelor. La realizarea armturii cu ajutorul plaselor sudate trebuie urmrit ca: - ultimele dou bare marginale de pe fiecare latur a plaselor s nu prezinte mai mult de 5% noduri nesudate (fa de numrul total de noduri pe bar) i n nici un caz dou noduri alturate nesudate; - a ezarea plaselor s se fac ntr-o succesiune care s permit , f r a stnjeni, montarea plaselor urmtoare: - nndirile prin petrecere s fie executate corect; - s se asigure men inerea pozi iei plaselor n timpul beton rii i asigur rii grosimii stratului de acoperire cu beton. 5.7. Stratul de acoperire cu beton a barelor din elementele de beton armat, are drept scop asigurarea proteciei armturii contra eroziunii i buna conlucrare a acesteia cu betonul. Grosimea necesar a stratului de beton pentru acoperirea armturilor este indicatn cap.II al prezentei lucrri. Montarea armturilor va fi efectuatn poziiile prevzute n proiect, asigurndu-se meninerea acestor poziii i n timpul turnrii betonului. La montare se vor prevedea: - cel puin 3 distanieri la fiecare metru ptrat de plac sau perete; - cel puin un distanier la fiecare metru liniar de grind sau stlp; - cel puin un distanier la fiecare 2m liniari de grindn zona cu armtura pe dou sau mai multe rnduri. Distanierii pot fi confecionai din mas plastic sau prisme de mortar prevzute cu cte o srm pentru a fi legate de armturi. Se interzice folosirea cupoanelor de oel beton.

Pentru meninerea n poziie a armturilor de la partea superioar a plcilor, se vor folosi capre din oel beton sprijinite pe cofraj i dispuse ntre ele la distan de maximum 1m (respectiv 1buc/mp). n cazul plcilor n consol, distana dintre caprele de meninere a poziiei armturii va fi de maximum 50cm (respectiv 4buc/mp). Praznurile i plcuele metalice nglobate vor fi fixate prin puncte de suduri armtura elementului, sau vor fi legate cu srm de cofraj sau armturi, asigurnd meninerea poziiei carcaselor n timpul turnrii betonului. Se recomand ca atunci cnd se dispune de mijloace mecanice de ridicare i montaj, armtura s se monteze sub form de carcase preasamblate, de preferin sudate prin puncte. 5.8. nlocuirea arm turilor se poate efectua, n cazul n care nu se dispune de sortimentul i diametrele prevzute n proiect, cu respectarea urmtoarelor condiii: - adaptarea altor diametre, de acelai tip de oel cu cel nlocuit se va face nct aria armturii s rezulte egal cu cel mai mult 5% mai mare dect cea din proiect; - n cazul armturilor de rezisten din grinzi, diametrul mai mare dect cel prevzut n proiect, dar fr a se schimba tipul de oel; - distanele minime i respectiv maxime, rezultatele ntre bare, precum i diametrele minime adoptate trebuie sndeplineasc condiiile din cap.II; - nlocuirea armturilor cu bare din alt tip de oel dect cel prevzut n proiect, se va efectua numai pe baza datelor precizate de proiectant. 5.9. Executarea lucr rilor de arm turi pe timp friguros n scopul continurii activitii de construcii pe perioada de timp friguros (15 noiembrie - 15 martie) proiectul de organizare va fi completat de ctre executant cu 30 zile naintea nceperii acestei perioade, cu msuri menite s fac posibil aceast continuare. n afara msurilor generale care se iau pe antier, pentru lucrrile de armtur se vor avea n vedere urmtoarele msuri speciale: - depozitarea armturilor se va face de preferinn spaiile acoperite disponibile, iar n cazul c acestea nu exist, se vor proteja (cu prelate, folii), astfel nct s se evite cderea zpezii sau formarea gheii pe suprafaa barelor; - barele pe suprafaa crora s-a format ghea, trebuie curate nainte de prelucrare, prin cioc nire cu ciocan de lemn, prin jet de ap fierbinte, aer cald sau abur. La fel se procedeazi n cazul armturilor montate, dar numai cu puin timp naintea turnrii betonului, pentru a nu se forma din nou gheaa (pojghia) de ghea. - este interzis dezghe area cu ajutorul fl c rii, deorece prin afumarea suprafe ei oelului se micoreaz aderena la beton; - fasonarea armturii se va face la temperaturi pozitive (n cazuri speciale i sub 0C), folosind, dup posibiliti, spaii nchise; - la fundaiile puternice armate, montarea armturilor se va face numai cu puin timp nainte de turnare, deoarece n cazul unei eventuale nghe ri, arm tura ar mpiedica operaiunea de dezgheare a fundului spturii;

- poriunile de armturi care rmn afar din beton dup turnarea acestuia, se vor izola cu grij prin nvelirea cu psl mineral, cli etc i carton asfaltat, pentru a nu se produce nghearea betonului care ader la ele; - n cazul n care sunt necesare suduri, acestea nu vor fi executate la temperaturi sub -5 C dect cu nclzirea barelor de sudat la 40-50 C; - nu se admite sudarea n locuri neacoperite pe timp de ploaie, furtun sau ninsoare; - legturile de bare, plase sau carcase care trebuie ridicate n vederea montrii, se vor cura de zpad sau ghea; - cablurile (ufele) pentru ridicare vor fi de asemenea curate de zpad sau gheai vor fi verificate vizual dac sunt bune pentru a fi utilizate fr toroane sau srme rupte. Legarea sarcinii se face numai de ctre oameni instruii n acest sens, iar comanda de ridicare se va da numai de eful formaiilor de lucru; - pentru asigurarea bunei funcionaliti a utilajelor de debitat-fasonat, acionate de motoare electrice, se vor lua msuri de protejare a motoarelor mpotriva intemperiilor. Se va verifica consistena unsorii n lagre, se va sufla cu aer sub presiune la colector i bobinaj pentru eliminarea prafului sau a umezelii. Se recomand ca prin proiectul de organizare amintit s nu se programeze executarea lucrrilor a cror protecie mpotriva ngheului este dificil sau costisitoare (plci subiri n ncperi unde se asigur uor temperaturi necesare lucrului normal - fasonri, asamblri de carcase etc) sau lucrri la elemente de construcii masive executate n spaii care pot fi uor nchise (fundaii etc). 6. CONDIII DE CALITATE, VERIFICAREA I RECEPIA LUCRRILOR DE ARMTURI La terminarea montrii armturii n fiecare element de construcie n care urmeaz a se turna beton, trebuie efectuat o verificare foarte minuioas privind calitatea acestor lucrri, deoarece ele constituie "LUCRRI ASCUNSE", deci nu mai pot fi controlate ulterior cu mijloace simple. Verificrile trebuie efectuate de ctre beneficiar (dirigintele de antier), executant (eful de lot) i proiectant i trebuie s se refere la toate aspectele lucrrii i anume: - num rul, diametrul, pozi ia barelor n diferite sec iuni transversale, caracteristice elementului de structur; - distana dintre etrieri, diametrul acestora i modul lor de fixare; - lungimea poriunilor de bare care depesc reazemele sau care urmeaz a fi nglobate n elemente care se toarn ulterior (musti); - lungimi de petrecere la nndiri; - calitatea sudurilor; - numrul i calitatea legturilor dintre bare; - dispozitivele de meninere a poziiei armturilor n cursul betonrii (capra, distanieri etc);

- modul de asigurare al grosimii stratului de acoperire sau beton al armturii; - poziia, modul de fixare i dimensiunile pieselor. Aceste elemente se consemneaz cronologic n: REGISTRUL DE PROCESE VERBALE PENTRU VERIFICAREA CALITII LUCRRILOR CE DEVIN ASCUNSE. Nu sunt valabile procesele verbale de lucrri ascunse ncheiate numai de eful de lot. Nu se admite trecerea la o nou faz de execuie, nainte de ncheierea procesului verbal referitor la faza precedent, dac aceasta devine o lucrare ascuns. Valabilitatea procesului verbal de lucrri ascunse este de 7 zile; dacn acest timp nu s-au executat betonrile, trebuie refcut procesul verbal. Este interzis prezentarea la banca finanatoare n vederea decontrii taloanelor de plat a obiectelor pentru care nu exist proces verbal de lucrri ascunse care s ateste n mod indubitabil c lucrrile sunt de calitate conform cu proiectul sau cu prescripiile tehnice, sau c n urma remedierilor efectuate au fost aduse n aceast situaie. n procesul verbal de lucrri ascunse ncheiat dup decofrarea elementului din beton se va consemna i poziia mustilor. Se interzice cu desvrire s se execute lucrri care snglobeze sau s ascund defecte ale structurii de rezisten sau care smpiedice accesul i reparaiile corecte ale acestora. Registrul constituie un document oficial i ca atare se numeroteazi se parafeaz de ctre directorul intreprinderii de execuie sau mputernicitul su. Este obligatorie completarea cu cerneal a tuturor rubricilor, iar ruperea foilor i tersturile sunt interzise. Registrul va fi vizat de ctre organele de control tehnic ale intreprinderii executante i ale beneficiarului, ale forurilor tutelare, precum i de ctre proiectant. Scopul procesului verbal de lucrri ascunse este de a se consemna calitatea lucrrilor i conformitatea lor cu proiectul i prescripiile tehnice n vigoare (inclusiv abaterile admisibile). Remedierile defeciunilor sau ale abaterilor mai mari dect cele admisibile, se vor efectua numai cu avizul scris al beneficiarului i respectiv al proiectantului. Dup executarea remedierilor, se va ntocmi un nou proces verbal de lucrri ascunse. 7. NORME DE PROTEC IA MUNCII I PSI Se vor prelucra i respecta de ctre toi factorii interesai, urmtoarele acte normative: - Norme republicane de protecia muncii (elaborate de Ministerul Muncii i Ministerul Sntii n anul 1975, cu modificri n 1977); - Norme de protecia muncii n activitatea de construcii-montaj (aprobate cu Ordinul MCInd nr.1233/D din decembrie 1980); - Norme de prevenire i stingere a incendiilor i Norme de dotare cu maini, instalaii, utilaje, aparatur, echipamente de protecie i substane chimice pentru prevenirea i stingerea incendiilor (elaborat de INCERC, aprobat de MCInd cu Ordinul nr.18/M din 8 iulie 1976).

La executarea lucrrilor se vor respecta prevederile din urmtoarele prescripii: Legea nr. 319/2006 - Legea securitii i sntii n munc HGR nr. 1425/2006 pentru aprobarea Normelor metodologice de aplicare a HGR nr. 1091/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 971/2006 privind cerinele minime pentru semnalizarea de securitate HGR nr. 1028/2006 privind cerinele minime de securitate i sntate n munc HGR nr. 1051/2006 privind cerinele minime de securitate i sntate pentru

prevederilor Legii securitii i snii n munc nr. 319/2006 locul de munc i/sau de sntate la locul de munc referitoare la utilizarea echipamentelor cu ecran de vizualizare manipularea manual a maselor care prezint riscuri pentru lucrtori, n special cu afeciuni dorsolombare HGR nr. 1048/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 1146/2006 privind cerinele minime de securitate i sntate pentru Ordinul ministrului muncii, solidaritii sociale i familiei nr. 753/2006 privind Ordinul ministrului muncii, solidaritii sociale i familiei nr. 755/2006 pentru utilizarea de ctre lucrtori a echipamentelor individuale de protecie la locul de munc utilizarea n munc de ctre lucrtori a echipamentelor de munc protecia tinerilor n munc aprobarea formularului pentru nregistrarea accidentului de munc - FIAM i a instruciunilor de completare a acestuia munc Norme republicane de protecia muncii, aprobate de Ministerul Muncii i Ministerul Sntii cu ordinele nr.34/1975 i respectiv 60/1975, cu modificrile aduse prin Ordin nr.39/77 i 110/30/77 (b.d.i. 3-4/77 i 5-6/79); Normele de protec ia muncii n activitatea de construc ii-montaj, aprobate de Ordinul MMPS 57/1996 privind norme generale de protecia muncii; Regulamentul MLPAT 9/N/15.03.1993 privind protecia i igiena muncii n construcii Ordinul MMPS 235/1995 privind normele specifice de securitatea muncii la nlime; Ordinul MMPS 255/1995 - normativ cadru privind acordarea echipamentului de Normativele generale de prevenirea i stingerea incendiilor aprobate prin Ordinul MI Legea nr. 53/2003 - Codul Muncii; Decretul nr. 466/1979 privind regimul produselor i substanelor toxice; M.C.Ind. cu Ordinul nr.1233/D.1980. Directiva Consiliului Comunitilor Europene 89/391/CEE privind introducerea de msuri pentru promovarea mbuntirii securitii i sntii lucrtorilor la locul de

- ed. 1995;

protecie individual; nr. 775/22.07.1998;

Legea nr. 126/1995 privind regimul materiilor explozive; Alte acte normative n vigoare n domeniu la data executrii propriu-zise a lucrrilor. Legea nr. 307/2006 privind aprarea mpotriva incendiilor Ordinul ministrului administra iei i internelor nr. 1435/2006 pentru aprobarea

Normelor metodologice privind avizarea i autorizarea privind securitatea la incendiu i protecia civil P 118-1999 - Normativ privind sigurana la foc a construciilor NP 086-2005 - Normativ pentru proiectarea, executarea i exploatarea instalaiilor C 300 - 1994 - Normativ de prevenirea i stingerea incendiilor pe durata executrii

de stingerea incendiilor lucrrilor de construcii i instalaii aferente acestora n afara msurilor generale de protecia muncii trebuie respectate msurile specifice lucrrilor de armturi i anume: barele de beton se descol cesc i se ndreapt pe un teren de lucru separat i la diferite utilaje folosite pentru ndeprtarea (descolcire), tiere, ndoire, mprejmuit, la o distan de minimum 2m de spaiile de circulaie; pretensionare, transport etc a oelului beton se vor respecta instruciunile specifice fiecrui utilaj; la mecanismul de ndeprtare se vor respecta: naintea pornirii motorului se va face acoperirea cu aprtoare de protecie; capetele barelor se fixeaz numai cnd mecanismul de ndreptat nu este n poriunea de trecere a barelor pe tambur trebuie acoperit pe timpul tierea barelor se face cu tane mecanice sau electrice; barele mai scurte de

funciune; funcionrii; 0,30m nu se in cu mna; cuitele tanelor trebuie s fie bine ascuite i fixate astfel ca distana dintre ele s fie mai mic de 1mm; ndoirea manual a barelor trebuie fcut cu chei speciale care trebuie s fie n bun n timpul curirii barelor de rugin, muncitorii trebuie s poarte ochelari de protecie, la elementele izolate, grinzi - montarea arm turilor se face prin partea lateral a la carcasele care se monteaz vertical, este interzis s se lege barele stnd pe etrieri carcasele de armturi pentru stlpi, grinzi, piloi etc se sudeazn poziie orizontal pe circulaia pe armturile carcaselor sudate este interzis; dac armturile sunt montate n apropierea unei linii electrice aflate sub tensiune, se iau stare; iar rugina i praful trebuie ndeprtate cu perii sau mturi; cofrajului (i nu din interiorul lui) care dup montare se nchide; legai interior sau pe barele armturii; capre sau pe suporturi metalice;

msurile de electrosecuritate necesare;

msuri de electrosecuritate se iau i n cazul executrii lucrrilor de sudur; montarea armturilor planeelor se face numai dup verificarea susinerilor cofrajelor este interzis prezena oric rei persoane n apropierea muncitorilor care fasoneaz este interzis a se executa de pe cutia cofrajului montarea armturilor n grinzi sau alte

ca s poat prelua greutatea oamenilor i armturilor; manual oel beton, deoarece exist pericol de lovire n cazul scprii barelor; elemente izolate; trebuie amenajate, pe partea lateral a cofrajului, schele de lucru cu balustrade de 0,70m; pentru montarea armturilor la nlime, cnd nu este posibil a se realiza parapete de pe toat durata lucr rilor, muncitorul este obligat s poarte pe cap cascheta de agarea, manipularea i depozitarea barelor fasonate sau a carcaselor, se va face n protecie, muncitorii vor fi dotai cu centuri de siguran; protecie; strict concordan cu msurile de securitate specifice. NOT : n momentul execu iei se vor aplica normele n vigoare.

rezisten
CAIETE DE SARCINI ARM TURI

R.05

R.05 - CAIET DE SARCINI - ARMTURI

1. GENERALITI Acest capitol cuprinde specificaii pentru lucrrile de confecionare i montare a armturilor. 2. STANDARDE, NORMATIVE I PRESCRIPII CARE GUVERNEAZ EXECUIA DE ANSAMBLU A LUCRRII. STAS-uri:

STAS 438/1,3-89 STAS 438/2-91


10107/0-90-Calculul i alc tuirea elementelor structurale din beton, beton armat i beton precomprimat. NORMATIVE: NE012-2010-Normativ pentru executarea lucrrilor din beton i beton armat. ST-009-96 - Specifica ie tehnic privind cerin ele i criteriile de performan pentru produse din oel utilizate ca armturi n structuri din beton C28-83-Instruciuni tehnice pentru sudarea armturilor de oel-beton. P59-86-Instruciuni tehnice pentru proiectarea i folosirea armrii cu plase sudate a elementelor de beton. C56-85-Normativ pentru verificarea calit ii i recep ia lucr rirlor de construc ii i instalaii aferente. 3. MATERIALE I STANDARDE CARE TREBUIE RESPECTATE S-au utilizat n proiecte pentru armarea elementelor din beton armat arm turi din OB37, PC52 i plase sudate din STNB.Caracteristicile geometrice (diametre, tolerane, seciuni)

Faz de proiectare:

P.Th. + D.E.

Data:

25.09.2007

pagina 1 din 5

ale armturilor, precum i caracteristicile mecanice de livrare (rezistena la rupere la traciune, limita de curgere, alungirea la rupere etc.) sunt cele din STAS 438/1,3-89 i STAS 438/2-91. 4. TESTE, VERIFICRI, PROBE I STANDARDE CARE TREBUIE RESPECTATE Se vor respecta cele prevzute n normativul C56-85 i NE012-99. 5. PREPARARE, CONFECIONARE Se vor respecta cele prevzute n normativul NE012-99, cap.3. 6. EXECUIA LUCRRILOR Lucrrile de armare prevzute n proiecte nu prezint dificulti deosebite de execuie. Se vor utiliza numai materialele care corespund proiectelor i normelor tehnice n vigoare (standarde, norme de fabricaie etc.). Vezi caietul de sarcini privitoare la betonul armat. Pentru detalii constructive se vor studia n afara celor prevzute n proiect i cele prevzute n STAS 10107/0-90, cap.6, n special cele prevzute fa de modul de realizare a ciocurilor armturilor. Livrarea oelului beton se va face conform prevederilor n vigoare i trebuie s fie nsoite de certificatul de calitate emis de productor. In cazurile n care livrarea se face de ctre o baz de aprovizionare, aceasta este obligat s transmit copii ale certificatelor de calitate, corespunztoare loturilor pe care le livreaz. Barele de o el beton, trebuie s fie depozitate separat pe tipuri i diametre, urmrindu-se: evitarea condiiilor care favorizeaz corodarea oelului; evitarea murdririi acestora cu pmnt sau alte materiale; asigurarea posibilitilor de identificare uoar a fiecrui sortiment i diametru. Pentru fiecare cantitate i diametru aprovizionat, operaia de verificare va consta din: constatarea existenei certificatului de calitate; verificarea dimensiunilor seciunii; examinarea aspectului; verificarea prin ndoire la rece. La cererea proiectantului sau beneficiarului sau cnd exist dubii asupra calitii oelurilor aprovizionate, executantul va proceda la verificarea caracteristicilor mecanice prin ncercarea la traciune. nainte de fasonarea armturilor barele trebuie s fie curate i drepte. n acest scop se va ndeprta pmntul, urmele de ulei, vopsea sau alte impuriti. Fasonarea barelor, confecionarea i montarea eventualelor carcase sau plase de armtur se va face n strict conformitate cu prevederile proiectului. Barele tiate i fasonate vor fi depozitate n pachete etichetate, n aa fel nct s se evite confundarea lor i s se asigure pstrarea formei i cureniei lor pnn momentul montrii.

ndoirea armturilor se execut cu o micare lent froc. La mainile de ndoire cu dou viteze, nu se admite curbarea barelor cu profil periodic la viteza mare a mainii. Se va aduce la cunotina proiectantului dac la ndoire barele au tendina de a se fisura sau rupe. Este interzisnclzirea sau tierea cu flacr a barelor. Arm turile vor fi montate n pozi ia prev zut n proiect i detaliile de armare, meninerea poziiei trebuie s fie asiguratn tot timpul turnrii betonului. Pentru asigurarea stratului de acoperire cu beton prevzut, se vor utiliza distanieri confecionai din mas plastic sau prisme de mortar prevzute cu cte o srm pentru a fi legate de arm turi. Se interzice folosirea cupoanelor de 0 el-beton. La montare se vor prevedea: cel puin trei distanieri la fiecare metru ptrat de plac sau perete; cel puin un distanier la fiecare metru liniar de grind sau stlp; cel puin un distanier ntre rndurile de armturi la fiecare doi metri liniari de grinda n zona cu armtur pe dou sau mai multe rnduri; capre din oel-beton sprijinite de cofraj i dispuse ntre ele la distane de maximum un metru (respectiv o bucat pe un mp), pentru meninerea n poziie a armturilor de la partea superioar a plcilor. Dac nu se specific altfel prin proiect, legarea armturilor se va face cu dou fire de srm neagr de 1,5 mm diametru (STAS 889-89) n modul urmtor: - re ele de arm turi din pere i i pl ci vor fi legate n mod obligatoriu la toate ncrucirile dac latura reelei este mai mare de 30 cm. n caz contrar vor fi legate n mod obligatoriu douncruciri marginale pe tot conturul, iar restul ncrucirilor din doi n doi n ambele sensuri (ah). nn direa barelor se va face prin petrecere sau prin sudur n conformitate cu prevederile proiectului. La fasonarea i montarea arm turilor se vor respecta toleran ele prev zute n normativul NE012-99. Stratul de acoperire cu beton se consider de la faa interioar a cofrajului la faa exterioar a armturii. Stratul de acoperire cu beton, dac prin proiectul elementului nu se specific altfel, conform STAS 10107/0-90. 7. VERIFIC RI N VEDEREA RECEP IEI Se vor respecta strict prevederile din "Sistemul de evidenn activitatea de control tehnic al calitii construciilor" elaborat de IGSIC i publicat n BC nr.2/81. 8. MSURTORI I DECONTRI Lucrrile de armare se vor msura i deconta de ctre beneficiar la kg.

9. MSURI PRIVIND TEHNICA SECURITII MUNCII I PREVENIREA INCENDIILOR


La executarea lucrrilor se vor respecta prevederile din urmtoarele prescripii: Legea nr. 319/2006 - Legea securitii i sntii n munc HGR nr. 1425/2006 pentru aprobarea Normelor metodologice de aplicare a HGR nr. 1091/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 971/2006 privind cerinele minime pentru semnalizarea de securitate HGR nr. 1028/2006 privind cerinele minime de securitate i sntate n munc HGR nr. 1051/2006 privind cerinele minime de securitate i sntate pentru

prevederilor Legii securitii i snii n munc nr. 319/2006 locul de munc i/sau de sntate la locul de munc referitoare la utilizarea echipamentelor cu ecran de vizualizare manipularea manual a maselor care prezint riscuri pentru lucrtori, n special cu afeciuni dorsolombare HGR nr. 1048/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 1146/2006 privind cerinele minime de securitate i sntate pentru Ordinul ministrului muncii, solidaritii sociale i familiei nr. 753/2006 privind Ordinul ministrului muncii, solidaritii sociale i familiei nr. 755/2006 pentru utilizarea de ctre lucrtori a echipamentelor individuale de protecie la locul de munc utilizarea n munc de ctre lucrtori a echipamentelor de munc protecia tinerilor n munc aprobarea formularului pentru nregistrarea accidentului de munc - FIAM i a instruciunilor de completare a acestuia munc Norme republicane de protecia muncii, aprobate de Ministerul Muncii i Ministerul Sntii cu ordinele nr.34/1975 i respectiv 60/1975, cu modificrile aduse prin Ordin nr.39/77 i 110/30/77 (b.d.i. 3-4/77 i 5-6/79); Normele de protec ia muncii n activitatea de construc ii-montaj, aprobate de Ordinul MMPS 57/1996 privind norme generale de protecia muncii; Regulamentul MLPAT 9/N/15.03.1993 privind protecia i igiena muncii n construcii Ordinul MMPS 235/1995 privind normele specifice de securitatea muncii la nlime; Ordinul MMPS 255/1995 - normativ cadru privind acordarea echipamentului de Normativele generale de prevenirea i stingerea incendiilor aprobate prin Ordinul MI M.C.Ind. cu Ordinul nr.1233/D.1980. Directiva Consiliului Comunitilor Europene 89/391/CEE privind introducerea de msuri pentru promovarea mbuntirii securitii i sntii lucrtorilor la locul de

- ed. 1995;

protecie individual; nr. 775/22.07.1998;

Legea nr. 53/2003 - Codul Muncii; Decretul nr. 466/1979 privind regimul produselor i substanelor toxice; Legea nr. 126/1995 privind regimul materiilor explozive; Alte acte normative n vigoare n domeniu la data executrii propriu-zise a lucrrilor. Legea nr. 307/2006 privind aprarea mpotriva incendiilor Ordinul ministrului administra iei i internelor nr. 1435/2006 pentru aprobarea

Normelor metodologice privind avizarea i autorizarea privind securitatea la incendiu i protecia civil P 118-1999 - Normativ privind sigurana la foc a construciilor NP 086-2005 - Normativ pentru proiectarea, executarea i exploatarea instalaiilor C 300 - 1994 - Normativ de prevenirea i stingerea incendiilor pe durata executrii

de stingerea incendiilor lucrrilor de construcii i instalaii aferente acestora NOT : n momentul execu iei se vor aplica normele n vigoare.

rezisten
CAIETE DE SARCINI BETOANE SIMPLE I ARMATE

R.06

R.06 - CAIET DE SARCINI - BETOANE SIMPLE I ARMATE

1. GENERALITI
n acest capitol sunt prezentate, pe mrci i elemente de construcii, condiiile de preparare i punere n oper a betonului. 2. MATERIALE I PRODUSE 2.1. Betonul marf- betonul livrat de staiile de betoane trebuie, obligatoriu, s fie nsoit de fi de calitate. Sortimentele de beton ce se livreaz trebuie s respecte, pentru fiecare marc, urmtoarele caracteristici prevzute de norme: consisten; mrirea maxim a agregatelor; tipul de ciment utilizat.

2.2. Ciment Stabilirea cimentului s-a fcut innd seama de urmtoarele criterii: subterane. 2.3. Agregate Pentru prepararea betoanelor, avnd densitatea aparentntre 2201 i 2500kg/mc, se folosesc agregate grele, provenitte din sfrmarea natural sau din concasarea rocilor. Agregatele trebuie s provin din roci stabile, adic nealterabile de aer, ap sau nghe, se interzice folosirea agregatelor provenite din roci feldspatice sau istoase. marca betonului; condiii de execuie; condiii de exploatare.

Pentru alegerea tipului de ciment pentru fundaii s-a inut seama de agresivitatea apei

Faz de proiectare:

P.Th. + D.E.

Data:

25.09.2007

pagina 1 din 18

2.4. Apa
Apa utilizat la prepararea betonului trebuie sndeplineasc urmtoarele condiii: s fie limpede i fr miros; s aib reacie neutr, slab acid sau slab alcalin (pentru max.=10; pt. min.=4); s nu conin deeuri sau scurgeri provenite de la fabrici de celuloz, zahr, glucoz,

acid sulfuric, vopsele, cocserii, ateliere de galvanizare) 2.5. Livrarea, depozitarea, manipularea Cimentul poate fi depozitat n saci sau n vrac. Depozitarea cimentului ambalat n saci trebuie s se facn ncperi nchise, fr umezeal, bine aerisite. Pstrarea cimentului n vrac se face n depozite tip siloz. Durata de depozitare nu va depi 3 luni de la data fabricrii pentru cimenturile cu ntrire normali respectiv o lunn cazul cimenturilor cu ntrire rapid (RIM). Cimentul depozitat un timp mai ndelungat nu va putea fi ntrebuinat la lucrri de beton i beton armat dect dup verificarea strii de conservare i a rezistenelor mecanice. Cimenturile care vor prezenta rezistene mecanice inferioare limitelor prescrise mrcii respective, vor fi declasate i utilizate numai n domeniul corespunztor noii mrci. nainte de folosirea cimentului se va face controlul calitii cimentului, efectundu-se urmtoarele verificri: constatarea existenei certificatului de calitate examinarea strii de conservare determinarea nceputului i sfritului zilei verificarea constanei de volum

Aceste verificri se respect lunar precum i n cazul evenimentelor accidentale ca: umezire, amestecare cu corpuri strine. Depozitarea agregatelor se face pe platforme betonate i separat pe sorturi compartimentate corespunztor evitrii amestecrii cu alte sorturi. 3. EXECUTAREA LUCRRILOR DE BETONARE 3.1. Prepararea i transportul betonului Prepararea i verificarea caracteristicilor betonului se face corespunztor precizrilor din Normativul NE012-99, cap.5. Transportul betonului de lucrabilitate L.3 i L.4 (tasarea conului cu 5-9cm respectiv 10...15cm) se face cu autoagitatoare, iar a celor cu lucrabilitate L.2 (tasarea conului cu 1...4cm) cu autobasculante cu ben amenajate corespunztor. Se admite transportul betonului de lucrabilitate L.3 cu autobasculanta cu condiia ca la locul de descrcare s se asigure reomogenizarea amestecului. Transportul local al betonului se poate efectua cu bene, pompe, vagonei, benzi transportoare, jgheaburi sau roabe.

Mijloacele de transport trebuie s fie etane pentru a nu permite pierderile laptelui de ciment. Pe timp de ari sau ploaie, suprafaa liber de beton trebuie s fie protejat, astfel nct s se evite modificarea caracteristicilor betonului. Durata de transport se consider din momentul nceperii nc rc rii mijlocului de transport i sfritul descrcrii acesteia i nu poate depi valorile de mai jos dect cnd se utilizeaz aditivi ntrzietori: Temperatura amestecului de beton C ntre 10 i 30C sub 10C Cimenturi de marca 35 60 90 Cimenturi de marca 40 30 60 Durata maxim de transport* (minute)

Ori de cte ori intervalul de timp dintre desc rcarea i renc rcarea cu beton a mijloacelor de transport depete o or, precum i la ntreruperea lucrului, acestea vor fi curate cu jet de ap.

3.2. Pregtirea turnrii betonului


nainte de a se ncepe turnarea betonului se vor verifica: corespondena cotelor cofrajelor, att n plan orizontal ct i pe vertical, cu cele din orizontalitatea i planeitatea cofrajelor plcilor i grinzilor; verticalitatea cofrajelor stlpilor sau diafragmelor i coresponden a acestora n existena msurilor pentru meninerea formei cofrajelor i pentru asigurarea msurile pentru fixarea cofrajelor de elemente de susinere; rezistena i stabilitatea elementelor de susinere existente i corecta montare i proiect;

raport cu elementele nivelelor inferioare; etaneitii lor;

fixare a susinerilor, existena penelor sau a altor dispozitive de decofrare, a tlpilor pentru repartizarea presiunilor pe teren, etc; dispoziia corect a armturilor i corespondena diametrelor i numrul lor, cu cele din proiect, solidarizarea armturilor ntre ele (prin legarea, durura, petrecere) existena n numr suficient a distanierilor; instalarea conform planului (proiectului), a pieselor ce vor r mne nglobate n beton sau care servesc pentru crearea de goluri. n cazul n care se constat nepotriviri fa de proiect sau se apreciaz ca neasigurat rezistena i stabilitatea susinerilor, se vor adopta msuri corespunztoare.

* n cazul autobasculantelor, durata maxim se reduce cu 15 minute.

nainte de a se ncepe betonarea, cofrajul i armturile se vor cura de eventualele corpuri strine, mortar rmas de la turnarea precedent, rugin neaderent etc i se va proceda la nchiderea ferestrelor de curire. n urma efecturii verificrilor i msurilor menionate mai sus, se va proceda la consemnarea celor constatate ntr-un proces verbal de lucrri ascunse. Dac pn la nceputul betonrii intervin unele evenimente de natur s modifice situaia constatat (ntreruperi, accidente etc) se va proceda la o nou verificare conform prevederilor de la pct. 2.1. i la ncheierea altui proces verbal. Suprafa a betonului turnat anterior i nt rit, care va veni n contact cu betonul proaspt, va fi curat cu deosebit grij prin ciocnire, de pojghia superficial de ciment i de betonul slab compactat, ndeprtndu-se apoi materialul prin splare cu jet de ap sau aer comprimat. Cofrajele din lemn, beton vechi i zidriile, vor fi bine udate cu ap de mai multe ori, cu 2-3 ore nainte i imediat naintea turnrii betonului, iar apa rmas n denivelri va fi ndeprtat. Se vor verifica, de asemenea, suprafeele de zidrie pe care urmeaz a se turna betonul, prin confruntarea cotelor reale cu cele din proiect i se va proceda la curirea resturilor de mortar. Dac se constat crpturi ntre scndurile de cofraj, care nu s-au nchis la udarea acesteia, ele vor fi astupate. nainte de turnarea betonului trebuie verificat funcionarea corect a utilajelor de transport i de compactare a betonului. Se interzice nceperea betonrii nainte de efectuarea verificrilor i msurilor indicate la pct.3.2.

3.3. Reguli generale de betonare


3.3.1. Betonarea unei construcii, va fi condus nemijlocit de maistrul sau eful punctului de lucru. Acesta va fi permanent la locul de turnare i va supraveghea comportarea i meninerea poziiei iniiale a susinerilor cofrajelor i armturilor i va lua msuri operative de remediere a oricror deficiene constatate. Att deficienele constatate ct i msurile adoptate vor fi consemnate n condica de betoane. 3.3.2.Betonul trebuie s fie pus n lucrare n maximum 15 minute de la aducerea lui la locul de turnare. Punerea n lucrare se va face frntreruperi, iar dac acestea nu pot fi evitate se vor crea rosturi de lucru, conform prevederilor de la pct.6.6. 3.3.3. La turnarea betonului trebuie respectate urmtoarele reguli generale: a) la locul de punere n lucrare, descrcarea betonului se va face n bene, pompe de beton sau jgheaburi, pentru a se evita alte manipulri; b) dac betonul adus la locul de punere n lucru prezint segregri, se va proceda la descrcarea i reamestecarea lui pe platforma special amenajat, fr a se aduga ns ap; c) nlimea de cdere liber a betonului nu trebuie s fie mai mare de 1,5m;

d) turnarea betonului de la nlime mai mare de 1,5m se va face prin tuburi alctuite din tronsoane de form tronconic; e) betonul trebuie s fie r spndit uniform i n grosime de cel mult 50cm. Nu se admite ntinderea betonului prin tragere cu grebla sau azvrlirea cu lopata la distane mai mari de 1,50m; f) se vor lua msuri pentru a se evita deformarea sau deplasarea armturilor fa de poziia prevzutn proiect, ndeosebi pentru armturile dispuse la partea superioar a plcilor n consol, dac totui se vor produce asemenea defecte, ele vor fi corectate n timpul turn rii; g) se va urmri cu atenie nglobarea completn beton a armturilor, respectndu-se grosimea stratului de acoperire, n conformitate cu prevederile proiectului; h) nu este permis ciocnirea sau scuturarea armturii n timpul vibrrii betonului i nici aezarea pe armturi a vibrorului; i) n nodurile cu arm turi dese se va urm ri cu toat aten ia umplerea complet a seciunii, prin ndesarea lateral a betonului cu ipci sau vergele de oel, concomitent cu vibrarea lui; n cazul c aceste msuri nu sunt eficiente, se vor crea posibiliti de acces lateral al betonului prin spaii care s permit ptrunderea vibratorului; j) circulaia muncitorilor i utilajelor de transport n timpul betonrii se va face pe puni speciale care s nu rezeme pe armturi, fiind interzis circulaia direct pe armturi sau pe cofraje; k) n cazul turn rii unor betoane speciale (aparente, torcretare etc) sau a unor elemente de construcii diferite de cele indicate la pct.3.4, se vor respecta prescripiile speciale sau precizrile date prin proiect; l) instalarea podinei pentru circula ia lucr torilor i a mijloacelor de transport pe planeele de beton, precum i depozitarea pe ele a schelelor, cofrajelor i armturilor pentru etajele superioare este permis numai dup 24...36 ore n funcie de temperatura i tipul de ciment utilizat.

3.4. Betonarea diferitelor elemente i pri de construcie


3.4.1. Betonarea fundaiilor La executarea fundaiilor de beton i beton armat se vor respecta i prevederile cuprinse La executarea fundaiilor vor fi avute n vedere urmtoarele: Materialele ntrebuinate trebuie s corespund indicaiilor din proiect i prescripiilor Execuia fundaiilor nu poate snceap dac nu s-a fcut n prealabil controlul spturii Fundaia se va executa, pe ct posibil, frntrerupere pe distana dintre dou rosturi la cap.6 din Normativul C.140/86, la cap.10 din Normativul P.10-86.

din standardele i normele de fabricaie n vigoare; de fundaie. de tasare, n cazul cnd aceast condiie nu a putut fi respectat se va proceda conform prevederilor de la "Rosturi de lucru", avndu-se n vedere i urmtoarele:

durata maxim admis a ntreruperii de betonare, pentru care nu se vor lua m suri

speciale la reluarea betonrii, va fi ntre 1,5 i 2 ore, funcie de tipurile de ciment folosite (cu sau fr adaosuri); n cazul n care rostul de lucru din funda ie nu poate fi evitat, acesta se va realiza suprafaa rostului de lucru va fi perpendicular pe axa fundaiei icanat sau vertical turnarea benzilor de funda ie se va face n straturi orizontale de 30-50cm, iar vertical, la o distan de 1,00m de marginea stlpului; pe toatnlimea; suprapunerea stratului urm tor superior de betoane se va face obligatoriu nainte de nceperea prizei cimentului din stratul inferior; nu se admit rosturi de turnare nclinate la funda ii, cuzine i, pungi de funda ie, nu se admit rosturi de lucru n fundaiile izolate sau sub zonele cu concentrri maxime la construc iile n care fundaiile sunt executate longitudinal, se va urmri ca fiecare betonarea i vibrarea fcndu-se frntrerupere; de eforturi; band de funda ie n parte s fie turnat f r ntrerupere, trecerea la banda urm toare fcndu-se dup ce turnarea benzii precedente a fost terminat; reluarea turnrii se va face dup pregtirea suprafeelor rosturilor; suprafa a rostului de lucru trebuie s fie bine cur at i sp lat abundent cu ap , n cazul ntreruperilor cu durate mai mari, tratarea suprafeelor betonului ntrit va fi:

imediat nainte de turnarea betonului proaspt; udarea ndelungat (8-10ore) nainte de nceperea betonrii; curirea cu peria de srm, jet de aer etc. Pentru a se asigura condi ii favorabile de nt rire i a se reduce deforma iile de contrac ii, se va men ine umiditatea betonului n primele zile dup turnare, protejnd suprafeele libere prin: acoperirea cu materiale de protecie (prelate, rogojini etc); stropirea periodic cu ap, care va ncepe dup 2 pn la 12 ore de la turnare, n funcie

de tipul cimentului utilizat i temperatura mediului. Temperatura minim la care se va proceda la stropire va fi +5C. Executarea rosturilor de tasare se va trata ca o lucrare ascunsi se va recepiona de ctre reprezentantul beneficiarului, n timpul execuiei sale, ncheindu-se un proces verbal de lucrri ascunse. Rostul de tasare se va face ntr-un plan perpendicular pe talpa fundaiei, iar limea sa pentru construcii fundate pe terenuri obinuite, va fi de minimum 3cm pentru construciile fundate pe terenuri dificile, limea rostului se va lua potrivit prescripiilor pentru fundare pe astfel de terenuri. Astuparea poriunilor de sptur rmase n afara fundaiilor se va realiza potrivit cu prevederile cap.1 "Lucrri de terasamente".

naintea turn rii cuzine ilor, se vor verifica toate arm turile din punct de vedere al

num rului de bare, al pozi iei, formei, diametrului, lungimii, distan elor etc, precum i a msurilor pentru meninerea verticalitii mustilor pentru pereii subsolului. Se verific, de asemenea, cofrajelen privina corespondenei ca poziie i dimensiuni cu proiectul, dac au fost cur ate i corect preg tite, precum i dimensiunile stratului de acoperire, a c rui grosime minim va fi: pentru fundaii cu strat de egalizare, la armturile de la faa inferioar: 35mm; pentru feele fundaiilor n contact cu pmntul: 45mm; abaterile limit pentru dimensiunile stratului de acoperire sunt de 10mm. Rezultatele verificrilor, att pentru armturi, ct i pentru cofraje, vor fi consemnate n n cazul n care elementele de beton simplu sau beton armat sunt expuse la umiditate,

procesele verbale de lucrri ascunse, ncheiate ntre beneficiar i executant. se vor respecta prevederile din proiect i din anexa I.3 a Normativului NE012-99 privind m rcile minime de beton, dozajul de ciment i raportul ap - ciment pentru asigurarea gradului de impermeabilitate impus. n cazul n care elementele de beton simplu sau beton armat sunt n contact cu ape naturale agresive, se vor respecta prevederile din proiect i din Anexa I.5 din Normativul NE012-99, privind mrcile de beton, dozajul de ciment, raportul ap - ciment, a tipului de ciment, precum i a stratului minim de beton de acoperire a armturilor, pentru asigurarea gradului de impermeabilitate impus. Cnd betonul se toarn n s p turi cu pere ii nesprijini i, acesta va umple bine tot volumul dintre perei. Dac unele prbuiri sau goluri n teren sunt prea mari, precum i n cazul s p turilor adnci taluzate sau sprijinite, se vor utiliza cofraje, innd seama c umplutura ulterioar cu pmnt s se fac uor i s permit compactarea lui. Fundaiile ce au suprafee nclinate (de regul sub 60 grade fa de vertical) se toarn 3.4.2. Betonarea stlpilor, diafragmelor, pereilor, trebuie s se fac cu respectarea prevederilor de la pct.0 precum i a urmtoarelor reguli: n l imea de c dere liber a betonului pn la fa a superioar a cofrajului, a ferestrelor de betonare sau a feei superioare a elementului ce se toarn nu va depi 1m; betonarea se va face frntrerupere, chiar i atunci cnd turnarea se face prin turnarea se va face n straturi orizontale de 30...40cm nlime; acoperirea cu un ferestre laterale; strat nou trebuie s se fac naintea nceperii prizei cimentului din betonul stratului inferior. 3.4.3. Betonarea grinzilor i plcilor se va face cu respectarea prevederilor de la pct.0. precum i a urmtoarelor reguli: a) turnarea grinzilor i a pl cilor va ncepe dup 1-2 ore de la terminarea turn rii stlpilor sau a pereilor pe care reazem pentru a se asigura ncheierea procesului de n cofraje.

tasare a betonului proaspt introdus n acetia i n acelai timp, pentru a se asigura o bun legturntre betonul nou i cel vechi; b) grinzile i plcile care vin n legtur se vor turna de reguln acelai timp, se admite crearea unui rost de lucru la 1/5... 1/3 din deschiderea plcii i turnarea ulterioar a prii centrale a acestuia. c) turnarea grinzilor se va face n straturi orizontale; d) la turnarea plcilor se vor folosi reperi dispui la distane de max.2,0m pentru a se asigura respectarea grosimii prevzute prin proiect. 3.4.4. Betonarea cadrelor se va face respectnd regulile date la pct.0, 0 i 0 dnd o atenie deosebit zonelor de la noduri, pentru a se asigura umplerea complet a seciunii. 3.5. Compactarea betonului 3.5.1. Compactarea betonului se execut prin vibrarea mecanicn cazul imposibilitii de continuare a compactrii prin vibrare (defectarea vibratoarelor, ntreruperi de curent electric etc), turnarea betonului se va continua pn la pozi ia corespunztoare unui rost, compactnd manual betonul. 3.5.2. Se pot utiliza numai vibratoare omologate, pentru care se cunosc caracteristicile tehnice i funcionale i pentru care se dispune de prescripii de utilizare i ntreinere. 3.5.3. Personalul care efectueaz vibrarea betonului, trebuie s fie instruit n prealabil asupra modului de utilizare, a procedeului pe care urmeaz s-l aplice. 3.5.4. n cazul plcilor, suprafa a betonului vibrat se va nivela imediat dup terminarea acestei operaii cu ajutorul unui dreptar sprijinit pe ipci de ghidare. 3.5.5. Alegerea tipului de vibrare (mrimea capului vibratorului, fora perturbatoare i frecvena corespunztoare acesteia) se va face n funcie de dimensiunile elementelor i de posibilitile de introducere a capului vibrator (butelie) prin barele de armtur. 3.5.6. Lucrabilitatea betoanelor compactate prin vibrare intern se recomand s fie L.3 sau L.3/L.4. 3.5.7. Durata de vibrare optim , din punct de vedere tehnico-economic, se situeaz ntre durata minim de 5sec. i durata maxim de 30sec., n func ie de lucrabilitatea betonului i tipul de vibrator utilizat. Prelungirea duratei de vibrare pn la 60sec., impus de condiii speciale locale, nu este de natur s duneze calitii betonului. 3.5.8.Semnele exterioare dup care se recunoate c vibrarea betonului s-a terminat, sunt urmtoarele: betonul nu se mai taseaz; suprafaa betonului devine orizontali uor lucioas; nceteaz apariia bulelor de aer la suprafaa betonului i se reduce diametrul lor.

3.5.9. Distana dintre dou puncte succesive de introducere a vibratorului de interior este de 1,4r, unde r este raza de aciune a vibratorului. n cazurile n care nu este posibil respectarea acestei distane (din cauza configuraiei armturilor, a unor piese nglobate sau alte cauze) se recomand utilizarea concomitent a mai multor vibratoare, distana ntre ele depind 2r. 3.5.10. Grosimea stratului de beton supus vibrrii se recomand s nu depeasc 3/4 din lungimea capului vibrator (butelie); la compactarea unui nou strat, butelia trebuie s ptrund 5...15cm n stratul compactat anterior. 3.5.11. Vibrarea de suprafa se va utiliza la compactarea betonului din elemente de construcie de suprafa mare i grosimi de 3...35cm, domeniul de grosime optim fiind de 3...20cm. 3.5.12. Lucrabilitatea betoanelor compactate prin vibrare de suprafa , se recomand s fie L.2 (tasare 1...4cm). 3.5.13. Se recomand ca durata vibrrii s fie de 30...60sec. Timpul optim de vibrare se stabile te prin determin ri de prob efectuate n oper cu prima arj de beton ce se compacteaz. 3.5.14. Grosimea stratului de beton necompactat (turnat) trebuie s fie de 1,1...1,35 ori mai mare dect grosimea final a stratului compactat, n func ie de lucrabilitatea betonului. n cadrul determin rilor de prob prev zute la pct.5.13 se stabile te i grosimea stratului de beton necompactat necesar pentru realizarea grosimii finite a elementului. 3.5.15. Distan a dintre dou pozi ii succesive de lucru ale pl cilor i riglelor vibrante trebuie s fie astfel stabilit nct s fie asigurat acoperirea succesiv a ntregii suprafee de beton compactat.

3.6. Rosturi de lucru


n msura n care este posibil, se vor evita rosturile de lucru, deoarece genereaz zone de slab rezisten, organizndu-se execuia astfel nct betonarea s se fac frntreruperea pe nivelul respectiv sau ntre rosturi de dilatare. Cnd rosturile de lucru nu pot fi evitate, poziia lor trebuie s fie stabilit, innd seama de mrimea solicitrilor din diferitele seciuni ale elementelor de construcie i de posibilitile de organizare a lucrului, ele vor fi prevzute n zonele n care solicitrile sunt minime. Cnd rosturile de lucru nu sunt indicate prin proiect, poziia lor va fi stabilit de ctre executant naintea nceperii betonrii, respectndu-se urmtoarele reguli: la stlpi se vor prevedea rosturi numai la baz, n cazul unor tehnologii speciale se la grinzi, dac din motive justificate nu se poate evita ntreruperea, aceasta se va n cazul n care grinzile se betoneaz separat, rostul de lucru se las la 3...5cm sub admit rosturi sub form de grind sau plac. face n regiunea de moment minim. nivelul inferior plcii.

la plci, rostul de lucru va fi paralel cu armtura de rezisten sau cu latura cea mai

mici situat la 1/5 i 1/3 din deschidere. Rosturile de lucru vor fi realizate inndu-se seama de urmtoarele reguli: durata maxim admis a ntreruperilor de betonare pentru care nu este necesar luarea unor msuri speciale la reluarea turnrii, nu trebuie s depeasc momentul de ncepere al prizei cimentului folosit; n lipsa unor determin ri de laborator, acest moment se va considera la 2 ore de la prepararea betonului, n cazul cimenturilor cu adaosuri i respectiv 1,5 ore n cazul cimenturilor fr adaos. n cazul cnd s-a produs o ntrerupere de betonare mai mare, reluarea turnrii este permis numai dup ce betonul a atins rezistena la compresiune de minim 12daN/cmp i dup pregtirea suprafeeleor rosturilor, prin curirea betonului ce nu a fost bine compactat i a pojghiei de lapte de ciment ntrit ce eventual s-a format iar imediat nainte de turnarea betonului proaspt, suprafaa rosturilor va fi splat abundent cu ap.

3.7. Tratarea betonului dup turnare


Pentru a se asigura condiii favorabile de ntrire i a se reduce deformaiile din contracie, se va asigura meninerea umiditii betonului minim 7 zile dup turnare, protejnd suprafeele libere prin: acoperirea cu materiale de protecie stropirea periodic cu ap aplicarea de pelicule de protecie

Acoperirea cu materiale de protecie se va face cu: prelate, rogojini, strat de nisip, etc. Aceast operaie se face de ndat ce betonul a cptat suficient rezisten pentru ca materialul s nu adere de suprafaa acoperit. Materialele de protecie vor fi meninute permanent n stare umed. Stropirea cu ap va ncepe dup 12 ore de la turnare n funcie de tipul de ciment utilizat i temperatura mediului, dar imediat dup ce betonul este suficient de ntrit pentru ca prin aceast operaie s nu fie antrenat pasta de ciment. Stropirea se va repeta la intervale de 2-6 ore, n aa fel nct suprafaa betonului s se menin umed. Se va folosi ap care ndeplinete condiiile prevzute pentru apa de amestecare a betonului, care poate proveni din reeaua public sau din alt surs. n ultimul caz, apa trebuie sndeplineasc condiiile tehnice prevzute n STAS 790-84. Stropirea se va face prin pulverizarea apei. n cazul n care temperatura mediului este mai mic dect 5 grade C, nu se va proceda la stropirea cu ap. Pe timp ploios, suprafeele de beton proaspt vor fi acoperite cu prelate sau folii de polietilen, att timp ct prin cderea precipitaiilor exist pericolul antrenrii pastei de ciment.

Betonul ce ar urma s fie n contact cu apa curgtoare va fi protejat de aciunea acestora prin devierea provizorie a apei timp de cel puin 7 zile, dup care turnarea, sau prin sisteme etane de protecie (palplane sau batardouri).

3.8. Executarea lucrrilor de beton pe timp friguros


Prevederi generale n cazul lucr rilor executate pe timp friguros, se vor respecta prevederile din Normativele C.16-84 i NE012-99. Msurile specifice ce se adoptn perioada de timp friguros se vor stabili innd seama de: regimul termoclimatic real existent pe antier n timpul prepar rii, transportului, dimensiunile i masivitatea sau subirimea elementelor ce se betoneaz; gradul de expunere a lucrrilor - ca suprafai durat - la aciunea timpului friguros intensitatea prezumat a frigului n perioada respectiv. turnrii i protejrii betonului;

n cursul ntririi betonului; La executarea pe timp friguros a betoanelor de orice fel este necesar s se exercite un control permanent i deosebit de exigent din partea conduc torului tehnic al lucr rii, delegatului CTC i al beneficiarului i, oricnd va fi nevoie, din partea proiectantului. n procesele verbale de lucrri ascunse se vor meniona msurile adoptate pentru protecia lucrrilor i constatrile privind eficiena acestora. Lucrri executate monolit Cofrajele trebuie s fie bine curate de zpadi ghea. Se recomand ca imediat naintea turnrii betonului s se procedeze la curirea final prin intermediul unui jet de aer cald sau abur. n ceea ce privete susinerile cofrajelor, se va acorda o atenie deosebit rezemrii lor, lundu-se msurile corespunztoare, n funcie de comportarea la nghe a terenurilor i anume: pentru pmnturile stabile la nghe, rezemarea popilor se va face pe tlpi aezate pentru pmnturi nestabile, precum i n cazul umpluturilor, popii se vor aeza pe pe pmntul curat n prealabil de zpad, gheai stratul vegetal i nivelat. grinzi cu suprafaa mare de rezemare, pe fundaii existente etc. n funcie de condiiile de temperatur, suprafaa expusi forma elementelor, se va stabili tipul de cofraj, modul de protejare a acestuia cu materiale termoizolante sau de nclzire, precum i modul de rezemare a susinerilor. Depozitarea armturilor se va face de preferinn spaii acoperite disponibile, n lipsa unor asemenea spaii, armturile vor fi protejate astfel ca s se evite cderea zpezii sau formarea gheii pe suprafaa barelor. Barele acoperite cu ghea vor fi curate nainte de tiere i turnare, prin ciocnire cu un ciocan de lemn.

Fasonarea armturilor se va face numai la temperaturi pozitive folosind, dup caz, spaii nclzite. Dezghearea cu ajutorul flcrii este interzis. Se vor utiliza tipuri de ciment indicate pentru elemente supuse pe antier la tratament termic n scopul accelerrii ntririi betonului, conform anexei IV.1 din Normativul NE012-99. Pentru betoane de marca B.200 i B.250, tipurile de ciment indicate a se utiliza sunt Pa.35, Hz.35, SR.35 i SRA.35. Cimentul de tipul M.30 poate fi utilizat numai cu acordul proiectantului i numai justificat de imposibilitatea procurrii unui tip din cimenturile indicate a se utiliza din considerente tehnico-economice temeinic fundamentate. Se recomand utilizarea la prepararea betoanelor a aditivilor plastifiani, acceleratori sau antigel, n funcie de particularitile lucrrilor. Utilizarea aditivilor se va face conform prevederilor din anexa V.4 din Normativul NE012-99. La stabilirea compoziiei betonului se va urmri adoptarea unei cantiti ct mai reduse de ap de amestec. Reeta de beton afiat la locul de preparare a betonului trebuie s indice urmtoarele: temperatura apei la introducerea n amestec n funcie de temperatura agregatelor temperatura betonului la descrcarea din betonier, care trebuie s fie cuprins n ziua preparrii betonului; ntre +15 grade C i +30 grade C. La transportul betonului se vor lua msuri pentru limitarea la minimum a pierderilor de cldur ale betonului prin: evitarea distanelor mari de transport, a staionrilor pe trasee i a transbordrilor n cazul benelor i basculantelor, acestea vor fi acoperite cu prelate. betonului; naintea ncrcrii unei noi cantiti de beton, se va verifica dacn mijlocul de transport utilizat nu exist ghea sau beton ngheat, acestea vor fi ndeprtate cu grijn cazul c exist, folosind un jet de ap cald. Este obligatorie compactarea tuturor betoanelor prin vibrare mecanic. Protejarea betonului dup turnare trebuie s asigure acestuia n continuare a temperaturii de min. +5 grade C, pe toat perioada de ntrire necesar pn la atingerea rezistenei de min.50daN/cmp, moment de la care aciunea frigului asupra betonului nu mai poate periclita calitatea acestuia. n acest scop, suprafeele libere ale betonului vor fi protejate imediat dup turnare, prin acoperire cu prelate, folii de polietilen, saltele termoizolante etc, astfel nct ntre ele i beton s rmn un strat de aer staionar (neventilat) de 3...4cm grosime. Durata minim de meninere a proteciei pentru atingerea rezistenei de 50daN/cmp se numete "durat de prentrire" i este determinat de: tipul de ciment utilizat i valoarea raportului A/C; temperatura medie a betonului din lucrare.

Durata de prentrire se poate aprecia cu ajutorul diagramelor din fig.

Decofrarea se poate efectua numai dup verificarea rezistenei pe probe de beton pstrate n aceleai condiii ca i elementul n cauzi dup examinarea atent a calitii betonului pe feele laterale ale pieselor turnate, efectundu-se n acest scop unele decofrri pariale, de prob:

3.9. Decofrarea 3.9.1. Reguli generale


La ndeprtarea elementelor de cofraj trebuie avut n vedere ca rezistena betonului s fi atins valorile de mai jos(exprimate direct sau n procente fa de marc ): Elemente de cofraj ce se Deschiderea elementului de beton n ndeprteaz L<6 1. Prile laterale 2. Feele interioare cu meninerea siguran 3. Popii de susinere 70% 80% 90% Stabilirea rezistenelor la care au ajuns prile de construcie se va face prin ncercarea epruvetelor de control confecionate n acest scop i pstrarea n condiii similare elementelor n cauz, conform prevederilor din STAS 1275-81 sau prin ncercri nedistructive. n cursul operaiei de decofrare se vor respecta urmtoarele: desfurarea operaiei va fi supravegheat direct de ctre conductorul de lot. n cazul n care se constat defecte de turnare (goluri, zone segregate etc) care pot afecta stabilitatea construciei, decofrarea se va sista pn la aplicarea msurilor de remediere sau consolidare; susinerile cofrajelor se desfac ncepnd din zona central a deschiderii elementelor slbirea pieselor de fixare (pene, vinciuri etc) se va face treptat, frocuri; decofrarea se va face astfel nct s se evite preluarea brusc a ncrcrilor de ctre i coninnd simetric ctre reazeme; popilor de 50% 60% 60% 6 < L < 1 2 L > 12 La atingerea rezistenei de minim 25daN/cmp, astfel ca feele i muchiile elementului s nu fie deteriorate

elemente ce se decofreaz, ruperea muchiilor betonului sau degradarea materialului cofrajelor i susinerilor. n cazul construciilor etajate avnd deschideri mai mari de 3m, la decofrare se vor lsa sau remonta popi de siguran care vor fi meninui iar poziia acestora se recomand a se stabili astfel: la grinzi pn la 6m deschidere se las un pop de siguran la mijlocul acestora; la deschideri mai mari, numrul lor se va spori astfel nct distana dintre popi sau de la popi la reazeme s nu depeasc 3m; la plci se va lsa cel puin un pop de siguran la mijlocul lor i cel puin un pop la 12m de plac;

ntre diferite etaje, popii de siguran se vor aeza pe ct posibil unul sub altul.

Nu este permisndeprtarea popilor de sigurani unui planeu aflat imediat sub altul care se cofreaz sau se betoneaz. Dup decofrarea oricrei pri de construcie se va proceda, de ctre eful lotului, delegatul beneficiarului i eventual de ctre proiectant la o examinare amnunit a tuturor elementelor de rezisten ale structurii, ncheindu-se un proces verbal, de lucrri ascunse, n care se vor consemna calitatea lucr rilor, precum i eventualele defecte constatate i aprecierea importanei lor. Este interzis efectuarea de operaii de orice fel, naintea acestei examinri. n cazul n care se constat defecte importante (goluri, zone segregate sau necompactate etc), remedierea acestora se va face numai pe baza detaliilor acceptate de proiectant i cu supravegherea beneficiarului. Dup executarea acestor remedieri, se va ntocmi un proces verbal de lucrri ascunse n care se va meniona procedeul de remediere adoptat. La lucrrile la care se prevede aplicarea unor finisaje, defectele superficiale se vor remedia odat cu executarea finisajului respectiv. 4. CONTROLUL CALIT II LUCR RILOR Controlul calitii lucrrilor se face n conformitate cu cap. 10 din Normele NE012-99 din care prezentm un extras. 4.1. naintea nceperii beton rii se va verifica i dac sunt preg tite corespunz tor suprafeele de beton turnate anterior i cu care urmeaz s vinn contact betonul nou, respectiv dac: s-a ndeprtat stratul de lapte de ciment; s-a ndeprtat zona de beton necompactat; suprafeele n cauz prezint rugozitatea necesar asigurrii unei bune legturi ntre

betonul nou i cel vechi. Constatrile acestor verificri se vor nscrie n procesul verbal de lucrri ascunse n cursul betonrii elementelor de construcii se va verifica dac: datele nscrise n fiele de transport ale betonului corespund celor prevzute i nu lucrabilitatea betonului corespunde celei prevzute; condiiile de turnare i compactare asigur evitarea oricror defecte; se respect frecvena de efectuare a ncercrilor i prelevrilor probelor; se asigur meninerea poziiei armturilor i a pieselor nglobate; se asigur meninerea dimensiunilor i formelor cofrajelor, precum i comportarea se aplic msurile de protecie a suprafeelor libere ale betonului proaspt. fiele de transport corespunztoare betonului pus n lucrare; s-a depit durata de transport;

elementelor de susinere i sprijninire; n condica de betoane se vor consemna:

ora nceperii i terminrii betonrii; temperatura mediului (n perioada de timp friguros); msurile adoptate pentru protecia betonului proaspt; evenimente intervenite (ntreruperea turnrii, intemperii etc).

n cazul n care conductorul de lot rspunde direct i de prepararea betonului, acesta este obligat s verifice n paralel calitatea cimentului i agregatelor, precum i modul de dozare, amestecare i transport al betonului. Constatrile acestor verificri se trec n condica de betoane. La decofrarea oricrei pri de construcie se va verifica i consemna n proces - verbal de lucrri ascunse: aspectul elementelor, semnalndu-se dac se ntlnesc zone de beton necorespunztor (necompactat, segregat, goluri, rosturi etc); dimensiunile seciunilor transversale ale elementelor; distanele dintre diferite elemente; poziia elementelor verticale (stlpi, diafragme, perei) n raport cu cele poziia golurilor de trecere; poziia armturilor care urmeaz a fi nglobate n elemente ce se toarn ulterior.

corespunztoare situate la nivelul imediat inferior;

Calitatea betonului pus n oper , pentru fiecare parte de structur (funda ii, nivel, tronson etc) se apreciazinnd seama de: constatrile examinrii vizuale i prin ciocnirea tuturor elementelor; concluziile aprecierii calitii betonului livrat; analiza rezultatelor ncercrilor efectuate pe epruvetele confecionate pe antier; analiza rezultatelor ncercrilor nedistructive (cu ultrasunete sau combinate) sau ale

ncercrilor pe carote extrase. Calitatea betonului pus n lucrare se consider corespunztoare dac: nu se constat defecte de turnare sau compactare (goluri, segregri, ntreruperi de la ciocnire se nregistreaz un sunt corespunztor i uniform; calitatea betonului livrat este corespunztoare; rezultatele ncercrilor efectuate pe epruvete confecionate pe antier sau a celor betoane etc);

nedistructive sunt corespunztoare. Rezultatele aprecierii calitii betonului pus n lucrare pentru fiecare parte de structur, se consemneazntr-un proces verbal ncheiat ntre beneficiar i executant. Dac nu sunt ndeplinite condiiile de calitate se vor analiza de ctre proiectant msurile ce se impun. 4.2. Recepia structurii de rezistense efectueaz pe ntreaga construcie sau pe pri de construcie (fundaie, tronson, scar, etc) n funcie de prevederile programului privind controlul de calitate pe antier, stabilit de proiectant mpreun cu beneficiarul i executantul.

Aceast recepie are la baz examinarea direct efectuat de cei trei factori pe parcursul execuiei. Suplimentar se va verifica: existena i coninutul proceselor verbale de lucrri ascunse, precum i a proceselor verbale de verificare a calit ii betoanelor dup decofrare i de apreciere a calit ii betonului pus n lucrare; constatrile consemnate n cursul execuiei de ctre beneficiar, proiectant, CTC sau confirmarea prin proces verbal a executrii corecte a msurilor prevzute n diferite consemnrile din condica de betoane; dimensiunile de ansamblu i cotele de nivel; dimensiunile diferitelor elemente n raport cu prevederile proiectului; poziia golurilor prevzute n proiect; poziia relativ, pe ntreaga nlime a construciei, elementelor verticale (stlpi, ncadrarea n abaterile admise; comportarea la proba de inundare a teraselor; respectarea condi iilor tehnice speciale impuse prin proiect privind materialele orice alt verificare se consider necesar. alte organe de control; documente examinate;

diafragme, perei), consemnndu-se eventualele dezaxri;

utilizate, compoziia betonului, gradul de impermeabilitate, gradul de gelivitate etc; Verificrile efectuate i constatrile rezultate la recepia structurii de rezisten se consemneazntr-un proces verbal ncheiat ntre beneficiar, proiectant i executant, precizndu-se n concluzie dac structura n cauz se atest sau se respinge. n cazurile n care se constat deficiene n executarea structurii, se vor stabili msurile de remediere, iar dup executarea acestora se va proceda la o nou recepie. Acoperirea elementelor structurii cu alte lucrri (ziduri, tencuieli, protecii, finisaje etc) este admis numai n baza dispoziiei de antier dat de beneficiar i proiectant. Aceast dispoziie se va da dupncheierea recepiei structurii de rezisten sau, n cazuri justificate, dupncheierea recepiei pariale a structurii de rezisten. Recepia parial va consta din efectuarea tuturor verificrilor menionate, cu excepia examinrii rezistenei betonului la vrsta de 28 de zile care se va face la recepia definitiv a structurii de rezisten. n asemenea situaii, proiectantul va preciza unele pri de elemente asupra crora s se poat efectua determinri ulterioare i care nu se vor acoperi dect dup ncheierea recepiei definitive a structurii. n cazul construciilor cu caracter deosebit n ceea ce privete alctuirea constructiv sau tehnologia de execuie sau a celor de importan deosebit, prin proiect se poate prevedea ca recepia structurii de rezisten s se fac prin ncercri in situ. Recepia construciilor de beton i beton armat se va face n conformitate cu prevederile Legii nr.8/1977.

5. MSURI PRIVIND INCENDIILOR


TEHNICA

SECURITII

MUNCII

PREVENIREA

La executarea lucrrilor se vor respecta prevederile din urmtoarele prescripii: Legea nr. 319/2006 - Legea securitii i sntii n munc HGR nr. 1425/2006 pentru aprobarea Normelor metodologice de aplicare a HGR nr. 1091/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 971/2006 privind cerinele minime pentru semnalizarea de securitate HGR nr. 1028/2006 privind cerinele minime de securitate i sntate n munc HGR nr. 1051/2006 privind cerinele minime de securitate i sntate pentru

prevederilor Legii securitii i snii n munc nr. 319/2006 locul de munc i/sau de sntate la locul de munc referitoare la utilizarea echipamentelor cu ecran de vizualizare manipularea manual a maselor care prezint riscuri pentru lucrtori, n special cu afeciuni dorsolombare HGR nr. 1048/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 1146/2006 privind cerinele minime de securitate i sntate pentru Ordinul ministrului muncii, solidaritii sociale i familiei nr. 753/2006 privind Ordinul ministrului muncii, solidaritii sociale i familiei nr. 755/2006 pentru utilizarea de ctre lucrtori a echipamentelor individuale de protecie la locul de munc utilizarea n munc de ctre lucrtori a echipamentelor de munc protecia tinerilor n munc aprobarea formularului pentru nregistrarea accidentului de munc - FIAM i a instruciunilor de completare a acestuia munc Norme republicane de protecia muncii, aprobate de Ministerul Muncii i Ministerul Sntii cu ordinele nr.34/1975 i respectiv 60/1975, cu modificrile aduse prin Ordin nr.39/77 i 110/30/77 (b.d.i. 3-4/77 i 5-6/79); Normele de protec ia muncii n activitatea de construc ii-montaj, aprobate de Ordinul MMPS 57/1996 privind norme generale de protecia muncii; Regulamentul MLPAT 9/N/15.03.1993 privind protecia i igiena muncii n construcii Ordinul MMPS 235/1995 privind normele specifice de securitatea muncii la nlime; Ordinul MMPS 255/1995 - normativ cadru privind acordarea echipamentului de M.C.Ind. cu Ordinul nr.1233/D.1980. Directiva Consiliului Comunitilor Europene 89/391/CEE privind introducerea de msuri pentru promovarea mbuntirii securitii i sntii lucrtorilor la locul de

- ed. 1995;

protecie individual;

Normativele generale de prevenirea i stingerea incendiilor aprobate prin Ordinul MI Legea nr. 53/2003 - Codul Muncii; Decretul nr. 466/1979 privind regimul produselor i substanelor toxice; Legea nr. 126/1995 privind regimul materiilor explozive; Alte acte normative n vigoare n domeniu la data executrii propriu-zise a lucrrilor. Legea nr. 307/2006 privind aprarea mpotriva incendiilor Ordinul ministrului administra iei i internelor nr. 1435/2006 pentru aprobarea

nr. 775/22.07.1998;

Normelor metodologice privind avizarea i autorizarea privind securitatea la incendiu i protecia civil P 118-1999 - Normativ privind sigurana la foc a construciilor NP 086-2005 - Normativ pentru proiectarea, executarea i exploatarea instalaiilor C 300 - 1994 - Normativ de prevenirea i stingerea incendiilor pe durata executrii

de stingerea incendiilor lucrrilor de construcii i instalaii aferente acestora NOT : n momentul execu iei se vor aplica normele n vigoare.

rezisten
CAIETE DE SARCINI BETOANE

R.07

R.07 - CAIET DE SARCINI - BETOANE

1. GENERALITI Betonul simplu i armat s-a prevzut pentru realizarea fundaiilor i a elementelor de structur prevzute a fi realizate din beton. 2. STANDARDE, NORMATIVE I PRESCRIPII CARE GUVERNEAZ EXECUIA DE ANSAMBLU A LUCRRII NORMATIVE: P100-1/2006-Normativ pentru proiectarea antiseismic a construciilor. NE012-2010-Normativ pentru executarea lucrrilor din beton i beton armat. P10-86-Normativ privind proiectarea i executarea lucrrilor de fundaii directe la construcii. C56-85-Normativ pentru verificarea calit ii i recep ia lucr rilor de construc ii i instalaii aferente. P59-86-Instruciuni tehnice pentru proiectarea i folosirea armrii cu plase sudate a elementelor de beton. C28-83-I.T. pentru sudarea armturilor de oel beton. C130-78-Instruc iuni tehnice pentru aplicarea prin torcretare a mortarelor i betoanelor. NP51-87-Norme tehnice provizorii pentru folosirea plcilor cu gujoane. STAS-uri: STAS 1799-88-Controlul executrii betoanelor. STAS 10107/0-Calculul i alcturirea elementelor din beton, beton armat i beton precomprimat. STAS 388-80-Liani hidraulici. Ciment portland. STAS 1667-76-Agregatele naturale pentru betoane i mortare cu liani minerali.
Faz de proiectare: P.Th. + D.E. Data: 25.09.2007 pagina 1 din 12

STAS 4606-80-Agregate naturale. Metode de ncercare. STAS 790-84-Apa pentru betoane i mortare 3. MATERIALE FOLOSITE LA PREPARAREA BETONULUI 3.1. Clasele betoanelor i caracteristicile acestora vor fi cele prev zute n proiectele de execuie 3.2. Cimentul 3.2.1. La prepararea betoanelor se vor folosi cimenturile indicate n proiectele deexecu ie i n descrierea general a lucr rilor pe obiecte. Condi iile tehnice de recep ie, livrare i control pentru ciment, trebuie s corespund prevederilor STAS 227/1-86. 3.2.2. Schimbarea tipului de ciment, se poate face numai cu avizul scris al proiectantului. 3.2.3. n timpul transportului de la fabric la antier i al depozitrii pe antier, cimentul trebuie ferit de umezeali impurificri cu materii strine (pmnt, crbune, substane organice, ipsos, var hidratat, cenu de termocentral). 3.2.4. Cimentul la care se constat c nu sunt ndeplinite condiiile prevzute pentru priza sau constanta de volum, este interzis a se utiliza la prepararea betonului. 3.2.5. n cazul n care intervalul de timp, dintre livrarea de la fabrici utilizarea cimentului, depete 30 zile, acesta se va folosi numai dac, la o nou verificare a rezistenelor mecanice, la vrsta de 7 zile, acestea se ncadreazn condiiile standardizate. 3.2.6. Executantul este obligat sin o eviden clar, pentru fiecare siloz n parte, a loturilor de ciment introdus i a consumului zilnic. 3.3. Agregate 3.3.1. La prepararea betoanelor se vor folosi sorturile de agregate: 0-3, 3-7, 7-16, 16-31 mm, provenite din sortarea produselor debalastiern staii specializate. 3.3.2. Agregatele vor ndeplini condiiile tehnice prevzute n STAS 1667-76, metodele de determinare a caracteristicilor fiind cele din STAS 4606-80. 3.3.3. Pentru cantitatea livratn cadrul unui transport, furnizorul este obligat ca odat cu documentul de expedi ie s trimit i certificatul de calitate respectiv. Laboratorul executantului este obligat s examineze mai nti datele nscrise n certificatul de calitate care trebuie s garanteze calitatea agregatului, apoi va proceda la verificarea condiiilor de calitate, conform articolului de mai jos. 3.3.4. Laboratorul executantului va verifica ndeplinirea condiiilor de calitate ale agregatelor, efectund determinrile conform standardelor n vigoare astfel: la sosirea pe antier (la aprovizionare) nainte de utilizare

3.4. Apa Apa utilizat la prepararea betonului i tratarea sa, va fi ap din reeaua potabil. Dac se folosete ap din alte surse, aceasta va ndeplini, n totalitate, condiiile de calitate din STAS 790-84. 4. TESTE, VERIFICRI, PROBE I STANDARDE CARE TREBUIE RESPECTATE Se vor respecta cele prevzute n normativele C56-85 i NE012-99. Se va acorda o atenie special calitii betoanelor puse n oper, asigurndu-se realizarea m rcii de beton prev zut n proiect i ob inerea elementelor de beton f r defeciuni din turnare (goluri, segregri etc.). Controlul executrii betoanelor n ceea ce privete ncercrile i frecvena lor se va face cu respectarea strict a prevederilor STAS 1799-88. 5. BETOANE, COMPOZIIE, PREPARARE, CONFECIONARE, TRANSPORT Betonul se va prepara de preferinn staii de betoane centralizate. Fiecare tip de beton va fi definit prin: clas, grad de impermeabilitate (dac este impus prin proiect), lucrabilitate, precedate eventual de simboluri ale destinaiei betonului (cldire, structur, element etc.). n stare proaspt, betoanele vor ndeplini la locul de punere n lucrare, urmtoarele condiii: 5.1. Lucrabilitatea L2-betoane de egalizare L3-betoane n fundaii L4-betoanen suprastructuri (centuri, stlpiori, planee etc.). 5.2. Temperatura temperatura minim va fi de +7 grade C temperatura maxim va fi de: 25 grade C, betoane din fundaii i suprastructuri 30 grade C, betoane de egalizare i completare, betoane de pant Executantul va stabili- innd seama de condi iile de temperatur ale mediului i de fluxul tehnologic de preparare i transport-caracteristicile de lucrabilitate i temperatura la fabrica de betoane, astfel nct s se asigure respectarea condiiilor impuse betoanelor la locul de turnare. Compoziia betonului se va stabili conform normativului NE012-99. Fabrica de betoane trebuie s fie atestat, conform normativului NE012-99. Executantul este obligat s ia toate msurile pentru realizarea condiiilor necesare acestui scop. Dozarea materialelor componente ale betonului se va face gravimetric, admindu-se urmtoarele abateri: ciment 2% agregate 3%

ap1% Se va verifica cel puin de dou ori pe sptmni ori de cte ori se consider necesar, funcionarea corect a mijloacelor de dozare, folosindu-se greuti etalonate cel puin pn la 200 kg (de exemplu 8 greuti a 25 kg fiecare). Este interzis prepararea betonului n instalaiile care nu asigur respectarea abaterilor prevzute n art.3.5.6. Compoziia de beton adoptat, va fi corectatn ceea ce privete cantitatea de ap (n func ie de umiditatea agregatelor) i propor iile dintre diferitele sorturi (n func ie de granulozitatea acestora), astfel nct s fie respectat raportul maxim A/C i domeniul de granulozitate total prescris. Ordinea de introducere a materialelor componente n betonier va fi urmtoarea: agregatele, cimentul, apa, eventual HMS (dac se utilizeaz). Durata de malaxare a unei arje va fi de minim 1,5 minute. Executantul va stabili caracteristicile betonului proaspt la preparare, cu un ecart care sin seama de evoluia acestora n funcie de durata de transport, timpul de ateptare i condiiile de mediu, astfel nct la punerea n lucrare s fie ndeplinite condiiile prevzute la art.3.5.2. n perioadele de timp friguros, executantul trebuie s ia toate msurile necesare preparrii betonului peste temperatura minim prevzut. Aceste msuri vor include: ndeprtarea gheii i a bulgrilor de agregate ngheate, acoperirea agregatelor cu prelate i nclzirea lor cu abur sau aer circulnd prin registre de evi, utilizarea apei calde etc. Agregatele nu vor fi nclzite la temperaturi mai mari de 80 grade C. Dac la prepararea betoanelor se utilizeaz ap cald, cu temperatura mai mare de 40 grade C, se va evita contactul direct al apei cu cimentul. n acest caz se va amesteca mai nti apa cu agregatele i numai dup ce temperatura amestecului a cobort sub 40 grade C se va aduga i cimentul. n perioadele de timp clduros, executantul va lua toate msurile necesare producerii betonului sub temperatura maxim admis.. Aceste msuri vor cuprinde: stropirea depozitelor de agregate cu ap rece, protecia depozitelor de agregate cu ap rece, protecia depozitelor de agregate i a rezervoarelor de apmpotriva aciunii directe a razelor de soare i a vnturilor calde i uscate, folosirea apei reci la prepararea betoanelor, sau nlocuirea unei pri din apa de amestecare cu ghea, rcirea cimentului, betonarea n orele cu temperaturi mai sczute ale zilei sau noaptea. 5.3. Transportul betonului 5.3.1. Transportul betonului de la fabrica de betoane, la locul de punere n lucrare se va face cu autoagitatoare sau basculante cu bena etan. Transportul local al betonului se va face cu pompe de beton, bene, jgheaburi, skipuri, tomberoane etc. 5.3.2. Fiecare transport de beton, va fi nsoit de un bon de transport, n care vor fi menionate cel puin urmtoarele date: numrul bonului i data ntocmirii

betoniera la care s-a preparat betonului tipul de beton i volumul destinaia betonului ora plecrii din staie ora sosirii n antier ora nceperii i terminrii descrcrii Datele referitoare la fabrica de betoane vor fi completate de eful fabricii, iar datele din antier vor fi completate de conductorul lucrrii. Bonul de transport se va ntocmi n dublu exemplar: un exemplar va rmne n antier, iar cellalt se va ntoarce la fabrica de betoane. 5.3.3. Durata de transport, care se consider din momentul nceperii ncrcrii i pn la terminarea descrcrii mijlocului de transport, nu va depi: 45 minute cnd temperatura mediului este mai mare de 30 grade C; 60 minute cnd temperatura mediului este cuprinsntre 15-30 grade C; 90 minute cnd temperatura mediului este mai mic de 15 grade C. 5.3.4. Executantul va lua toate msurile pentru ca n timpul transportului s nu se altereze calitatea betonului (pierderi de lapte de ciment sau segreg ri n cazul transportului cu basculante, adugri de apn autoagitatoare n cazul transportului betonului cu acestea). 5.3.5. Executantul va asigura transportul betonului n bune condiiuni n timpul executrii lucrrilor pe timp friguros sau clduros, lund msurile corespunztoare de protecie n scopul conservrii caracteristicilor betonului proaspt. 5.3.6. Controlul calitii betonului proaspt, a betonului ntrit, interpretarea rezutatelor se va face conform normativului NE012-99. 6. EXECUIA LUCRRILOR 6.1. Descrierea lucr rilor Lucrrile de betonare se vor executa respectnd planele de execuie i indicaiile date n descrierea general a lucrrilor pe obiecte. 6.2. Piese metalice nglobate 6.2.1. Executantul va lua toate msurile necesare amplasrii conform detaliilor din proiectul de execuie a tuturor pieselor nglobate prevzute. 6.2.2. La montarea pieselor nglobate, se vor lua msuri pentru fixarea lor astfel nct s se asigure men inerea pozi iei corecte n tot timpul turn rii betonului. La montarea pieselor nglobate se vor respecta toleranele prevzute n normele n vigoare dac nu se prevede altfel n proiectul de detaliu. 6.3. Recomand ri pentru execu ia de detaliu 6.3.1. Executanii vor verifica calitatea materialelor, elementelor de construcii, fundaiilor, structurii de rezisten etc. pe ntreg parcursul realizrii lucrrilor, ntocmind procese verbale pentru lucrri ascunse.

6.3.2. Se vor folosi numai materialele, semifabricatele, care corespund proiectelor i normelor tehnice n vigoare. 6.3.3. Betonarea condica betoanelor. 6.3.4. Se vor evita, pe ct posibil, rosturile de lucru organizndu-se execuia astfel nct betonarea s se fac frntrerupere pe ntreg nivelul respectiv, pn la rosturile de dilatare. Cnd rosturile de lucru nu pot fi evitate ele vor fi prev zute n conformitate cu normativul NE012-99. Rosturile de lucru se vor buciarda i se vore uda abundent naintea continurii turnrii. 6.3.5. n tot timpul turn rii betonului se va supraveghea comportarea i meninerea n poziia iniial a susinerilor cofrajelor i armturilor i se vor lua msuri operative de remediere a oricror deficiene constatate, eventual ntrerupnd betonarea. 6.3.6. Decofrarea elementelor de beton se va face numai atunci cnd rezistena betonului a atins, fa de marc, procentele stabilite prin proiectele de detaliu, sau la termenele prevzute n normativul NE012-99. 6.3.7. Dup decofrarea oricrei pri de construcie se va proceda la o examinare amnunit a tuturor elementelor de rezisten ale structurii, ncheindu-se procesul verbal de lucrri ascunse. 6.3.8. Se interzice executantului s procedeze la executarea de lucrri care s nglobeze sau s ascund defecte ale structurilor de rezisten, sau care smpiedice accesul i repararea corect a acestora conform soluiilor ce se vor da de proiectant. 6.3.9. Betonarea elementelor se va face pe baza proiectelor de execu ie, a proiectelor tehnologice elaborate de executant i a prevederilor prezentului caiet de sarcini. 6.3.10. nainte de a ncepe betonarea oricrui element, se vor verifica: cotele de nivel i starea de curenie a suprafeei betonului turnat n faza anterioar; coresponden a cotelor cofrajelor att n plan ct i ca nivel cu cele din proiect, verticalitatea cofrajelor, existena msurilor pentru meninerea formei, asigurarea etaneitii precum i pentru fixarea cofrajelor de elemente de susinere; rezistena i stabilitatea elementelor de susinere, corecta rezemare i fixare a susinerilor, existena penelor sau a altor dispozitive de decofrare etc.; dispoziia corect a armturilor i corespondena diametrelor i numrului lor cu cele din proiect, solidarizarea armturilor ntre ele, existena n numr suficient a distanierilor etc.; instalarea conform proiectului i fixarea pieselor metalice nglobate n beton, a buloanelor de ancorare i a celor ce servesc pentru crearea diferitelor goluri; funcionarea corect a mijloacelor de preparare, transport i punere n oper a betonului, precum i a celor de rezerv; elementelor de construcii se va face numai sub supravegherea conductorului tehnic al lucrrii, care va consemna mersul lucrrilor n

asigurarea condiiilor tehnico-organizatorice pe toate fazele procesului de preparare, transport, punere n operi tratare ulterioar a betonului, astfel nct s fie respectate toate prevederile referitoare la beton i betonare. n cazul n care se constat nepotriviri fa de proiect sau se apreciaz c nu sunt asigurate toate condiiile necesare nceperii betonrii, se vor lua msurile corespunztoare. 6.3.11. Betonarea va fi condus nemijlocit de eful lucr rii. Acesta va fi permanent la locul de turnare i va supraveghea desf urarea opera iunii, lund m suri operative de remediere a oric ror deficien e constatate. Att deficien ele ct i m surile adoptate vor fi consemnate n Fia de betonare a elementului respectiv. 6.3.12. Betonul trebuie pus n lucrare n timp ct mai scurt posibil dup ce este adus la locul de turnare, punerea luin oper f cndu-se f r ntreruperi ntre rosturile de turnare prevzute n proiectul tehnologic. 6.3.13. Turnarea betonului se va face n straturi orizontale, pe ct posibil uniforme, cu grosimea de maximum 30 cm. nlimea de cdere liber a betonului nu va fi mai mare de 1 m cnd se toarn cu pompa i 1,50 m cnd se toarn cu bena. 6.3.14. Durata maxim de timp admisntre turnarea a dou straturi succesive, se va aprecia n funcie de compoziia betonului, condiiile de mediu i dimensiunile elementului, astfel nct s existe garan ia c stratul nou de beton turnat poate fi livrat mpreun cu stratul turnat anterior. 6.3.15. Dac , totu i, betonul din stratul anterior s-a nt rit, sau dac din motiver de for major este imposibil continuarea beton rii, suprafa a betonului va fi considerat rost de turnare i va fi tratatn consecin (se va cura betonul necompactat, laptele de ciment, se va crea o suprafa rugoas care nainte de reluarea betonrii va fi bine suflat cu aer i splat). 6.3.16. La turnarea betonului se va urmri cu atenie nglobarea complet a armturilor n beton i realizarea corect a grosimii stratului de acoperire. n zonele cu armturi dese, piese nglobate etc., umplerea complet cu beton se va face cu o deosebit grij, iar acolo unde este cazul se vor crea posibiliti de acces lateral a betonului prin spaii care s permiti ptrunderea vibratorului. 6.3.17. Se va evita deformarea sau deplasarea armturilor i a pieselor metalice nglobate fa de poziia prevzut; se interzice cioc nirea i/sau scuturarea armturilor n timpul betonrii precum i aezarea pe armturi sau piese metalice nglobate a vibratoarelor n stare de funcionare; se interzice circulaia muncitorilor direct pe armturi sau cofraje. 6.3.18. Compactarea betonului se va face prin vibrare. Pentru ca aceast opera ie s se desf oare n bune condi iuni pe tot parcursul lucr rilor, executantul va lua msuri privind: vibratorul se va introduce ct mai pe vertical , p trunznd n stratul inferior pe o adncime de cca.10...15 cm; scoaterea vibratorului se va face ct mai lent, pentru a se evita formarea de goluri n punctele de extragere;

durata de vibrare optim din punct de vedere tehnico-economic se situeazntre 5-30", n funcie de lucrabilitatea betonului, dimensiunile elementului i gradul de armare, precum i de tipul de vibrator utilizat; prelungirea duratei de vibrare pn la cca.60", impus de condiii speciale; punctele de introducere a vibratorului vor fi situate la cca. (1,5...2)*R, R fiind raza de aciune a vibratorului; semnele dup care se recunoate c vibrarea s-a terminat sunt : betonul nu se mai taseaz; suprafaa betonului devine orizontali uor lucioas; nceteaz apariia bulelor de aer la suprafaa betonului i se reduce diametrul lor; apare lapte de ciment sau ap la mbinrile cofrajelor. 6.3.19. Turnarea betonului pe timp friguros. In condiiile n care temperatura aerului este mai mic sau egal cu 5 grade C, sau exist probabilitatea ca n interval de 24 de ore s scad sub aceast limit, se recomand ca temperatura betonului s fie n jurul valorii maxime prescrise, lundu-se msurile necesare pentru curirea suprafeei de betonare de zpadi ghea. Este interzis folosirea clorurii de calciu ca agent de dezgheare. Dac temperatura suprafeei care urmea s fie acoperit cu beton este mai mic de +5 grade C, betonarea nu va ncepe. 6.3.20. Turnarea betonului pe timp clduros. La turnarea betonului pe timp clduros, executantul va lua toate msurile necesare respectrii temperaturii maxime i protejrii corespunztoare a betonului mpotriva efectului evaporrii rapide a apei din beton. Se reomand betonarea n timpul nopii. 6.3.21. Tratarea betonului dup turnare. 6.3.21.1. Pentru a se asigura condiii normale de ntrire, betonul va fi meninut permanent umed timp de minimum 7 zile fie printr-o stropire permanent cu aspersoare fie prin acoperirea betonului cu prelate, rogojini, pnz de sac etc., meninute permanent umede. 6.3.21.2. n perioadele de timp clduros tratarea betonului se va face pe o perioad de minimum 14 zile de la turnare. 6.3.21.3. n perioadele de timp friguros, msurile de protecie se vor lua cnd temperatura mediului ambiant (msurat la ora 8 dimineaa) este mai mic de +5 grade C, sau n intervalul de o lun de zile de la data turnrii betonului, prognoza meteorologic apreciaz c temperatura va sc dea sub aceast valoare. Protecia betonului va asigura pe lng condiii normale de ntrire i : o rezisten de min. 50 daN/cm2 suficient pentru a evita deterioarare prin ac iunea ngheului i dezgheului; evitarea de fisuri cauzate de contractarea prin r cire brusc a stratului superficial de beton.

Protecia betonului pe feele libere se va face cu rogojini sau alt material termoizolant aplicat peste o folie de polietilen. nlturarea proteciei i decofrarea se va face progresiv n funcie de regimul de temperatur msurat, nlturarea complet fcndu-se numai atunci cnd diferena de temperatur dintre suprafaa betonului i aer este mai mic de 11 grade C. 6.3.22. Decofrarea. Dac prin proiect nu se specific altfel, se vor respecta termnele minime de decofrare prevzute n normativul NE012-99. n cursul operaiei de decofrare se vor respecta urmtoarele : desfurarea operaiei va fi supravegheat direct de ctre conductorul lucrrii; n cazul n care se constat defecte de turnare (goluri, zone segregate), care pot afecta capacitatea portant a elementului, decofrarea elementelor de susinere se va sista pn la aplicarea msurilor de remediere; susinerile cofrajului se desfac ncepnd din zona central a deschiderii elementelor i slbirea pieselor de fixare (pene, vnciuri etc.) se va face treptat frocuri; decofrarea se va face astfel nct s se evite preluarea brusc a ncrcrilor de c tre continund simetric ctre reazeme;

elementele ce se decofreaz , ruperea muchiilor betonului sau degradarea materialului cofrajelor i susinerilor; nu este permisndeprtarea popilor de siguran ai unui planeu aflat imediat sub altul 6.3.23. Remedierea defectelor. 6.3.23.1. Imediat dup decofrare se va examina aspectul betonului semnalndu-se zonele cu beton necorespunztor (beton necompactat, segreg ri, goluri, rosturi de betonare nepermise etc.). n acela i timp se va verifica poziia golurilor de trecere,poziia armturilor care urmeaz a fi nglobate n elementele ce se toarn ulterior. Toate constatrile vor fi consemnate ntr-un proces verbal de lucrri ascunse. 6.3.23.2. Solu iile de remediere a defectelor se vor stabili de comun acord cu proiectantul n funcie de tipul defectelor, astfel: remedierea defectelor de suprafa (segregri sau zone de beton necompactat) se va remedierea zonelor de beton cu goluri sau rosturi de betonare nepermise se va face prin 6.3.23.3. La remedierea defectelor prin torcretare se vor respecta urmtoarele reguli: se cur bine prin piuire zonele de beton necompactate sau segregate pn la betonul se cur armtura, se sufl cu aer comprimat i se spal cu jet de ap sub presiune. sntos i compact; Splarea zonelor pe care urmeaz a se aplica torcretul se va face cu 1-2 ore nainte de face prin torcretare conform art.3.6.3.8.3.; rebetonare (plombare conform art.3.6.3.8.4.). care se cofreaz sau se betoneaz.

executarea operaiei de torcretare. Torcretul nu se va aplica dect dup zvntarea suprafeei; la prepararea amestecului de torcret se va utiliza ciment Hz35 i nisip 0-3 mm, n proporie de 1:2. Cantitatea de ap se stabilete de ctre torcretistn funcie de consistena necesar la punerea n oper; aplicarea torcretului se va face n straturi succesive pn la completarea zonei de remediat; finisarea suprafeei se va face la 30-45' dup torcretare, mai nti cu mistria, i dreptarul pentru ndeprtarea excesului de beton, apoi prin dricuire cu drica metalic sau mistria pn se obine o suprafa apropiat de cea a betonului din zonele nvecinate. Se admite pentru corectarea neregularitilor utilizarea de mortar fin preparat din ciment i nisip 0-1 mm n proporie de 1:2; protecia zonelor remediate se va face fie prin acoperirea lor cu soluie polisol sau sinolac, fie prin stropire permanent timp de 3 zile i protecie cu pnz de sac sau prelat. 6.3.23.4. Remedierea defectelor prin rebetonare (plombare) se va face respectnd urmtoarele precizri: se cur bine prin pi uire betonul necompact pn la betonul s n tos. Se cur armtura, se sufl cu aer comprimat i se spal cu jet de ap sub presiune; punerea n oper a betonului se va face prin turnare n exces n cofraje laterale evazate, prevzute de la caz la caz pe una sau toate feele elementului remediat; compactarea betonului se va face prin vibrare intern concomitent cu turnarea, pn la umplerea complet a zonei de plombat; la circa 24 ore dup turnare, zona se decofreazi se ndeprteaz prin cioplire excesul de beton pn la feele elementului i se va finisa suprafaa cu mortar fin avnd compoziia ciment:nisip 1:2; protecia zonelor remediate se va face fie prin acoperire cu soluie de polisol sau sinolac, fie prin stropire permanent cu ap timp de 3 zile i protecie cu pnz de sac sau prelat. 7. ABATERI, TOLERANE I VERIFICRILE ACESTORA La executarea i verificarea lucrrilor de beton armat monolit se vor respecta abaterile maxime admise prevzute n normativul NE012-99. 8. VERIFIC RI N VEDEREA RECEP IEI Se vor respecta strict prevederile din "Sistemul de evidenn activitatea de control tehnic al calitii construciilor" elaborat de IGSIC i publicat n BC nr.2/81. 9. MSURATORI I DECONTRI Lucrrile de betoane se vor plti la mc, conform detaliilor din plane.

10. MSURI PRIVIND TEHNICA SECURITII MUNCII I PREVENIREA INCENDIILOR


La executarea lucrrilor se vor respecta prevederile din urmtoarele prescripii: Legea nr. 319/2006 - Legea securitii i sntii n munc HGR nr. 1425/2006 pentru aprobarea Normelor metodologice de aplicare a HGR nr. 1091/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 971/2006 privind cerinele minime pentru semnalizarea de securitate HGR nr. 1028/2006 privind cerinele minime de securitate i sntate n munc HGR nr. 1051/2006 privind cerinele minime de securitate i sntate pentru

prevederilor Legii securitii i snii n munc nr. 319/2006 locul de munc i/sau de sntate la locul de munc referitoare la utilizarea echipamentelor cu ecran de vizualizare manipularea manual a maselor care prezint riscuri pentru lucrtori, n special cu afeciuni dorsolombare HGR nr. 1048/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 1146/2006 privind cerinele minime de securitate i sntate pentru Ordinul ministrului muncii, solidaritii sociale i familiei nr. 753/2006 privind Ordinul ministrului muncii, solidaritii sociale i familiei nr. 755/2006 pentru utilizarea de ctre lucrtori a echipamentelor individuale de protecie la locul de munc utilizarea n munc de ctre lucrtori a echipamentelor de munc protecia tinerilor n munc aprobarea formularului pentru nregistrarea accidentului de munc - FIAM i a instruciunilor de completare a acestuia munc Norme republicane de protecia muncii, aprobate de Ministerul Muncii i Ministerul Sntii cu ordinele nr.34/1975 i respectiv 60/1975, cu modificrile aduse prin Ordin nr.39/77 i 110/30/77 (b.d.i. 3-4/77 i 5-6/79); Normele de protec ia muncii n activitatea de construc ii-montaj, aprobate de Ordinul MMPS 57/1996 privind norme generale de protecia muncii; Regulamentul MLPAT 9/N/15.03.1993 privind protecia i igiena muncii n construcii Ordinul MMPS 235/1995 privind normele specifice de securitatea muncii la nlime; Ordinul MMPS 255/1995 - normativ cadru privind acordarea echipamentului de Normativele generale de prevenirea i stingerea incendiilor aprobate prin Ordinul MI M.C.Ind. cu Ordinul nr.1233/D.1980. Directiva Consiliului Comunitilor Europene 89/391/CEE privind introducerea de msuri pentru promovarea mbuntirii securitii i sntii lucrtorilor la locul de

- ed. 1995;

protecie individual; nr. 775/22.07.1998;

Legea nr. 53/2003 - Codul Muncii; Decretul nr. 466/1979 privind regimul produselor i substanelor toxice; Legea nr. 126/1995 privind regimul materiilor explozive; Alte acte normative n vigoare n domeniu la data executrii propriu-zise a lucrrilor. Legea nr. 307/2006 privind aprarea mpotriva incendiilor Ordinul ministrului administra iei i internelor nr. 1435/2006 pentru aprobarea

Normelor metodologice privind avizarea i autorizarea privind securitatea la incendiu i protecia civil P 118-1999 - Normativ privind sigurana la foc a construciilor NP 086-2005 - Normativ pentru proiectarea, executarea i exploatarea instalaiilor C 300 - 1994 - Normativ de prevenirea i stingerea incendiilor pe durata executrii

de stingerea incendiilor lucrrilor de construcii i instalaii aferente acestora NOT : n momentul execu iei se vor aplica normele n vigoare.

rezisten
CAIETE DE SARCINI COFRAJE

R.08

R.08 - CAIET DE SARCINI - COFRAJE

1. GENERALITI Lucrri de cofrare se vor executa la toate elementele de beton respectnd proiectele de execuie i indicaiile date n descrierea general a lucrrilor pe obiecte. 2. STANDARDE, NORMATIVE I PRESCRIPII CARE GUVERNEAZ EXECUIA DE ANSAMBLU A LUCRRII NORMATIVE: C11-74-Instruciuni tehnice privind alctuirea i folosirea n construcii a panourilor din placaj pentru cofraje. NE012-2010-Executarea lucrrilor din beton i beton armat. 3. MATERIALE I STANDARDE CARE TREBUIE RESPECTATE * * * Cofrajele se pot confeciona din lemn sau produse pe baz de lemn i metal. Materialele utilizate trebuie s asigure realizarea unei suprafee de beton Se vor respecta cele prevzute n normativul NE012-99. 4. TESTE, VERIFICRI, PROBE I STANDARDE CARE TREBUIE RESPECTATE Se vor respecta prevederile din normativul C140-85 pct.2 i anexa X.3. care cuprinde abaterile admisibile. 5. PREPARARE, CONFECIONARE Pentru alc tuirea cofrajelor din panouri de placaj se vor respecta prevederile din normativul C11-74.

corespunztoare tipului de finisaj specificat prin proiectul prii de arhitectur.

Faz de proiectare:

P.Th. + D.E.

Data:

25.09.2007

pagina 1 din 4

6. EXECUIA LUCRRILOR 6.1. Descrierea lucr rilor 6.1.1. Lucrrile de cofraje nu presupun dificulti deosebite de execuie, care s presupun pevederi suplimentare celor specificate n normativul NE012-99. 6.1.2. La adoptarea materialului din care se va confeciona cofrajului i tipul de cofraj ce se va utiliza, se va ine seama de tipul elementelor de executat, de dimensiunile acestora i de tehnologia de punere n oper a betonului. 6.1.3. Cofrajele i susinerile lor, vor fi astfel alctuite nct sndeplineasc urmtoarele condiii: s asigure obinerea formei i dimensiunilor prevzute n proiect; s fie stabile i rezistente sub aciunea ncrcrilor ce apar n procesul de execuie; s fie alctuite din elemente care s permit un mare numr de refolosiri; s fie prevzute cu piese de asamblare de inventar. 6.1.4. Pentru a reduce aderena ntre beton i cofraje acestea se ung pe feele ce vin n contact cu betonul, nainte de fiecare folosire, cu produse speciale, ageni de decofrare. Acestea trebuie s nu pteze betonul, s nu deterioreze cofrajul, s se aplice uor i s-i pstreze proprietile neschimbate, n condiiile climaterice de execuie ale lucrrilor. 6.1.5. Depozitarea cofrajelor se va face astfel nct s se evite deformarea i degradarea lor (umezire, murdrire, putrezire, ruginire etc.). este interzis depozitarea cofrajelor direct pe pmnt sau depozitarea altor materiale pe stivele de panouri de cofraje. 6.1.6. La montarea cofrajelor se va acorda o mare atenie sprijinirilor i legrii cofrajului. este interzis legarea cofrajului de barele de armturi. Se vor utiliza tirani, bare metalice sau buloane corespunz toare. Leg turile cofrajelor nu vor l sa g uri neregulate care s necesite repara ii ale suprafe ei betonului i nu vor conduce la degradarea acestuia. Se recomand ca dupndeprtarea cofrajului s nu rmn nici un element metalic nglobat n beton la o distan mai mic de 2,5 cm de faa betonului. 6.1.7. Sprijinirile cofrajelor vor fi astfel montate nct s nu permit deplasri sau deformri ale cofrajului n timpul turnrii betonului. 6.1.8. La cofrajele stlpilor se vor prevedea la partea inferioar ferestre speciale pentru curire nainte de betonare i la intervale de maximum 2 m nlime, ferestre pentru turnarea betonului, dac betonul nu se toarn cu pompa sau bene cu furtun. n cazul pereilor, curirea suprafeei de beton vechi se va face nainte de nchiderea cofrajelor, dar se vor prevedea i ferestre care s permit verificarea nainte de betonare a curirii suprafeei. La muchiile aparente ale elementelor se vor prevedea ipci care s realizeze o teire la 45 grade de aproximativ 3 cm. 6.1.9. Panourile de cofraj i celelalte piese de susinere sau asamblare, trebuie s fie confecionate cu ajutorul abloanelor i dispozitivelor, care s asigure exactitatea dimensiunilor, formelor i poziiilor pieselor de asamblare sau susinere.

6.2. Abateri, tolerane i verificrile acestora


Se vor respecta cele prevzute n normativul NE012-99. 6.3. Defecte admise i neadmise Se vor respecta cele prevzute n normativul NE012-99 7. VERIFIC RI N VEDEREA RECEP IEI Se vor respecta strict prevederile din "Sistemul de evidenn activitatea de control tehnic al calitii construciilor" elaborat de IGSIC i publicat n BC nr.2/81. 8. MSURATORI I DECONTRI Lucrrile de cofraje se vor plti de ctre beneficiar la metru ptrat conform detaliilor din plane. 9. MSURI PRIVIND TEHNICA SECURITII MUNCII I PREVENIREA

INCENDIILOR La executarea lucrrilor se vor respecta prevederile din urmtoarele prescripii: Legea nr. 319/2006 - Legea securitii i sntii n munc HGR nr. 1425/2006 pentru aprobarea Normelor metodologice de aplicare a HGR nr. 1091/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 971/2006 privind cerinele minime pentru semnalizarea de securitate HGR nr. 1028/2006 privind cerinele minime de securitate i sntate n munc HGR nr. 1051/2006 privind cerinele minime de securitate i sntate pentru

prevederilor Legii securitii i snii n munc nr. 319/2006 locul de munc i/sau de sntate la locul de munc referitoare la utilizarea echipamentelor cu ecran de vizualizare manipularea manual a maselor care prezint riscuri pentru lucrtori, n special cu afeciuni dorsolombare HGR nr. 1048/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 1146/2006 privind cerinele minime de securitate i sntate pentru Ordinul ministrului muncii, solidaritii sociale i familiei nr. 753/2006 privind Ordinul ministrului muncii, solidaritii sociale i familiei nr. 755/2006 pentru utilizarea de ctre lucrtori a echipamentelor individuale de protecie la locul de munc utilizarea n munc de ctre lucrtori a echipamentelor de munc protecia tinerilor n munc aprobarea formularului pentru nregistrarea accidentului de munc - FIAM i a instruciunilor de completare a acestuia

munc

Directiva Consiliului Comunitilor Europene 89/391/CEE privind introducerea de

msuri pentru promovarea mbuntirii securitii i sntii lucrtorilor la locul de Norme republicane de protecia muncii, aprobate de Ministerul Muncii i Ministerul

Sntii cu ordinele nr.34/1975 i respectiv 60/1975, cu modificrile aduse prin Ordin nr.39/77 i 110/30/77 (b.d.i. 3-4/77 i 5-6/79); Normele de protec ia muncii n activitatea de construc ii-montaj, aprobate de Ordinul MMPS 57/1996 privind norme generale de protecia muncii; Regulamentul MLPAT 9/N/15.03.1993 privind protecia i igiena muncii n construcii Ordinul MMPS 235/1995 privind normele specifice de securitatea muncii la nlime; Ordinul MMPS 255/1995 - normativ cadru privind acordarea echipamentului de Normativele generale de prevenirea i stingerea incendiilor aprobate prin Ordinul MI Legea nr. 53/2003 - Codul Muncii; Decretul nr. 466/1979 privind regimul produselor i substanelor toxice; Legea nr. 126/1995 privind regimul materiilor explozive; Alte acte normative n vigoare n domeniu la data executrii propriu-zise a lucrrilor. Legea nr. 307/2006 privind aprarea mpotriva incendiilor Ordinul ministrului administra iei i internelor nr. 1435/2006 pentru aprobarea M.C.Ind. cu Ordinul nr.1233/D.1980.

- ed. 1995;

protecie individual; nr. 775/22.07.1998;

Normelor metodologice privind avizarea i autorizarea privind securitatea la incendiu i protecia civil P 118-1999 - Normativ privind sigurana la foc a construciilor NP 086-2005 - Normativ pentru proiectarea, executarea i exploatarea instalaiilor C 300 - 1994 - Normativ de prevenirea i stingerea incendiilor pe durata executrii

de stingerea incendiilor lucrrilor de construcii i instalaii aferente acestora NOT : n momentul execu iei se vor aplica normele n vigoare.

rezisten
CAIETE DE SARCINI COFRAREA BETONULUI

R.09

R.09 - CAIET DE SARCINI - COFRAREA BETONULUI

1. GENERALIT I Prevederile din acest capitol se refer la lucrrile de alctuire i folosire a panourilor din placaj pentru cofraje. Cofrajele sunt construcii temporare, necesare construciilor pentru redarea formei i dimensiunilor elementelor din beton, precum i pentru susinerea acestora n perioada cnd acestea nu au capacitatea de a o face singure. Soluiile de realizare a cofrajelor trebuie s fie: economice, astfel nct costul, consumul de materiale i de manoper s rezulte n rezistente la sarcinile ce le revin, n special: din greutatea (mpingerea) betonului care solicit elementele de sus inere sau fa a la montri - demontri i manipulri repetate; la aciunea agenilor atmosferici; exacte, n privina redrii corecte a formei i dimensiunilor elementelor din betoane n etane, astfel nct s nu permit scurgerea laptelui de ciment de la rosturi; simple, astfel nct s asigure: execuia uoarn intreprinderea productoare; nsuirea rapid de ctre muncitori a tehnicii de lucru; uurina la montare - demontare, manipulare i transport. Cofrajele sunt utilizate n principal pentru formarea urmtoarelor elemente: fundaii perei de beton monolit; plci de beton turnat monolit pentru planee;
P.Th. + D.E. Data: 25.09.2007 pagina 1 din 12

ponderi ct mai sczute din totalul necesar realizrii construciei;

cofrajului;

limita abaterilor admisibile;

Faz de proiectare:

stlpi, grinzi, nervuri etc.

2. STANDARDE DE REFERIN C.1 1-74 - Instruciuni tehnice privind alctuirea i folosirea n construcii a NE012-2010 - Normativ pentru executarea lucrrilor de beton cu beton armat; Proiect tip IPC nr. 7161/1-78 privind popi extensibili, dispozitive de sus inere panourilor din placaj pentru cofraje;

metalice. 3. MATERIALE panouri tipizate (modulate) - NID - MEFMC 1442-72; panouri de cofraj cu astereal din scnduri de rinoase; cherestea de rinoase - STAS 11949-74 ; placaj pentru lucrri de exterior - STAS 7004-72 ; material auxiliar mrunt - tirani, buloane, cleme, boluri; uruburi cu cap necat pentru lemn - STAS 1452; cuie filetate - STAS 2111-71 (tip B sau D); emulsie parafinoas "SIN".

4. LIVRARE, DEPOZITARE, MANIPULARE Recepia panourilor de cofraj se face pe loturi, la furnizor. Verificarea calitii la recepie se face prin examinarea unei probe reprezentnd 5% din lot; dac din aceast prob o cantitate mai mare de 10% nu corespunde, lotul se recepioneaz panou cu panou. Verificarea dimensiunilor se va putea face folosind abloanele care au servit la confecionarea panourilor, dup o prealabil verificare atent a acestora. Pentru fiecare lot de panouri, constructorul va verifica existena certificatului de calitate emis de furnizor. Transportul panourilor att de la furnizor la antier (dup efectuarea recepiei) ct i de pe un antier la altul, se va face de preferinn pachete de cel mult 500kg cuprinznd 10... 16 panouri de acelai tip, asamblate prin balotare. Manipularea pachetelor se poate face cu o macara de capacitate corespunztoare, folosind dispozitive de manipulare adecvate. Se interzice aruncarea sau bascularea panourilor. Depozitarea panourilor de cofraj se va face pe tipuri, n stive, pe supori de 15-20cm n l ime, chiar i pentru o perioad scurt de neutilizare. Stivele vor fi formate prin suprapunerea panourilor astfel mperecheate, nct suprafeele lor de contact cu betonul s se afle fan fa. Dac depozitarea urmeaz a se face pe o perioad mai ndelungat, stivele se vor acoperi cu o prelat sau cu o folie de polietilen. Att panourile de cofraj ct i celelalte materiale i elemente de inventar formnd setul de cofrare se vor manipula cu atenie, pentru a nu se degrada prematur i a nu se descompleta.

Dup recuperare prin decofrare a panourilor de cofraj i a celorlalte piese componente ale setului de cofraj, ele se cur de resturile de beton i se ung pentru o mai bun conservare pn la urmtoarea folosire. Pentru ungerea de gard, imediat dup curire, se recomand folosirea "emulsiei parafinoase SIN" avnd urmtoarea compoziie: parafin spun ap 20...25% 1,5...2% 78,5...73%

Tratarea se va face la rece ntr-un strat subire. 5. TEHNOLOGIA LUCRRILOR DE COFRARE CU PANOURI 5.1. Lucr ri preg titoare i principalele etape ale cofr rii Pentru orice element de construcii, operaiile de montare a panourilor de cofraj se succed n principiu n urmtoarea ordine: curirea i nivelarea locului de montaj; trasarea poziiei cofrajelor; transportul i aezarea panourilor i a celorlalte materiale i elemente de inventar, curirea i ungerea panourilor; asamblarea i susinerea provizorie a acestora; verificarea poziiei cofrajelor pentru fiecare element de construcie, att n plan ct ncheierea, legarea (blocarea) i sprijinirea definitiv a tuturor cofrajelor cu ajutorul

n apropierea locului de montaj;

i pe verticali fixarea lor n poziie corect; dispozitivelor de montare (caloi, juguri, tirani, zvoare, distanieri, proptele, contavntuiri etc) i etanarea rosturilor. La folosirea panourilor de cofraj, se vor evita, pe ct posibil, practicarea gurilor n astereali baterea cuielor n schelet. Se interzice cu desvrire tierea sau cioplirea panourilor, n scopul adaptrii lor dimensionale sau de detaliu la cazuri particulare de folosire, n toate asemenea cazuri fiind necesar adoptarea unor completri la faa locului sau a unor panouri speciale. Panourile de care sunt fixate cutiile pentru guri de trecere, ipcile pentru anuri ale traseelor de instalaii etc, vor fi folosite cu aceeai destinaie la fiecare refolosire. Cutiile i ipcile se vor fixa de panouri n cuie avnd grosimea minim de 1,8mm. Pentru a se uura decofrarea panourilor echipate cu astfel de piese n relief, acestea vor fi curate i unse cu deosebit atenie. Contravntuirile eafodajelor vor fi bine strnse cu dispozitivele lor de asamblare, verificarea fiind obligatorie. Termenele la care se va face decofrarea elementelor de construcii sunt cele din "Normativul pentru executarea lucrrilor de beton i beton armat", NE012-99.

Imediat dup decofrare, se vor ndeprta bavurile de pe suprafaa betonului, folosind rachete, dli sau polizoare i se vor remedia eventualele defecte ale suprafeei betonului n condiiile art.5.67 al "Normativului pentru executarea lucrrilor de beton i beton armat", NE012-99. Pentru buna desfurare a lucrrilor de cofraj sunt necesare urmtoarele activiti pregtitoare: Analiza proiectului de execu ie al obiectivului i a condi iilor specifice de execuie, urmrind n principal: seciuni prin obiectiv, forme i dimensiuni ale elementelor din beton armat monolit i specifica iile privind obligativitatea continuit ii unor elemente din beton turnat prefabricat; monolit, rosturi de lucru, tehnologii de execuie, sau alte indicaii tehnologice preconizate; dotarea antierului cu utilaje, cofraje, dispozitive de manipulare, scule etc, n termenul de execuie al obiectivului; stadiul organizrii de antier i termenul de ncepere a lucrrii propriu-zise. vederea alegerii proceselor tehnologice;

Gruparea elementelor de beton armat monolit i alegereatehnologiilor


Elementele se grupeaz dup formi dimensiuni, avndu-se n vedere tehnologia ce se poate adopta la fiecare grupi indicaiile proiectantului privind obligativitatea continuitii betonrii anumitor elemente. ntocmirea proiectului tehnologic operativ privind lucrrile de cofraj.

5.2. Condiii privind cofrarea diferitelor elemente de construcii


Pentru cofrarea fundaiilor (continue sau izolate) cu nlime mic, panourile se dispun cu latura lung orizontal, iar pentru cele cu nlime mare cu latura lung vertical. Pentru solidarizarea i sprijinirea panourilor se folosesc montani, cleti, distanieri, rui, dulapi de aliniere, proptele etc. Pentru cofrarea pereilor, panourile pot fi dispuse cu latura lung fie orizontal, n care caz panourile sunt susinute de montani verticali, aliniai pe orizontal cu rigle, fie vertical, n care caz sunt susinute i aliniate prin moaze orizontale dispuse la minimum dou niveluri. Prima soluie se adoptn general dac se urmrete obinerea unor elemente de cofraj avnd o suprafa mai mare, manevrabile cu macaraua, iar cea de-a doua, dac montarea i demontarea panourilor se face manual la fiecare cofrare. n ambele cazuri, panotajul (mprirea pe panouri a suprafeei de cofrat) va fi identic pentru ambele fee ale peretelui, rosturile dintre panouri trebuind s fie fan fa. n acest fel, tiranii se monteaz cu uurin n lcaurile (guri sau chertri marginale) din panaouri anume practicate la confecionare. Panotarea va trebui snceap de la interseciile pereilor spre mijloc. Pentru a se putea prelua abaterile inerente att la trasarea peretelui ct i la dimensiunile efective ale panourilor rezultate la confecionarea sau n urma repetatelor folosiri, panotarea va trebui s prevadn timp un interspaiu de minimum 5cm lime. Acoperirea acestui interspaiu se va putea face fie

cu o furur din lemn, care se poate realiza din doi dulapi avnd seciunea n form de pan, fie cu o pies din tabl. Spaiul de compensare realizat permite o scoatere uoar a panourilor adiacente. Pentru obinerea unei suprafee plane, panourile de cofraj pentru perei se vor alinia riguros la montare, att la rosturile dintre ele ct i, dac este cazul, n zona de contact cu panourile de cofraj pentru plac. La partea inferioar, alinierea panourilor se va realiza cu ajutorul unor tlpi de rezemare i se vor menine feele la distana corespunztoare grosimii peretelui, cu ajutorul unor distanieri, care pot fi din eav PVC prevzut la capete cu conuri de protecie tot din PVC. Meninerea alinierii panourilor asamblate se ine cu ajutorul montanilor i al riglelor de aliniere respectiv al moazelor i cu ajutorul tiranilor trecui prin distanieri. Asigurarea verticalitii se face prin propele, de preferin reglabile. mpingerea betonului proaspt care acioneaz asupra panourilor de cofraj se preia prin elementele de sprijinire ale panourilor - montani respectiv moaze - i prin tiranii de legtur realizai n general din oel beton i blocai cu zvoare cu excentric sau pan. n cadrul proiectului de cofraj se vor verifica prin calcul elementele de sprijinire i legtur din punct de vedere al rezistenei i al deformaiilor. Cofrajele stlpilor se alctuiesc n general din panouri dispuse vertical. Panourile vor putea fi aezate n plan: fie simetric, n care caz o latur a stlpului (n general cea mic ) de regul se cofreaz cu un panou special de limea stlpului, calotarea fcndu-se cu caloi drepi pe dou laturi paralele legai cu tirani din buloane sau din oel beton; fie decalate "n mori c " n care caz calotarea, de regul , se face cu calo i triunghiulari, strni, de preferin, prin piese speciale cu pan. Pentru ieirea muchiilor stlpului, se folosesc elemente triunghiulare din ipci de lemn sau PVC. Trasarea bazei se face de regul printr-o ramp de scndur. Pentru a se putea controla i cura baza stlpului, se prevede o fereastr de vizitare, care poate fi realizatn cazul folosirii panourilor de inventar, prin montarea decalat pe vertical, a unuia din panouri. Atunci cnd cofrajul se monteaz asamblat peste armtura gata montat, iar placa nu se monteaz concomitent, se poate renuna la fereastra de vizitare. La cofrarea grinzilor i nervurilor, pentru feele laterale panourile se dispun, n general, cu latura lung pe orizontal. Se recomand ca panoul special pentru fundul grinzii s fie cuprins ntre panourile de cofraj ale feelor laterale i s fie susinut aparte, pentru a permite decofrarea mai timpurie a lateralelor. Calotarea panourilor laterale de cofraj ale grinzilor se face cu ajutorul unor juguri, legate n cazul grinzilor nalte la partea superioar prin tirani din oel-beton trecnd prin distanieri tubulari din PVC. La cofrarea plcilor, panotarea va urmri o raional dispunere a elementelor de susinere (popi, grinzi, eafodaje etc), precum i acoperirea unei suprafee maxime cu panouri de inventar. Pentru uurarea decofrrii este necesar s se prevad pe ambele direcii cte o fie de compensare de 5-10cm lime.

n cazul cofrrii concomitente a elementelor verticale (perei, stlpi) cu cele orizontale (grinzi, nervuri, plci) n scopul turnrii betonului ntr-o singur faz, mbinarea cofrajelor se va face n aa fel nct panourile de cofraj pentru elementele orizontale s se suprapun peste cele verticale, pentru a permite decofrarea pereilor i a stlpilor naintea grinzilor i plcilor. Cofrarea concomitent trebuie ns evitat ori de cte ori este posibil, ntruct: panourile orizontale pot presa pe cele verticale, prin greutatea betonului, fcnd realizarea ferestrelor de vizitare devine obligatorie; n orice caz, cur irea bazei cofrajele elementelor verticale trebuie realizate de nlime exact, nefiind posibil dificil recuperarea mai rapid a panourilor verticale; stlpilor se va face dup executarea ntregului cofraj; depirea nlimii elementelor de beton, ceea ce, de regul, face imposibil folosirea panourilor de inventar fr completri pe vertical.

5.3. Cofrarea diferitelor elemente de construcii 5.3.1. Fundaii


La fundaiile continue, se traseaz mai nti axul longitudinal pe fundul anului (spturii), fa de care apoi se va trasa poziia feelor interioare ale panourilor de cofraj. La fundaiile izolate, pe fundul spturii se traseaz cele dou axe perpendiculare ale fiec rei fundaii n parte, n raport cu care se traseaz apoi poziia feelor interioare ale panourilor de cofraj. Fixarea cofrajelor la fundaii (continue sau izolate) se va face cu montani, proptele, ru i, distan ieri etc, dup care n prealabil s-a verificat pozi ia cofrajelor n raport cu prevederile proiectului.

5.3.2. Perei
Cofrarea pereilor cu panouri se executn urmtoarea ordine: se traseaz axele pereilor i conturul lor; se fixeaz tlpile de rezemare i aliniere; se monteaz panourile de cofraj pentru una din feele peretelui ncepnd cu panoul

de la intersec ie i pe m sura ce se execut montarea, fiecare panou de cofraj se asambleaz, se introduc i piesele ce asigur coplaneitatea panourilor i se sprijin provizoriu cu proptele; se monteaz armtura peretelui; se fixeaz cutiile i ramele pentru goluri; se monteaz panourile de cofraj pe cea de-a doua fa a peretelui; concmitent cu montarea panourilor de cofraj de pe cea de-a doua fa a peretelui se se monteaz scheletul de susinere (montani, rigle, moaze) i se fixeaz cu tiranii; se verific verticalitatea cofrajelor cu ajutorul firului cu plumb i se face proptirea n

monteaz distanieri prin care se introduc tiran ii;

poziie definitiv.

5.3.3. Stlpi
Montarea cofrajelor din panouri pentru stlpi se executn urmtoarea ordine:

se traseaz axele perpendiculare i conturul stlpului, fixndu-se rama de trasaj; se monteaz armtura; se cur baza stlpului; se monteaz cofrajul gata asamblat i prevzut cu ipcile triunghiulare de teire a se sprijin provizoriu cofrajul cu ajutorul proptelelor; dup verificarea pozi iei i verticalit ii se strng definitiv calo ii i se fixeaz

colurilor;

definitiv proptelele. n cazul prevederii ferestrelor de vizitare, curirea bazei stlpului se face ca ultim operaie. n cazul asamblrii la faa locului a cofrajului, trei laturi ale acestuia se monteaz naintea armturii, sprijinindu-se provizoriu, iar dup montarea armturii, cofrajul se ncheie cu cea de-a patra latur.

5.3.4. Planee
Montarea eafodajelor de susinere a cofrajelor pentru planee (grinzi, nervuri, plci) se face n urmtoarea ordine: se trateaz poziia elementelor verticale de susinere (popi, palei etc); se amplaseaz elementele verticale de susinere i contravntuiesc provizoriu; se monteaz i se fixeaz elementele orizontale ale e afodajului (rigle, grinzi se verific poziia i dimensiunile, operndu-se corecturile necesare.

extensibile etc); Strngerea definitiv a contravnturilor se face dup ultima verificare ce se efectueaz dup montarea cofrajelor.

5.3.5. Grinzi
Montarea cofrajelor din panouri pentru grinzi i nervuri se face n urmtoarea ordine: pe eafodajul stabilit de proiectant i executant se fixeaz pe cofrajul pentru fundul se monteaz panourile feelor laterale; n cazul unor grinzi nalte, dup cofrarea unei fee laterale se monteaz armtura; se consolideaz cofrajul grinzii (nervurii) prin montarea jugurilor care au eventual la grinzii sau nervurii, verificndu-se cu atenie cota, rectilinitatea i orizontalitatea;

partea superioar tirani de strngere trecui prin distanieri.

5.3.6. Plci
Montarea cofrajelor din panouri pentru plci se face n urmtoarea ordine: se monteaz panourile de inventar i eventualele panouri de completare pe eafodajul pregtit, corespunztor planului de panotaj, lund msuri menite s mpiedice deplasarea orizontal a panourilor n timpul turnrii betonului; se completeaz conform aceluia i plan de panotaj cu fururile de compensare se verific cotele intradosului plcii i orizontalitatea acestuia. necesare decofrrii; Cofrajele din panouri se ung cu atenie naintea montrii armturilor n scopul de a se facilita operaia de decofrare i a se mri prin aceasta numrul de folosiri ale panourilor.

Ungerea se face imediat dup montarea cofrajului sau chiar n timpul montrii lui (la perei, stlpi, grinzi nalte). Pentru ungere se folosesc substane produse industrial n acest scop sau unguentul de gard aplicat dup decofrare, fiind interzis folosirea motorinei sau a petrolului lampant, care degradeaz materialele lemnoase. Este recomandabil ca aplicarea unguentului s se fac prin pulverizare. La operaiile de armare se va avea grij de a nu se lua unguentul de pe cofraj pe carcasele de armturi. nainte de nceperea turnrii se vor amenaja i verifica, la perei i stlpi, podinele de lucru pentru muncitorii betoniti, avnd nlimea i limea corespunztoare i prevzute cu parapete de protecie, precum i puni de circulaie deasupra armturilor la planee. De asemenea, se va verifica starea de funcionare a mijloacelor pentru transportul, punerea n operi compactarea betonului (autoagitatoare sau basculante, pompe de beton sau bene, vibratoare etc).

5.4. Decofrarea elementelor de construcii


La decofrarea elementelor verticale (perei, stlpi), ordinea operaiilor este n general invers celor indicate la montarea cofrajelor respective, anume: desfacerea zvoarelor de susinere (montani, rigle, moaze, caloi); scoaterea fururilor de compensare la perei; scoaterea panourilor, la perei ncepnd de la fururi; demontarea scndurilor de aliniere, respectiv a ramei de trasare.

Totodat, se poate efectua n mod asemntor i decofrarea lateral a grinzilor prin desfacerea i scoaterea tiranilor, demontarea jugurilor i ndeprtarea panourilor. La decofrarea elementelor orizontale (grinzi, nervuri, plci),ordinea operaiilor este, n general, urmtoarea: slbirea contravntuirilor, pentru a permite coborrea eafodajului n ansamblu; coborrea elementelor de sus inere verticale cu minimum 10cm prin ac ionarea scoaterea la plci a fururilor de compensare i a panourilor de cofraj; demontarea eafodajului, i anume: demontarea grinzilor, a contravntuirilor i a

asupra dispozitivelor amintite (pene, filete etc);

popilor.

6. ABATERI ADMISIBILE
Abateri limit la dimensiuni reprezentnd deschideri: pentru grinzi i plci fr grinzi cnd deschiderea este 3,00m cnd deschiderea este 3,00m pentru plcile planeelor cu grinzi cnd deschiderea este 3,00m cnd deschiderea este 3,00m 6,0mm 8,0mm 10,0mm 12,5mm

pentru perei cnd lungimea(nlimea) este 3,00m cnd lungimea (nlimea) este 3,00m 10, ,0m 12, ,5m m 3 ,0m , m 2 ,0m , m ,0mm 3 ,0mm 4

Abateri limit la dimensiunile seciunilor transversale: la stlpi, grinzi la grosimea pereilor i plcilor Tolerane la rectiliniaritatea muchiilor: pe m pe toat lungimea muchiei Tolerane la planeitatea suprafeei:

Deformaiile pe care le sufer cofrajul n timpul turnrii i compactrii betonului nu vor depi limitele admisibile cuprinse n acelai tabel 1 al anexei XXI la normativul NE012-99, la col.4.

Etapele controlului de calitate la lucrrile de cofraje sunt: Etapa preliminar - caracterizat prin asigurarea condiiilor tehnico-organizatorice necesare execut rii i realiz rii lucr rilor la nivelul calitativ prev zut n documenta iile tehnologice i prescripiile tehnice, constnd din: verificarea lucrrilor premergtoare celor de cofraje; verificarea mijloacelor de munc cantitativ i calitativ conform documentaiilor tehnologice; verificarea geometriei subansamblurilor de cofraj i nscrierii n limitele abaterilor admisibile; verificarea subansamblelor de cofraj privind: existena tuturor elementelor prevzute n documentaia de execuie; fixarea corect a elementelor de prindere (menghine, cleme, uruburi etc); integritatea feei cofrajului. Etapa de execuie a lucrrilor la nivelul calitativ prevzut n documentaiile tehnologice verificri dup trasare i nscriere n abaterile admisibile privind: pozi ia marcajelor fa de axele construc iei i fa de elementele corespunztoare turnate la etajul inferior; dimensiunea elementelor ce urmeaz a fi cofrate; verificarea dup montarea elementelor de baz (calo i n cazul stlpilor, montani i panouri n cazul pereilor, tlpile eafodajului i schelelor etc) privind: existena tuturor elementelor prevzute n documentaie; fixarea corecti stabil a elementelor de prindere i legtur; poziionarea corect fa de marcaj, n limitele abaterilor admise; i prescripiilor tehnice constnd din:

7. VERIFICRI N VEDEREA RECEEPIEI

verificri dup montarea fiecrui nivel de elemente (ex. panouri n cazul CMS, montani i panouri n cazul cofrajelor pitoare, ntregul ansamblu n cazul utilizrii subansamblelor mari de cofraje pentru perei etc), privind: existena tuturor elementelor prevzute; fixarea corecti stabil a elementelor de prindere i legtur; pozi ia golurilor, inclusiv a celor destinate verific rii, la recep ia structurii, a poziiei reciproce a axelor verticale ale elementelor de la diferite niveluri; ncheierea corecti asigurarea etaneitii; curirea cofrajelor; asigurarea msurilor NTS i PSI; poziionarea corect fa de marcaj; dimensiunile cofrajului; poziionarea fa de orizontali vertical. Etapa final de verificare la recepia lucrrilor conform documentaiilor tehnologice i La terminarea lucrrilor de cofraj se efectueaz recepia final de ctre o comisie format din beneficiar (diriginte de antier) i constructor (ef de lot, eful punctului de lucru, eful de echip). Comisia va efectua verificrile prevzute mai sus ("Verificri dup montarea fiecrui nivel de elemente"), precum i alte verificri prevzute n "Fiele de utilizare" specifice, n tabelele cu "Operaii de verificare la recepie". Rezultatele verificrii i eventualele remedieri ce trebuie fcute se vor consemna n "REGISTRUL DE PROCESE VERBALE PENTRU VERIFICAREA CALITII LUCRRILOR CE DEVIN ASCUNSE". Dup efectuarea remedierilor se va face verificarea i se va ncheia un nou proces verbal. ATENIE ! NAINTE DE TURNAREA BETONULUI CONDUCTORUL PUNCTULUI DE LUCRU (MAISTRU, INGINER) ESTE OBLIGAT S VERIFICE INTEGRITATEA, STABILITATEA, REZEMAREA PE TEREN, ETANEITATEA, POZIIONAREA I STABILITATEA ELEMENTELOR CE VOR FI NGLOBATE N BETON (armtur, rame, goluri, plcue metalice, instalaii etc) CONFORM DOCUMENTAIEI DE EXECUIE. Dup turnarea i ntrirea betonului se execut decofrarea pe baza unei dispoziii scrise date de eful de lot. La decofrare se vor respecta prevederile din Normativul NE012-99 Cap. "Decofrare". 8. MSURI PRIVIND TEHNICA SECURITII MUNCII I PREVENIREA prescripiilor tehnice.

INCENDIILOR La executarea lucrrilor se vor respecta prevederile din urmtoarele prescripii: Legea nr. 319/2006 - Legea securitii i sntii n munc HGR nr. 1425/2006 pentru aprobarea Normelor metodologice de aplicare a

prevederilor Legii securitii i snii n munc nr. 319/2006

HGR nr. 1091/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 971/2006 privind cerinele minime pentru semnalizarea de securitate HGR nr. 1028/2006 privind cerinele minime de securitate i sntate n munc HGR nr. 1051/2006 privind cerinele minime de securitate i sntate pentru

locul de munc i/sau de sntate la locul de munc referitoare la utilizarea echipamentelor cu ecran de vizualizare manipularea manual a maselor care prezint riscuri pentru lucrtori, n special cu afeciuni dorsolombare HGR nr. 1048/2006 privind cerinele minime de securitate i sntate pentru HGR nr. 1146/2006 privind cerinele minime de securitate i sntate pentru Ordinul ministrului muncii, solidaritii sociale i familiei nr. 753/2006 privind Ordinul ministrului muncii, solidaritii sociale i familiei nr. 755/2006 pentru utilizarea de ctre lucrtori a echipamentelor individuale de protecie la locul de munc utilizarea n munc de ctre lucrtori a echipamentelor de munc protecia tinerilor n munc aprobarea formularului pentru nregistrarea accidentului de munc - FIAM i a instruciunilor de completare a acestuia munc Norme republicane de protecia muncii, aprobate de Ministerul Muncii i Ministerul Sntii cu ordinele nr.34/1975 i respectiv 60/1975, cu modificrile aduse prin Ordin nr.39/77 i 110/30/77 (b.d.i. 3-4/77 i 5-6/79); Normele de protec ia muncii n activitatea de construc ii-montaj, aprobate de Ordinul MMPS 57/1996 privind norme generale de protecia muncii; Regulamentul MLPAT 9/N/15.03.1993 privind protecia i igiena muncii n construcii Ordinul MMPS 235/1995 privind normele specifice de securitatea muncii la nlime; Ordinul MMPS 255/1995 - normativ cadru privind acordarea echipamentului de Normativele generale de prevenirea i stingerea incendiilor aprobate prin Ordinul MI Legea nr. 53/2003 - Codul Muncii; Decretul nr. 466/1979 privind regimul produselor i substanelor toxice; Legea nr. 126/1995 privind regimul materiilor explozive; Alte acte normative n vigoare n domeniu la data executrii propriu-zise a lucrrilor. Legea nr. 307/2006 privind aprarea mpotriva incendiilor M.C.Ind. cu Ordinul nr.1233/D.1980. Directiva Consiliului Comunitilor Europene 89/391/CEE privind introducerea de msuri pentru promovarea mbuntirii securitii i sntii lucrtorilor la locul de

- ed. 1995;

protecie individual; nr. 775/22.07.1998;

Ordinul ministrului administra iei i internelor nr. 1435/2006 pentru aprobarea

Normelor metodologice privind avizarea i autorizarea privind securitatea la incendiu i protecia civil P 118-1999 - Normativ privind sigurana la foc a construciilor NP 086-2005 - Normativ pentru proiectarea, executarea i exploatarea instalaiilor C 300 - 1994 - Normativ de prevenirea i stingerea incendiilor pe durata executrii

de stingerea incendiilor lucrrilor de construcii i instalaii aferente acestora NOT : n momentul execu iei se vor aplica normele n vigoare.

ProceduraTehnicadeExecutie
I.TENCUIELI
1. SCOPUL Prezentaprocedurastabilestedescriereamoduluideexecutieatencuielilor 2. DOMENIULDEAPLICARE Prezentaproceduraseaplica la lucrarideexecutieatencuielilor, aplicate manual saumecanizatpesuprafetedezidarie,blocuriBCA,betonmonolit,planseesaugrinzi prefabricate. 3. DEFINITIISIPRESCURTARI

3.1.Definitii Tencuieli = acoperirea suporafetelor elementelor de constructii executate din lemn, piatra, caramida si beton cu un mortar, care dupa un anumit interval de timp seintaresteformindunstratrezistent. Tencuieli umede = tencuielile la care aplicarea mortarului se face direct pe suprafatadetencuit. Sprit = primul strat al tencuielii ce are ca scop sa asigure o buna legatura a tencuieliicusuprafatadetencuit. Grund = stratul cel mai gros al tencuielii si care serveste pentru acoperirea neregularitatilor suprafetelor de tencuit si ca sa dea forma bruta, pe care se aplica apoistratulvizibil. Stratul vizibil = ultimul strat al tencuieliiceau ca scop sa dea forma si aspectul definitiv. Tinci = mortarul stratului vizibil, cu aceiasi compozitie cu a grundului, eventual cu o cantitate mai mare de var pasta si nisip fin, iar la fatade numai cu ciment si praf depiatra.

4. DOCUMENTEDEREFERINTA C1884Normativpentruexecutareatehnologiilorumede STAS2694/80Mortarepentruzidariisitencuieli STAS146/80Var STAS545/180Ipsospentruconstructii SR1500/96CimenturicompoziteuzualetipII stas1667/76Nisip STAS790/84Apa STAS4606/80Impuritatiinagregate 5. RESPONSABILITATI Sefulpunctuluide lucruverificapreluareafrontuluide lucru intocmeste impreuna cu dirigintele P.V. de receptie calitativaastructuriiderezistenta. examineaza corespondenta dintre caracteristicile materialelor primite cu prevederileproiectului. Verifica respectarea procedurilor de executie impreunacudirigintele. Verificadiferitelefazealelucrarii.

6. CONTINUTULPROCEDURII 6.1.MATERIALELE

Materialele necesare pentru prepararea mortarelor de tencuieli nu pot fi introduse in lucrare decit daca sa verificat in prealabil certificatul de calitate care sa confirme casuntcorespunzatoare.

CONDITIIPREALABILE Pentru executia unor tencuieli de calitate, in prealabil se va efectua un control al suprafetelorceurmeazaafiexecutate. La inceperea tencuielilor trebuie sa fie terminate toate lucrarile care ulterior sau simultanarputeaprovocadeteriorareatencuielilor.

Suprafetelesuporttrebuiesafiecurate,faranoroi,petedegrasime,etc. Pentru o buna aderare a tencuielilor, suprafetele pe care se aplica trebuie sa fie planesifaraabateri. TEHNOLOGIADEEXECUTIE 1. Trasareasuprafetelordetencuit Dupa controlul si pregatirea stratului suport se va executa trasarea suprafetelor, prin diferite metode :cu repere de mortar, scoabe metalice sau sipci de lemn.Se verifica modul de fixare a acestor repere, astfel incit sa se obtina un strat de mortar cu grosimea stabilita. 2. Executareaamorsarii Suprafetele de beton vor fi in prealabil stropite cu apa, apoi se face amorsarea prin stropire cu un sprit in grosime de 3 mm.,compus din ciment si apa, care sa realizeze unstrat continu. Suprafetele de zidarie de caramida vor fi in prealabil stropite cu apa si vor fi amorsatecumortarfluidcugrosimeademax.3mm.. Suprafeteledin BCAse amorseazacu unsprit ingrosime de0,2 0,3cm. executatcuun mortardeciment varnisip. La suprafetele din rabit nu se aplica sprit, ciun strat suport numit smir, din mortar de var cu ipsos sau var cu ciment, dupa cumeste si mortarulgrundului.Mortarulsmiruluitrebuie saaibaoconsistentamaivirtoasadecitagrundului. Aplicarea spritului se face manual sau mecanizat .La executarea amorsarii se va urmari ca spritul sa fie cit mai uniform, iar inainte de aplicarea grundului se va verifica dacaspritulesteintaritsisuprafataestesuficientderugroasa.

3. Executareagrundului Grundul se va aplica dupa cel putin 24 ore de la aplicarea spritului, in una saudoua reprize, in special mecanizat.Este interzisa aplicarea pe suprafete inghetate sau daca este pericoldeinghet inaintedeintarire.

Pefatade,spritulsigrundulsevoraplicadesusinjos.Inaintedeaplicareastratuluivizibilseva controlacasuprafetelegrunduitesanuaibaurmedevarnehidratate. 4. Executareastratuluivizibil Pentru obtinerea unei grosimi de 25 mm., tinciul se va arunca cu mistria la anumite interval,astfelcaacesteasasenivelezecudrisca. Tencuielile interioare gletuite se vor realiza fie prin inchiderea porilor cu un strat subtire(1mm.)depastadevarcuadaosdeipsos(glet devar),fiecuunstrat deipsosde2 mm. (glet de ipsos); netezite fix.Gletul de ipsos se va aplica numai pe un strat vizibil cu un anumit graddeumiditate,atitcitestenecesar,inaintedeterminareaprizei. Pe timp friguros, tencuielile se executa fie cu mortare obisnuite, in care caz trebuie asigurata in tot timpul executarii o temperatura in incapere de cel putin +5 C, fie cu mortarespeciale. 5. Conditiitehnicedecalitate Verificarea aspectului general al tencuielii se va face vizual, cercetind suprafata tencuita, ce trebuie sa fie uniforma, fara denivelari, fisuri sau impuscaturi Muchiile de racordare a peretilor cu tavanele, colturile, spaletii ferstrelor trebuie sa fie drepte, verticale sau orizontale.Nu trebuie sa existe goluri sau portiuni neacoperite cu mortar la racordarea tencuielilorcutimplaria, inspateleradiatoarelor,etc.. Solbancurilesidiferiteleprofiluritrebuie saaibapantelespreexterior,iarlacrimarulsafieexecutatcorect. Verificarea aderentei straturilor de tencuiala la stratul de suport se face, in general, numaiprinciocanire.Unsunetdegolaratadesprindereatencuielii. Verificareaplaneitatii se facecuundreptarde2mlungime,asezat inorice directiepesuprafatatencuitasimasurareagolurilorintredreptarsitencuiala. Controlul verticalitatii si orizontalitatii suprafetelor muchiilor se face cuundreptar,bolobocsifirulcuplumb. Graduldenetezirealsuprafetelortencuiteseverificanumailatencuieligletuitesi seapreciazaprinplimbareapalmeipesuprafatarespectiva.

CONTROLULPROCESULUI Nr. Opratiuneatehnologica

crt. saufazadeexecutie controlul 1 Receptia .sef pct.lucru materialelo rinaintedepunereain laborant 2 3

Cine efct.

Docum.ce se

complet. control Certificat calit. bonconsum P.V.L.A.

Tipulde

Observatii

Preluarefrontlucru

diriginte sef pct. lucru diriginte sefpct.Lucru

Verificariinperioada de executie sipe faze delucrari 7. INREGISTRARI

P.V.L.A.

certificatedecalitatemateriale bonurideconsum bonlivrare mortar7.4.p.v.l.a.(F 110)

NUME Intocmit: Verificat: Aprobat


SEMNATURA

DATA

II.LUCRARIDEARMARE
Coddocument:00892 Editia/Revizia:1/0

Elaborat Verificat Avizat

Numelesiprenumele

Semnatura

Data

Proceduradecontrollucrariarmare

1.

SCOP fazeledeurmarire.

Stabilestemodulde desfasurarea procedurii,precizandconditiilegenerale, 2. DOMENIULDEUTILIZARE

Proceduraseaplicalasupervizarealucrarilor dearmare , in conformitatecu cerinteleprogramuluide asigurareacalitatiisialegislatieiinvigoare. 3. DOCUMENTEDEREFERINTA Caieteledesarcinigeneralesispecifice ManualulFIDIC(dupacaz) Proiecttehnic cudetaliide executieaferenteStandarde sinormativeinvigoare: Produseledinotelpentruarmaturanepretensionatatrebuiesafieinconformitatecu prevederilespecificatieitehniceST009,iarutilizarealortrebuiesaseconformeze prevederiloraplicabiledinstandardeleseriaSREN1992,SREN1994,SREN1996,SREN 1998,impreunacuanexelenationalealeacestora,celordinST009 ~icelordin prezentulnormativ.

4.

PREVEDERIGENERALE

Claseledetoleranlamontareaarmturiisunturmtoarele(asevedeaanexeleCiD): a) ladistaneledintrebareledearmtur: (i) lafunda ii:TD,Ix,darnumaimultde10mm; (ii) laplciiperei:TD,VIII,darnumaimultde5mm; (iii) lastlpiigrinzi:TD,VIII,darnumaimultde3mm; (iv) pentruetrieri,agrafeifrete:TD,IX,darnumaimultde10mm;

b) laacoperireacubetonaarmturii, fadedimensiuneanominal(cnom,tabelul0. 4,nr.crt.2),nfunc iedenl imeaelementului(h),abaterileadmisesunt:

(i) h<=150mm:10mm; (ii) h=400mm:10mm...+15mm; (iii) h>=2500mm:10mmm...+20mm cuurmtoarelemen iuni:

- pentruvaloriintermediarealenl imiisevainterpolaliniar; - lafundaiiielementedinbetonnfundaiiacoperireapoatefi sporitcu15mm.

5.

PROCEDURA

5.1Verificareairecep iaarmturiimontateseefectueaz: a) laterminarealucrrilordemontare,pentruoetapdelucru,cndsefacei recep ialucrrilor;

b) imediatnaintedepunereanoperabetonului, cndseefectueazonouverificare.

5.2Verificareaannturiimontateseefectueazprinexaminaredirectimsurrisimple,

caresereferlaurmtoarele:

a) tipul,clasaitrasabilitateaproduselor:prinobservarevizualiconfruntare cudocumenteleprivindproduselerespective; b) diametreleincadrareantoleraneprivinddimensiunileipozi iile:prin msuraredirect,ncelpu indouseciuni, nfiecarezonncarearmareadifer,o ateniedeosebitfiindacordatdistaneifadecofraj(acoperireacubeton); c) pozi iaiaspectulnndirilor:prinobservarevizualimsuraredirect, cuUlmtoareleprecizri: (i) pentrumbinrisudatesaurealizateprinaltemetode,executate natelier(dectreexecutantsauprelucrtor),sevorluan consideraredocumentelederecep iecaretrebuiesfientocmite laatelier; (ii) pentrumbinriexecutatelafaalocului,sevorluan consideraredocumentelederecep ientocmitedeexecutant,dup realizareanndirilorrespective; d) legareaarmturiilancruciriiexistenadistan ierilor,prinobservarevizual iapreciere, inclusivprinsolicitaremanual,astabilitiicarcaseidearmturia fixriidistanierilor;

e) stareaarmturii,prinobservarevizualimsurare,dupcaz,privind: (i) curenia:suprafaaarmturiinutrebuiesfieacoperitdematerii carempiedicaderena(pmnt,substanegraseetc.);

(ii) stareadecorodare,pentrucareseaplicurmtoarelecondi ii:

- seacceptstareaexistentncazurilencarearmturaprezint: .ruginsuperficialneaderent(brunrocat),caresecur uorprintergere .ruginsuperficialaderent(brunrocatsauneagr),cu aspectmat,rugos,carenusedesprindeprinlovire; - semsoaradncimeazonelorcucoroziunelocalizat (puncte,pete)saucuruginnstraturicaresedesprindprin lovire,dupcurarearuginii,urmndca: .ncazulncarereducereasec iuniiestemaimicdectcea corespunztoareabaterilor limitadmisibilenegativepentru diametrularmturii,ssepoatacceptastareaexistent,cu avizulproiectantului; .ncazulncarereducereasec iuniiestemaimare,sse refuzerecepiaarmturii.

Evaluareastriiarmturiincazurilencareaceastaprezintcoroziunelocalizatsau nstraturi,prinmsurareareduceriisec iunii,trebuieefectuatnzonelencare coroziuneaestevizibilavansat,ncelpuintreisec iunialefiecreibaredearmtur.

ncazuridedubiiprivindverificareaarmturiimontateconformcelorartatemai nainte,sevorprevedeamsuripentruaseclarificasituaia, iarpentruneconformit iseva dispuneremedierealor. Pentruaevitaapari ianeconformit iloresterecomandatverificareaarmturilor la fasonareaacestora,naintedemontare. 5.3Oateniedeosebitvafiacordatverificriiarmturiidinzoneledeancorarea armturilorpretensionate(alctuire,pozi ie, fixare).

6. RESPONSABILITATI.

Dirigintele de santier,raspunde de aplicarea intocmai a acesteiproceduri. Dirigintele de santier raspunde de existenta si evidenta inregistrarilor de calitate , precum si de respectarea planului de control al calitatii prezentat de beneficiar.

In cazul in care, in urma controalelor efectuate in santier , descopera lucrari necorespunzatoare, Dirigintele de santier are obligatia de evidentia acest aspect prin intocmirea unei Note de constatare , care va fi adusa la cunostinta beneficiarului si antreprenorului . In baza acestei note , antreprenorul va intocmiunRaportde neconformitate(RNC). Dirigintele de santier trebuie sa verifice modul de rezolvare al RNC , care se aplica in baza DispozitieideSantierdatadeproiectant siconsemnatprin PVde receptie remediere semnat de toti factorii responsabili , sa completeze si inregistreze Fisa produsului neconform aferenta neconformitatii constatate ( FPN);

7. RECEPTIALUCRARILOR Recepiaarmturiimontatereprezintconfirmareaconformit iiacesteiacuproiectuli prevederilereglementrilortehniceaplicabile,pebazaverificriiefectuate,prinncheierea procesuluiverbalderecep iecalitativpefaze(pentrulucrricaredevinascunse),cu patiicipareareprezentantuluibeneficiaruluilucrrii;ncazulrecep ieiarmturiielementelor structurale,icupatiicipareaproiectantului. Verificareaarmturiisefacedinnou,nintervalulde24deorenaintedepunerean operabetonului.

ncazurilencareexecutantullucrrilordeconstruciiaplicunsistemdemanagement alcalit ii(asevedeatabelul20,1,nr.cli.2),labazaprocesuluiverbalderecep iecalitativpe fazealucrrilordeconfec ionareimontareaarmturiinepretensionatevorstadocumentele

aplicabilealeacestuisistem, lacaresevafacetrimitere(proceduri,instruciuniinregistrri privind:aprovizionarea,recepia, manipularea,depozitareaitrasabilitateamaterialelor; executareaiverificarealucrrilor;echipamenteledemsurare;calificareapersonalului; tratareaneconformit iloretc.).

ncelelaltecazuri,prinprocesulverbalderecepiecalitativpefazesevorconsemna toatedateleprecizate.

III.LUCRARIDECOFRARE

Elaborat Verificat Avizat

Numelesiprenumele

Semnatura

Data

Proceduradecontrollucraribetoane 1. SCOP Stabilestemodulde desfasurarea procedurii,precizandconditiilegenerale ,fazelede urmarire. 2. DOMENIULDEUTILIZARE a. Procedura se aplica la supervizarea lucrarilor de cofrare, in conformitatecu cerinteleprogramuluide asigurareacalitatiisialegislatieiinvigoare. 3. DOCUMENTEDEREFERINTA a. Caieteledesarcinigeneralesispecifice b. Manualul FIDIC(dupacaz) c. Proiecttehniccudetalii de executieaferente

Standardesinormativeinvigoare: - Normativpentruexecutarea lucrrilordebetonibetonarmatindicativeC140 79 (B.C.nr.12/1979ibrour) - Normativprivindalctuirea,executareaifolosireacofrajelorglisanteindicativeC4176 (B.C.nr.1112/1976) Normativprivindalctuirea,executareaifolosireacofrajelorglisante"indicativC4176.

4.

PREVEDERIGENERALE

Tehnologiiledemontareidemontarealecofrajelordinpanourideinventardemontabile.ale cofrajelorpitoareialecofrajelorglisantesevordesfurapebazaunor instruciunielaborate deproiectantulcofrajeloriaprevederilordinnormativelenvigoare. Abaterilimit


Abaterilimit ptcofrajela construciicivile, Panourilecofrajelorgataconstruite Cofrajegataconfec ionate industriale, agrozootehniceispecial

1.Abaterilimitla dimensiunile panourilor: lalungimi lal imi 2.Abaterilimitla dimensiunealiber (lumin)

4 mm 3 mm

10mm 2mm 3mm

pentruplci,pereisau grinzi 3.Abaterilimitla dimensiunileseciunilor transversale

2% 1,0%

- grosimiperei,plci - stlpi,grind 4.nclinarealimitfaa deorizontala muchiilorisuprafeelor - peunmliniar - petoatsuprafaa, laplaneu Abaterilimit ptcofraje lapoduriipasarele 1 1.Abaterilimitla dimensiunile panourilor 1 lal imi 2.Abaterilimitla dimensiunealiber (lumina) nsec iuni transversale

Panourilecofrajelorgataconfec ionate Cofrajegataconfec ionate 2 3


4mm

3mm

4mm 6mm

laeleva ii lafundaii 3.nclinareafade verticalamuchiilor i suprafeelor peunmliniar petoatnl imeala eleva ii 4.nclinareafade

3 2,5

2 1

orizontalamuchiilori suprafeelor peunmliniar petoatsuprafaa exclusivecuzine ii pesuprafaaunui cuzinet 5.Abaterilapozi ian planaaxelor pentrufunda ii pentrucuzine i 6.Abaterilapozi ian planverticalacoteide nivel pentrufunda ii pentrurestuleleva ii funda ii pentrucuzine i

2, 15mm 10mm

20mm 20mm 2mm

5. Verificareasireceptiacofrajelorsisustineriloracestora 5.1Verificareacofrajelorsisustineriloracestoraseefectueaza: a) laterminarealucrarilordecofraje,pentruetapadelucru,seefectueaza sireceptiacofrajelor; b) imediat inaintedepunereainoperaabetonuluiincofrajelerespective,cand seefectueazanouaverificare.

Verificareacofrajelorsisustineriloracestoraseefectueazaprin: a) examinaredirectasimasurarisimple; b) masuraricuaparatura. Prinmasurariseurmaresteconfirmareaincadrariiintoleranteleprevazute pentrumontareacofrajelor.

Verificareacofrajelorsisustineriloracestoraprinobservaredirectasimasurarisimple sereferalaurmatoarele: a) comparareacuprevederiledin proiectultehnologicsi/sauprevederileproducatorului,In ceeacepriveste:

(i) alcatuireadeansamblu:vizual; (ii) tipuriledematerialesiintegritateaacestora:vizual,precumsi analizareadocumentelorprivindcalitateaacestora;

(iii) dimensiunile:prinmasurare; (iv) Imbinarile(elementeledefixaresicontactulintreelementele concurenteinimbinare):visualsiprinsolicitarecu mana,sanuaibajocin imbinare; b) asezareacorespunzatoareaelementelorpanourilorcofrajelorpropriuzise, fata debazaderezemare,precum, siintreele:vizualpozitiesilaspatiilibereintre ele; c) faptulcaelementeledesustineresaulegaturapunctuala(popi, contravantuiriinciinate,legaturiinterioareetc.)suntfixate:prinsolicitarecu mana,sanuaijoc;legaturileinterioaresuntcorrectmontate:prinobservare

vizuala;

d) stareadecuratenie:vizual; e) aplicareaagentilordedecofrare:vizual; f) dimensiunile,Incelputin2sectiunipentrufiecareelement,precumsiale golurilorsipozitiarelativaaacestora:prinmasuraredirecta; g) trasareainaltimiidetumareabetonului:prinmasuraredirectafatade fundulcofrajului,saufatadealtesuprafeteexistente;

h) aspectulgeneralalsuprafeteicarevineincontactcubetonul:vizual.

Verifidlrilecofrajelorprinmasuriiricuaparaturiisereferiila: a) cotedenivelpentrufundulcofrajului; b) axe,pentruspatiulcofratsipentrugoluri; c) Incliniiri,dadiestecazul; d) verificiiriIntoatepunctelesisectiunile,caretrebuiesafieprecizateIncaietul desarciniIntocmitdeproiectant,Incazulcofrajelorcuformedeosebite(pliicisau pereticurbietc.).

Neconformitati1e, fieInceeaceprivestea\catuireasimontarea,fieInceeacepriveste depiisireatolerantelor(abateriloradmisibile) ladimensiunisi/saupozitie,se consemneaziisitrebuiesafierezolvatedeexecutant. Pentruapreveniaparitiaunorneconformitati,executantultrebuiesaasigureuncontrol preliminarprivindaprovizionarea, manipulareasidepozitareamaterialelorutilizate,precumsi uncontrolalinstruiriipersonaluluicarevaexecutalucrarilerespective.

Verificareacofrajelorsisustineriloracestorasefacedinnou,inintervalulde24deore inaintedemontareaarmaturii,dacaestecazul,precumsiinaintedepunereainoperaa betonului,daca intreacesteoperatiuniatrecutperioadamailunga. Aceastaadouaverificareseefectueazaprinobservaredirectasimasurari simple,conformpct.704.1.2.

Incazurileincareexecutantullucrarilordeconstructiiapliciaunsistemde

management alcalitiatii(asevedeatabelul20,I,nr.crt.2),executareasiverificarealucrarilor decofrajesisustinerialeacestoratrebuieefectuateconformprevederilor aplicabilealeacestui sistem(proceduri,instructiunisiinregistrariprivind:aprovizionarea,receptia,manipularea, depozitareasitrasabilitateamaterialelor;executareasiverificarealucrarilor;echipamentelede masurare;calificareapersonalului;tratareaneconformitatiloretc.).

7.

RESPONSABILITATI. Dirigintele de santier , raspunde de aplicarea intocmai a acestei proceduri . Dirigintele de santier raspunde de existenta si evidenta inregistrarilor de calitate , precum si de respectarea planului de control al calitatii prezentat de beneficiar. In cazul in care, in urma controalelor efectuate in santier , descopera lucrari necorespunzatoare, Dirigintele de santier are obligatia de evidentia acest aspect prin intocmirea unei Note de constatare , care va fi adusa la cunostinta beneficiarului si antreprenorului . In baza acestei note , antreprenorul va intocmiunRaportde neconformitate(RNC). Dirigintele de santier trebuie sa verifice modul de rezolvare al RNC ,carese aplica in baza Dispozitiei de Santier data de proiectant si consemnat prin PV de receptie remediere semnat de toti factorii responsabili , sa completeze si inregistreze Fisa produsului neconform aferentaneconformitatiiconstatate ( FPN);

RECEPTIALUCRARILOR Receptiacofrajelorsisustineriloracestoraconstainconsemnareaconformitatii lucrarilor,pebazaverificariiefectuatelaterminarea lucrarilorsiarezolvariieventualelor neconformitati,printrunprocesverbalpentrureceptiacalitatiipefaze(pentrulucraricare devinascunse),cuparticipareareprezentantuluibeneficiaruluilucrariisiincazulunorcofraje si/sauesafodajedeosebite,pentrucareproiectantulaintocmit caietedesarcini,sicu participareaproiectantului.

IV.LUCRARIDETERASAMENTE

Elaborat Verificat Avizat

Numelesiprenumele

Semnatura

Data

Proceduradecontrollucrariterasamente

1. SCOP a. Stabilestemodulde desfasurarea procedurii,precizandconditiile generale,fazelede urmarire. 2. DOMENIULDEUTILIZARE a. Procedura se aplica la supervizarea lucrarilor de terasamente , in conformitate cu cerintele programului de asigurare a calitatii si alegislatieiinvigoare. 3. DOCUMENTEDEREFERINTA a. Caieteledesarcinigeneralesispecifice b. Manualul FIDIC(dupacaz) c. Proiecttehniccudetalii de executieaferente d. Standardesinormativeinvigoare: 1. STAS509171Terasamente.Prescrip iigenerale. 2. STAS291484Lucrridedrumuri.Terasamente.Condi iigenerale. 3. STAS291673Lucrridedrumuriiciferate.Protejareataluzelorianurilor descurgereaapelor. 4. STAS838982Lucrridembuntirifunciare.Diguri.Condi iitehnicei metodedeverificare. 5. STAS838881Lucrridembuntirifunciare.Reelededesecare.Condi ii tehniceimetodedeverificare. 6. STAS605477Terenuldefunda ie.Adncimeadenghe. 7. STAS1913/182Terenuldefunda ie.Pmnturi.Determinareaumidit ii. 8. STAS274569Terenuldefunda ie.Urmrireatasriiconstruciilorprinmetode topografice. 9. STAS9824/074Trasareapeterenaconstruciilor.Prescrip iigenerale. 10. STAS9824/175Trasareapeterenaconstruciilorcivile, industrialei agrozootehnice. 11. STAS9824/275Trasareapeterenaliniilordecaleferat.

12. STAS9824/374Msurtoriterestre.Trasareapeterenadrumurilorpublice proiectate. 13. STAS985074Lucrridembuntirifunciare.Verificareacompactrii terasamentelor. 14. C16983Normativpentruexecutarealucrrilordeterasamentepentrurealizarea funda iilorconstruciilorcivileiindustriale(BuletinulConstruciilornr.1/1984) 15. P.7079Instruciunitehnicepentruproiectareaiexecutareaconstruciilorpe pmnturicuumflrisicontraciimari(BuletinulConstruciilornr.4/1979). 16. .2985Normativprivindmbuntireaterenurilordefundareslabeprin procedeemecanice(BuletinulConstruciilor nr.5/1978). 17. C.6174Instruciunitehnicepentrudeterminareatasrilorconstruciilorde locuinesocialculturaleiindustrialeprinmetodetopografice(Buletinul Construciilornr.4/1975). 18. P.777Normativpentruproiectareasiexecutareaconstruciilor fundatepe terenurislabe(BuletinulConstruciilorar.5/1978). 19. C.18277Normativpentruexecutareamecanizataterasamentelordedrumuri (BuletinulConstruciilornr.11/1977). 20. C.D.1264Normativcondi ionat(departamental)privindexecutareastraturilorde pmntstabilizatcuvariciment nplatformaterasamentelordecaleferat (AprobatdeMTTccuord.nr.537/1965). 21. C.16880InstruciunitehnicepentruconsolidareapmnturilorsensibileIa umezireianisipurilorfineprinsilicatizareielectrosilicatizare(Buletinul Construciilornr.12/1980). 22.

4. PREVEDERIGENERALE Oricelucraredeterasamentevafinceputdupefectuareaoperaieidepredare primireaamplasamentului,trasrilorreperilorcoteizero,etc.consemnatntr un procesverbalncheiatdedelega iibeneficiarului,proiectantuluiiexecutantului. nainte de nceperea lucrrilor de terasamente se va verifica ntreaga trasare pe teren, att n ansamblu ct i pentru fiecare obiect n parte, determinndu se dac se ncadreaznabaterileprevzute nanexaI.I.ncazulncareacesteabaterisunt depite, ncercrilenupotfinceputedectcuacordulscrisalproiectantului. 2.2.Laverificrilepefazedelucrrisevorefectuadectrecomisiarespectiv,eventual ncolaborarecuspecialitiigeotehnicieni, sondajedeverificareacorectitudiniiproceselor verbaledelucrriascunse,cuofrecvendeminimum1/10dinceleprescrisepentru verificrilepeparcursullucrrilor,iarrecepiapreliminardeminim1/20dinacesteasau altetipurideverificripecarecomisialecrededecuvin.ncazulunorrezultate necorespunztoaresevaprocedaconformcaietuluiI,pct.2.5. Sevaverificadeasemeneadacstratuldepmntvegetalafostrecuperat

dupdecapareiafost depozitatcorectnvedereaunornoiutilizri. ntoatecazurilencarelucrrilesauunelecategoriidelucrriseexecutnmai multeetape(deex.terasamente,etc,pentrucidecomunica ii,canale,etc),verificrilese vorefectuadupfiecareetap. ncazulncarespturileaufostexecutatencondi iispeciale(deex.,subap,cusau frepuismente,hidromecanizare, forare,etc),sevaverificanmodspecialdacnusau produsdislocri,afuierietc,isevaconsemnanprocesulverbaldelucrriascunse eventualeledeficieneimsuriledendreptareaplicate,conformindica iilorscriseale proiectantului

Abaterileadmisibilefadegraduldecompactareprevzutnproiectsunt: - pentrusistematizriverticale:mediu10%;minimum15% - jurulfunda iilorisubsolurilorisubpardoseli;mediu 5%;minim8%; - laanurideconducte:mediu5%;minim8% - abatereaadmisibil fadegraduldecompactareprevzutnproiectestede:2%pentru mediei5%pentrutoatebuletineledencercriirezultateleverificrilor men ionatemaisus sevorconsemnanproceseverbaledelucrriascunse.

TOLERANELEADMISE latrasareapeterenaconstruciilor(STAS9824/175) 1. Toleraneleadmiselatrasareaconstruciilorpeorizontalpentru lungimi.Tabelul1

Lungiminm Toleranencm Toleranecoordonaterectan gularedetrasareT/d1

25

50

100

150

200 250

5 5

Not:Pentrulungimiintermediare,toleranelesestabilescprininterpolare.

Toleraneleprevzutentabeluldemaisussemajoreaz,func iedepantaterenului,cu suporturiledintabelul2.

Pantaterenurilor (p)ngrade Sporuldepant%

p3 zero

3<p10 25

10<p15 50

p>15 100

2. Pentruunghiuri,toleranadetrasareeste10. 3. Toleranaadmislatrasareareperuluidecota0,00estede1cm. ANEXAII.2.3 GRADULDECOMPACTAREADMISIBIL FadegraduldecompactarestabilitprinproiectconformSTAS291476(tabelul2)

N r

Zonede terasament, lacarese prescriegradu

Graduldecompactareadmisibil, nfunc iede naturapmntuluiNecoeziv


Coeziv

Imbr Imbrcmi cr decompactare, t n% fade cmin iperm n isemi anente permanent celdinproiect 1 Primii30cm aiterenului naturaldesub unrambleucu nl imea(h) de: h2,00m h>2,00m

Imbrcmin iperma nente


Imbrcmin iperma nente

100 95

95 92

97 92

93 90

In corpulramblee lor,cu adncimea(h) sub patuldrumului: h0,50m

100 100 95

97 97 92

100 97 92

97 94 90

0,5h2,00m h>2,00m ndeblee, peadncimea de0,30m sub

100

100

100

100

Not:Graduldecompactareesteraportuldintredensitateaaparentnstareuscat(Pef)a materialuluidinterasamentidensitateaaparentnstareuscat(P max)amaterialuluiob inut nlaboratorprinmetodaProctornormal. * Sevaevitafenomenuldenfoieresuperficial. 5. Verificareasi receptialucrarilor Laterminarealucrrilordespturipentrufundaiisevaverificapentrufiecare npartedimensiunileicoteledenivelrealizateisevorcomparacudimensiuniledin proiect;ncazuldepiriioricreidintreabaterileadmisibile,esteinterzisnceperea executriicorpuluifunda iilor naintedeasefiefectuattoatecorecturilenecesare aduceriispa iuluirespectivnlimiteleadmisibile. ntoatecazurilencareseconstatclacotadenivelstabilitpentruproiectnatura terenuluinucorespundecuaceeaavutnvederelaproiectare,solu iadecontinuare alucrrilornupoatefistabilitdectpebazauneidispoziiiscriseaproiectantului. Verificareanaturiiterenuluisubcotadefundaresevafacefieprin probede laborator,fieprinpenetrarestaticsaudinamic.Acesteprobesevorfacecelpuin cteunalafiecare200m2 suprafadespturiminimum3pentrufiecareobiect. 1.3.naintedencepereaexecutriicorpuluifundaiilorsevancheiaun proces verbal delucrriascunse,semnatdebeneficiar, constructor ip roiectant;nprocesulverbalsevornscrieitoatemodificrileintrodusefade proiect. Umpluturile(perne)depmnt,nisip,balast,pietrisaupiatrspart,care servescdreptconsolidareaterenuluidefundareipecareseaeazdirectfunda ii, trebuietratate calucrrispeciale,verificnduse

- corespondenacuprevederileproiectuluianaturiiterenuluipecareseaeaz, n aceleai condi iicaipentrufunda iapropriuzis(pct.1.2i1.3demaisus); - calitateamaterialuluiutilizatpentruaceastumplutur,neadmindu senicioabatere de laproiect. nsferadegranulozitate, pentrucareseadmit abateride 5% fadecomponenteledesorturi; - respectareatehnologieidecompactareprevzutnproiect; - realizareagraduluidecompactareprevzutnproiect;determinrilesevorfacepe toat grosimeapernei,cteunapentrufiecarestratelementarprevzutasecompactacel puinunalafiecare20m3 materialcompactatnzonelencarecondi iiledecompactare suntdificilesevorfaceprobesuplimentare; Umpluturilecompactatecumaiulgreuurmeazacelairegimcaialpernelor delapct.1.4. Pentruumpluturiledepmntutilizatepentruplatforme,cideaccespietonalesau cucircula ieautouoar,sistematizriverticale,completareaspturilordefunda iesau pentruconductesubpardoselietc,sevaverifica: ndeprtareapmntuluivegetaliaaltorstraturiindicatenproiect; - corespondenacuproiectulanaturiipmntuluiutilizatiatehnologieidecompactare; - realizareagraduluidecompactare(D),conf.STAS1913/13 1983agraduluidendesare(In) adensit iipmntuluinstareuscat(Pd)rezisteneilapenetrarestaticpecon(Rp)sau dinamic(Rd),dateprinproiect. Verificrilesevorefectuapentrufiecarestratelementarnparteipentrutoatgrosimea umpluturii;frecvenalorvafideunalafiecare50...100m3 pmntcompact.

8.

RESPONSABILITATI: Diriginteledesantier,raspundedeaplicareaintocmaiaacestei proceduri. Dirigintele de santier raspunde de existenta si evidenta inregistrarilor de calitate, precum si de respectarea planului de control al calitatii prezentat de beneficiar. In cazul in care, in urma controalelor efectuate in santier , descopera lucrari necorespunzatoare, Dirigintele de santier are obligatia de evidentia acest aspect prin intocmirea unei Note de constatare , care va fi adusa la cunostinta beneficiarului si antreprenorului . In baza acestei note , antreprenorul va intocmi unRaportde neconformitate(RNC).

V.LUCRARIDEBETONARE

Elaborat Verificat Avizat

Numelesiprenumele

Semnatura

Data

Proceduradecontrollucraribetoane

1. SCOP a. Stabilestemodul dedesfasurareaprocedurii,precizand conditiilegenerale,fazeledeurmarire. 2. DOMENIULDEUTILIZARE a. Procedura se aplica la supervizarea lucrarilor de betonare, in conformitate cucerinteleprogramului deasigurareacalitatii sialegislatieiin vigoare. 3. DOCUMENTEDEREFERINTA a. Caieteledesarcini generalesi specifice b. Manualul FIDIC(dupacaz) c. Proiecttehniccudetalii deexecutieaferente d. Standardesi normative in vigoare: NE012/99 C56/85 STAS166776 STAS387 STAS623276 STAS38880 STAS362286

STAS860079 Legea10/1995 privindcalitateain constructii 4. PREVEDERIGENERALE a. Abateriadmisibilealeelementelordebeton dupadecofrare. a) Fundatii: - lungime:20 mm - inaltime:20 mm b) Stalpi: - inaltime:16 mm - sectiune : 5mm c) Pereti : - lungime:16 mm. - grosime:5mm. d) Grinzi: - lungime:10mm - sectiune:5mm e) Placi: - lungimesaulatime : 20 mm - grosime:5mm. b. Defecteadmisibile: 1. Sunt admise urmatoarele defecte privind aspectul elementelordin beton sibetonarmat : - defecte de suprafata ( pori, segregari, denivelari) avandadancimea de max1cm sisuprafatade max400cmp; defecte in stratul deacoperirealarmaturilor(stirbiturilocale,segregari) cuadancimea maimicadecat acoperireade beton silungime demax5 cm; 2. Defectele care se incadreaza in limitele mentionate la punctul 1 nu se vor inscrie in procesul verbal , dar vor fi remediate pana la terminarea lucrarii . Defectele care depasesc limitele mentionate se inscriu in procesul verbal care se intocmeste la decofrare si vor fi remediate conform solutiilor stabilitedeproiectant.

5. PROCEDURA Verificariinaintedeincepereabetonarii. Betoanele vor fi aduse de la o statie de betoane insotite de certificate de calitate conform NE012/99 Claselebetoanelorce urmeazaafi turnatevorfi celeprevazuteinproiect. Transportul betonului se va face intr un timp cat mai scurt pentru a evita intrarea in faza de priza ; Indiferent de mijlocul folosit de turnare , se va evita turnarea de la o inaltime mai mare de 1,5mpentru a impiedica aparitia segregarii inbetonulintarit . Constructorul trebuiesaaibadescrisinPlanul decontrolalcalitatii, verificarisi incercari: locul unde se desfasoara, documentatia tehnica de referinta pe baza careia se deruleaza operatia respectiva, echipamentele de lucru utilizate, echipamentele de masura si control utilizate si persoanele care raspund de executiasicontrolulacesteifazedelucrari In cazul prepararii betonului pe santier trebuie avute in vedere urmatoareleaspecte: - Nusevorprepara pe santierbetoane>C8/10 - Cimentul folosit pentru betoane va fi ciment tip Portland si va fi depozitat astfelincatsafieferit de umiditatesiintemperii. - Nisipul trebuiesafiecurat , lipsitdematerialeeterogenecare ar puteaafectarezistentabetonului si durataprizei. Pietrisulnutrebuiesaaibaconstituenti alteratisauin descompunere. Apapentrubetoanenu vacontinesaruri , uleiuri saualte substanteorganicecaresaIafectezecalitatea. Existentaunuilaboratorautorizat de santiersaucontractcu unlaboratorautorizat;

Inaintea turnariibetonuluisevorfaceurmatoareleverificari : Daca etapa anterioara a fost complet incheiata ( PV receptie lucrare anterioara ). Verificari aleproiectuluisi aledetaliilorde executie; Dacaarmatura montata corespundecuplanseledearmare Dacacofrajeleaufostcuratate de corpuristraine; -

Daca elemente ca : buloane , suporti sau alte piese ce urmeaza a fi inglobate; Daca exista la punctual de lucru vibrator pentru beton in stare de functionare; Daca elementele de cofraj au fost unse cu substante care sa permita o decofrareusoara si dacaau fostumezite. Daca , in cazul unor turnaricare vor dura mai multe zile , s au stabilit limitele cele mai potrivite pentru turnarile zilnice , tinand cont derosturileconstructiei.

Control: Dirigintele de santier trebuie sa verifice daca sunt indeplinite toate conditiile cerute de NE 012 / 99 si numai dupa aceasta va fi de accord cu incepereabetonarii: - Dacaau fostrespectate planseledin proiect si normativele in vigoare - Daca cofrajelesunt bineancorate ,piesele inglobate,armaturilesi golurilesunt pozitionateconform proiectului. Dacaa fostincheiat Procesulverbaldelucrariascunse semnat debeneficiar ,proiectantsi constructor. Daca exista in documentatia prezentata de beneficiar procedura tehnica deexecutiepentrulucrari debetonare .

Verificariintimpulbetonarii . Control:Diriginteledesantiertrebuiesaverificeca: Betoanele se vor turna in straturi de max . 30 cm si se vor compacta prin vibrare . Toate suprafetele plane betonate vor fi netede si finisate la suprafata.Betoanelesevibreaza inmax 15min. delaturnare. Turnarea betonului se va face continuu , fara intreruperi pe inaltimea unui etaj. Cofrajele nu vor fi indepartate pana cand betonul nu ajunge la rezistentanecesara,pentru a nufi avariatladecofrare. Se face prelevarea de probe in vederea incercarilor la un laborator acreditat.

Verificaridupabetonare . Control:Diriginteledesantiertrebuiesaverifice: Aspectulbetonuluidupadecofrare , actiune care se vaincheiaprintr un proces verbal semnatdebeneficiarsiconstructor. Existenta Raportului de incercare asupra probelor de beton dupa 28 de zile de la turnare ;data turnariisirezultatulincercariivor ficonsemnate inCondicadebetoane.

6.

RESPONSABILITATI: Diriginteledesantier,raspundedeaplicareaintocmaiaacestei proceduri . Dirigintele de santier raspunde de existenta si evidenta inregistrarilor de calitate , precum si de respectarea planului de control al calitatii prezentat debeneficiar. In cazul in care, in urma controalelor efectuate in santier , descopera lucrari necorespunzatoare, Dirigintele de santier are obligatia de evidentia acest aspect prin intocmirea unei Note de constatare , care va fi adusa la cunostinta beneficiarului si antreprenorului . In baza acestei note , antreprenorul va intocmi unRaportde neconformitate(RNC). Dirigintele de santier trebuie sa verifice modul de rezolvare al RNC , care se aplica in baza Dispozitiei de Santier data de proiectant si consemnat prin PV de receptie remediere semnat de toti factorii responsabili , sa completeze si inregistreze Fisa produsului neconform aferenta neconformitatii constatate ( FPN) ;

7.RECEPTIA LUCRARILOR. Receptia pe faza se intelege un anume stadiu fizic care impune din punct de vedere tehnic incheierea ei prin turnarea betonului . Aceasta faza se materializeaza prin existenta Procesului verbal de lucrari ascunse al fazei respective si poate fi considerate terminata prin semnarea Procesului verbal de aspect al betonului dupa decofrare si prin consemnarea rezultatelor probelordebeton prelevateinCondicade betoane. Receptia in faza determinanta se intelege acel stadiu fizic la care, o lucrare de constructii odata ajunsa , nu mai poate continua fara acceptul scris al beneficiarului, proiectantului , executantului si care se autorizeaza de

I.S. C.

( Inspectoratul de Stat in Constructii ), materializataprinProcesul

verbalde fazadeterminanta. Receptiacalitativa prinintocmireaProcesului verbal de receptiecalitativa al lucrarilor de betonare in care se vorconsemnaverificarileefectuate , rezultateleobtinutesiconcluziaprivindposibilitateacontinuariilucrarilor , semnat de responsabilul CQ , dirigintele de santier , proiectant , sefpunct de lucrusi RTE.

Receptia la terminarealucrarilor se efectueaza la terminarealucrarilor de constructii , intocminduse Procesul verbal de receptie laterminarealucrarilor. In aceasta faza constructorul are obligatia de a preda catre beneficiar Condicade betoanecompleta.

8. INREGISTRAREACALITATII. DOCUMENTE: PVreceptie fazaanterioara(armare,cofrare) PVlucrariascunse; PVreceptiecofrajesiarmare; Buletindetransmitereprobebetonpentruincercarilaborator; Buletin rezultate incercari otelbeton; Certificatecalitatemateriale; Raportincercareprobebeton ; Condicadebetoane; PVdereceptiecalitativaa materialelorpesantier; PVde aspectal betonului dupadecofrare;

VI.LUCRARIDEZIDARIE

Elaborat Verificat Avizat

Numelesiprenumele

Semnatura

Data

Proceduradecontrollucrarizidarie

1. SCOP a. Stabilestemodul dedesfasurareaprocedurii,precizand conditiilegenerale,fazeledeurmarire. 2. DOMENIULDEUTILIZARE a. Procedura se aplica la supervizarea lucrarilor de zidarie, in conformitate cu cerinteleprogramului deasigurareacalitatii sialegislatieiin vigoare. 3. DOCUMENTEDEREFERINTA a. Caieteledesarcinigeneralesi specifice b. Manualul FIDIC(dupacaz) c. Proiecttehniccudetalii de executieaferenteStandardesi normative in vigoare: CR062006Normativzidarie

4.PREVEDERIGENERALE 1. Execuia nainte de punerea n oper, elementele pentru zidrie din argil ars se vor uda bine cu ap, fieprinudarea nstivcuajutorulunuifurtun, fieprin imersareabucatcubucat ntr unrecipientcuap; - consistenamortaruluideterminatcuconuletalonvafipentruzidriadecrmiziplinede 8...13cm,iarpentruzidriadincrmiziiblocuricugoluriverticalvafide7...8cm; - rosturileorizontaleiverticalvorfibineumplutecumortar,petoatgrosimeazidului, lsndu seneumplut numai11,5cmdelafeeleziduluinvedereauneiperfecteadereneatencuielii. - rosturileverticalvorfiesutecusuprapunereacrmizilorpeminimumdecrmidn lungulziduluisaucelpuin100mmncazulblocurilorceramicededimensiunimari; - grosimearosturilororizontale(ntredoucrmizisuprapuse) vafide12mmiacellor verticale(ntredoucrmizialturate)de10mm; - ntrerupereazidrieisevafacentrepteiexcludentrerupereanstrepi; - lazidriadeblocuriceramicesefolosesclaintersecii,ramificaiiicolurijumtisau fraciunidecrmid.Acesteaseobindoarprintiereaunuiblocceramiccupolizorul unghiular. - nl imeazidrieirealizatntrunschimbvafilimitat,astfelnctsseevite pierdereastabilit iiacesteiai suprancrcareamortaruluiproaspt. Pentrudeterminareanl imiimaximeazidrieiexecutatentrunschimbvorfiluaten consideraregrosimeazidriei,tipulmortarului, formaidensitateacorpurilordezidriei graduldeexpunere lavnt; - ncazulzidriilorstructuralnaintedeexecu iazidrieisemonteazcarcaseledearmatura stlpiorilorconformproiectului, iar peparcursulexecu ieizidrieisemonteaznrosturi bareleorizontaledelegatur,dacacesteasuntprevzute,conformproiectului; - naintedeexecutareazidrieideumplutur,pesuprafeeledecontactdintrestlpii zidriesevaaplicaunspridemortar,iarrostulverticaldintrezidrieielementulde structurvafiumplut complet cumortar; - deasemenea,sevorprevedeamustidelegturntrestlpiizidriadeumplutur conform proiectuluideexecu ie; - lanivelulgrinziloriplaneelor,zidriavafibinempnatiancorat.

5. Verificareasireceptialucrarilordezidarie:
- Verificareacalit iiexecu ieizidriilorconst dinurmtoarele: - prinmsurtorilafiecarezidse vaverificadacrosturileverticalesuntesute

lafiecarernd - sevorverificagrosimilerosturilorverticaleiorizontale prinmsurareaa520de rosturilafiecarezid; - vizualsevaverificantoateziduriledactoaterosturileverticaliorizontalesunt umplute cumortar; - orizontalitatearndurilordezidriesevaverificacuajutorulfurtunuluidenivelia dreptaruluipecantlatoatezidurile; - modulderealizarealegturilor zidriilorseva verificalatoatecolurile,ramifica iilei intersec iile; - grosimeazidriilorsevaverificalafiecarezidnparte.Msurareagrosimiisefacela3 nl imisaupunctediferitealezidului; - verticalitateazidriei,asuprafeeloriamuchiilor,severificcuajutorulfiruluideplumb, verificareasefacencte3punctepenl imelafiecarezid; - planeitateasuprafeelorirectiliniaritateamuchiilorsevaverificaprinaplicareape suprafaaziduluiaunuidreptar.Verificareasefacelatoatezidurile; - lungimeainl imeatuturorzidurilor,dimensiunilorgolurilorialeplinurilordintregoluri severificprinmsuraredirectcuruleta.

6. RESPONSABILITATI. Dirigintele de santier,raspunde de aplicarea intocmai a acesteiproceduri. Dirigintele de santier raspunde de existenta si evidenta inregistrarilor de calitate , precum si de respectarea planului de control al calitatii prezentat de beneficiar. In cazul in care, in urma controalelor efectuate in santier , descopera lucrari necorespunzatoare, Dirigintele de santier are obligatia de evidentia acest aspect prin intocmirea unei Note de constatare , care va fi adusa la cunostinta beneficiarului si antreprenorului . In baza acestei note , antreprenorul va intocmiunRaportde neconformitate(RNC). d. Dirigintele de santier trebuie sa verifice modul de rezolvare al RNC , care se aplica in baza Dispozitiei de Santier data de proiectant si consemnat prinPV de receptie remediere semnat de toti factorii responsabili , sa completeze si inregistreze Fisa produsului neconform aferenta neconformitatii constatate ( FPN);

4. Instructions for the in-time monitoring of the construction


In conformity with the provisions of Law 10/1995 concerning the durability and safety of constructions, the owner of the investment is obliged to ensure a permanent supervision of the technical state of the construction. The supervision of the technical state of the construction will take place during the service life of the construction according to the existing legislation. The technical legislation is: Normativul P130/1999-Normativ privind comportarea in timp a constructiilor. Normativul C-149-149/1981- Norme privind efectuarea remedierilor in constructii. Legea 10/1995 Legea calitatii in constructii. HG 766-1997

The monitoring must be done for: Evident changes in the position of the building, manifested by horizontal of vertical displacement and by shifting from the initial position; Deformations of the structural elements manifested by bendings, displacements, settlements, rotations or exfoliation of the finishings; Changes in the protection level and comfort given by the pilling off of the hygrothermal insulation manifested by mold or condensation; Defects and degradations of the structural elements, manifested by cracks in the masonry or concrete or by rust stains on the reinforced concrete elements; Opening or closing of the division joints between elements of the construction or building sections; The malfunctioning or blockage of the functionality of utilities that are conditioned by their position; The blockage of pipes or of the water evacuation system; Buckling of compressed elements or rupture of tensioned ones; Rotting or weakness of elements subjected to biologic attack;

Phenomenon that need to be monitored during the service life of the construction: The proper evacuation of water from plates or terraces to the water evacuation system, to avoid water infiltration at the foundation and unwanted settlements; Assuring the water proofing of the floors; The immediate evacuation of the surface water by providing sidewalks with a gradient oriented at the water evacuation system;

Overloading of the construction by adding extra levels, changing of the functional by adding walls, placement of heavy objects on plates, creation of new openings in structural walls, partial or total removal of walls will be done only after consulting the designer and receiving of a new construction permit.

Observation zones and measuring points: Zones of joining between sidewalk and building; The attic of the building; Eavesdrops and water evacuation pipes; The buildings faade; Installations from canals; Common installations on levels;

Schedule for checking, measurements and recordings: Sidewalks-once a year; Building basement-once a year: Attic-once a year; Eavesdrops-once a year; Buildings faade-once year; Installations from canals-once a year; Common installations on levels-once a year; Water evacuation system-once a year;

Inspections of the construction are mandatory after earthquakes, strong winds and floods. After every inspection a report sheet will be written containing: The date of the inspection; The studied zones; Initial observations; Observations concerning the last inspection; Behavior of previous repairs; Proposal of solutions.

The report sheet will be handed to the owner of the building which will take the decisions on which solution to be applied and who will add the report sheet to the technical book of the construction.

The administrator, owner or tenant of the building has to know the following: The admissible live load on plates; The admissible live load on stairs and landings; The admissible live load on balconies; It is forbidden the placement of heavy machinery or water tanks at the last levels of the building; There are forbidden the modifications of the functional that may jeopardize the strength and stability of the building;

In addition, they also have the following obligations: They are obliged to respect all the contractual obligations established with the owner, concerning the activity of in-time monitoring of the behavior of the construction; To ensure the maintenance of the construction; Lets the owner be aware of any degradations during the exploitations so that they can take action for any repairs and consolidation;

OBLIGATIONS OF THE OWNER Is responsible for the in-time monitoring of the behavior of the construction under any forms; Organizes the activity of monitoring by personal means or by contracting a specialized firm by following the instructions given in the execution project by the designer; Commissions in-depth inspections or technical expertise in case of degradation that are considered to a fact, the durability, strength or stability of the construction after exceptional events; Commissions technical expertise for constructions that have an expired service life that suffer a change in the functional or of the exploitation conditions, as well as in the case of significant deficiencies in the current monitoring. Comunicates to the State Inspectorate In Construction, Public Works Urbanism And Territorial Arrangement the construction for the in time monitoring Insures the keeping of the technical book of construction and keeps an everyday journal of the events Takes measurements necessary for the maintaining of the capacity of the services of the construction that is in custody ( rational exploitation, maintenance and repairs in due time) and the prevention of the producing of accidents based on data from the current or special monitory.

When the construction is alienated or ranted, stipulates in the contract the obligations necessary regarding the in time monitory of the behaviourof the building during service Takes part, based on the data that he has, that the investigation organized by different personal for the porpose of knowing aspects of the behavior of the construction Names the persones that execute the current and special monitoring, named responsabiles for the behavior of the construction, in case that they execute the special monitoring they need to be autorizated by the State Inspectorate In Construction, Public Works Urbanism And Territorial Arrangement, according to the instructions regarding the authorization of personnel with the special monitoring and the behavior of the construction during service. Insures the decision making and provisory interventions, stipulated by the designer in case of situations that represent a danger and commissions the technical experization of the construction. OBLIGATIONS OF THE DESIGNER:

Plans the program for the in-time monitoring the construction and the instructions regarding the current monitoring Establishes together with the investigators and/or with the owner the constructions that need to follow the special monitoring. Plans the project of special monitoring fot the new constructions as well as for the constructions that are already in service, based on commissions; Monitors the applications of the special monitoring project and inserts in this project all the modifications given by the different situations that occurred in site; Hand over to the investigator and/or owner at the reception of finishing of the works the project for in-time monitoring of the construction with all the modifications to include them in the technical book of constructions Insures using the project for the executions the acces points for the current special monitoring ( including for the extended investigations ); Takes part at the reception of the measurement and control equipement chosen to be mounted using a special monitoring project, in the cases provided in the project offers technical assistance at the mounting of the equipement. Sets according to measurements taken for a long period long of timethe intervals for the value characterizing the normal state as well as the limit state nominated as attention, warning, or danger chosen for the construction; Insures the decision making in case of interventions when the monitoring system for the behavior of the constructions signals at the normal situations, decision that he communicates to the investigator or to the owner;

Takes part at the commissions and orders the making of the data base containing the behavior of different types of constructions ( during construction and service ) for the porpose of the improvement the design activities.

OBLIGATIONS OF THE CONSTRUCTOR: Execute the current monitoring during the execution time if that is stipulated in the contract; Mounting of the observations and the measurements means in conformity with the provisions given in the project for the special monitoring, insuring their observations and protections during the execution of the construction until the reserchement at the finalized of the works, when he hands them over to the investigator and/or owner with a verbal process; Warns the designer in case of inconsistencies regarding the special monitoring that result during the execution in order to take the necessary corrections needed the documentation for the technical book of construction; Prepares and hands over to the investigator and/or owner the necessary documentation for the technical book of the construction; Insures and hands over to the user and/ or owner of the measurements data taken during the execution time of the construction; In the case that repairs or consolidation are executed he prepares and hands over to the investigator and/or owner the necessary documentation fot the technical book of the constructions;

OBLIGATIONS OF THE OWNER AND ADMINISTRATOR: Answers for the realization of the contractual obligations settle by the owner regarding the activity of the monitoring of the behavior of the construction under any forms. Insures the current maintenance of the construction; Insures in the case of normal exploitation the observation and measurements means mounted on the constructions that are in his use or administration; Give notice to the owner of the degradations that takes place during the exploitation of the construction so that the owner can take measures for the necessary repairs or consolidation;

OBLIGATIONS OF THE PERSONNEL RESPONSIBLE FOR THE MONITORING OF THE CONSTRUCTION BEHAVIOUR:

They know in detail the content of the instructions or of the project for the special monitoring of the behavior during service of the object that they were authorized for; Know in detail the technical book of construction; they prepare and keep and they fill in every day the journal of events; They take place at the reception and mounting of the measurement and control equipements according to the instructions or the projects of special monitory; They control the applying of the conditions stipulated in the instructions or project of special monitoring of the service behavior and of those given in technical book of constructions; Checks ( at given intervals and immediately after any special events, earthquake, floods, torrential rains, massive falls of snow, accidental material overloading, fires, explosions, a.s.o ); The technical state of the construction, for the porpose of high lighting those elements of the constructions that are in a state of degradation or that by their condition of exploitation represent a danger for the safety and stability of the construction; Imposes the execution of a expertise, of an extended expection or of other measures thru firms that have authorized specialist if degradation are observed; Prepares reports regarding the current monitory of the construction and takes part in the preparing of the reports regarding the special monitoring of the constructions; They know the schedule for the measurements correlated with the execution and service phazes; Insure the sesization to the ones intitled of the emergence of events or surpassing of control values to take suitable measures;

OBLIGATIONS OF THE PERSONNEL RESPONDING WITH THE MONITORING OF THE COnSTRUCTIONS: Takes part in the approving of the special monitoring project; Know in detail the content of the instructions of the current monitoring or of the special monitoring project; Know the construction, general characteristics of the structure, used materials, dimensions, characteristics of the foundations conditions and of the environment a.s.o; Know the objectives of the current and special monitoring ( characterstics, phenomenons, dimensions, estimation criteria, quality conditions, attention, warning and alarm limits a.s.o ); Takes part in charging, reception, checking and depositing of the measurements and control equipement; Know the stability measurements methods; Know the mounting details for every measuring points and equipement as well as the necessary checkings before and after the mounting and execution of the mounting of the equipement; Know the measurement schedule, correlated with the execution and service phases; Know the methods of recording and fileingof the data ( tables, cards, computer programs ) take extreme care in the safety keeping and accessibility of the data; Know the way of processing and of comparing the control values ( normal, of a tension, of warning, of alarming ) and execute this works; Insure the sesizations the ones in title in the case of events or over passing of control values to take suitable measures; Prepare reports concerning the current and special monitoring of the construction;

ATRIBUTES OF the State Inspectorate In Construction, Public Works Urbanism And Territorial Arrangement: Inspect, on site, if the provisions of Legea nr.10/1995, ale H.G.R nr.766/1997 in conformitate cu H.G. R nr.507/1997 during execution; Checks the existence of the instructions regarding the current monitoring and/or the project of special monitoring of constructions; Inspects during the service time, on constructions that are chosen using norms, instructions and projects the monitoring of behavior during explotation, the compliance of the investigators, owners, users or administrator of the prescription elaborated for this purpose;

Inspects the owners and users of the constructions regarding the applications of the previsions referring to the reception preparing, keeping and feeling of the technical book of the constructions, of the journal of the events, as well as the way in which they execute the current monitoring of the state of the constructions; Inspects the owners and users of the conctructions, existence of report concerning the current monitoring, special monitoring or extended inspections; Checks if intervention measurements fixings and consolidation are inscribed in their reports; Observes the diversions from the previsions of the law and applies sanctions provided by it.

PROCES-VERBAL DE RECEPTIE LA TERMINAREA LUCRARILOR Nr. .......... din ................ privind, lucrarea ........................................................... ..............................................................................., executata in cadrul contractului nr. ..... din ......., incheiat intre ......... .................. pentru lucrarile de ......................................... 1. Lucrarile au fost executate in baza autorizatiei nr. .........., eliberata de ............. la ..........., cu valabilitate pana la ....................... Comisia de receptie si-a desfasurat activitatea in intervalul .............., fiind formata din: ............................................. (nume si prenume) ............................................. ............................................. 3. Au mai participat la receptie: ................................................................................ (nume si prenume) (calitatea) 4. Constatarile comisiei de receptie: 4.1. Din documentatia scrisa si desenata necesara a fi prezentata au lipsit sau sunt incomplete piesele cuprinse in lista anexa nr. 1. 4.2. Cantitatile de lucrari cuprinse in lista anexa nr. 2 nu au fost executate. 4.3. Lucrarile cuprinse in lista anexa nr. 3 nu respecta prevederile proiectului. 4.4. Valoarea declarata a investitiei este de .......... lei. 5. Comisia de receptie, in urma constatarilor facute, propune: ................................................................................ ................................................................................ 6. Comisia de receptie motiveaza propunerea facuta prin: ................................................................................ ................................................................................ ................................................................................ 7. Comisia de receptie recomanda urmatoarele: ................................................................................ ................................................................................ ................................................................................ 8. Prezentul proces-verbal, continand .......... file si .............. anexe numerotate, cu un total de ........ file, a fost incheiat astazi ............... la ................. in ........ exemplare. Comisia de receptie*) Presedinte: ..................... Membri: ......................... Specialist*) ................................. .................................

PROCES-VERBAL DE RECEPTIE FINALA Nr. ............ din .................... privind lucrarea ............................................................ ................................................................................ ..............................................................................., autorizata cu nr. .......... din .........., cu valabilitate pana la .........., de catre ............................. 1. Comisia de receptie finala si-a desfasurat activitatea in intervalul ..... ................, fiind formata din: ...................................... (nume si prenume) 2. Au mai participat la receptie: ................................................................................ (nume si prenume) (calitatea) 3. Comisia de receptie finala, in urma examinarii lucrarii si a documentelor cuprinse in cartea tehnica a constructiei, a constatat urmatoarele: 3.1. Lucrarile pe specialitati au fost executate si receptionate conform listei anexa nr. 1. 3.2. Lucrarile au fost complet terminate la data de ......................... 3.3. Observatiile facute de comisia de receptie finala sunt prezentate in lista anexa nr. 2. 3.4. Cartea tehnica a constructiei si fisa sintetica a obiectului au fost (nu au fost) completate. 3.5. Instructiunile de exploatare si urmarire a comportarii in timp a obiectului (nu) sunt in posesia utilizatorului. 3.6. Constructia s-a comportat (nu s-a comportat) corespunzator in perioada de la terminarea ei la data de .......... pana in prezent, respectiv pe o durata de ................ luni, constatarile comisiei fiind enumerate in anexa nr. 3. 3.7. Valoarea obiectului este de ........... lei, conform listei anexa nr. 1. 4. In baza constatarilor facute, comisia de receptie finala propune: ................................................................................ ................................................................................ 5. Comisia de receptie finala motiveaza propunerea facuta prin: ................................................................................ ................................................................................ 6. Comisia de receptie finala recomanda urmatoarele: ................................................................................ ................................................................................ 7. Prezentul proces-verbal, continand .......... file si .............. anexe numerotate, cu un total de ........ file, a fost incheiat astazi ............... la ............. in ....... exemplare. Comisia de receptie*) Presedinte: .................... Membri: ........................ Specialisti*)

PROCES-VERBAL DE RECEPTIE LA TERMINAREA LUCRARILOR Nr. ......... din ................... privind lucrarea ............................................................ ..............................................................................., executata in cadrul contractului nr. ...... din ......., incheiat intre ........ si intre ........................... pentru lucrarile de ....................... ................................................................................ 1. Lucrarile au fost executate in baza autorizatiei nr. .......... eliberata de ................. la .........., cu valabilitate pana la .................... 2. Comisia de receptie si-a desfasurat activitatea in intervalul ..........., fiind formata din: ....................................... (nume si prenume) 3. Au mai participat la receptie: ................................................................................ (nume si prenume) (calitatea) 4. Comisia de receptie, in urma constatarilor facute, propune: ................................................................................ ................................................................................ 5. Comisia de receptie recomanda urmatoarele: ............................... ................................................................................ ................................................................................ 6. Prezentul proces-verbal, continand ........... file si ............. anexe numerotate, cu un total de ......... file, a fost incheiat astazi .............. la ................ in ............... exemplare.

Comisia de receptie*) Investitor (proprietar): ........................... Delegat al administratiei publice locale: ..........

PROCES-VERBAL DE RECEPTIE FINALA Nr. ............. din ................... privind lucrarea ............................................................ ................................................................................ ..............................................................................., autorizata cu nr. ....... din ........, cu valabilitate pana la ..............., de catre ....................................................................... 1. Comisia de receptie finala si-a desfasurat activitatea in intervalul ..............., fiind formata din: ................................... (nume si prenume) 2. Au mai participat la receptie: ................................................................................ (nume si prenume) (calitatea) 3. Comisia de receptie finala, in urma examinarii lucrarii si a documentelor, a constatat urmatoarele: ....................................................... 4. Valoarea obiectului este de ............. lei, conform listei anexa nr. 1. 5. In baza constatarilor facute, comisia de receptie finala propune: ................................................................................ 6. Prezentul proces-verbal, continand .......... file si .............. anexe numerotate, cu un total de ......... file, a fost incheiat astazi .............. la ............, in ........... exemplare.

Comisia de receptie finala*) Investitor (proprietar): ............................ Delegat al administratiei publice locale: ...........

5. RECEPTIA LUCRARII
Receptia lucrarilor de constructii si instalatii aferente acestora este actul prin care investitorul certifica realizarea lucrarilor de constructii si instalatii aferente acestora, in conformitate cu prevederile contractuale si cu cerintele documentelor oficiale si declara ca accepta sa preia lucrarile executate si ca acestea pot fi date in folosinta. Receptia constructiilor se face prin proces verbal de receptie, pe baza proiectului tehnic avand documentatia D.T.A.C. avizata, intocmit de catre o comisie formata din: - reprezentantul Inspectoratului de Stat in Constructii ; - reprezentantul autorizatorului (primariei) printr-un membru al compartimentului Disciplina in Constructii; - reprezentantul proiectantului, prin arhitect si inginerul proiectant al structurii de rezistenta ; - reprezentantul beneficiarului prin dirigintele de santier. Cu aceasta ocazie proiectantul da o declaratie de conformitate prin care se atesta ca imobilul supus receptiei este conform proiectului. Receptia constructiei se poate face numai daca imobilul este realizat cel putin la faza rosu avand inchiderile exterioare (ferestre, usi) si acoperisul executate. Comisia de receptie examineaza: a) respectarea prevederilor din autorizatia de construire, precum si avizele si conditiile de executie impuse de autoritatile competente. Examinarea se va face prin: - cercetarea vizuala a constructiei; - analiza documentelor continute in cartea tehnica a constructiei; b) executarea lucrarilor in conformitate cu prevederile contractului, ale documentatiei de executie si ale reglementarilor specifice, cu respectarea exigentelor esentiale, conform legii; c) referatul de prezentare intocmit de proiectant cu privire la modul in care a fost executata lucrarea. Investitorul va urmari ca aceasta activitate sa fie cuprinsa in contractul de proiectare; d) terminarea tuturor lucrarilor prevazute in contractul incheiat intre investitor si executant si in documentatia anexa la contract. In cazurile in care exista dubii asupra inscrisurilor din documentele cartii tehnice a constructiei, comisia poate cere expertize, alte documente, incercari suplimentare, probe si alte teste.

INTOCMIREA CARTII TEHNICE A CONSTRUCTIEI SI RECEPTIA LUCRARILOR EXECUTATE

Cartea tehnica a constructiei reuneste ansamblul documentelor tehnice referitoare la proiectarea, executia, receptia, exploatarea si urmarirea comportarii in timp a constructiei si instalatiilor aferente acesteia si trebuie sa cuprinda toate datele si informatiile necesare pentru identificarea si evaluarea starii tehnice a evolutiei ei in timp.

CUPRINSUL CARTII TEHNICE A CONSTRUCTIEI - conform Anexei nr. 6 la HGR 273/1994 care aproba Regulamentul de receptie a lucrarilor de constructii si instalatii aferente acestora, este urmatorul: Centralizatorul cartii tehnice (fisa cu date sintetice privind constructia, borderoul general al dosarelor cu documentatia de baza si copiile borderourilor fiecarui dosar in parte ).

Capitolul A -Documentatia privind proiectarea :

- acte referitoare la tema de proiectare si amplasarea constructiei; - avize care au fundamentat elaborarea proiectului; - documentatia tehnica a constructiei efectiv realizate (arhitectura, detalii de executie pentru structura de rezistenta, schemele de instalatii ) , cu toate modificarile aduse pe parcursul excutiei de catre proiectant, constructor sau beneficiar ( investitor ) prin dispozitii de santier sau proiecte modificatoare; - breviarele de calcul pe specialitati; - indicarea distincta a diferentelor fata de proiectele tehnice si detaliile de executie initiale, cu precizarea cauzelor care au condus la aceste diferente; - caietele de sarcini privind executia lucrarilor.

Capitolul B Documentatia privind executia: - autorizatia de construire ( inclusive planurile-anexa vizate spre neschimbare ); - procesele verbale de receptie a terenului de fundare, a fundatiilor, a structurii de

rezistenta si a lucrarilor ascunse, procesele verbale de admitere a fazelor determinante ale executiei; in situatia cand executia lucrarilor de construire nu a fost urmarita de un diriginte de santier atestat si nu s-au incheiat procesele verbale pentru fazele determinante si lucrarile ascunse, comisia pentru receptia lucrarilor va solicita elaborare unei expertize tehnice care sa ateste calitatea executiei; dupa caz expertiza tehnica va preciza solutiile de remediere care se impun si va cuprinde procesele verbale care sa certifice executare intocmai a acestora; - certificatele de calitate, condica de betoane, rezultatul incercarilor de rezistenta, ale betoanelor, certificatele de calitate pentru materialele puse in opera, registrul proceselor verbale de lucrari ascunse, notele de constatare, ale autoritatilor de control, registrul de dispozitii si note de santier, jurnalul principalelor evenimente ( inundatii, seisme, temperature excesive, etc.), caietele de atasament s.a. - procesele verbale privind montarea instalatiilor de masurare prevazute prin proiectul de urmarire in timp a comportarii constructiei, inclusive citirile initiale de la care incep masuratorile(daca este cazul). - expertiza tehnica,verificari de teren sau cercetari suplimentare, necesare ca urmare a unor accidente tehnice sau a unor greseli tehnice (daca este cazul);

CapitolulC-Documentatia privind receptia lucrarilor executate: -procese verbale de receptie la terminarea lucrarilor si cel final; -alte acte incheiate ca urmare a cererilor comisiilor de receptie privind verificari sau cercetari suplimentare,cu indicarea rezultatelor acestora si a modului de rezolvare.

CapitolulD- Documentatia privind urmarirea comportarii constructiei in exploatare si interventiile in timp: -prevederile scrise ale proiectantului privind urmarirea comportarii constructiei, instructiunile de exploatare si intretinere, lista prescriptiilor tehnice de baza care trebuie respectate pe timpul exploatarii constructiei; -proiectele de modificare a constructiei dupa receptia finala (cand este cazul); -acte de constatare a eventualelor deficiente aparute dupa receptia finala si masurile de interventie luate; -procese verbale de predare-primire a constructiei la schimbarea proprietarului;

Fazele determinante se stabilesc de proiectanti pe specializari: arhitectura, rezistenta, instalatii. Acestea se realizeaza la acele etape ale lucrarilor care afecteaza iremediabil executia in continuare a lucrarilor. Fazele determinante fac parte in mod obligatoriu din proiectul tehnic. Fazele determinante intalnite de obicei sunt urmatoarele: - Trasare constructiei; - Verificarea naturii terenului de fundare si stabilirea corespondentei cu studiul geotehnic realizat si utilizat la faza de proiect; - Realizarea fundatiilor armate si nearmate; - Realizarea stalpilor si peretilor(lucrari care dupa turnare raman ascunse si nu mai pot fi verificate); - Realizarea placilor din beton armat(lucrari care dupa turnare raman ascunse si nu mai pot fi verificate); - Realizarea sarpantei; - Verificarea si realizarea probelor de presiune la instalatiile sanitare , termice si incendiu; - Realizarea probelor la instalatiile electrice; - Verificarea trasarii peretilor de compartimentare. La fazele determinante participa de obicei: - inspectorul din partea inspectoratului de stat pentru constructii; - Proiectantul lucrarii; - Beneficiarului investitiei; - Executantul; - Dirigintele de santier(sau dirigintii de santier); - Responsabilul tehnic cu executia.

Fazele determinante se incheie cu realizarea unui proces verbal. In cazul in care executia nu este realizata corespunzator faza determinanta se respinge si se sanctioneaza persoana responsabila sau persoanele responsabile.

Inspectoratul de stat pentru constructii este o instituie publica care are rolul de a verifica si certifica calitatea in constructii. Este obligatorie anuntarea inceperii executiei unui imobil la inspectoratul de stat pentru constructii cu minim 10 zile inainte de inceperea executiei lucrarilor. Tot atunci se depune si programul de control al calitatii intocmit de catre proiectant. Inspectorii de stat pentru constructii participa la fazele determinante date de catre proiectanti. Acestea vin pe teren impreuna cu dirigintele si proiectantul si verifica calitatea lucrarilor

executate. In cazul in care ele nu sunt conforme se respinge faza determinanta si se pot da si amenzi in cazul in care exista persoane responsabile de esecul fazei determinante. Inspectoratul de stat pentru constructii este institutia care atesta: dirigintii de santier, responsabilii tehnici cu executie, expertii tehnici, verificatorii de proiecte, etc.

Ctre,

Primria

Subsemnatul ____________________________________________ cu domiciliul/ sediul n judeul ____________________________ municipiul ___________________ cod potal ______________ strada _____________________ nr. _____ bloc ______ sc. ________ etaj _______ ap. ______ telefon ____________ titular al Autorizaiei de construire/desfiinare a construciilor i amenajrilor ____________________________ v comunicm c la data de __________ 200 ___ ora _____ , vor ncepe lucrrile de executare autorizate la imobilul situat n municipiul ____________________________ cod potal ____________ strada _____________________ nr. __________ nr. fi cadatral/nr. Carte funciar __________ numrul topografic al parcelei ___________ . Data ________________ 200 ___

Semntura,

UNITATEA ______________________________________________________________________________ SANTIER ____________________________________ PUNCT DE LUCRU ____________________________ OBIECTUL_______________________________________________________________________________ TRONSONUL_____________________ TRAVEEA ____________________ NIVELUL__________________

PROCES-VERBAL DE VERIFICARE A ASPECTULUI BETONULUI DUP DECOFRARE I POZIIONARE GOLURI TEHNOLOGICE I DE INSTALAIE
Nr._____ Data_____________

S-au verificat urmtoarele elemente de beton:


__________________________________________________________________________________________ __________________________________________________________________________________________

Cuprins ntre orele ______________________ turnat pe data____________________________ Aspectul betoanelor dup decofrare:
_________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________

Existena i poziia golurilor verificate dup planele nr. ________________________________ Se vor lua urmtoarele msuri la termenele nscrise mai jos
_______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________

Numele CONSTRUCTOR: _________ ____________ BENEFICIAR: INSTALATOR: _________ ____________ _________ ____________

Prenumele ___________________________ ___________________________ ___________________________

Semntura _____________ _____________ _____________

Remedierea defectelor constatate s-a fcut pe baza soluiei date de: _________ __________________ ______________________________________________________________ prin _______________________________________________________________________________________ Se confirm executarea corespunztoare (de calitate) a remedierilor. Data ______________

Numele CONSTRUCTOR: _________ ____________ BENEFICIAR _________ ____________

Prenumele ___________________________ ___________________________

Semntura _____________ _____________

UNITATEA ______________________________________________________________ ANTIER ________________________ PUNCT DE LUCRU ______________________ OBIECTUL ______________________________________________________________

PROCES VERBAL DE TRASARE A LUCRRILOR DE ______________________________________________________________ ______________________________________________________________ ______________________________________________________________ Nr. _____ Data _____________

Trasarea a fost executat pe baza planelor nr. _________________________ din proiectul nr. __________________ Elementul de reper i verificarea este (borna, construcia nvecinat etc.) ______________________________________________________________ ______________________________________________________________ avnd coordonatele: X _____________ Y _____________ Z _____________ Cota: ____________________

Numele Executat trasarea: Verificat: __________ __________

Prenumele __________ __________

Semntura _________ _________

Unitatea. Beneficiar.. Obiectivul.

PROCES VERBAL DE VERIFICARE A COTEI DE FUNDARE


Incheiat astazi anul.

Punct de lucru .

- Am procedat la verificarea cotei de fundare pentru. ..aferente obiectivului. . - Verificarea s-a efectuat pe baza prevederilor planselor de executie cu numarul ..rezultand urmatoarele.. .

Beneficiar (numele si semnatura) . .

Executant (numele si semnatura) .. ...

Unitatea. Beneficiar.. Obiectivul.

PROCES VERBAL DE VERIFICARE A NATURII TERENULUI DE FUNDARE


Incheiat astazi anul.

Punct de lucru - Am procedat la verificarea naturii terenului de fundare aferent obiectivului. la cota de fundare din proiect numarul. .constantindu-se ca terenul de fundare este alcatuit din ..si CORESPUNDE/NU CORESPUNDE prevederilor din proiect Urmare a verificarilor se stabilesc urmatoarele: a) se poate trece la executarea urmatoarelor fundatii .. b) adancirea sapaturii pana la cota dupa care se va intocmi un nou process verbal de verificare a naturii terenului de fundare. c) Masuri suplimentare referitoare la fundatie ( largire talpa; armare suplimentara) .. d) Solicitarea proiectantului pentru emiterea de solutii (cand nu participa la vericare) e) Alte solutii.. . Beneficiar Executant (numele si semnatura) (numele si semnatura) . . ..

INSPECIA DE STAT N CONSTRUCII, LUCRRI PUBLICE, URBANISM I AMENAJAREA TERITORIULUI IJCLPUAT ___________________

PROCES-VERBAL DE CONTROL A CALITII LUCRRILOR N FAZE DETERMINANTE Nr. _________ Data ___________ Nr. nregistrare la IJCLPUAT ______________________. Nr. nregistrare la societatea de construcii controlat ____________________. Ca urmare a controlului efectuat la faa locului de inspectorul de specialitate __________ ___________________ la obiectivul _______________________________ codul _____________ ce se realizeaz pe baza autorizaiei de construire nr. _______________ valabil pn la data de _________________ obiectul ____________________________ _________________________ ce se execut pe baza proiectului nr. ________________ elaborat de ______________________________________________________________ verificat de: numele i prenumele atestat nr. n domeniile 1. 2. 3. 4. responsabil tehnic cu execuia: numele i prenumele atestat nr. n domeniile

n faza determinant:_____________________________________________________________________________________ ______________________________________________________________________________________________________ n prezena antreprenorului:________________________________________________________________________________ reprezentat de: ___________________________________________________________________________________ cu participarea investitorului: ______________________________________________________________________________ reprezentat de: ___________________________________________________________________________________ dirigintelui de antier: _______________________ autorizat nr. __________________ i a proiectantului: _______________________________________________________________________________________ reprezentat de: ___________________________________________________________________________________ n baza prevederilor legii 10/1995, a procedurii privind controlul statului n fazele de execuie determinante pentru rezistena i stabilitatea construciilor, aprobat prin Ordinul MLPAT nr. 31/N/02.10.1995, a reglementrilor tehnice n vigoare, a controlului efectuat asupra lucrrilor din teren i a documentelor privind: calitatea materialelor i a elementelor de construcii puse n oper calitatea lucrrilor ce au devenit ascunse calitatea lucrrilor constatat de investitor, executant i proiectant cu prilejul verificrilor efectuate n baza obligaiilor legale i contractuale se constat c: SUNT (NU SUNT) asigurate condiii corespunztoare de continuare a execuiei lucrrilor SUNT (NU SUNT) respectate detaliile de execuie prevzute n planele: ________________________________ SUNT (NU SUNT) respectate prevederile reglementrilor tehnice n vigoare: ______________________ ___________________________________________________________________________________________ Meniuni speciale: _____________________________________________________________________________________________________ _____________________________________________________________________________________________________ _____________________________________________________________________________________________________ n baza celor prezentate mai sus, SE (NU SE) AUTORIZEAZ CONTINUAREA EXECUTRII LUCRRILOR Prezentul proces-verbal a fost ntocmit n ______ exemplare, cte unul pentru fiecare semnatar i originalul la IJCLPUAT. Societatea comercial IJCLPUAT INVESTITOR PROIECTANT ANTREPRENOR Nume Prenume Semntur

UNITATEA : SANTIER ...................................... PUNCT DE LUCRU ............................... OBIECTUL ..........................................................

PROCES-VERBAL DE INCEPERE PREDARE AMPLASAMENT A LUCRARILOR Nr data ..

1. Valoare contract ............................... RON 2. Beneficiar ......................................... 3. Executant ......................................... 4. Proiect nr. .................. ntocmit de ................................................................ 5. Contract nr.. din .. finanat de banca ........................ 6. Data nceperii execuiei ............................ 7. Termen de execuie .................................. 8. nceperea execuiei se va comunica la ISCPLUAT, titulari de avize, autorizaii nu este cazul 9. Din partea executantului, responsabil tehnic cu execuia atestat MLPAT . nr .. 10. Din partea beneficiarului, de calitatea lucrrilor i semnarea situaiilor de lucrri rspunde ................................................. 11. S-au predat urmtoarele amplasamente libere de orice sarcini, azi ...................... .............................................. ................................................

12. Personalul din execuie va fi instruit de c tre executant conform normelor NPSM i PSI n funcie de condiiile specifice amplasamentului.

Numele, prenumele Executant, Diriginte santier .............................. .................................

Functia ......................... ......................

Semnatura

UNITATEA ______________________________________________________________________________
ANTIER

____________________________________ PUNCT DE LUCRU ____________________________

OBIECTUL_______________________________________________________________________________

PROCES-VERBAL PENTRU VERIFlCAREA CALITII LUCRRILOR CE DEVIN ASCUNSE


Nr._____ Data_____________

Faza din lucrare supus verificrii:


__________________________________________________________________________________________ __________________________________________________________________________________________

Elementele de identificare (sector, poriune, ax, cot, etc.):


_________________________________________________________________________________________ _________________________________________________________________________________________

Verificrile s-au fcut pe baza prevederilor proiectului nr. _____________, planele nr. ________________ sau a dispoziiei de antier nr.______________ din data de ________________________ . Concluzii:
_______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________ _______________________________________________________________________________________________________________

Numele

Prenumele

Semntura

CONSTRUCTOR: _________ ____________ ___________________________ _____________ BENEFICIAR _________ ____________ ___________________________ _____________

Atestm refacerea (remedierea) lucrrilor conform prevederilor proiectului. Data ______________ Numele Prenumele Semntura

CONSTRUCTOR: _________ ____________ ___________________________ _____________ BENEFICIAR _________ ____________ ___________________________ _____________

S.C. ......................................................... OBIECTUL ............................................. PUNCTUL DE LUCRU .........................

PROCES VERBAL DE PREDARE-PRIMIRE A AMPLASAMENTULUI I A BORNELOR DE REPERE Nr. ..................... Data ........................ 1. Delimitarea terenului conform plan nr. .................................... avnd coordonatele (axele): ....................................................................................................................................................... ............................................................................................................................ Plana nr. ....................... Proiect nr. ..................................... Cu repere de identificare a terenului i trasare a lucrrilor (bornele, construciile etc.): ....................................................................................................................................................... ............................................................................................................................ Indicativul bornei de referin ........................................ Cota absolut .............................. borna 1 borna 2 borna 3 borna 4 X Coordonata Y Z 2. Construcii instalaii existente pe amplasament sau n subsol: ....................................................................................................................................................... ....................................................................................................................................................... ....................................................................................................................................................... ....................................................................................................................................................... 3. Alte meniuni: CONSTRUCTORUL se oblig: a) s transporte cantitatea de ............. moloz existent b) s demoleze volumul de fundaii existent pe amplasament pentru a fi transportate ...................... mc. 4. Numele PREDAT: BENEFICIAR: PROIECTANT: PRIMIT: CONSTRUCTOR: Prenumele Funcia Semntura BENEFICIARUL se oblig: a) s plteasc constructorului costul ncrcrii i transporturilor comandate b) s plteasc constructorului valoarea lucrrilor comandate.

UNITATEA ________________________________________________________________ ANTIER ___________________ PUNCT DE LUCRU _____________________________ OBIECTUL _________________________________________________________________ PROCES-VERBAL DE RECEPIE LA TERMINAREA LUCRRILOR Nr. _________ Data ___________ Investitor: __________________________________________________________ privind lucrarea: _____________________________________________________ executat n cadrul contractului nr. ___________________ data _______________ ncheiat ntre executant: ___________________________ i investitor: ____________________________________ pentru lucrrile de: ____________________________________________________________________________________ 1. 2. Lucrrile au fost executate n baza autorizaiei nr. _________________ eliberat de _____________________________ la data ____________________ cu valabilitate pn la data ______________________ Comisia de recepie i-a desfurat activitatea n intervalul ______________ - ______________ fiind format din: Nr. Numele i prenumele Calitatea Denumirea unitii crt. de care aparine 1. 2. 3. 4. 5. 3. Au mai participat la recepie: Nr. Numele i prenumele crt. 1. 2. 3. 4. Constatrile comisiei: 4.1. Din documentaia scris i desenat necesar a fi prezentat, au lipsit sau sunt incomplete urmtoarele piese: ______________________________________________________________________________________________ ______________________________________________________________________________________________ 4.2. Urmtorarele cantiti de lucrri nu au fost executate: ______________________________________________________________________________________________ ______________________________________________________________________________________________ 4.3. Urmtoarele lucrri nu respect prevederile proiectului: ______________________________________________________________________________________________ ______________________________________________________________________________________________ n urma constatrilor fcute, comisia propune: ______________________________________________________________________________________________ ______________________________________________________________________________________________ Comisia motiveaz propunerea fcut prin: ______________________________________________________________________________________________ ______________________________________________________________________________________________ Comisia recomand urmtoarele: ______________________________________________________________________________________________ ______________________________________________________________________________________________ Prezentul proces-verbal, coninnd ____file a fost ncheiat astzi _________________ la locul: _______________________ n _____ exemplare. COMISIA: PREEDINTE Numele i prenumele MEMBRI: Numele i prenumele

Calitatea

5.

6.

7.

8.

Specialist Specialist

Semntur Semntur

RAPORT DE NECONFORMITATE (R.N.C.) Nr. _________ Data ___________ Unitatea ___________________________________________ DATE DE IDENTIFICARE BENEFICIAR:______________________________ Contract: _________________________________ Denumire lucrare: ________________________________________________________ Proiect: __________________________________ Desen: ___________________________________ PARTEA I - RAPORT DE INSPECIE Descrirea neconformitii i a cauzei acesteia: _________________________________________________________________ ______________________________________________________________________________________________________ Compartiment Control Calitate (CQ) Nume i prenume _________________________________ Semntura _____________________ Data ________________ Executant Nume i prenume _________________________________ Semntura _____________________ Data ________________ PARTEA II RAPORT DE EVALUARE Reparaia / prelucrarea ESTE (NU ESTE) posibil Dispunerea de eliminare a neconformitii ____________________________________________________________ ______________________________________________________________________________________________________ Dispunere dat de compartimentul: 1. Tehnologii de execuie 2. Proiectare 3. _________________ Nume i prenume _________________________________ Semntura _____________________ Data ________________ Documente emise ________________________________________________________________________________ Vizat ef compartiment Nume i prenume _________________________________ Semntura _____________________ Data ________________ Aprobat de conducerea unitii executante Nume i prenume _________________________________ Semntura _____________________ Data ________________ Aprobat de beneficiar Nume i prenume _________________________________ Semntura _____________________ Data ________________

PARTEA III RAPORT DE REMEDIERE Remedierea a fost efectuat conform dispunerii din prezentul R.N.C. Executant Nume i prenume _________________________________ Semntura _____________________ Data ________________ PARTEA IV RAPORT DE CONFORMITATE Verificare eliminare neconformitate Compartiment Control Calitate (CQ) Nume i prenume _________________________________ Semntura _____________________ Data ________________

PROCES-VERBAL DE RECEPTIE LA TERMINAREA LUCRARILOR Nr. .......... din ................ privind, lucrarea ........................................................... ..............................................................................., executata in cadrul contractului nr. ..... din ......., incheiat intre ......... .................. pentru lucrarile de ......................................... 1. Lucrarile au fost executate in baza autorizatiei nr. .........., eliberata de ............. la ..........., cu valabilitate pana la ....................... Comisia de receptie si-a desfasurat activitatea in intervalul .............., fiind formata din: ............................................. (nume si prenume) ............................................. ............................................. 3. Au mai participat la receptie: ................................................................................ (nume si prenume) (calitatea) 4. Constatarile comisiei de receptie: 4.1. Din documentatia scrisa si desenata necesara a fi prezentata au lipsit sau sunt incomplete piesele cuprinse in lista anexa nr. 1. 4.2. Cantitatile de lucrari cuprinse in lista anexa nr. 2 nu au fost executate. 4.3. Lucrarile cuprinse in lista anexa nr. 3 nu respecta prevederile proiectului. 4.4. Valoarea declarata a investitiei este de .......... lei. 5. Comisia de receptie, in urma constatarilor facute, propune: ................................................................................ ................................................................................ 6. Comisia de receptie motiveaza propunerea facuta prin: ................................................................................ ................................................................................ ................................................................................ 7. Comisia de receptie recomanda urmatoarele: ................................................................................ ................................................................................ ................................................................................ 8. Prezentul proces-verbal, continand .......... file si .............. anexe numerotate, cu un total de ........ file, a fost incheiat astazi ............... la ................. in ........ exemplare.

Comisia de receptie*) Presedinte: ..................... Membri: .........................

Specialist*) ................................. .................................

PROCES-VERBAL DE RECEPTIE FINALA Nr. ............ din .................... privind lucrarea ............................................................ ................................................................................ ..............................................................................., autorizata cu nr. .......... din .........., cu valabilitate pana la .........., de catre ............................. 1. Comisia de receptie finala si-a desfasurat activitatea in intervalul ..... ................, fiind formata din: ...................................... (nume si prenume) 2. Au mai participat la receptie: ................................................................................ (nume si prenume) (calitatea) 3. Comisia de receptie finala, in urma examinarii lucrarii si a documentelor cuprinse in cartea tehnica a constructiei, a constatat urmatoarele: 3.1. Lucrarile pe specialitati au fost executate si receptionate conform listei anexa nr. 1. 3.2. Lucrarile au fost complet terminate la data de ......................... 3.3. Observatiile facute de comisia de receptie finala sunt prezentate in lista anexa nr. 2. 3.4. Cartea tehnica a constructiei si fisa sintetica a obiectului au fost (nu au fost) completate. 3.5. Instructiunile de exploatare si urmarire a comportarii in timp a obiectului (nu) sunt in posesia utilizatorului. 3.6. Constructia s-a comportat (nu s-a comportat) corespunzator in perioada de la terminarea ei la data de .......... pana in prezent, respectiv pe o durata de ................ luni, constatarile comisiei fiind enumerate in anexa nr. 3. 3.7. Valoarea obiectului este de ........... lei, conform listei anexa nr. 1. 4. In baza constatarilor facute, comisia de receptie finala propune: ................................................................................ ................................................................................ 5. Comisia de receptie finala motiveaza propunerea facuta prin: ................................................................................ ................................................................................ 6. Comisia de receptie finala recomanda urmatoarele: ................................................................................ ................................................................................ 7. Prezentul proces-verbal, continand .......... file si .............. anexe numerotate, cu un total de ........ file, a fost incheiat astazi ............... la ............. in ....... exemplare. Comisia de receptie*) Presedinte: .................... Membri: ........................ Specialisti*)

PROCES-VERBAL DE RECEPTIE LA TERMINAREA LUCRARILOR Nr. ......... din ................... privind lucrarea ............................................................ ..............................................................................., executata in cadrul contractului nr. ...... din ......., incheiat intre ........ si intre ........................... pentru lucrarile de ....................... ................................................................................ 1. Lucrarile au fost executate in baza autorizatiei nr. .......... eliberata de ................. la .........., cu valabilitate pana la .................... 2. Comisia de receptie si-a desfasurat activitatea in intervalul ..........., fiind formata din: ....................................... (nume si prenume) 3. Au mai participat la receptie: ................................................................................ (nume si prenume) (calitatea) 4. Comisia de receptie, in urma constatarilor facute, propune: ................................................................................ ................................................................................ 5. Comisia de receptie recomanda urmatoarele: ............................... ................................................................................ ................................................................................ 6. Prezentul proces-verbal, continand ........... file si ............. anexe numerotate, cu un total de ......... file, a fost incheiat astazi .............. la ................ in ............... exemplare.

Comisia de receptie*) Investitor (proprietar): ........................... Delegat al administratiei publice locale: ..........

PROCES-VERBAL DE RECEPTIE FINALA Nr. ............. din ................... privind lucrarea ............................................................ ................................................................................ ..............................................................................., autorizata cu nr. ....... din ........, cu valabilitate pana la ..............., de catre .......................................................................

1. Comisia de receptie finala si-a desfasurat activitatea in intervalul ..............., fiind formata din: ................................... (nume si prenume) 2. Au mai participat la receptie: ................................................................................ (nume si prenume) (calitatea) 3. Comisia de receptie finala, in urma examinarii lucrarii si a documentelor, a constatat urmatoarele: ....................................................... 4. Valoarea obiectului este de ............. lei, conform listei anexa nr. 1. 5. In baza constatarilor facute, comisia de receptie finala propune: ................................................................................ 6. Prezentul proces-verbal, continand .......... file si .............. anexe numerotate, cu un total de ......... file, a fost incheiat astazi .............. la ............, in ........... exemplare.

Comisia de receptie finala*) Investitor (proprietar): ............................ Delegat al administratiei publice locale: ...........