Drift test
PSL 2 Not Required Not Required Not Required Required Tested after valve been assy;operated & pressure test Pass through main bore of Xmas tree PSL 1 Primary pressure Holding (3 min) (1.5*W.P) Reduction pressure to Zero Secondary pressure holding (3 min) (1.5*W.P) Pressure applied to each side of gate/plug & other side open to atmosphere Holding Period (3 min) Reduction pressure to zero between holding period Test min 2 times each side of gate/plug
body
Primary pressure Holding (3 min) (1.5*W.P) Reduction pressure to Zero Secondary pressure holding (15 min) (1.5*W.P)
Pressure applied to each side of gate/plug & other side open to atmosphere Holding Period (3 min) Open valve under full differential pressure except fr check valve (Repeat 2 times) Holding Period (3 min
Pressure applied to each side of gate/plug & other side open to atmosphere Holding Period (3 min) Open valve under full differential pressure except fr check valve Holding Period (15 min) Open valve under full differential pressure Holding Period (15 min)
Pressure applied to direction indicated on the body except check valve test on down stream Holding Period (3 min) Unidirectional Valve Reduction pressure to zero between holding period Test min 2 times each side of gate/plug
Pressure applied to direction indicated on the body except check valve test on down stream Holding Period (3 min) Reduction pressure to zero between holding period Test min 2 times each side of gate/plug
Pressure applied to direction indicated on the body except check valve test on down stream Holding Period (3 min) Holding Period (15 min) Holding Period (15 min)
body
Test perform at ambient temp using nitrogen as test medium. Equipment completely submerged in the water Holding period (15 min) (W.P) Pressure applied to each side of gate/plug & other side open to atmosphere Holding Period (15 min) (W.P) Holding period (15 min) (300 psi)2
back seat
NOTES:-
1 Equipment with end or outlet connection have diff W.P use low W.P except fr X-over connector & Chokes 2 Split gate valve may have both seats tested simultaneously