PROJECT: 2 X 500 MW (Unit-1 & 2) DVC - Mejia Phase - II Turbine Drain System

This document describes the turbine drain system for a 2 x 500 MW power plant project. The system drains water that condenses in the turbine and piping during start-up and shut-down to prevent unacceptable water accumulation. It includes drain lines from various areas of the turbine that are collected in headers and discharged to flash tanks to cool the steam before entering the condenser. The drain lines are connected based on the pressure stage and a continuous orifice drain is also provided to drain water during operation.

Uploaded by

Abhishek8200
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views2 pages

PROJECT: 2 X 500 MW (Unit-1 & 2) DVC - Mejia Phase - II Turbine Drain System

This document describes the turbine drain system for a 2 x 500 MW power plant project. The system drains water that condenses in the turbine and piping during start-up and shut-down to prevent unacceptable water accumulation. It includes drain lines from various areas of the turbine that are collected in headers and discharged to flash tanks to cool the steam before entering the condenser. The drain lines are connected based on the pressure stage and a continuous orifice drain is also provided to drain water during operation.

Uploaded by

Abhishek8200
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT: 2 x 500 MW (Unit-1 & 2) DVC Mejia Phase-II TURBINE DRAIN SYSTEM

Rev.no.00/29.11.07

Reference Documents :Drwg No. 1-13100-96131 Drain System Scheme

1.0 INTRODUCTION

During through lected

start-up & shut-down meager steam

flow colbe

the turbine steam gets condensed & water gets in lower parts of turbine & piping which must

drained off for proper operation . 2.0 DESCRIPTION

Drains the tion turbine of system

are provided in the following areas to prevent

of

unacceptable accumulabelow , discharge through

water water

. The lines from the

described

collected

system in to condenser

headers connected to a Turbine flash tanks .

The

various drain

lines are connected

to

the

headers divided

in five drainage groups depending on the pressure stage in the respective line. Higher pressure drain has been coonected at the rear end of the header to maintain the pressure gradient towards flash box . Drains MAL 11 & 12 Drain MAL 22 Drain MAL 65 from M. S. control valves .

from HP turbine casing . from CRH line .

PROJECT: 2 x 500 MW (Unit-1 & 2) DVC Mejia Phase-II TURBINE DRAIN SYSTEM
Rev.no.00/29.11.07

- Drains MAL 47, 51, 52, 54 & 55 from extraction lines . - Drains MAL 26,27,31,32 from HRH stop & control valve & admission pipes . - Drain MAL 81 from seal steam system ( MAW ) . A continuous orifice drain is also provided to drain water during operation . LP by-pass is kept warmed up when the is in operation to avoid thermal shock . This is a line turbine done by

tapping

upstream of HRH strainer & connecting this

back to HRH line down stream of HRH strainer after passing it through LP bypass valves .

Condensate

is

sprayed in turbine flash

tanks

to

cool

the

flashed

steam

before

admitting

it

to

the

condenser . To ensure uniform warming of Main steam stop cum by

control valves the drain valves MAL 11 & 12 are actuated warm is Other up cut controller . in Turbine drain sub-loop

control system .

before warm up of the M. S. piping valves are opened or closed

drain

automatically

through Automatic Turbine Runup System ( ATRS ) .