PROJECT: 2 X 500 MW (Unit-1 & 2) DVC - Mejia Phase - II Turbine Drain System
PROJECT: 2 X 500 MW (Unit-1 & 2) DVC - Mejia Phase - II Turbine Drain System
Rev.no.00/29.11.07
1.0 INTRODUCTION
flow colbe
the turbine steam gets condensed & water gets in lower parts of turbine & piping which must
of
water water
described
collected
system in to condenser
The
various drain
to
the
headers divided
in five drainage groups depending on the pressure stage in the respective line. Higher pressure drain has been coonected at the rear end of the header to maintain the pressure gradient towards flash box . Drains MAL 11 & 12 Drain MAL 22 Drain MAL 65 from M. S. control valves .
PROJECT: 2 x 500 MW (Unit-1 & 2) DVC Mejia Phase-II TURBINE DRAIN SYSTEM
Rev.no.00/29.11.07
- Drains MAL 47, 51, 52, 54 & 55 from extraction lines . - Drains MAL 26,27,31,32 from HRH stop & control valve & admission pipes . - Drain MAL 81 from seal steam system ( MAW ) . A continuous orifice drain is also provided to drain water during operation . LP by-pass is kept warmed up when the is in operation to avoid thermal shock . This is a line turbine done by
tapping
back to HRH line down stream of HRH strainer after passing it through LP bypass valves .
Condensate
is
tanks
to
cool
the
flashed
steam
before
admitting
it
to
the
control valves the drain valves MAL 11 & 12 are actuated warm is Other up cut controller . in Turbine drain sub-loop
control system .
drain
automatically