Maintenance Monthly1 (Boiler, CA, N2)

The document outlines a monthly maintenance plan for several air compressors and a boiler over January. It lists the assets, identification numbers, scheduled maintenance intervals in weeks, start and end dates for maintenance in the first two weeks of January, estimated maintenance times of 1.5 hours, and notes that maintenance times may change depending on actual running hours of the machines. It was prepared by Nguyen Van Hoat and approved by Dau Minh Son.

Uploaded by

gopaltry
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views1 page

Maintenance Monthly1 (Boiler, CA, N2)

The document outlines a monthly maintenance plan for several air compressors and a boiler over January. It lists the assets, identification numbers, scheduled maintenance intervals in weeks, start and end dates for maintenance in the first two weeks of January, estimated maintenance times of 1.5 hours, and notes that maintenance times may change depending on actual running hours of the machines. It was prepared by Nguyen Van Hoat and approved by Dau Minh Son.

Uploaded by

gopaltry
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

MONTHLY MAINTENANCE PLAN MONTHLY MAINTENANCE PLAN Boiler & AIR COMPRESSOR

ATTN C.C : Mr. Son : Mr. Hin, Mr Vinh Jan-11 What Week Asset Desc AssetNo Interval Start Date End Date 2 week/time 2 week/time Air compressor N02 (CA-3) MASAC02 2 week/time 2 week/time 3-Jan 10-Jan 3-Jan 10-Jan 3-Jan 10-Jan 3-Jan 3-Jan 10-Jan 3-Jan 10-Jan 3-Jan 10-Jan 3-Jan During Prod. CIP stop Non-impact Inhouse Outsource prod. 1.5h 1,5h 1,5h 1.5h 1,5h 1.5h 1,5h 1 1 1 1 1 1 1 When Estimate time Manpower Estimate Remark cost
(x1000VND)

Date:25/12/2010

MONTH :

Check Clear Check Clear Check Clear Clear

Air compressor N01 (CA-2)

MASAC01

1&2

Air compressor N03 (CA-4 & CA-4-1)

MASAC03 & 04 MASAC04

2 week/time 2 week/time

Air compressor N04 (CA-5)

4 week/time

Note:

The time for maintenance can be change in order to suitable with actual running hours of machines Prepared by Approved by

Nguyn Vn Hot

U MINH SN

Code: ENG-RF-003. Author: chungbt;. Authorizer: sondm; Revision: 0. Date effective: 1-Oct-2008