Minesight Economics
Minesight Economics
D A T A S H E E T
KEY FEATURES
Maximize NPV using destination selection and cutoff grade optimization > Lerchs-Grossmann method for ultimate pit design with optional reblocking > Floating cone technique for ultimate pit design > Mining sequence design with limit on pushback width > Options for simple slopes, complex slopes and slopes by azimuth > Optional mining cost by bench or block
> > > >
> >
>
>
Vertical discounting option Automatically evaluate pit bottoms Optimize schedules to follow most profitable ore extraction Determine optimal mining direction Multiple plants/processes, waste destinations, and stockpile reclaiming options Generate resource reports within the pit shell Create long term production schedules from series of pit shells Analyze varying capital-versus-productionrate scenarios
Populate block model items for value/block, value/ ton, pit number, destination, and period mined > Evaluate production rates > Create reports and graphs for cutoff grade optimization results > Visualize pit shells to create bench contours and solids > Rapidly calculate and evaluate alternative plans > Create detailed scheduling charts and reports > Use shells as the basis for final designs with the MineSight 3D Pit Expansion tool > Export cutoff grade and stockpile strategies to MineSight Strategic Planner for more detailed analysis and scheduling
>
SOFTWARE SOLUTIONS FROM MINTEC, INC. Mintec, Inc. | Tucson, AZ USA | 520.795.3891 www.minesight.com