0% found this document useful (0 votes)
136 views

GLT Engineers Private, Singapore: Foundation Design

This document provides a foundation design for a bored pile with a diameter of 200mm that will support a 5-tier carpark. It estimates the pile will penetrate 15.5m below the cut-off level. Shaft and end bearing capacities are calculated based on soil data from boreholes. The estimated short term geotechnical capacity is 433.5kN and the long term capacity is 310.89kN. The minimum capacity controlled by geotechnical factors is 433kN.

Uploaded by

Rio Handoko
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
136 views

GLT Engineers Private, Singapore: Foundation Design

This document provides a foundation design for a bored pile with a diameter of 200mm that will support a 5-tier carpark. It estimates the pile will penetrate 15.5m below the cut-off level. Shaft and end bearing capacities are calculated based on soil data from boreholes. The estimated short term geotechnical capacity is 433.5kN and the long term capacity is 310.89kN. The minimum capacity controlled by geotechnical factors is 433kN.

Uploaded by

Rio Handoko
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

GLT ENGINEERS PRIVATE, SINGAPORE

FOUNDATION DESIGN
PROJECT TITLE BOREHOLE : 891 B TAMPINES AVE 8 : BH 20

Type of pile : Pile size : Concrete grade : Surface perimeter , As : Bearing area, Ab :

BoredPile 200 Dia. for 5 Tier Carpark 200 35 N/mm^2 0.63 m^2/m 0.03 m^2 12.5 m

EST. PILE PENETRATION LENGH FROM PILE CUT OFF LEVEL :

STRUCTURAL CAPACITIES OF PILES IN ACCORDANCE WITH BS8004 AND GEOTECHNICAL CAPACITIES OF PILES BASED ON N-VALUES (MEYERHOF, 1976) Qu = C1*Ns*As + C2*Nb*Ab Qs = C1*Ns*As Where C1 = 2 for Bored pile with SPT < 100 Where C1 = 2.5 for Bored pile with SPT >= 100 Ns Ns ( ave.) Cu Cu ( ave.) fs kN/m^2 Shaft Friction (kN)

SHAFT FRICTION

Datum (m) 0.00

Layer Soil Layer depth(m)

3.00 3.00 1.00 4.00

Excavation

0.0

0.00

0.0

Yellow,Brown & Red Fine to coarse clayey

0.0

20

10

-8.80

-6.2

Qnsf, total
2.00 6.00 3.00 9 00 9.00 3.00 12.00 3.00 15.00 0.50 15.50 Dense to very dense Yellowish pinky & white, fine to Coarse silty sand with quartz 100.0 92.0 " Ditto " 84.0 74.5 Very dense Greyish white fine to coarse silty 65.0 37.5 Stif light grey & yellownClaye with organic 10.0 9.5 "Ditto" 9.0 4.5

=
9

-6.2
11.3

19

35.8

75

141.4

149

280.9

230

72.3

Qs total Qs,

541 6 541.6

Shaft length =

12.5 m

Qs

541.6

kN
Qb = C2*Nb*Ab

Qnsf

-6.2

kN

END BEARING Db = Where C2*Nb = 1.5 m C2 = 12(Db/B) = 9000 kN/m^2 =>

= 90.00 < 400 Where

0.2 m Nb = (C2*Nb) <= 7500 kN/m^2 100

Qb

235.6 kN

GEOTECHINICAL CAPACTY Short term Long term

D:\yEnnIe\GLT\HDB file\BATCH 7\Block 891B TAMPINES AVE 8\EXCEL\Borepile-891B

Qu = Qs + Qb Qa = (Qs+Qb)/2.5 = STRUCTURAL CAPACITY

Qa = Qs/1.5+Qb/3 - Qnsf =

433.5 kN

310.89 kN

fy = Asc =

460 N/mm2 3T32 = 2413 mm2 493.0 kN 486.8 kN

Qa = (0.4*Ab*fcu + 0.75*fy*As Qan = Qa - Qnsf =

=> (Minimum) : Geotechinical Capacity Controls = Say =

433 kN 430 kN

D:\yEnnIe\GLT\HDB file\BATCH 7\Block 891B TAMPINES AVE 8\EXCEL\Borepile-891B