This document provides a detailed description of a one and a half circuit breaker protection scheme. It includes 16 sections that describe the configuration of the scheme involving two buses connected by three circuit breakers, and how it provides two feeding paths for each of two lines. Diagrams are included to illustrate the circuit breaker connections and labeling of different sections of the scheme. The document also discusses different CT methods that can be used in this type of protection scheme, including 3CT, 4CT, 5CT and 6CT methods, and provides diagrams of each.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
542 views256 pages

400KV Substion AP Transco

This document provides a detailed description of a one and a half circuit breaker protection scheme. It includes 16 sections that describe the configuration of the scheme involving two buses connected by three circuit breakers, and how it provides two feeding paths for each of two lines. Diagrams are included to illustrate the circuit breaker connections and labeling of different sections of the scheme. The document also discusses different CT methods that can be used in this type of protection scheme, including 3CT, 4CT, 5CT and 6CT methods, and provides diagrams of each.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 256

400KV PROTECTION

PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)


[email protected], Mobile:9440336984

BASICS OF ONE AND HALF CIRCUIT BREAKER SCHEME


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

ONE & HALF BREAKER DESCRIPTION


BUS-1
1. IN THIS TWO BUSES ARE PRIOVIDED.

BUS-1

BUS-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
2. THESE TWO BUSES ARE INTER-CONNECTED BY THREE CIRCUIT BREAKERS.

BUS-1

BUS-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1 1-52 CB
3. THEY ARE DESIGNATED AS 1-52 CB, 2-52 CB, 3-52 CB.

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

2-52 CB

3-52 CB BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1 1-52 CB
4. LINE - 1 IS CONNECTED IN BETWEEN 1-52 CB & 2-52 CB. 5. LINE - 2 IS CONNECTED IN BETWEEN 3-52 CB & 2-52 CB.

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2 2-52 CB

3-52 CB LINE-1 BUS-2 LINE-2

ONE & HALF BREAKER DESCRIPTION


BUS-1 1-52 CB
6. LINE-1 HAVING TWO FEEDING PATHS i.e A. VIA BUS-1 & 1-52 CB B. VIA BUS-2, 3-52 CB & 2-52 CB 7. LINE-2 HAVING TWO FEEDING PATHS i.e A. VIA BUS-2 & 3-52 CB B. VIA BUS-1, 1-52 CB & 2-52 CB

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2

2-52 CB

3-52 CB LINE-1 BUS-2 LINE-2

ONE & HALF BREAKER DESCRIPTION


BUS-1 1-52 CB
8. FOR INTURUPTING LINE-1 THE 1-52CB AND 2-52CB IS TO BE TRIPPED. 9. FOR INTURUPTING LINE-2 THE 3-52CB AND 2-52CB IS TO BE TRIPPED.

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2 2-52 CB

3-52 CB LINE-1 BUS-2 LINE-2

ONE & HALF BREAKER DESCRIPTION


BUS-1 1-52 CB
10. FOR ANY PROBLEM IN LINE-1 OR LINE-2 ALONG WITH MAIN BREAKER THE MIDDLE BREAKER OR SAY TIE BREAKER (2-52 CB) MUST TRIP.

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2 2-52 CB

3-52 CB LINE-1 BUS-2 LINE-2

ONE & HALF BREAKER DESCRIPTION


BUS-1 1-52 CB
11. NORMALLY IN ALL TYPES OF BUSBAR CONFIGUARATIONS ONE BREAKER IS SUFFICIENT FOR ONE FEEDER. 12. HERE TWO FEEDERS ARE CONTROLED BY THREE BREAKERS. 13. SO THESE TWO FEEDERS CONTROLLED BY THREE CIRCUIT BREAKERS IT IS CALLED ONE & HALF BREAKER SYSTEM.

LINE-1

BUS-1

BUS-2

1-52 CB 2-52 CB

3-52 CB

LINE-2 2-52 CB

3-52 CB LINE-1 BUS-2 LINE-2

ONE & HALF BREAKER DESCRIPTION


MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1 1-52 CB

14. THE BAY BETWEEN BUS-1 & LINE-1 IS CALLED MAIN BAY FOR FEEDER-1.

LINE-1

BUS-1

BUS-2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

LINE-2

2-52 CB

3-52 CB LINE-1 BUS-2 LINE-2

ONE & HALF BREAKER DESCRIPTION


MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1 1-52 CB

15. THE BAY BETWEEN LINE-1 & LINE-2 IS CALLED TIE BAY FOR FEEDER-1 & 2.

LINE-1

BUS-1

BUS-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

LINE-2

2-52 CB

3-52 CB LINE-1 BUS-2 LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

ONE & HALF BREAKER DESCRIPTION


MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1 1-52 CB

16. THE BAY BETWEEN BUS-2 & LINE-2 IS CALLED MAIN BAY FOR FEEDER-2.

LINE-1

BUS-1

BUS-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

MAIN BAY(3RD BAY) FOR FEEDER-2

LINE-2

2-52 CB

3-52 CB BUS-2

LINE-1

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

MAIN BAY(3RD BAY) FOR FEEDER-2

ONE & HALF BREAKER DESCRIPTION


1-52 CB
MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1

17. IN THIS SYSTEM FULL DIA MEANS 2 FEEDERS CONTROLLED BY 3 CBs. 18. HALF DIA MEANS 1 FEEDER CONTROLLED BY 2 CBs. (Nothing but Double CB System)

LINE-1

BUS-1

BUS-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

MAIN BAY(3RD BAY) FOR FEEDER-2

LINE-2

2-52 CB

3-52 CB BUS-2

LINE-1

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

MAIN BAY(3RD BAY) FOR FEEDER-2

ONE & HALF BREAKER DESCRIPTION


1-52 CB
MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1

GOPALA KRISHNA PALEPU ADE/MRT/ T&C/400KV SS/ O/O CE/400KV / L&SS/ VS APTRANSCO, HYDERABAD [email protected] Mobile: 9440336984

LINE-1

BUS-1

BUS-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

3-52 CB

2-52 CB

MAIN BAY(3RD BAY) FOR FEEDER-2

LINE-2

2-52 CB

3-52 CB BUS-2

LINE-1

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

MAIN BAY(3RD BAY) FOR FEEDER-2

SUBSTATION DESIGN/LAYOUT
(I-CONFIGUARATION)
FEEDER1 FEEDER3 FEEDER5 FEEDER7 FEEDER9 FEEDER11

BUS-1 DIA1
BAY1

DIA2
BAY4

DIA3
BAY7

DIA4
BAY10

DIA5
BAY13

DIA6
BAY16

BAY11

BAY14

BAY12

BUS-2

FEEDER2

FEEDER4

FEEDER6

FEEDER8

FEEDER10

BAY15

FEEDER12

BAY18

BAY3

BAY6

BAY9

BAY17

BAY2

BAY5

BAY8

SUBSTATION DESIGN/LAYOUT
(D-CONFIGUARATION)
FEEDER1
BAY2

FEEDER2

FEEDER5
BAY8

FEEDER6

FEEDER9

FEEDER10
BAY14

BAY13

BAY1

BAY7

DIA1

DIA3

DIA5

BUS-1

BUS-2
BAY10 BAY12 BAY16 BAY4

BAY15

BAY3

BAY9

DIA2

DIA4

DIA6

BAY5

BAY11

BAY17

FEEDER3

FEEDER4

FEEDER7

FEEDER8

FEEDER11

FEEDER12

BAY18

BAY6

SUBSTATION DESIGN/LAYOUT
(DOUBLE BUS & DOUBLE BREAKER SYSTEM)
FEEDER1 FEEDER3 FEEDER1 FEEDER3

BUS-1
BAY2 BAY1 BAY5 BAY6

BAY1

BAY3

BAY5

BAY7

BUS-1 BUS-2
BAY4 BAY6 BAY2 BAY8 BAY4 BAY3 BAY7 BAY8

BUS-2

FEEDER2

FEEDER4

FEEDER2

FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 800KV SYSTEM

FEEDER 8 1-52 CB

FEEDER 1 2-52 CB

FEEDER 2

8-52 CB

3-52 CB

FEEDER 7

MESH / RING LAYOUT


4-52 CB

FEEDER 3

7-52 CB

6-52 CB FEEDER 6 FEEDER 5

5-52 CB FEEDER 4

SUBSTATION DESIGN/LAYOUT
(DOUBLE MAIN BUS & TRANSFER BUS SYSTEM)
T/F-1 T/F-2

BUS-1
BUS COUPLER

BAY3 BAY1 BAY2

BAY4

BAY5

TRANSFER BUS COUPLER BAY6

BUS-2

TRANSFER BUS

BAY7

BAY8

FEEDER1 FEEDER2

FEEDER3 FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 400 & 220 KV SYSTEM

SUBSTATION DESIGN/LAYOUT
(DOUBLE MAIN BUS & CB BYPASS ISO SYSTEM)
T/F-1 T/F-2

BAY1

BAY2

BAY4 BUS COUPLER

BAY6

BAY7

BUS-1

BUS-2

BAY3

BAY5

WHEN ANY CB PROBLEM OR FOR PREVENTIVE MAINTANENCE THEN ALL OTHER FEEDERS SHIFTED TO ANOTHER BUS OF FAULTED CB BUS AND CLOSE THE BYPASS ISOLATOR, THEN PROTECTION IS SHIFTED TO BUS COUPLER AND OPEN THE FAULTY CB.

FEEDER1

FEEDER2

FEEDER3

FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 220KV SYSTEM

SUBSTATION DESIGN/LAYOUT
(SINGLE BUS & TRANSFER BUS SYSTEM)
T/F-1 T/F-2

TRANSFER BUS
TRANSFER BUS COUPLER

BUS-1
BAY1 BAY2 BAY3

BAY4

BAY5

BAY6

BAY7

FEEDER1

FEEDER2

FEEDER3

FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 220 & 132 KV SYSTEM

CT METHODS IN ONE AND HALF CIRCUIT BREAKER SCHEME


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

DIFFERENT CT METHODS OF ONE & HALF BREAKER SYSTEM

CB LINE CB LINE CB LINE LINE CB LINE LINE CB CB

CB 3 CT METHOD CB 4 CT METHOD CB 5 CT METHOD CB 6 CT METHOD CB 6 CT METHOD CB 6 CT METHOD

CB AT/F CB AT/F CB CB CB CB AT/F AT/F AT/F AT/F

ONE & HALF BREAKER SYSTEM


(3CT METHOD)
BUS-1 1-89 BUS-2 3-89

1-52CB 1-CT 1-89A 2-CT


P2

3-52CB

P2

P1

P1

3 3-CT
3-89A

2-89A 2-52CB 1-89L

P1

3 3

P2

2-89B 3-89T

LINE 1 T/F-1

ONE & HALF BREAKER SYSTEM


(4CT METHOD)
BUS-1 1-89 BUS-2 3-89

1-52CB 1-CT 1-89A 2-ACT 2-BCT


P1 P2

3-52CB

P2

P1

P1

3 3-CT
3-89A

P2

2-89A 1-89L

P1

P2

2-52CB

2-89B 3-89T

LINE 1 T/F-1

ONE & HALF BREAKER SYSTEM


(5CT METHOD)
BUS-1 1-89 BUS-2 3-89

1-52CB 1-CT 1-89A 2-CT


P1 P2

3-52CB

3P1

P2 P1

3 3-CT
3-89A

2-89A 1-89L 1L-CT


P2

P2

2-52CB

2-89B 3-89T

3P1

3T-CT 3 P1

P2

LINE 1 T/F-1

ONE & HALF BREAKER SYSTEM


(6CT METHOD)
BUS-1 1-89
P2 P1

BUS-2 3-89

3 1A-CT

3A-CT

P2

3 3

1-52CB
P1

P1

3-52CB

1B-CT 3 P2

3B-CT

P1 P2

1-89A 2A-CT
P2

3-89A 2B-CT

P1

2-89A 1-89L

2-52CB

P1

P2

2-89B 3-89T

T/F-1 LINE 1

ONE & HALF BREAKER SYSTEM


(6CT METHOD)
BUS-1 1-89 BUS-2 3-89

1-52CB
P2

3-52CB
3-CT

1-CT 3 P1

P2 P1

1-89A 2A-CT
P2

3-89A 2B-CT

P1

2-89A 1-89L
P2

2-52CB

P1

P2

2-89B 3-89T

1L-CT 3 P1

3T-CT

3 P1

P2

T/F-1

LINE 1

ONE & HALF BREAKER SYSTEM


(6CT METHOD)
BUS-1 1-89
P2 P1

BUS-2
P2

3-89

3 1-CT

P1

3 3-CT
3-52CB

1-52CB

1-89A 2A-CT
P2

3-89A 2B-CT

P1

2-89A 1-89L
P2

2-52CB

P1

P2

2-89B 3-89T

1L-CT 3 P1

3T-CT

3 P1

P2

T/F-1

LINE 1

ONE & HALF BREAKER SYSTEM


(8CT METHOD)
BUS-1 1-89
P2 P1

BUS-2 3-89

3 1A-CT

3A-CT

P2

3 3

1-52CB
P1

P1

3-52CB

1B-CT 3 P2

3B-CT

P1 P2

1-89A 2A-CT
P2

3-89A 2B-CT

P1

2-89A 1-89L
P2

2-52CB

P1

P2

2-89B 3-89T 3T-CT


P2

3 1L-CT P1
LINE 1

P1

T/F-1

TYPICAL ONE & HALF BREAKER SYSTEM ADOPTED IN GIS


DS : DISCONNECTOR SWITCH, GS: GROUNDING SWITCH, CT: CURRENT TRANSFORMER, VD: VOLTAGE DIVIDER

TYPICAL ONE & HALF BREAKER SYSTEM ADOPTED IN GIS


DS : DISCONNECTOR SWITCH, GS: GROUNDING SWITCH, CT: CURRENT TRANSFORMER, VD: VOLTAGE DIVIDER

1-1/2 CB SYSTEM (SIEMENS VATECH)


VD VD GS GS GS GS GS VD GS GS GS VD

CT DS CB

CT DS DS

CT CB

CT DS DS

CT CB

CT DS

CORE WISE APLICATION OF CTs IN ONE AND HALF CIRCUIT BREAKER SCHEME
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

CURRENT TRANSFORMER CONNECTIONS IN 3CT METHOD 1 CT 2 CT 3 CT BUSBAR-1 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CORE 1
( PS)

PROTECTION

CONNECTED TO MAIN PROTECTION FOR TRANSFORMER

CORE 2
( PS)

BUSBAR-1 CHECKUP PROTECTION (SPARE) SPARE

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR FOR TRANSFORMER METERING & ENERGY METER FOR AT/F SPARE BUSBAR-2 CHECKUP PROTECTION (SPARE) BUSBAR-2 PROTECTION

CORE 3
( 0.5 / 0.2)

CORE 4
(0.5 / 0.2)

METERING & ENERGY METER FOR FEEDER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-2 PROTECTION AFTER LBB/BFR FOR FEEDER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-1 PROTECTION FOR FEEDER

CORE 5
( PS)

CORE 6
( PS)

CURRENT TRANSFORMER CONNECTIONS IN 3CT METHOD 1 CT 2 CT 3 CT BUSBAR-1 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CORE 1
( PS)

PROTECTION

CONNECTED TO MAIN PROTECTION FOR TRANSFORMER

CORE 2
( PS)

BUSBAR-1 CHECKUP PROTECTION (SPARE)

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR FOR TRANSFORMER SPARE BUSBAR-2 CHECKUP PROTECTION (SPARE) BUSBAR-2 PROTECTION

CORE 3
(0.5 / 0.2)

METERING & ENERGY METER FOR FEEDER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-2 PROTECTION AFTER LBB/BFR FOR FEEDER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-1 PROTECTION FOR FEEDER

CORE 4
( PS)

CORE 5
( PS)

BUSHING CT METERING CORE (0.5 / 0.2)

NORMALLY THIS SYTEM ADOPTS, WHEN ONE SIDE LINE, OTHER SIDE AUTO TRANSFORMER / BUS REACTOR IS PROVIDED IN A DIA OF ONE AND HALF BREAKER SYSTEM, IF BUSHING CT METERING CORE IS AVAILABLE, THEN IT IS USED FOR METERING & ENERGY METER FOR AT/F OR BUS REACTOR.

CURRENT TRANSFORMER CONNECTIONS IN 4CT METHOD 1- CT CORE-1


(PS)
CT SECONDARY CORE IS CONNECTED TO BUSBAR-1 PROTECTION BUSBAR-1 CHECKUP PROTECTION (SPARE)

2-BCT
SPARE

2-ACT
SPARE

3-CT
CT SECONDARY CORE IS CONNECTED TO BUSBAR-2 PROTECTION BUSBAR-2 CHECKUP PROTECTION (SPARE)

CORE-2
(PS)

SPARE

SPARE

CORE-3
(0.5/0.2)

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO PANEL METERS & ENERGY METER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-2 PROTECTION AFTER LBB/BFR 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-1 PROTECTION

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO PANEL METERS & ENERGY METER 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN PROTECTION

CORE-4
(PS)

CORE-5
(PS)

CURRENT TRANSFORMER CONNECTIONS IN 5CT METHOD


1-CT CORE-1 (PS) CORE-2 (PS) CORE-3 (0.5/0.2) CORE-4 (PS) CORE-5 (PS)
BUSBAR-1 PROTECTION BUSBAR-1 CHECKUP PROTECTION (SPARE)

1-LCT
TEED PROT-1 (BAY 1&2) TEED PROT-2 (BAY 1&2)

2-CT
TEED PROT-1 (BAY 2&3) TEED PROT-2 (BAY 2&3)

3-TCT
TEED PROT-1 (BAY 2&3) TEED PROT-2 (BAY 2&3)

3-CT
BUSBAR-2 PROTECTION BUSBAR-2 CHECKUP PROTECTION (SPARE)

SPARE

METERING & ENERGY METER MAIN-2 PROTECTION

SPARE

METERING & ENERGY METER BACKUP PROTECTION

SPARE

TEED PROT-2 (BAY 1&2) AFTER LBB/BFR (1-52) TEED PROT-1 (BAY 1&2)

TEED PROT-2 (BAY 1&2) AFTER LBB/BFR (2-52) TEED PROT-1 (BAY 1&2)

TEED PROT-2 (BAY 2&3) AFTER LBB/BFR (3-52) TEED PROT-1 (BAY 2&3)

MAIN-1 PROTECTION

MAIN PROTECTION

Paralleling of 2Nos CTs to the Main-1/Main-2/Backup line protection is not required. This gives better transient response. Separate STUB protection can be connected (Nothing BUT TEED Protection).

CURRENT TRANSFORMER CONNECTIONS IN 6CT METHOD


(GIS or AIS with DEAD TANK CBs)
1B-CT CORE-1 (PS) CORE-2 (PS)
BUSBAR-1
PROTECTION

1A-CT

2B-CT

2A-CT

3A-CT

3B-CT
BUSBAR-2
PROTECTION

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-1 PROTECTION 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-2 PROTECTION AFTER LBB/BFR 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO PANEL METERS & ENERGY METER

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO MAIN-1 PROTECTION 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR 2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND CONNECTED TO PANEL METERS & ENERGY METER

BUSBAR-1 CHECKUP
PROTECTION

BUSBAR-2 CHECKUP
PROTECTION

(SPARE)

(SPARE)

CORE-3 (0.5/0.2)

SPARE

SPARE

CURRENT TRANSFORMER CONNECTIONS IN 6CT METHOD


1-CT CORE-1 (PS) CORE-2 (PS) CORE-3 (0.5/0.2) CORE-4 (PS) CORE-5 (PS)
BUSBAR-1 PROTECTION BUSBAR-1 CHECKUP
PROTECTION (SPARE)

1L-CT
TEED PROT-1 (BAY 1&2) TEED PROT-2 (BAY 1&2) METERING & ENERGY METER MAIN-2 PROTECTION MAIN-1 PROTECTION

2A-CT
SPARE SPARE

2B-CT
SPARE SPARE

3T-CT
TEED PROT-1 (BAY 2&3) TEED PROT-2 (BAY 2&3) METERING & ENERGY METER BACKUP PROTECTION MAIN PROTECTION

3-CT
BUSBAR-2 PROTECTION BUSBAR-2 CHECKUP
PROTECTION (SPARE)

SPARE

SPARE

SPARE

SPARE

TEED PROT-2 (BAY 1&2)


AFTER LBB/BFR (1-52)

TEED PROT-2 (BAY 2&3) TEED PROT-1 (BAY 2&3)

TEED PROT-2 (BAY 1&2)


AFTER LBB/BFR (2-52)

TEED PROT-2 (BAY 2&3)


AFTER LBB/BFR (3-52)

TEED PROT-1 (BAY 1&2)

TEED PROT-1 (BAY 1&2)

TEED PROT-1 (BAY 2&3)

CURRENT TRANSFORMER CONNECTIONS IN 8CT METHOD


1B-CT 1A-CT
LBB PROT (BAY-1) LBB PROT (BAY-1)

1L-CT
TEED PROT-1 (BAY 1&2) TEED PROT-2 (BAY 1&2)

2B-CT
LBB PROT (BAY-2) TEED PROT-1 (BAY 2&3) TEED PROT-2 (BAY 1&2)

2A-CT
LBB PROT (BAY-2)

3T-CT
TEED PROT-1 (BAY 2&3)

3A-CT
LBB PROT (BAY-3) LBB PROT (BAY-3) TEED PROT-1 (BAY 2&3)

3B-CT
BUSBAR-2 MAIN-1 PROTECTION BUSBAR-2 MAIN-2 PROTECTION TEED PROT-2 (BAY 2&3)

CORE-1 (PS) CORE-2 (PS) CORE-3 (PS) CORE-4 (PS) CORE-5 (0.5/0.2)

BUSBAR-1 MAIN-1 PROTECTION BUSBAR-1 MAIN-2 PROTECTION

TEED PROT-2 TEED PROT-2 (BAY 2&3) (BAY 2&3) TEED PROT-1 (BAY 1&2)

TEED PROT-2 TEEDPROT-1 (BAY 1&2) (BAY 1&2) TEED-1 FOR BAY-1 & 2 IS: 1L-CT, 1A-CT & 2A-CT TEED-2 FOR BAY-1 & 2 IS: 1L-CT, 1B-CT & 2B-CT

MAIN-2
PROTECTION

BACKUP
PROTECTION

MAIN-1
PROTECTION METERING & ENERGY METER

SOME TIMES DUPLICATED BUSBAR PROTECTION WITH DUPLICATE LBB IS REQUIRED

MAIN
PROTECTION METERING & ENERGY METER

TEED-1 FOR BAY-2 & 3 IS: 3T-CT, 3A-CT & 2B-CT TEED-2 FOR BAY-2 & 3 IS: 3T-CT, 3B-CT & 2A-CT

CT CORES CONEECTION DIAGRAMS IN ONE AND HALF CIRCUIT BREAKER SCHEME


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

BUS

3 3 3
2 1-52CB 1
P2

3
1-89 3 1

BUS BAR PROTECTION

BUS BAR CHECKUP PROT METERING

MAIN-2/BACKUP PROTECTION
MAIN-1 PROTECTION

3 3 3
2 3

BB-EVT / CVT

3 3 3 3 3
P1

SINGLE BUS SYSTEM


2 1-CT 5 1-89L CORES 3 4

1-CVT

ONE & HALF BREAKER ( 3 CT METHOD) WITH PROTECTION SCHEME


87BB1 BUSBAR-1 79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 BF 87L 21M2 VL1 CVT VL1 FEEDER1 / LINE1 79 VL1 / VBB1 VL2 / VBB2 25 21M1 VL1

BF

FEEDER2 / LINE2 MAIN-1 BF VBB2 VL2 / VL1 OR VBB1 CVT VBB2 79 25 BUSBAR-2 87BB2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED . MAIN-2 CVT VL2 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)

ONE & HALF BREAKER ( 4 CT METHOD) WITH PROTECTION SCHEME


87BB1 BUSBAR-1 79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 BF 87L 21M2 VL1 CVT VL1 FEEDER1 / LINE1 21M1 VL1

79 VL1 / VBB1 VL2 / VBB2 25 BF

FEEDER2 / LINE2 MAIN-1 BF VBB2 VL2 / VL1 OR VBB1 CVT VBB2 79 25 BUSBAR-2 87BB2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED . MAIN-2 CVT VL2 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME


87BB1 BUSBAR-1 CVT VBB1 79 VBB1 VL1 / VL2 OR VBB2 25 BF VL1 21M1 VL1

87L

21M2

CVT

VL1 FEEDER1 / LINE1

79 VL1 / VBB1 VL2 / VBB2 25 BF

FEEDER2 / LINE2 MAIN-1 VL2 / VL1 OR VBB1 CVT VBB2 BF MAIN-2 CVT VL2 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)

VBB2

79 25

BUSBAR-2 87BB2

FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 5 CT METHOD) WITH PROTECTION SCHEME


87BB1 BUSBAR-1 79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 BF 21M1 87 TD1 HZ 87L 21M2 VL1 VL1

87 TD2 LZ

CVT

VL1 FEEDER1 / LINE1

79 VL1 / VBB1 VL2 / VBB2 25

BF

FEEDER2 / LINE2

.
BF VBB2 VL2 / VL1 OR VBB1 CVT VBB2 79 25 87 TD1 HZ BUSBAR-2 87BB2 87 TD2 LZ

CVT VL2 MAIN-1 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE) MAIN-2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME


87BB1 BUSBAR-1 79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 BF 21M1 87 TD1 HZ 87L 21M2 VL1 VL1

87 TD2 LZ

CVT

VL1 FEEDER1 / LINE1

79 VL1 / VBB1 VL2 / VBB2 25

BF

FEEDER2 / LINE2

.
BF VBB2 VL2 / VL1 OR VBB1 CVT VBB2 79 25 87 TD1 HZ BUSBAR-2 87BB2 87 TD2 LZ

CVT VL2 MAIN-1 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE) MAIN-2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME


87BB1 BUSBAR-1 21M1 CVT VBB1 79 VBB1 VL1 / VL2 OR VBB2 25 FEEDER1 / LINE1 BF 87 TD2 LZ 87 TD1 HZ 87L 21M2 VL1 VL1

CVT

VL1

79 VL1 / VBB1 VL2 / VBB2 25

BF

VL2 / VL1 OR VBB1 VBB2 VBB2 CVT

FEEDER2 / LINE2 79 CVT VL2 25 87 TD2 LZ BF 87 TD1 HZ BUSBAR-2 87BB2 FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED . MAIN-1 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE) MAIN-2

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME CVT VBB1 (WITH LATEST CONCEPT)
BUSBAR-1 VL1 / VL2 OR VBB2 VBB1 79 BF 87L 21M2 VL1 CVT VL1 FEEDER1 / LINE1 21M1 VL1

25

87BB

VL1 / VBB1 VL2 / VBB2 25 79 BF

IN THIS CONCEPT FOR ONE & HALF BREAKER SYSTEM A NEW RELAY DEVELOPED WHICH INCLUDES AUTO RECLOSURE + CHECK SYN + LBB RELAY(79+25+50). FROM THIS RELAY TO BUSBAR RELAY ONLY FIBRE OPTIC CONNECTION(NO PHYSICAL). THE DATA WILL BE COMMUNICATED BETWEEN 87BB & LBB. IN THIS 1+1 DUPLICATED BUSBAR PROTECTION IS ADOPTED. FEEDER2 / LINE2 MAIN-1 MAIN-2 CVT VL2 PROTECTION OF LINE2 (OR TRANSFORMER, IF APPLICABLE)

87BB

BF 79 VBB2 VL2 / VL1 OR VBB1 25

BUSBAR-2 CVT VBB2

FOR TRANSFORMER PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 3 CT METHOD) WITH PROTECTION SCHEME


21L1- LINE DIST PROT1 21L2- LINE DIST PROT2 87 BB M2 BUSBAR PROTN MAIN-2 87 BB M1 BUSBAR PROTN MAIN-1 87 BB M1 BUSBAR PROTN MAIN-1 87 BB M2 BUSBAR PROTN MAIN-2 67HV- ICT DIR O/C,E/F 87T1- ICT DIFF PROT1

MAIN-1 MAIN-2

MAIN-1 MAIN-2 MET+SYN

2-52CB

MAIN-1 MAIN-2 MET+SYN

DISTURBANCE RECORDER, EVENT RECORDER, FAULT LOCATOR ARE IN BUILT FUNCTIONS IN BOTH NUMERICAL DIST PROT RELAYS 21L1 & 21L2

DISTURBANCE RECORDER, EVENT RECORDER, ARE IN BUILT FUNCTIONS IN BOTH NUMERICAL DIFF PROT RELAYS 87T1 & 87T2

87T2- ICT DIFF PROT2

LATEST CONCEPT REDUNDANT LINE PROTECTION REDUNDANT ICT PROTECTION REDUNDANT BUSBAR PROTECTION LBB IS IN BUILT FUNCTION OF BUSBAR

FOR ICT CVT IS NOT AVAILABLE. ACCORDING TO CONDITION IT IS SELECTED BUS-1 CVT OR BUS-2 CVT OR LINE CVT HV & LV OVER FLUX PROT ARE IN BUILT. ICT HV METERING IS BUSHING CT

3-52CB

1-52CB

BUS-II

BUS-I

MET+SYN

ONE & HALF BREAKER ( 4 CT METHOD) WITH PROTECTION SCHEME


21L1- LINE DIST PROT1 21L2- LINE DIST PROT2 87 BB M2 BUSBAR PROTN MAIN-2 87 BB M1 BUSBAR PROTN MAIN-1 87 BB M1 BUSBAR PROTN MAIN-1 87 BB M2 BUSBAR PROTN MAIN-2 67HV- ICT DIR O/C,E/F 87T1- ICT DIFF PROT1

MAIN-1 MAIN-2

MAIN-1 MAIN-2 MET+SYN

2-52CB

MAIN-1 MAIN-2 MET+SYN

DISTURBANCE RECORDER, EVENT RECORDER, FAULT LOCATOR ARE IN BUILT FUNCTIONS IN BOTH NUMERICAL DIST PROT RELAYS 21L1 & 21L2

DISTURBANCE RECORDER, EVENT RECORDER, ARE IN BUILT FUNCTIONS IN BOTH NUMERICAL DIFF PROT RELAYS 87T1 & 87T2

87T2- ICT DIFF PROT2

LATEST CONCEPT REDUNDANT LINE PROTECTION REDUNDANT ICT PROTECTION REDUNDANT BUSBAR PROTECTION LBB IS IN BUILT FUNCTION OF BUSBAR

FOR ICT CVT IS NOT AVAILABLE. ACCORDING TO CONDITION IT IS SELECTED BUS-1 CVT OR BUS-2 CVT OR LINE CVT HV & LV OVER FLUX PROT ARE IN BUILT

3-52CB

1-52CB

BUS-II

BUS-I

MET+SYN

NUMERICAL BUSBAR SCHEME INCL LBB/BFR/CBF (DECENTRALISED & CENTRALISED ARCHITECTURE)


DECENTRALISED CONCEPT FO BU/PU CENTRALISED CONCEPT

(REB 500) ABB

(REB 670) ABB

OR
(7 SS 52) SIEMENS
FO OR OR

(487B) SEL

BU/PU

OR
(MICOM P740) AREVA (MICOM P746) AREVA

BU/PU FO

BU / PU TO BUSBAR DIGITAL COMMUNICATION LBB INBUILT FEATURE

LBB INBUILT FEATURE

COMPARISION BETWEEN DIFFERENT CT METHODS


CT PURPOSE
BUSBAR & BUSBAR CHECKUP PROTECTION MAIN-1 MAIN-2 PROTECTION & METERING

3 CT METHOD
1 CT

4 CT METHOD
1 CT

6 CT (S) METHOD
1B CT &

5 CT METHOD
1 CT

6 CT (T1) METHOD
1 CT

6 CT (T2) METHOD
1 CT

ABOVE FOR BUS-1 3 CT 1 - CT & 2 - CT 3 CT 1 CT & 2 B - CT 3B CT 1 A CT & 2 B CT

BELOW FOR BUS-2 3 CT 1 L - CT 3 CT 1 L - CT ABOVE FOR FEEDER-1 BELOW FOR FEEDER-2 3 L - CT 3 L - CT 3 L CT 3 CT 1 L - CT

ABOVE CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDER-1 BELOW CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDER-2 3 - CT & 2 CT 3 - CT & 2 A - CT 3 A - CT & 2 A - CT

ADDITIONAL PROTECTION AVAILABLE

STUB-1 & STUB-2 PROTECTION FOR LINE & AT/F STUB-1 & STUB-2 PROTECTION IS A NORMALLY INBUILT PROTECTION FOR MAIN-1 & MAIN-2 RELAYS, IN CASE OF LATEST NUMERICAL RELAYS. STUB PROTECTION WORKS WHEN LINE ISOLATOR OPEN CONDITION ONLY.

TEED-1 & TEED-2 PROTECTION FOR LINE & AT/F TEED1 IS NORMALLY HIGH IMPEDENCE DIFFERENTIAL RELAY & TEED-2 IS NORMALLY LOW IMPEDENCE DIFFERENTIAL RELAY. THESE ARE NOT INBUILT FUNCTIONS OF MAIN-1 & MAIN-2 RELAYS.

BLIND ZONE

A FAULT BETWEEN CIRCUIT BREAKERS AND CT (END FAULT) MAY THEN STILL BE FED FROM ONE SIDE EVEN WHEN THE BREAKER HAS BEEN OPENED. CONSEQUENTLY, FINAL FAULT CLEARING BY CASCADED TRIPPING HAS TO BE ACCEPTED IN THIS CASE. THIS SITUATION LBB/BFR OPERATES AND TIME TAKEN TO CLEAR FAULT IS ABOUT 300 mSECs. THIS IS BLIND ZONE AREA. MINIMUM CT METHOD. REDUCING THE COST OF CTs TIE CB BLIND ZONE AREA IS TAKEN CARE. MAIN CB & TIE CB BLIND ZONE AREA IS TAKEN CARE BLIND ZONE FOR MAIN CB & TIE CB TIE CB BLIND ZONE AREA IS TAKEN CARE TIE CB BLIND ZONE AREA IS TAKEN CARE

ADVANTAGES

WHEN THE FAULT IS TAKEN PLACE BETWEEN THE MAIN CB, TIE CB & LINE ISOLATOR, DURING SERVICE ONLY, DISTANCE SCHEME SHOULD TAKE CARE.

WHEN THE FAULT IS TAKEN PLACE BETWEEN THE MAIN CB, TIE CB & LINE ISOLATOR DURING SERVICE ONLY, TEED PROTECTION IN ADDITION TO DISTANCE SCHEME SHOULD TAKE CARE.

400KV C.T. INFORMATION


PRIMARY CONNECTIONS : P1 P2 CURRENT RATING : 2000 AMPS

P1 P1 P2

P2

CORES CORE-1 CORE-2

CLASS

PURPOSE BUSBAR PROTECTION

SECONDARY CONNECTIONS CURRENT RATING : 1A 2000/ 1A 1000/ 1A 1S1 1S2 1S2 1S3 2S1 2S2 2S2 2S3 3S1 3S3 3S4 3S2 500/ 1A __

1S1 1S2 1S3

CORE-4 CORE-5

PS PS

MAIN-2 4S1 4S3 4S1 4S2 4S1 4S4 PROTECTION 4S4 4S2 4S4 4S3 MAIN-1 5S1 5S4 PROTECTION 5S1 5S3 5S4 5S2 5S1 5S2 5S4 5S3

EYE BOLT DESIGN

DEAD TANK DESIGN

2S1 2S23 2S

CORE-3 0.5 / 0.2

METERING

3S1 3S4

3S1 3S2 3S4 3S3

1 1S S1 1S 2 3

1 5S S2 5 S3 5 S4 5

4S1 4S2 4S3 4S4

HAIR PIN / U SHAPE DESIGN

PS

BUSBAR CHECKUP 2S1 2S3 PROTECTION

__
U

2S1 2S2 2S3

3 3

3 3

PS

1S1 1S3

5S1 5S2 5S3 5S4 4S1 4S2 4S3 4S4

U U
3S1 3S2 3S3 3S4

U
3S1 3S2 3S3 3S4

MAIN-1, MAIN-2 PROTECTION & METERING FOR LINE ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME

PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

NORMS OF PROTECTION FOLLOWED IN APTRANSCO


FOR TRANSMISIION LINES & DISTRIBUTION LINES ( FEEDER / LINE PROTECTION )

Sr.No
1. 2. 3. 4. 5. 6. 7.

VOLTAGE 11 KV LINES 33 KV LINES 66 KV LINES 132 KV LINES

MAIN- 1 PROTECTION
2 O/L + E/F ( 51 + 51N ) 3 O/L + E/F ( 51 + 51N ) SWITCHED DISTANCE SCHEME OR NUMERICAL DISTANCE SCHEME (21P+ 21N) NON SWITCHED DISTANCE SCHEME OR

MAIN-2 PROTECTION/ BACKUP PROTECTION

DIRECTIONAL O/L & E/F RELAYS WITH HIGH SET ( 67 + 67N ) SWITCHED DISTANCE SCHEME OR

220 KV LINES NUMERICAL DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21P+ 21N)
DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21) OR LINE 400 KV LINES NUMERICAL + in BUILT DEF RELAY(67N) DIFFERENTIAL SCHEME (87L) WITH 67N DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21) OR LINE 765 KV LINES NUMERICAL + in BUILT DEF RELAY(67N) DIFFERENTIAL SCHEME (87L) WITH 67N

IF MAIN-1 & MAIN-2 ARE NUMERICAL RELAYS, BOTH SHOULD BE SEPARATE MEASURING PRINCIPLES (CHARECTERESTICS), MODELS AND ALGORITHAMS (SHOULD NOT BE DUPLICATED) AND ALL FEATURES SHOULD BE AVAILABLE IN BOTH SCHEMES AND BOTH RELAYS SHOULD BE 100% REDENDENCY IN ALL ASPECTS ( COMPLEMENTARY TO EACH OTHER ) . DISSIMILAR CARRIER SCHEMES ARE TO BE SELECTED ( POTT & PUTT or BLOCK & UNBLOCK). OTHER WISE MAIN-2 MAY BE DIFFERENT MAKE OR PHASE COMPARISION PROTECTION/LINE DIFFERENTIAL PROTECTION WITH BACKUP DISTANCE PROTECTION IS TO BE ADOPTED. BOTH M1 & M2 SHOULD CONTAIN DIRECTIONAL EARTH FAULT PROTECTION (67N) WITH DIRECTIONAL COMPARISION PICKUP SCHEME AS INBUILT FUNCTION.
ZONE-1: 80% OF MAIN LINE ZONE-2: 100% OF MAIN LINE + 50% OF SHORTEST LINE AT OTHER END ZONE-3: 100% OF MAIN LINE + 100% OF SHORTEST LINE AT OTHER END ZONE-4: 100% OF MAIN LINE + (100% OF SHORTEST LINE + 20% OF LONGEST LINE) AT

OTHER END.

MAIN-1 PROTECTION FOR LINE (21L1)


P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

CT MB

(4CT METHOD)
IR5 / A511 IY5 / A531 IB5 / A551 VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171 1-CVT CORE 1 200VA CLASS: 3P

CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-5

3 3 3
5S4 5S4 5S2 5S2 5S2 5S2 5S4 5S4

CORE-5

5S4 5S2

IN5 / A571

CT MB

5S2 5S4

P2 P2 P2

MAIN-1 PROTECTION FOR LINE (21L1)


(4CT METHOD) (NEW DEVELOPMENT)
P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

CT MB IR5 / A511 IY5 / A531 IB5 / A551

CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-5

3 3 3
5S4 5S4 5S2 5S2 5S2 5S2 5S4 5S4

CORE-5

5S4 5S2

IN5 / A571

IA =250.10 A IB =250.10 A IC =250.10 A VAB =400.0 KV VBC =400.0 KV VCA =400.0 KV

VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171

1-CVT CORE 1 200VA CLASS: 3P

ESC

ENT

CT MB

ENABLED TRIP

TARGET RESET

IN5 / A571
5S2 5S4

INST TIME COMM SOTF ZONE1 ZONE2 ZONE3 ZONE4

PH-A PH-B PH-C GND 50 51 79 RESET 79 LOCKOUT

IB5 / A551 IY5 / A531 IR5 / A511

P2 P2 P2

SEL

SEL- 421
PROTECTION AUTOMATION CONTROL

MAIN-1 PROTECTION FOR LINE (21L1)


(5CT METHOD)
P2 P2 P2 1-LCT
CTR: 2000-1000-500/1A

CT MB IR5 / A511 IY5 / A531 IB5 / A551 VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171 1-CVT CORE 1 200VA CLASS: 3P

CLASS: PS

3 3 3
5S4 5S4 5S2 5S2

CORE-5

5S4 5S2

IN5 / A571

MAIN-2 PROTECTION FOR LINE (21L2)


(4CT METHOD)
P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

CT MB

50Z LBB/BFR

CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-4

3 3 3
4S4 4S4 4S2 4S2 4S2 4S2 4S4 4S4

CORE-4

IR4 / C411 IY4 / C431 IB4 / C451 IN4 / C471

21 L2

4S4 4S2

VR21 / E211 VY21 / E231 VB21 / E251 VN21 / E271 1-CVT CORE 2 200VA CLASS: 3P

CT MB

4S2 4S4

P2 P2 P2

50ZT LBB/BFR

MAIN-2 PROTECTION FOR LINE (21L2)


(4CT METHOD) ( NEW DEVELOPMENT)
P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

CT MB IR4 / C411 IY4 / C431 IB4 / C451 VR21 / E211 VY21 / E231 VB21 / E251 VN21 / E271

1-CVT CORE 2 200VA CLASS: 3P

CLASS: PS
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-4

3 3 3
4S4 4S4 4S2 4S2 4S2 4S2 4S4 4S4

CORE-4

4S4 4S2

IN4 / C471

CT MB

IN4 / C471
4S2 4S4

IB4 / C451 IY4 / C431 IR4 / C411

P2 P2 P2

MULTI FUNCTION NUMERICAL RELAY FOR MULTI BREAKER, MULTI CT & CVT/PT APPLICATION
(NEW APPLICATION) (ONE & HALF BREAKER SYSTEM or RING BUS SYSTEM)

1-52 CB

2-52 CB

3-52 CB

59

50 BF-1 50 BF-2 25-2


1-52,2-52: MAIN & TIE CIRCUIT BREAKER 21P: PHASE DISTANCE PROTECTION 21N: GROUND DISTANCE PROTECTION 27: UNDER VOLTAGE RELAY 67: DIRECTIONAL RELAY 50: INST OVER CURRENT RELAY 51: TIME OVER CURRENT RELAY 59: OVER VOLTAGE RELAY 64: EARTH FAULT RELAY 50BF-1: LBB/BFR OF MAIN CB 50BF-2: LBB/BFR OF TIE CB 79-1,2: AUTO RECLOSURE RELAY OF MAIN & TIE CB 25-1,2: CHECK SYNCHRONISAM RELAY FOR MAIN & TIE CB

79-1 79-2 25-1

21P 50P 51P 67P 27 21N 50N 51N 67N

3 LINE CVT
LINE

BUS-1 PT

BUS-2 PT

MAIN-2 PROTECTION FOR LINE (21L2)


(5CT METHOD)
P2 P2 P2 1-LCT
CTR: 2000-1000-500/1A

CT MB IR4 / C411 IY4 / C431 IB4 / C451 VR21 / E211 VY21 / E231 VB21 / E251 VN21 / E271 1-CVT CORE 2 200VA CLASS: 3P

CLASS: PS

3 3 3
4S4 4S4 4S2 4S2

CORE-4

4S4 4S2

IN4 / C471

MULTI FUNCTION PANEL METERING & ENERGY METER


(4CT METHOD)
P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

CT MB IR3 / D311 IY3 / D331 IB3 / D351

CLASS: 0.5
3 CT METHOD : 1-CT & 2-CT 4 CT METHOD : 1-CT & 2-BCT 6 CT METHOD : 1-ACT & 2-BCT

2-BCT
CTR: 2000-1000-500/1A

CLASS: 0.5

3 3 3

CORE-3

3 3 3
3S4 3S4 3S2 3S2 3S2 3S2 3S4 3S4

CORE-3

3S4 3S2

IN3 / D371

CT MB

VR31 / E311 VY31 / E331 VB31 / E351 VN31 / E371 1-CVT CORE 3 100VA

3S2 3S4

P2 P2 P2

CLASS: 0.5/0.2

MULTI FUNCTION PANEL METERING & ENERGY METER


(5CT METHOD)
P2 P2 P2 1-LCT
CTR: 2000-1000-500/1A

CT MB IR3 / D311 IY3 / D331 IB3 / D351

CLASS: 0.5/0.2 IN3 / D371

3 3 3
3S4 3S4 3S2 3S2

CORE-3

3S4 3S2

VR31 / E311 VY31 / E331 VB31 / E351 VN31 / E371 1-CVT CORE 3 100VA CLASS: 0.5/0.2

LBB & BUSBAR PROTECTION SCHEMES ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

BASICS OF LBB/BFR PROTECTION


LOCAL BREAKER BACKUP PROTECTION
A PROTECTION WHICH IS DESIGNED TO CLEAR A SYSTEM FAULTY BY INITIATING TRIPPING OTHER CIRCUIT BREAKER(S) IN THE CASE OF FAILURE TO TRIP OF THE APPROPRIATE CIRCUIT BREAKER. IN MODERN NETWORKS THE CRITICAL FAULT CLEARING TIME MAY BE LESS THAN 200ms. HENCE, IF THE FAULT IS NOT CLEARED DUE TO FAILURE OF THE PRIMARY PROTECTIVE RELAYS OR THEIR ASSOCIATED CIRCUIT BREAKER, A FAST ACTING BACKUP PROTECTIVE RELAY MUST CLEAR THE FAULT. THERE ARE TWO BASIC FORMS. REMOTE BACK-UP. LOCAL BACK-UP.

REMOTE BACK-UP
PROVIDES BACK-UP PROTECTION FOR THE BOTH THE RELAYS (MAIN-1 & MAIN-2) AND BREAKERS AT REMOTE SUBSTATION.

LOCAL BACK-UP
LOCAL BACK-UP PROTECTION CAN BE DEVIDED INTO TWO CATAGORIES. RELAY BACK-UP BREAKER BACK-UP

RELAY BACK-UP
z

DUPLICATE PRIMARY PROTECTION. i.e ONE IS NON SWITCHED DISTANCE PROTECTION AND ANOTHER IS SWITCHED DISTANCE SCHEME OR OTHER WISE BOTH SCHEMES CHARECTERSTICS ARE DIFFERENT (QUADRALATERAL, MHO CIRCULAR, TAMOTO & OPTICAL ) OR DIFFERENT MANUFACTURERS(ABB, ALSTOM, SIEMENS, EASUN REYROLL, SEL, GE, NXT PHASE OR BASLER) OR DIFFERENT METHODS (i.e ELECTROMECHANICAL, STATIC, NUMERICAL{MICROPROCESSOR &DSP}). IF MAIN-1 & MAIN-2 ARE NUMERICAL RELAYS BOTH SHOULD BE SEPARATE CHARECTERESTICS AND SEPARATE MODELS AND ALL FEATURES SHOULD BE AVAILABLE IN BOTH SCHEMES AND BOTH RELAYS SHOULD BE 100% REDENDENCY IN ALL ASPECTS. TO INCREASE THE SECURITY, THE CIRCUIT BREAKER HAS TWO TRIP COILS, ONE IS CONNECTED TO MAIN-1 PROTECTION AND ANOTHER IS CONNECTED TO MAIN-2 PROTECTION. BECAUSE OF THE HIGH COST OF HIGH VOLTAGE CIRCUIT BREAKERS, IT IS NOT FEASIBLE TO DUPLICATE THEM. IN CASE OF A BREAKER FAILURE THE OTHER CIRCUIT BREAKERS CONNECTED TO THE SAME BUS AS THE FAULTED BREAKER MUST THERE FORE BE TRIPPED.

BREAKER BACK-UP

LBB/BFR FLOW CHART


MAIN PROTECTION OPERATED YES TRIP MAIN BREAKER FAULT CLEARED YES RESET BREAKER FAILURE SCHEME

RETRIP

NO

YES

INITIATE BFR

WAIT FOR FAULT CLEARENCE

AND

TRIP BACK-UP/ Adjacent BREAKERS

The Breaker Failure Protection (LBB/BFR) can operate single-stage/two-stage. When used as single-stage protection, the Bus trip command is given to the adjacent Circuit Breakers if the protected feeder Breaker fails. When used as two-stage protection, the first stage can be used to repeat the trip command to the relevant feeder Breaker, normally on a different trip coil, if the initial trip command from the feeder protection is not successful. The second stage will result in a Bus trip to the adjacent Breakers, if the command of the first stage is not successful.

LBB/BFR TIME CO-ORDINATION CHART


FAULT OCCURS

NORMAL CLEARING TIME

NORMAL CLEARING
PROTECTIVE RELAY FOR EX: DISTANCE RELAY BREAKER INTURUPTING TIME RESETTING TIME OF THE CURRENT MEASURING UNITS

MARGIN

~30ms

~60ms

<12ms
TRIPPING RELAY TIME BACK-UP BREAKER INTERUPTING TIME MARGIN

SET TIME OF THE TIME MEASURING UNIT

INOPERATIVE BREAKER

BREAKER FAILURE RELAY START TOTAL CLEARING TIME OF THE BREAKER FAILURE RELAY MAXIMUM FAULT CLEARING TIME BEFORE SYSTEM INSTABILITY

LBB/BFR LOGIC
CURRENT INPUTS PHASE L1 PHASE L2/E PHASE L3

A/D CONVERTER PHASE CURRENT SET POINT

~
|||

I > ISET I > ISET


EARTH CURRENT SET POINT

& &

LED (PHASE START) ALARM RELAY (PHASE START)

>1
ALARM RELAY (EARTH START) LED (EARTH START)

OUT PUT OF DISTANCE RELAY OR SHORT CIRCUIT CURRENT RELAY BINARY INPUT CIRCUIT BREAKER FAILURE INITIATE

TIMING/OUTPUT STAGE

TIME STAGE T1

TRIP T1 RELAY

&
0
TIME STAGE T2 SWITCHED OFF TIME STAGE T2

LED

&
>1 O&

ALARM T1 RELAY TRIP T2 RELAY

LED LED
CB FAILURE INITIATE

LBB/BFR PROTECTION
LINE1 BUS-1 1-52CB 2-52CB 3-52CB AT/F-1 BUS-2

LBB/BFR IS LOCAL BREAKER BACKUP PROTECTION/ BREAKER FAILURE RELAY. 1No RELAY IS PROVIDED FOR EACH BREAKER. THIS IS CURRENT OPERATED RELAY. THIS RELAY IS ENERGISED WHEN MASTER TRIP RELAY(86-A OR/AND 86-B) OPERATES OR SINGLE PHASE TRIP RELAYS OPERATES AND GIVEN SIGNAL TO BREAKER FOR TRIP. IN THIS RELAY TIME DELAY IS PROVIDED. THIS RELAY OPERATES WHEN THE BREAKER IS UNDER TROUBLE/ FAILS TO OPERATE. AFTER ENERGISED THE RELAY AND TIME DELAY COMPLETES, EVEN CURRENT IS THERE THIS THINKS BREAKER FAIL TO OPERATE AND GIVEN SIGNAL AS PER SCHEME DESCRIBED NEXT PRESENTATION. NEW CONCEPT: Normally the CT connections for LBB/BFR relay is in series with Main-2 Protection. In case of Numerical Distributed LBB/BFR and Centralized Bus-Bar System, the CT connections for Bus-Bar are terminated at LBB/BFR and Centralized Bus-Bar is interconnected by Fiber-Optic cable.

50Z

50ZT

50Z

1-52 CB LBB/BFR OPERATION


ABB REL521 MAIN-1 86-A 86-A 2-52CB TC-2 TC-1 86-B

ABB REL316 MAIN-2

DIRECT TRIP 1&2 VIA CARRIER TO OTHER END BUSBAR-1 PROTECTION OPTD AND BUSBAR-1 ISOLATED

50Z

86-B

TO 86-B TRIP RELAY OF TIE CB(2-52CB)

1-52CB TC-1 BUS-1 TC-2

3-52CB BUS-2

Breaker Failure Relay of the Main Circuit Breaker Trips the Connected Bus, Tie Circuit Breaker, and Remote End Circuit Breaker

2-52 CB LBB/BFR OPERATION


ABB REL521 MAIN-1 ABB RET521 MAIN-1 86-A

ABB REL316 MAIN-2


50ZT
DIRECT TRIP 1&2 VIA CARRIER TO OTHER END TO 86-B TRIP RELAY OF LINE CB(1-52CB)

ABB RET316 MAIN-2


INTER TRIP TO LVCB & TBCCB

86-B

TO 86-B TRIP RELAY OF AT/F(ICT) CB (3-52CB)

1-52CB TC-1 BUS-1

2-52CB TC-2

3-52CB BUS-2

Breaker Failure Relay of the Tie Circuit Breaker Trips the Both Main Circuit Breakers and Remote End Circuit Breakers ( In case of Transformer LV Circuit Breaker)

3-52 CB LBB/BFR OPERATION


ABB RET521 MAIN-1 86-A 86-A 86-B
50Z
INTER TRIP TO LV CB & TBC CB BUSBAR-2 PROTECTION OPTD AND BUSBAR-2 ISOLATED

ABB RET316 MAIN-2

1-52CB TC-1 BUS-1

2-52CB TC-2 TC-2

86-B

TO 86-B TRIP RELAY OF TIE CB(2-52CB)

3-52CB TC-1 BUS-2

Breaker Failure Relay of the Main Circuit Breaker Trips the Connected Bus, Tie Circuit Breaker, and Remote End Circuit Breaker ( In case of Transformer LV Circuit Breaker)

BASICS OF BUSBAR PROTECTION


NEED FOR BUSBAR PROTECTION
IN ITS ABSENCE FAULT CLEARING TAKES PLACE IN ZONE-2 OF DISTANCE RELAY BY REMOTE END TRIPPING. THIS MEANS SLOW AND UNSELECTIVE TRIPPING AND WIDE SPREAD BLACKOUT.

EFFECT OF DELAYED CLEARENCE


GREATER DAMAGE AT FAULT POINT.
INDIRECT SHOCK TO CONNECTED EQUIPMENT LIKE SHAFTS OF GENERATOR AND WINDINGS OF TRANSFORMER.

BASIC THEORY
KIRCHOFFs CURRENT LAW STATES THAT THE SUM OF THE CURRENTS ENTERING A
GIVEN NODE MUST BE EQUAL TO THE CURRENTS LEAVING AT THAT NODE.

BUS BAR PROTECTION SYSTEMS


1. 2. 3. 4. HIGH IMPEDENCE DIFFERENTIAL PROTECTION MODERATE-IMPEDENCE DIFFERENTIAL PROTECTION LOW-IMPEDENCE DIFFERENTIAL PROTECTION NUMERICAL BUS DIFFERENTIAL PROTECTION

HIGH IMPEDENCE DIFFERENCIAL PROTECTION


THE HIGH IMPEDENCE PROTECTION SCHEME, ON THE OTHER HAND, IS A GOOD SOLUTION FOR SINGLE BUSBAR ARRANGEMENTS , ONE & HALF BREAKER SYSTEMS OR RING BUSBARS, PROVIDING THAT APPROPRIATE DEDICATED CT CORES ARE AVAILABLE FOR THIS USE ALONE. IT IS SENSTIVE, STABLE & FAST PROTECTION. HOWEVER, SPECIAL CT REQUIREMENTS, ADDITIONAL HIGH VOLTAGE DEVICE PROTECTION, DEMANDING MAINTANENCE etc PUT RESTRICTIONS IN ITS APPLICATIONS. A MEASURING CIRCUIT COMPRISES A HIGH-IMPEDENCE STABILIZING RESISTOR CONNECTED ACROSS THE CIRCULATING CURRENT ARRANGEMENT OF ALL THE CTs IN PARALLEL. THE VALUE OF THE STABILIZING RESISTOR IS CHOOSEN SUCH THAT THE VOLTAGE DROP ACROSS THE RELAY CIRCUIT IS INSUFFICIENT TO OPERATE THE FAULTS OUTSIDE THE PROTECTED ZONE.

LIMITATIONS OF CONVENTIONAL HIGH IMPEDENCE DIFFERENTIAL RELAY


PUTS STRINGENT REQUIREMENTS ON CTs. Class X for all CT Cores. NEED FOR DEDICATED CT CORES. Separate CT Cores for BUSBAR and CHECK ZONE Protection. IDENTICAL CT RATIO, MAGNETISING IMPEDENCE. AUX CTs RATIO CORRECTIONS UNACCEPTABLE. IN ABILITY TO COPE WITH INCREASING FAULT CURRENT. SLOW RESPONSE. Advantage of Numerical Protection Technology (e.g. Fault recording, Communication etc) not available. BASIC OPERATING TIME EXCLUDING RELAY TIME IS 15 20ms. THIS RELAY REQUIRES CHECK ZONE FEATURE. THE TRIP COMMAND IS ONLY GIVEN WHEN BOTH A DISCRIMINATING & CHECK ZONE SYSTEM OPERATES.

MEDIUM IMPEDENCE DIFFERENTIAL PROTECTION


MANY OF THE LIMITATIONS OF HIGH IMPEDENCE PROTECTION CAN BE OVERCOME USING MODERATE MEDIUM IMPEDENCE PROTECTION (OR STABILIZED HIGH-IMP SCHEME), WHICH IS A COMBINATION OF THE NORMAL HIGH-IMP AND STABILIZED DIFFERENTIAL SCHEMES.

LOW IMPEDENCE DIFFERENTIAL PROTECTION


LOW IMPEDENCE PROTECTION(PERCENTAGE BIASED BUS DIFFERENTIAL RELAY) IS MOST SUITABLE PROTECTION SCHEME FOR DOUBLE AND MULTIPLE BUSBAR SYSTEMS (WITH OR WITHOUT TRANSFER BUS) WITH FEEDERS BEING SWITCHED BETWEEN SECTIONS OF BUSBAR, WHICH OPERATES WITH FULL SELECTIVITY FOR ALL POSSIBLE BUSBAR CONFIGUARATIONS.

ADVANTAGES
FREE OF ANY NEED FOR MATCHED CT CHARACTERESTICS OR RATIOs, LOW LEAKAGE REACTANCE OR RESISTANCE. OTHER PROTECTIVE RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT. STABLE FOR INFINITE FAULT LEVELS. INSENSITIVE TO CT SATURATION. DETECTS FAULTS WITHIN 1 2ms & INITIATES TRIPPING WITHIN 5 7ms.

BASICS OF BUS BAR PROTECTION


BASIC THEORY
KIRCHOFFs CURENT LAW STATES THAT THE SUM OF THE CURRENTS ENTERING A GIVEN NODE MUST BE EQUAL TO THE CURRENTS LEAVING THAT NODE

EXTERNAL FAULT
I1 I2 I3 I4 I5 I6 I5 I3 I1

INTERNAL FAULT
IF

I2

I4

I6

IF

IF= I6= I1+I2+I3+I4+I5

IF= I1+I2+I3+I4+I5+I6

HIGH IMPEDENCE BUSBAR PROTECTION


87BBC
96 BBC : BUSBAR CHECK TRIPPING RELAY

87BBM

U U

U U

U U U U U U U U

U U U U U U U U U U U U
52 CIRCUIT BREAKER TRIP COIL

- VE
A varistor is normally applied across the relay input terminals to limit the voltage to a value safely below the insulation voltage of the secondary circuits

96 BBM : BUSBAR MAIN TRIPPING RELAY

+ VE

U U

U U

U U
Is

U U

U U

OPERATING COIL

OVER CURRENT COIL

52 CIRCUIT BREAKER TRIP COIL

LOW IMPEDENCE BUSBAR PROTECTION

96 BUS BAR TRIPPING RELAY

OVER CURRENT STARTER RELAYS

U U
RESTRAINT COIL

Id

+VE

-VE

DIFFERENCE BETWEEN BUSBAR SCHEMES


DETAILS
PRINCIPLE CTs BURDEN CT SATURATION UTILISATION OPERATING TIME STABILITY PERFORMANCE ADDITIONAL PROTECTION

HIGH IMPEDENCE BUSBAR PROTECTION


THE CURRENTS ENTERING AND LEAVING THE BUSBAR ARE COMPARED CONTINUOSLY. IT INVOLVES CHOOSING OF IMPEDENCE HIGH ENOUGH STABLISE THE RELAY FOR HEAVY EXTERNAL FAULTS. THIS IS CIRCULATING CURRENT PRINCIPLE.

PERCENTAGE BIASED LOW IMPEDENCE BUS BAR PROTECTION


IT HAS DIFFERENTIAL AND BIAS SETTING. THE RESULTANT BIAS IS PROPOTIONAL TO ARITHMATIC SUM OF ALL CURRENTS, WHEREAS THE OPERATING CURRENT IS VECTOR SUM OF ALL CIRCUIT CURRENTS.

IT REQUIRES ALL IDENTICAL CT RATIOs & TURNS RATIO. LOW IT CAN WORK WITH CTs OF UNEQUAL RATIOS ALSO. FREE OF RESISTANCE OF SECONDARY WINDING. Class X for all CT Cores. ANY NEED OF MATCHED CT CHARACTERESTIC OR RATIOs LOW MINIMUM KNEE POINT VOLTAGE OF 300-500V. LEAKAGE REACTANCE OR RESISTANCE. OTHER PROTECTIVE LOW MAGNETISING CURRENT(FEW MILLIAMPS). RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT. IMPOSES COMPARATIVELY HIGH BURDEN ON CTs. AUXILIARY CTs IMPOSES LESS BURDEN ON CTs. AUXILIARY CTs HAVE NO REDUCE THE PERFORMANCE OF THE SCHEME EFFECT ON PERFORMANCE OF SCHEME. OPERATION OF SCHEME EVEN WHEN CTs GET SATURATED DURING OPERATION OF SCHEME EVEN WHEN CTs GET SATURATED INTERNAL FAULTS. DURING INTERNAL FAULTS. INSENSITIVE TO CT SATURATION. IT IS GOOD SOLUTION FOR SINGLE BUSBAR ARRANGEMENTS, ONE & MOST SUITABLE FOR DOUBLE AND MULTIPLE BUSBAR SYSTEMS HALF BREAKER SYSTEMS OR RING BUSBAR SYSTEMS. ( WITH OR WITHOUT TRANSFER BUS). BASIC OPERATING TIME EXCLUDING RELAY TIME IS 15 20 mS. INABILITY TO COPE WITH INCREASING FAULT CURRENT. DETECTS FAULTS WITH IN 1 2 mS AND INITIATES TRIPPING WITH IN 5-7 mS. STABLE FOR INFINITE FAULT LEVEL.

HIGHLY SENSITIVE FOR INTERNAL FAULTS AND COMPLETELY STABLE HIGHLY SENSITIVE FOR INTERNAL FAULTS AND COMPLETELY FOR EXTERNAL FAULTS. STABLE FOR EXTERNAL FAULTS. THIS RELAY REQUIRES CHECK ZONE FEATURE. THE TRIP COMMAND IS THIS RELAY HAS IN BUILT CHECK ZONE FEATURE (NO SEPARATE ONLY GIVEN WHEN BOTH A DISCRIMINATING & CHECK ZONE SYSTEM CHECKZONE FEATURE) i.e OVER CURRENT STARTING RELAY OPERATES. PROVIDED.

BUS BAR MAIN & CHECHUP PROTECTION


(ANY CT METHOD)
P2 P2 P2 1-CT
CTR: 2000-1000/1A

CT MB

CLASS: PS

3-CT
CTR: 2000-1000/1A

CLASS: PS

3 3 3

CORE-1

3 3 3
1S3 1S3 1S1 1S1 1S1 1S1 1S3 1S3

CORE-1

IN1 / B171
1S3 1S1

IB1 / B151 IY1 / B131 IR1 / B111

BUS BAR PROTECTION FOR BUS-1

CT MB IR1 / B111 IY1 / B131 IB1 / B151


1S1 1S3

IN1 / B171

P2 P2 P2

BUS BAR PROTECTION FOR BUS-2

DUPLICATE BUS BAR PROTECTION


(NEW DEVELOPMENT)
P2 P2 P2 1-CT
CTR: 2000-1000/1A

CT MB

LBB

CLASS: PS

MAINCB LBB IS PART OF BUSBAR PROTECTION

3-CT
CTR: 2000-1000/1A

CLASS: PS

3 3 3

CORE-1

3 3 3
1S3 1S3 1S1 1S1 1S1 1S1 1S3 1S3

CORE-1

IN1 / B171
1S3 1S1

IB1 / B151 IY1 / B131 IR1 / B111

BUS BAR PROTECTION FOR BUS-1

50Z

LBB
CT MB IR1 / B111 IY1 / B131 IB1 / B151
1S1 1S3

IN1 / B171

50Z
P2 P2 P2

BUS BAR PROTECTION FOR BUS-2

3-52 2-52 1-CT 3-CT

BUS-2

BUS-1

U U
1-52

U U

6-52 5-52 4-CT 6-CT

BUS BAR PROTECTION

87 BB2 U U U U
4-52 9-52 8-52 9-CT

87 BB1

U U

7-CT

U U

7-52

12-52

12-CT

U U

11-52

10-CT

U U

10-52

15-52

BUS BAR-2 PROTECTION


15-CT

BUS BAR-1 PROTECTION


13-52 14-52 13-CT

U U

U U

18-52

18-CT

U U

17-52

16-CT

U U

16-52

21-52

21-CT

U U

20-52

19-CT

U U

19-52

NUMERICAL BUSBAR SCHEME INCL LBB/BFR/CBF


(DECENTRALISED & CENTRALISED CONCEPTS)
DECENTRALISED CONCEPT FO MAIN CB LBB CENTRALISED CONCEPT

(REB 500) ABB

(REB 670) ABB

OR
(7 SS 52) SIEMENS
FO OR

OR
(487B) SEL

OR

TIE CB LBB

OR
(MICOM P740) AREVA

OR
(MICOM P746) AREVA

MAIN CB LBB FO

LBB TO BUSBAR DIGITAL COMMUNICATION

LBB INBUILT FEATURE

LBB INBUILT FEATURE

NUMERICAL BUSBAR SCHEME INCL LBB/BFR/CBF


(DECENTRALISED CONCEPT- DUPLICATE )
DECENTRALISED CONCEPT DECENTRALISED CONCEPT FO FO MAIN CB LBB MAIN CB LBB

(REB 500) ABB

(REB 500) ABB

OR
(7 SS 52) SIEMENS

FO

OR
(7 SS 52) SIEMENS

FO

TIE CB LBB

OR
(MICOM P740) AREVA

TIE CB LBB

OR
(MICOM P740) AREVA
MAIN CB LBB

MAIN CB LBB FO FO LBB TO BUSBAR DIGITAL COMMUNICATION LBB TO BUSBAR DIGITAL COMMUNICATION

NUMERICAL BUSBAR SCHEME INCL LBB/BFR/CBF


(CENTRALISED CONCEPT - DUPLICATE)
CENTRALISED CONCEPT CENTRALISED CONCEPT

(REB 670) ABB

(REB 670) ABB

OR

OR
(487B) SEL

(487B) SEL

OR OR
(MICOM P746) AREVA (MICOM P746) AREVA

LBB INBUILT FEATURE

LBB INBUILT FEATURE

BUSBAR-1 PROTECTION TRIPPING SCHEME


1-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

HIGH SPEED TRIP RELAY FOR 1-52 CB HIGH SPEED TRIP RELAY FOR 4-52 CB HIGH SPEED TRIP RELAY FOR 7-52 CB HIGH SPEED TRIP RELAY FOR 10-52 CB HIGH SPEED TRIP RELAY FOR 13-52 CB HIGH SPEED TRIP RELAY FOR 16-52 CB

1-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

4-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

4-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

7-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

7-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

10-52CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

10-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

13-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

13-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

16-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

16-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

+VE

BUSBAR PANEL

BUSBAR-2 PROTECTION TRIPPING SCHEME


3-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

HIGH SPEED TRIP RELAY FOR 3-52 CB HIGH SPEED TRIP RELAY FOR 6-52 CB HIGH SPEED TRIP RELAY FOR 9-52 CB HIGH SPEED TRIP RELAY FOR 12-52 CB HIGH SPEED TRIP RELAY FOR 15-52 CB HIGH SPEED TRIP RELAY FOR 18-52 CB

3-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

6-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

6-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

9-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

9-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

12-52CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

12-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

15-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

15-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

18-52 CB PANEL
TRIP FROM 50 LBB TO START 50 LBB

18-52 CB PANEL
TO CLOSE CKT INTERLOCK TO BLOCK A/R TO TRIP COIL-1 TO TRIP COIL-2 DIRECT TRIP SEND CH-1 DIRECT TRIP SEND CH-2 TO DISTURBENCE RECORDER

+VE

BUSBAR PANEL

DISTRIBUTED LBB & NUMERICAL CENTRALISED BUS BAR PROTECTION


(REB 500) ABB (7 SS 52) SIEMENS (MICOM P740) AREVA

OR
BUS-1

OR

10-52

11-52

BUS-2

OR

OR

12-52

15-52

3-52

6-52

9-52

14-52

2-52

5-52

8-52

13-52

4-52

1-52

7-52

LATEST DEVELOPMENT IN NUMERICAL CENTRALISED BUS BAR PROTECTION

ABB
BUSBAR PROTECTION CENTRAL UNIT BAY UNIT
ABB Network Partner AG REL531

SIEMENS

AREVA

ABB Network Partner AG

REC 316*4

LINE PROTECTION
21 L1
ABB Network Partner AG REL531

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

C E

C E

21 L2
ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

21 L1

21 L2

21 L1

21 L2

TRANSFORMER PROTECTION
87 T1 1. 2. 3.

C E

C E

87 T2

87 T1

87 T2

87 T1

87 T2

DESCRIPTION
4.

IN THIS NO SEPARATE CORE IS REQUIRED FOR EITHER BUSBAR PROTECTION OR LBB / BFR. CENTRALISED BUSBAR IS CONNECTED FROM BAY UNIT OR LBB OR BFR THROUGH FIBRE OPTIC. BAY UNIT / BFR / LBB IS CONNECTED FROM MAIN-1 & MAIN-2 OF LINE PROTECTION OR MAIN & BACKUP PROTECTION OF TRANSFORMER THROUGH FIBRE OPTIC FOR REDUNDANCY TO BAY UNIT. THE CURRENT DATA IS TRANSFERED TO BAY UNIT TO BUSBAR CENTRAL UNIT FROM LINE / TRANSFORMER PROTECTIONS FOR NUMIRICAL ALGORITHAM OF LBB & BUSBAR CENTRAL UNIT AND IT WILL OPERATE FOR INTERNAL FAULTS AND DOES NOT OPERATE FOR THROUGH / EXTERNAL FAULTS.

MISCELENEOUS RELAYS & PROTECTIONS ADOPTED FOR LINE IN ONE AND HALF CIRCUIT BREAKER SCHEME
(STUB, TEED AND AUTO RECLOSURE FUNCTIONS) PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

STUB-1/ STUB-2 PROTECTION


3 3
BUS-1 1-52CB

2-52CB

3-52CB

BUS-2

LINE-1

STUB-1&2 (BAY 1&2) 1-89L REL 521 REL 316

DISTANCE / ATF RELAYS CONVERTED TO STUB/BUS OVER LOAD RELAYS WHEN LINE ISOLATOR OPENS

STUB-3&2 (BAY 3&2) 3-89T RET 521 RET 316

AT/F-1

WHEN A LINE IS SUPPLIED VIA TWO CIRCUIT BREAKERS IN A ONE & HALF CIRCUIT BREAKER ARRANGEMENT, THE LINE PROTECTION INCLUDES THE AREA BETWEEN THE TWO CTs. HOWEVER, WHEN THE LINE ISOLATOR IS OPEN THE LINE CVTs FOR THE DISTANCE PROTECTION ARE CONNECTED TO THE LINE AND CANNOT PROVIDE THE CORRECT VOLTAGE FOR THE STUB END.(i.e THE AREA BETWEEN THE LINE ISOLATOR AND CTs) (STUB = DEAD END) TO PROVIDE PROTECTION FOR A FAULT IN THIS AREA, REL 521/ REL 316 IS PROVIDED WITH A STUB PROTECTION WHICH GIVES AN BUS OVER CURRENT TRIP IF THE LINE ISOLATOR IS OPEN AND THE CURRENT EXCEEDS THE SET VALUE IN ANY PHASE.

STUB-1 (BAY 1&2 OR BAY 3&2)


OPERATES

IT OPERATES THE 3-PH TRIP GR-A MAIN CB (1-52CB OR 3-52CB) AND 3-PH TRIP GR-A TIE CB (2-52CB) IT OPERATES THE 3-PH TRIP GR-B MAIN CB (1-52CB OR 3-52CB) AND 3-PH TRIP GR-B TIE CB (2-52CB)

STUB-2 (BAY 1&2 OR BAY 3&2)


OPERATES

TEED-1/ TEED-2 PROTECTION


3 3 3
BUS-1 1-52CB TEED-1&2 (BAY 1&2) 2-52CB 3-52CB TEED-1&2 (BAY 2&3) BUS-2

LINE-1 AT/F-1 TEED PROTECTION IS BASED ON KIRCHOFFS CURRENT LAW. THREE SETS OF CTS ARE CONNECTED IN STAR FASHION. SOME OF THE CURRENTS MUST BE ZERO. IF ANY UNBALANCE CURRENTS ARE NOTICED THEN IMMEDIATELY TEED PROTECTION OPERATES. IF TEED PROTECTION BAY 1&2 OPERATED THEN IT TRIPS 1-52CB & 2-52CB. SIMILARLY IF TEED PROTECTION BAY 2&3 OPERATED THEN IT TRIPS 2-52CB & 3-52CB.
SUMMATION OF INDIVIDUAL PHASES OF T-SHAPED 3 CTs BEFORE REACHING TO RELAY. THIS IS CIRCULATING CURRENT PRINCIPLE. THE CURRENT FLOWING THROUGH IS ZERO DURING BALANCED CONDITION. HIGH IMPENDENCE THREE PHASE DIFFERENTIAL RELAY IS USED AS TEED-1 PROTECTION. T- SHAPED 3 CTs ARE CONNECTED TO RELAY. THE RELAY HAVING OPERATING COIL & RESTAIRING COIL. BASED ON THE DIFFERENTIAL CURRENT FLOWING THROUGH THE OPERATING COIL THE RELAY OPERATES. LOW IMPEDENCE PERCENTAGE BIASED THREE TERMINAL THREE PHASE DIFFERENTIAL RELAY IS USED AS TEED-2 PROTECTION.

TEED-1 PROTECTION

TEED-2 PROTECTION

TEED-1 PROTECTION
P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

{BAY1&2}(5CT METHOD) IR5 IY5 IB5

CLASS: PS P1 P1 P1 P2 P2 P2 2-CT
CTR: 2000-1000-500/1A

CLASS: PS

1-LCT
CTR: 2000-1000/1A

CLASS: PS

3 3 3

CORE-1

3 3 3

CORE-5

3 3 3
5S4 5S4 5S2 5S2 5S4 5S4 5S2 5S2 1S3 1S3 1S2 1S2

CORE-5

5S4 5S2

87 TEED-1

IN5

IR5 IY5 IB5 IN5

5S4 5S2

P1 P1 P1 P2 P2 P2

IT WORKS ON CIRCULATING CURRENT PRINCIPLE AND IT IS HIGH IMPEDENCE DIFFERENTIAL RELAY. TEED-1 PROTECTION FOR BAY 2&3 IS ALSO SAME AS ABOVE AND THE FOLLOWING CTs & CORES ARE USED 3-CT(CORE-5), 2-CT(CORE-1) & 3-TCT(CORE-1) ARE STARRED AND CONNECTED TO TEED-1 PROTECTION

IN1
1S3 1S2

IB1 IY1 IR1


P1 P1 P1

TEED-2 PROTECTION
{BAY1&2}(5CT METHOD) RAICA LBB/BFR
P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

CT MB

CT MB

CLASS: PS

1-LCT
CTR: 2000-1000/1A

CLASS: PS

3 3 3

CORE-2

3 3 3
4S4 4S4 4S2 4S2 2S3 2S3 2S2 2S2

CORE-4

4S4 4S2

RAICA LBB/BFR

87 TEED-2

P2 P2 P2

4S4 4S2

3 3 3
4S2 4S2

4S4

4S4

2-CT CORE-4
CTR: 2000-1000-500/1A

P2 P2 P2 CT MB

CLASS: PS

2S3 2S2

TEED-2 PROTECTION FOR BAY 2&3 IS ALSO SAME AS ABOVE AND THE FOLLOWING CTs & CORES ARE USED. 3-CT(CORE-4), 2-CT(CORE-2) & 3-TCT (CORE-2) ARE CONNECTED TO TEED-2 PROTECTION. IT WORKS ON KIRCHOFFS CURRENT PRINCIPLE & IT IS PERCENTAGE BIASED LOW IMPEDENCE DIFFERENTIAL RELAY

TEED / STUB PROTECTION TRIP SCHEME


ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 C E

86-A MTR/ HSTR

STUB OR TEED-1

86-A MTR/ HSTR

STUB OR TEED-1

86-A MTR/ HSTR

TRIP COIL-1 1-52CB TRIP COIL-2 BUS-1 86-B ABB REL521 MTR/ MAIN-1 HSTR

(BAY 1&2) (BAY 1&2)

TRIP COIL-1 2-52CB TRIP COIL-2

(BAY 2&3) (BAY 2&3)

TRIP COIL-1 3-52CB TRIP COIL-2 BUS-2 86-B MTR/ HSTR

TEED-2 OR STUB

86-B MTR/ HSTR

TEED-2 OR STUB

86-A : GROUP-A MASTER TRIP RELAY / HIGH SPEED TRIP RELAY 86-B : GROUP-B MASTER TRIP RELAY / HIGH SPEED TRIP RELAY LINE/TRANSFORMER ISOLATOR OPENS THIS INTERLOCK WILL INITIATE 21 L1 / 87 T1 & 21 L2 / 87 T2 CONVERTED STUB-1 & 2 PROTECTION

AUTO RECLOSURE BASICS


FAULTS ARE THREE TYPES 1. TRANSIENT FAULT: These are cleared by the immediate tripping of Circuit Breakers and do not reoccur when the line is re-energized. 2. SEMI-PERMANENT FAULTS: These require a time interval to disappear before a line is charged again. 3. PERMANENT FAULTS: These are to be located and repaired before the line is re-energized. About 80-90% of the faults occurring are transient in nature. Hence the Automatic Reclosure of breaker (after tripping on Fault) will result in the line being successfully re-energized. ADVANTAGES: A. Decreasing outage time. B. Improving Reliability. C. Improving system stability. D. Reduce fault damage and Maintenance Time. DEAD TIME: The time between the Auto-reclosing Scheme being energized and the operation of the contacts which energize the Circuit Breaker closing circuit. RECLAIM TIME: The Time Following a successful closing operation measured from the instant the Auto-Reclosing relay closing contacts make which must elapse before the Auto-Reclosing relay initiates another reclosing attempt. In other words, it may be said to be the time between 1st and 2nd Auto-Reclosure.

TYPES OF AUTO-RECLOSING SCHEMES: 1. BASED ON PHASE A. THREE PHASE AUTO-RECLOSING: This type of Auto-Reclosing causes an immediate drift part of the two systems and hence no interchange of synchronizing power can take place during the dead time. B. SINGLE PHASE AUTO-RECLOSING: In this, only the faulty phase(only SLG Faults) is reclosed without causing interruption in interchange synchronizing power between two systems through other two healthy phases. 2. BASED ON ATTEMPTS OF RECLOSURE A. SINGLE SHOT AUTO-RECLOSING: In this scheme, Breaker is reclosed only once on a given fault before lockout of Circuit Breaker Occurs. High-Speed Auto-Reclosing for EHT System is invariably Single Shot. B. MULTI-SHOT AUTO-RECLOSING: In this scheme, more than one reclosing attempts made for a given fault before lockout of Circuit Breaker occurs. B.I. DISADVANTAGES: Repeated closure attempts has with high fault level would seriously affect the Circuit Breaker, Equipment and System Stability. B.ii. CIRCUIT BREAKER LIMITATIONS: Ability of Circuit Breaker to Perform several Trip Close operations in quick succession. B. iii. SYSTEM CONDITIONS: In the percentage of the semi-Permanent faults (which could be burnt out) is moderate, For example on the lines through the forest, multi shot Auto-Reclosing is followed. 3. DEPENDING ON SPEED: A. HIGH-SPEED AUTO-RECLOSING: This aids in fast restoration of supply but should be done by taking into account the following factors. I. System disturbance time can be tolerated without loss of system stability. ii. Characteristics of Protection Schemes and Circuit Breaker. B. LOW SPEED OR DELAYED AUTO RECLOSING: This is suitable for highly interconnected systems where the loss of a single line is unlikely to cause two sections of the system to drift apart and loose synchronism.

METHOD OF ADOPTION IN ONE AND HALF BREAKER SYSTEM: The Auto-Reclosure Functions used for the Bus Breakers 1-52CB & 3-52CB are set as Masters and one for the Center Breaker 2-52CB(TIE) as Follower. Co-ordination is required between the Auto-Reclosure Functions. A Synchrocheck function is also loaded in each Relay to permit 3 pole Auto-Reclosing. Each Line Protection relays starts both MAIN & TIE Circuit Breakers to trip for the Concerned line. After a Successful reclosure of the Main Breaker, The Tie Breaker will be reclosed after a supplementary time delay. Should the Main CB AutoReclosure relay not be successful in its reclosing attempts, the Tie CB AutoReclosure is blocked. If the Main CB is Open or its Auto-Reclosure Relay is not ready or Out of service, The TIE CB Auto-Reclosure will reclose The TIE Breaker after its own dead time without any supplementary time delay. CHOICES OF EHV SYSTEM: 1. CHOICE OF DEAD TIME: A. Lower limit is decided by deionising of Circuit Breaker. B. Upper Limit is decided by Transient Stability and Synchronism. C. Longer Transmission Lines Require Longer dead Time. D. The dead time for High Speed Auto-Reclosing scheme with EHV System is 0.3 to 1.2 sec. 2. CHOICE OF RECLAIM TIME: This should not be set to such a low value that the operating cycle of Breaker is exceeded when two faults incident occurs close together. The reclaim time will be in the range of 10 to 30 sec., depending the breaker opening and closing mechanisms. 3. CHOICE OF ZONE: This should normally kept in Zone-1. It is a Zone-1 fault and SLG fault only autoreclosure is comes in to picture. In other zones the auto reclosure is blocked.

AUTO-RECLOSURE FOR ONE & HALF BREAKER SCHEME


TRIP COMMANDS AUTO RECLOSURE COMMANDS

79 (A/R)+ 25(SYNC) RAAAM RASC

79 (A/R)+ 25(SYNC) RAAAM RASC

79 (A/R)+ 25(SYNC) RAAAM RASC

1-52CB

2-52CB

3-52CB

ABB Network Partner AG ABB Network Partner AG REL531

REL531

ABB Network Partner AG

REC 316*4

ABB Network Partner AG

REC 316*4

LINE-1
C E

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

LINE-2
C E C E C E

21 MAIN-1 REL 521

21 MAIN-2 REL 316

21 MAIN-1 REL 521

21 MAIN-2 REL 316

AUTO RECLOSING TIMING CHART


INSTANT OF FAULT
OPERATES RESETS PROTECTION

TRANSIENT FAULT

OPERATING TIME

TRIP COIL CONTACTS ARC CONTACTS ENERGISED SEPARATE EXTINGUISHED FULLY OPEN

CLOSING COIL CONTACTS CONTACTS MAKE FULLY CLOSED ENERGISED

CIRCUIT BREAKER
OPENING TIME ARCING TIME RESETS CLOSING TIME DEAD TIME OPERATES RESETS

OPERATING TIME OPERATES

PROTECTION

PERMANENT FAULT

OPERATING TIME

RECLOSE ON TO FAULT

TRIP COIL CONTACTS ARC CONTACTS ENERGISED SEPARATE EXTINGUISHED FULLY OPEN

CLOSING COIL CONTACTS CONTACTS ENERGISED MAKE FULLY CLOSED

ARC CONTACTS CONTACTS SEPARATE EXTINGUISHED FULLY OPEN

CIRCUIT BREAKER

OPENING TIME

ARCING TIME SYSTEM DISTURBANCE TIME

CLOSING TIME DEAD TIME

OPERATING TIME RECLOSE INITIATED BY PROTECTION

TRIP COIL ENERGISED

AUTO RECLOSE RELAY


DEAD TIME CLOSING PULSE TIME RECLAIM TIME

RELAY READY TO RESPOND TO FURTHER FAULT INCIDENTS (AFTER SUCEESFUL RECLOSRE)

TIME

CARRIER INTERTRIPPING SCHEMES ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

TYPES OF CARRIER TRIPPING SCHEMES


PERMISSIVE TRIPPING
Permissive trip commands are always monitored by a protection relay. The circuit breaker is tripped when receipt of the command coincides with operation of the protection relay at the receiving end responding to a system fault. The receipt of an incorrect signal must coincide with operation of the receiving end protection for a trip operation to take place. Normally, the risk of a spurious trip is lesser. The intention of these schemes is to speed up tripping for faults occurring within the protected zone.

BLOCKING SCHEME
Blocking commands are initiated by a protection element that detects faults external to the protected zone. Detection of an external fault at the local end of a protected circuit results in a blocking signal being transmitted to the remote end. At the remote end, receipt of the blocking signal prevents the remote end protection operating if it had detected the external fault. Loss of the communications channel is less serious for this scheme than in others as loss of the channel does not result in a failure to trip when required. However, the risk of a spurious trip is higher.

TYPES OF CARRIER TRIPPING SCHEMES


Conventional time-stepped distance protection has One of the main disadvantages is that the instantaneous Zone 1 protection at each end of the protected line cannot be set to cover the whole of the feeder length and is usually set to about 80%. This leaves two 'end zones', each being about 20% of the protected feeder length. Faults in these zones are cleared in Zone 1 time by the protection at one end of the feeder and in Zone 2 time (typically 0.25 to 0.5 seconds) by the protection at the other end of the feeder. This situation cannot be tolerated in some applications, for two main reasons: I). Faults remaining on the feeder for Zone 2 time may cause the system to become unstable. II). Where high-speed auto-reclosing is used, the non-simultaneous opening of the circuit. Breakers at both ends of the faulted section results in no 'dead time' during the auto- reclose cycle for the fault to be extinguished and for ionized gases to clear. This results in the possibility that a transient fault will cause permanent lockout of the circuit breakers at each end of the line section. Even where instability does not occur, the increased duration of the disturbance may give rise to power quality problems, and may result in increased plant damage. Unit schemes of protection that compare the conditions at the two ends of the feeder simultaneously positively identify whether the fault is internal or external to the protected section and provide high-speed protection for the whole feeder length. This advantage is balanced by the fact that the unit scheme does not provide the back up protection for adjacent feeders given by a distance scheme. The most desirable scheme is obviously a combination of the best features of both arrangements, that is, instantaneous tripping over the whole feeder length plus back-up protection to adjacent feeders. This can be achieved by interconnecting the distance protection relays at each end of the protected feeder by a communications channel. The purpose of the communications channel is to transmit information about the system conditions from one end of the protected line to the other, including requests to initiate or prevent tripping of the remote circuit breaker. The former arrangement is generally known as a 'transfer tripping scheme' while the latter is generally known as a 'blocking scheme'. However, the terminology of the various schemes varies widely, according to local custom and practice.

TYPES OF CARRIER TRIPPING SCHEMES


1. ZONE 1 EXTENSION SCHEME (Z1X SCHEME) 2. TRANSFER TRIPPING SCHEMES I. DIRECT UNDER REACH TRANSFER TRIP SCHEME (DUTT) II. PERMISSIVE UNDER REACH TRANSFER TRIP SCHEME (PUTT) III. PUTT FWD SCHEME IV. PERMISSIVE UNDER REACH ACCELERATED SCHEME V. PERMISSIVE OVER REACH TRANSFER TRIP SCHEME (POTT) VI. WEEK IN FEED CONDITIONS. 3. BLOCKING OVER REACHING SCHEMES I. BLOCKING OVER-REACHING PROTECTION SCHEME USING ZONE 2.
OR DIRECTIONAL COMPARISION BLOCKING SCHEME

II. BLOCKING OVER-REACHING PROTECTION SCHEME USING ZONE 1. III. WEEK IN FEED CONDITIONS. 4. DIRECTIONAL COMPARISON UNBLOCKING SCHEME

PROPERTIES OF COMMAND PROTECTION SYSTEMS


OPERATING MODE PERMISSIVE UNDER REACH (PUTT) PERMISSIVE OVER REACH (POTT) DIRECT TRIP ACCELERA TED UNDER REACH BLOCKING OVER REACH UNDER REACHING SENDING ZONE-1 OVER REACHING SENDING - - PERMISSIVE CRITERIA RECEIVING
UNDER IMPEDENCE UNDER VOLTAGE OVER CURRENT DISTANE & DIRECTION

GENERAL REQUIREMENTS

SECURE & FAST

- - -

ZONE-2

SECURE & FAST DISTANCE & DIRECTION ZONE-2 DISTANCE & DIRECTION SECURE &
DEPENDABLE

ZONE-1 ZONE-1

- - - - -

SECURE & FAST FAST &


DEPENDABLE

- - -

REVERSE LOCKING

PREFFERED APPLICATIONS OF TELE/ CARRIER TRIPPING SCHEMES


PARAMETERS

PUTT

POTT

BLOCKING

UNBLOCKING

Signal Transmission System

Dependable and secure communication channel 1. Power line carrier with frequency shift modulation. HF signal coupled to 2 phases of the protected line, or even better, to a parallel circuit to avoid transmission of the HF signal through the fault location. 2. Microwave radio, especially digital(PCM) 3. Fibre -optic cables

Characteristic Best suited for longer lines - where Of line the Under-reach zone provides sufficient resistance coverage.

1. Excellent coverage On short lines in the Presence of fault resistance. 2. Suitable for the Protection of multiterminal lines with intermediate infeed.

Reliable communication channel (only required during external faults) 1. Power line carrier With amplitude Modulation (ON/OFF). The same frequency may be used on all terminals) All line types Preferred practice in the USA.

Dedicated channel With continuous signal Transfer 1. Power line carrier With frequency shift keying. Continuous Signal transmission must be permitted.

Same as POTT

COMPARISION OF TELE/ CARRIER TRIPPING SCHEMES


On normal two-terminal lines the main deciding factors in the choice of the type of scheme, apart from the reliability of the signalling channel, operating speed and the method of operation of the system. Table compares the important characteristics of the various types of scheme.

Criterion
Speed of operation Suitable for auto Re Close Current reversal Loss of communications Weak In feed/Open CB

Transfer Tripping Scheme


Fast Yes Special features required Poor Special features required

Blocking scheme
Not as Fast As fast Yes Special features required good Special features required

Speed with in-service testing Slower Security against mal-operation due to:

Modern digital or numerical distance relays are provided with a choice of several schemes in the same relay. Thus scheme selection is now largely independent of relay selection, and the user is assured that a relay is available with all the required features to cope with changing system conditions.

ADVANTAGES & DRAWBACKS OF TELE/ CARRIER TRIPPING SCHEMES


PARAMETERS

PUTT
1. Simple technique 2. No coordination Of zones and times With the opposite End required. 3.The combination Of different relay Types therefore presents no Problems.
1. Overlapping of the zone 1 reaches must be ensured. On parallel lines, teed feeders and tapped lines, the influence of zero sequence coupling and intermediate In feeds must be carefully considered to make sure a minimum overlapping of the zone 1 reach is always present. 2. Not suitable for weak In feed terminals

POTT
1. Can be applied without Under reaching zone1 stage (e.g. overcompensated Series compensated lines). 2. Can be applied on Extremely short lines (impedance less than minimum relay setting) 3. Better for parallel lines as mutual coupling is not critical for the overreach zone 4. Weak in feed terminals are no problem. (Echo and Weak In feed logic is included)

BLOCKING Same as POTT

UNBLOCKING
Same as POTT but: 1. If no signal is Received (no block and no unblock) then tripping by the overreach zone is released after 20 ms

ADVANTAGES

DRAWBACKS

1. Zone reach and signal timing coordination with the Remote end is necessary (current reversal).

Same as POTT Same as 1. Slow tripping all POTT Tele-protection trips must be delayed to wait for the eventual blocking signal. 2. Continuous channel Monitoring is not Possible.

ADVANTAGES & DRAWBACKS OF TELE/ CARRIER TRIPPING SCHEMES


PARAMETERS

PUTT
Not Suitable as the Zone1 Operation is essential and Zone1 setting in X and R direction must be small on Short Lines.

POTT
Suitable as the Z1B setting may be substantially larger than the Line impedance so that signal Transmission is secure for all faults on the Line. Suitable as the Strong end detects all the Line Faults with the OverReaching Z1B. The Weak In-feed end then echos the received Signal.

BLOCKING
Suitable as Reverse Reach Setting is independent of Line Length.

UNBLOCKING
Suitable Same as POTT.

Short Line

Weak Infeed
Amplitude Modulated Power Line Carrier Frequency or Phase Modulated Power Line Carrier
Communication

Not Suitable as the Zone1 Operation is essential at Both Ends for 100% Coverage.
Not Suitable as the Signal must be Transmitted through the Fault Location which Attenuates the Signal.

Partially Suitable Suitable Same as as the Reverse Fault POTT. is also Detected at the Weak In-feed end but no trip at Weak In-feed end.

Not Suitable same as PUTT.

Suitable as the Signal is only sent when the Line is not Faulted. Suitable as the Signal can be Transmitted under all Conditions. Suitable.

Not Suitable Same as PUTT.

Suitable as the Signal can be Transmitted through the Fault Location. Suitable.

Suitable same as PUTT.

Suitable Same as PUTT.

independent of Power Line

Suitable.

Suitable.

PROTECTION COUPLER PANEL


15

ALARM-1 250V DC

NSD 50/ NSD 70


ACTIVE START TRIP

C S

2+ 5C R

TX TRIP A(C)

1C S

2+ 5C R

TX TRIP C(A)

6+

RX TRIP A(C)

6+

RX TRIP C(A)

DISPLAY C
7

ALARM-2 250V DC

C S

910+ 1314+

TX TRIP B(D)

9C S

10+ 13C R

TX TRIP D(B)

E
G4AA TB: V9LB

C R

RX TRIP B(D)

14+

RX TRIP D(B)

G4AC TB: V9LC

GA4D TB:V9LC

PROTECTION COUPLERS FOR 400KV LINE


FOR EACH LINE 2Nos PROTECTION COUPLER PANELS PROVIDED. FOR EACH LINE 1NO CARRIER SPEECH PANEL PROVIDED. SO, ONE LINE REQUIRES TOTAL 3 PANELS. CARRIER SPEECH PANEL PURELY FOR VOICE COMMUNICATION BETWEEN TWO SUBSTATIONS, i.e THE LINE CONNECTED SUBSTATIONS. THE VOICE COMMUNICATION ARE TWO METHODS PROVIDED. ONE IS HOTLINE COMMUNICATION/DEDICATED/ LIFT&TALK METHOD. ANOTHER IS DIAL METHOD. IN PROTECTION COUPLER PANEL-1 TOTAL 3 CARDS ARE IMPORTANT FOR SENDING & RECEIVING TRIP SIGNALS. ONE CARD FOR ALARM i.e G4AA. ONE CARD FOR PERMISSIVE/PROTECTION TRIP i.e G4AC & ANOTHER CARD FOR DIRECT TRIPS i.e G4AD. IN PROTECTION COUPLER-2 PANEL ALSO 3 CARDS ARE PROVIDED SIMILAR TO PROTECTION COUPLER-1 PANEL. THE PROTECTION COUPLER PANEL DRAWING IS SHOWN IN PREVIOUS MENU. 1SET TX & RX FOR PERMISSIVE/ PROTECTION TRIP(G4AC) 1SET TX & RX FOR BACKUP FOR PERMISSIVE/ PROTECTION IN ANOTHER PANEL(G4AC). 1SET TX & RX FOR DIRECT TRIP CHANNEL-1( G4AD). 1SET TX & RX FOR SPARE UNDER EMERGENCY(G4AD). THE ABOVE ARRANGEMENT SIMILAR FOR PROTECTION COUPLER PANEL-2. G4AA CARD FOR ALARM.

MAIN-1 PROTECTION CARRIER INTER TRIPPING


NSD 50
G4AC V9LC 1 G4AC V9LC 6 G4AC V9LC 5 G4AC V9LC 2 LINE
IN OUT CARRIER RECEIVE

21L1
CR -VE

CS
CARRIER SEND

ABB

G4AA V9LB 5 G4AA V9LB 6


PANEL-1
ALARM

+VE

-VE

NSD 50

G4AC V9LC 10 G4AC V9LC 13 G4AC V9LC 14 G4AC V9LC 9 THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP AND CONNECTED IN ANOTHER PANEL

ABB
PANEL-2

MAIN-2 PROTECTION CARRIER INTER TRIPPING


NSD 50
G4AC V9LC 1 G4AC V9LC 6 G4AC V9LC 5 G4AC V9LC 2 LINE
IN OUT CARRIER RECEIVE

21L2
CR -VE

CS
CARRIER SEND

ABB

G4AA V9LB 5 G4AA V9LB 6


PANEL-2
ALARM

+VE

-VE

NSD 50

G4AC V9LC 10 G4AC V9LC 13 G4AC V9LC 14 G4AC V9LC 9 THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP AND CONNECTED IN ANOTHER PANEL

ABB
PANEL-1

DIRECT TRIP SEND CARRIER CHANNEL-1


96 BUSBAR PROT-2 PANEL 87 BUSBAR TRIP (ZONE-2) 96 BUSBAR PROT-1 PANEL 87 BUSBAR TRIP (ZONE-1) CONTROL PANEL T NC

PANEL-1

ABB NSD 50
DC +VE FROM PANEL

MAIN CB(1-52CB)
T NC

TIE CB (2-52 CB)

TIE CB(2-52CB)
50 LBB/BFR FOR MAIN CB / RAICA 59L1 / OVER VOLTAGE STAGE-1 59L2 / OVER VOLTAGE STAGE-2 87 HZ / TEED-1 PROTECTION 87 LZ / TEED-2 PROTECTION 50 LBB/BFR FOR TIE CB / RAICA

G4AD V9LC 2 G4AD V9LC 1

MAIN CB (1-52 CB)

DC VE FROM PANEL CONDITIONS FOR DIRECT TRIP 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED. 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED. 9. 87 HZ TEED-1 PROTECTION OPERATED 10. 87 LZ TEED-2 PROTECTION OPERATED.

DIRECT TRIP SEND CARRIER CHANNEL- 2


96 BUSBAR PROT-2 PANEL 87 BUSBAR TRIP (ZONE-2) 96 BUSBAR PROT-1 PANEL 87 BUSBAR TRIP (ZONE-1) CONTROL PANEL T NC

PANEL-2

ABB NSD 50
DC +VE FROM PANEL

MAIN CB(1-52CB)
T NC

TIE CB (2-52 CB)

TIE CB(2-52CB)
50 LBB/BFR FOR MAIN CB / RAICA 59L1 / OVER VOLTAGE STAGE-1 59L2 / OVER VOLTAGE STAGE-2 87 HZ / TEED-1 PROTECTION 87 LZ / TEED-2 PROTECTION 50 LBB/BFR FOR TIE CB / RAICA

G4AD V9LC 2 G4AD V9LC 1

MAIN CB (1-52 CB)

DC VE FROM PANEL CONDITIONS FOR DIRECT TRIP 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED. 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED. 9. 87 HZ TEED-1 PROTECTION OPERATED 10. 87 LZ TEED-2 PROTECTION OPERATED.

DIRECT TRIP RECEIVE CHANNEL-1&2


PANEL-1

ABB NSD 50
DC +VE G4AD V9LC 6 G4AD V9LC 5 PANEL-2
DIRECT TRIP-1 CARRIER RECEIVE RELAY

TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB(152CB) TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB(252CB)

+VE

-VE TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB(152CB) TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB(252CB)

ABB NSD 50
DC +VE G4AD V9LC 6 G4AD V9LC 5
DIRECT TRIP-2 CARRIER RECEIVE RELAY

PLCC CARRIER PROTECTION SYSTEM (TELEPROTECTION)


ABB Network Partner AG REL531 ABB Network Partner AG REL531

REL 521 MAIN-1 PROTECTION


C C E E

ELECTRICAL CONNECTION NSD 50 PANEL PLCC PANEL NSD 50 PANEL ELECTRICAL CONNECTION
ABB Network Partner AG REC 316*4 ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 9 10 11 12 13 14 15 16

NSD 50 PANEL PLCC PANEL NSD 50 PANEL

ELECTRICAL POWER LINE

REL 316 MAIN-2 PROTECTION

2 3 4 5 6 7 8

FIBRE OPTIC PROTECTION SYSTEM (TELEPROTECTION)


ABB Network Partner AG REL531 ABB Network Partner AG REL531

REL 521 MAIN-1 PROTECTION


C C E E

ELECTRICAL CONNECTION NSD 70 PANEL


GECOD/ SIFOX GECOD/ SIFOX
ABB Network Partner AG

NSD 70 PANEL TUNOS TUNOS FOX-U FOX-515 FOX-U FOX-515

NSD 70 PANEL

NSD 70 PANEL

ELECTRICAL CONNECTION
ABB Network Partner AG REC 316*4 REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 9 10 11 12 13 14 15 16

REL 316 MAIN-2 PROTECTION

2 3 4 5 6 7 8

FIBRE OPTIC CARRIER PROTECTION SYSTEM (TELEPROTECTION) DIGITAL RELAY CONNECTION VIA FIBRE OPTIC
ABB Network Partner AG REL531 ABB Network Partner AG REL531

REL 521 MAIN-1 PROTECTION


C C E E

OTERM

TUNOS

ABB Network Partner AG

REC 316*4

TUNOS

ABB Network Partner AG

REC 316*4

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

REL 316 MAIN-2 PROTECTION

2 3 4 5 6 7 8

OTERM
C E

FOX-U FOX-515

FOX-U FOX-515

MAIN-1 & MAIN-2 PROTECTION FOR AUTO TRANSFORMER ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

BASICS OF TRANSFORMER PROTECTION


1. PURPOSE OF POWER TRANSFORMER PROTECTION POWER T/F PROTECTION IS USUALLY INSTALLED TO DISCONNECT THE T/F AT: A. INTERNAL SHORT CIRCUITS AND EARTH FAULTS IN THE T/F AND ITS CONNECTED CIRCUITS. B. EXTERNAL FAULTS ON OTHER CIRCUITS. (BACK-UP PROTECTION) C. ABNORMAL SERVICE CONDITIONS SUCH AS OVERLOAD & OVER VOLTAGE. PROTECTION DEVICES INBUILT OR MOUNTED ON POWER T/F A. OIL IMMERSED POWER T/F USUALLY HAVE A GAS DETECTOR AND OIL SURGE. DETECTOR (BUCHHOLZ ALARAM & TRIP DEVICES), WHICH ARE EXCELLENT FOR DETECTING INTERNAL FAULTS. B. LOAD TAPCHANGER COMPARTMENTS MAY HAVE A SIMILAR OVER PRESSURE DEVICE. C. TEMPARATURE MONITORS FOR OIL & WINDING PROVIDE GOOD OVER LOAD PROTECTION. D. PRESSURE RELIEF DEVICE IS PROVIDED TO SAFE GUARD THE T/F FROM HIGH PRESURES. TRANSFORMER DIFFERENTIAL PROTECTION IT IS WIDELY USED AS INSTANTANEOUS PROTECTION FOR SHORT CIRCUIT FAULTS WITH IN THE DIFFERENTIAL ZONE. THIS IS TREATED AS MAIN-1 PROT FOR T/F. THE MOST COMMON TYPE OF PROTECTION IS THE CURRENT RESTRAINT TYPE. SOME TYPE OF DIFFERENTIAL RELAYS REQUIRE INTERPOSING CTs FOR CT RATIO MATCHING AND/OR PHASE SHIFT. HIGH IMPEDENCE DIFFERENTIAL PROTECTION CAN BE USED ON AUTO T/F & REACTORS. IT COVERS ONE GALVANICALLY INTERCONNECTED WINDING (WDG DIFF). BUT NOT A SEPARATE TERTIARY WINDING. IT REQUIRES A THREE PHASE SET OF CTs AT THE NEUTRAL SIDE OF WINDING.

2.

3.

4.RESTRICTED EARTH FAULT PROTECTION


AT/Fs are used to couple EHV Power Networks, If the Ratio of their Voltages is Moderate. An Alternative to Differential Protection that can be applied to AT/Fs. A Circulating Current System is arranged between Equal Ratio Current Transformers in the Two Groups of Line Connections and the Neutral End Connections. The Line Current Transformers can be connected in Parallel to A Single Element Relay, Thus providing a Scheme Responsive to Earth Faults Only. If Current Transformers are fitted in Each Phase at the Neutral End of the Windings and a Three-Element Relay is used, A Differential System can be provided, giving Full Protection against Phase and Earth Faults. This Provides High-speed Sensitive Protection. It is Unaffected by Ratio Changes on the Transformer due to Tap-changing and is immune to the Effects of Magnetizing In Rush Current. It does not respond to Interturn Faults. In Addition, This Scheme does not respond to any Fault in a Tertiary Winding. Unloaded Delta-connected Tertiary Windings are often not Protected.

5. BACK UP PROTECTION
A VARIETY OF RELAYS ARE AVAILABLE. A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY COMBINATION OF THESE) B. UNDER IMPEDENCE / DISTANCE ( Z<)(21T). C. NEUTRAL DISPLACEMENT PROTECTION (Un>).

6.OTHER TYPES OF RELAYS


A. OVER VOLTAGE RELAY (U >). B. OVER FLUX/ EXCITATION (V/F >)( INVERSE TIME & DIFENITE TIME). FOR 400KV/220KV & 765/400KV TRANSFORMERS BOTH SIDES( i.e HV & LV) OVER FLUX RELAYS ARE PROVIDED BECAUSE BOTH SIDES HAVING GRID. C. AT/F NEUTRAL CURRENT RELAY (51N).

NORMALLY ADOPTED POWER TRANSFORMERS CAPACITIES IN 400KV / 220KV CAPACITY OF TRANSFORMER HV VOLTAGE HV CURRENT LV VOLTAGE LV CURRENT

315 MVA 500 MVA 630 MVA

400 KV 400 KV 400 KV

454.68 A 721.71 A 909.35 A

220 KV 220 KV 220 KV

0826.68 A 1312.20 A 1653.37 A

NORMS OF PROTECTION FOLLOWED BY UTILITIES


FOR POWER TRANSFORMERS & AUTO TRANSFORMERS

CAPACITY S.No IN MVA

VOLTAGE RATIO IN KV

T Y P E

MAIN-1

MAIN-2

BACK UP PROTECTION HV LV

PROTECTION

ADDITIONAL SPECIAL PROTECTION PROTECTION


64REF IS 1-PH HIGH IMPEDANCE DIFFERENTIAL RELAY 87TH IS 3-PH HIGH IMPEDANCE DIFFERENTIAL RELAY (PRINCPLE : CIRCULATING CURRENT)

1 2 3 4 5 6 7 8 9 10

7.5 & 16 7.5 , 16 & 25 7.5 , 16 , 25 & 31.5 16 , 31.5 50 & 80 31.5, 50 31.5, 50 & 100 100, 200 & 250 100 & 160 315, 500 & 630 1000 & 1500

66 / 11 66 / 33 132 / 11 132 / 33 220 / 33 220 / 66 400 / 132 220 / 132 400 / 220 765 / 400

2 WINDING TRANSFORMER (STAR/STAR) ICT / AUTO TFR

3 OVER LOAD + 1 EARTH FAULT RELAY ( 51 )

87 TL DIFFERENTIAL RELAY

3 OL + 1 EL (51)

( LOW IMPEDANCE PERCENTAGE BIASED PHASE SEGREGATED DIFFERENTIAL RELAY PRINCIPLE: MERZ PRICE)

BUCHHOLZ, OLTC OSR OIL TEMP WDNG TEMP

HV & LV REF 64

NIL
HV REF (64)

3 OVER LOAD + 1 DIRECTIONAL EARTH FAULT RELAY ( 51P + 67N)


3 DIR OL (HIGHSET) + 1 DIR EL (HIGHSET)

3 OL + 1 DIR EL (51P + 67N)


3 DIR OL (HIGHSET) + 1 DIR EL (HIGHSET)

BUCHHOLZ OVER FLUX OLTC OSR PRV/PRD OIL TEMP WDNG TEMP

87 TH / 64 REF

OVER LOAD ALARM RELAY + NEUTRAL CURRENT E/F RELAY

ICT BUSHING CT INFORMATION


S.No
1 2

ITEM /MVA
CORE 1

HV
2 3 1

IV
2 3

NEUTRAL
1 2

LV
3

RATIO

100 160 315 500

600/1 800/1 1000/1 1600/1 600 V 800 V 1000 V 1600V 1.5 2.0 2.5 4.0 100 80 60 25 PS 87/64 REF

300/1 500/1 600/1 1000/1

--

600/1 800/1 1000/1 1600/1 600 V 800 V 1000 V 1600 V 1.5 2.0 2.5 4.0 100 80 60 25 PS 87/64 REF

500/1 800/1 1000/1 1600/1

--

600/1 800/1 1000/1 1600/1 600 V 800 V 1000 V 1600 V 1.5 2.0 2.5 4.0 100 80 60 25 PS 87/64 REF

600/1 800/1 1000/1 1600/1 600 V 800 V 1000 V 1600 V 1.5 2.0 2.5 4.0 100 80 60 25 PS NCT PROT

--

NEUTRAL BUSHING CT : CORE-1 : BEFORE STAR FORMATION IN RYB PHASES, CORE-2 : AFTER STAR FORMATION FOR 100, 160, 315 MVA TRANSFORMERS

5 6 7

100 VKNEE FOR 160 PS & VA 315 FOR MET 500 100 160 RCT IN OHMS 315 500 100 I MAGNETISING 160 IN mA at 315 VKNEE 500 CLASS OF ACURACY PURPOSE

Parameters of WTI CT for each winding shall be provided by the contractor.

Parameters of WTI CT for each winding shall be provided by the contractor

Parameters of WTI CT for each winding shall be provided by the contractor

0.2 CL AND BURDEN 30 VA ISF:5

0.2 CL AND BURDEN 30 VA ISF:5

MET

WTI

MET

WTI

WTI

MAIN / DIFFERENTIAL PROTECTION FOR AT/F


(4 CT METHOD)
P2 P2 P2 3-CT
CTR: 2000-1000-500/1A

CT MB

AUX.CT Y/ 0.91 / 0.577A

87 T1

CT MB

CLASS: PS
3 CT METHOD : 3-CT & 2-CT 4 CT METHOD : 3-CT & 2-ACT 6 CT METHOD : 3-ACT & 2-ACT

CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-5

5S3

5S3

5S3 5S4

5S4

5S4

P2 P2 P2

NUMERICAL RELAYS DOES NOT REQUIRE AUX CTs

AUX.CT Y/ 0.91 / 0.577A

2-ACT

3 3 3
5S4 5S4 5S3 5S3

CORE-5

5S4 5S3

AUX.CT Y/ 0.689 / 0.577A

5S1 5S3

3 3 3
5S3 5S3

5S1

5S1

P2 P2 P2 LV-CT CORE-5
CTR: 1200-800/1A

CT MB

CLASS: PS IN CASE OF 1&1/2 CB SYSTEM, THE DIFFERENTIAL PROTECTION CTs ASSOCIATED WITH MAIN & TIE CBs SHOULD BE CONNECTED TO SEPARATE BIAS WINDINGS AND THESE SHOULD NOT BE PARALLED IN ORDER TO AVOID FALSE OPERATION DUE TO DISSIMILAR CT TRANSIENT RESPONSE.

MAIN / DIFFERENTIAL PROTECTION FOR AT/F


(5 CT METHOD)
87 T1
CT MB

P2 P2 P2 3-TCT
CTR: 2000-1000-500/1A

CT MB

AUX.CT Y/ 0.689 / 0.577A

5S1 5S3

AUX.CT Y/ 0.91 / 0.577A

3 3 3
5S3 5S3

5S1

5S1

CLASS: PS

3 3 3
5S4 5S4 5S3 5S3

CORE-5

5S4 5S3

P2 P2 P2 LV-CT CORE-5
CTR: 1200-800/1A

CLASS: PS

NORMALLY LOW IMPEDENCE BIASED DIFFERENTIAL RELAY IS USED FOR TRANSFORMER DIFFERENTIAL PROTECTION
NUMERICAL RELAYS DOES NOT REQUIRE AUX CTs

SELECTION OF AUX.CTs FOR DIFFERENTIAL PROTECTION


NORMALLY 400KV/220KV AUTO TRANSFORMERS ARE OF CAPACITY 315MVA. FOR MERZ PRICE PROTECTION IF TRANSFORMER IS CONNECTED IN STAR/STAR THEN CT SECONDARIES ARE TO BE CONNECTED IN DELTA/DELTA. CORRECT RATIO CTs ARE NOT AVAILABLE, THEN AUX.CTs ARE TO BE PROVIDED FOR ACHEVING SUITABLE CURRENTS. IF AUX CTs ARE USING THEN MAIN CT SECONDARIES ARE CONNECTED IN STAR. THIS IS BROUGHT TO AUX CTs. AUX CTs PRIMARY IS CONNECTED IN STAR & SECONDARIES ARE CONNECTED IN DELTA. NORMALLY THE RELAY RATED CURRRENT IS 1A. AUX.CT s SECONDARIES ARE CONNECTED IN DELTA. FOR ACHIEVING 1A TO RELAY, AUX.CT SECONDARY CURRENT IS TO BE 0.577A. THE FULL LOAD PRIMARY CURRENT OF 315MVA AT/F IS 454.7A. BUT THE 400KV CTs RATIOs ARE AVAILABLE : 2000-1000-500/1A NEAREST VALUE TO FULL LOAD CURRENT IS 500/1A. HENCE IT IS ADOPTED. HENCE AT FULL LOAD HV CURRENT i.e 454.7A, THEN SECONDARY OF CT CURRENT WILL BE 0.91A. SO HV SIDE AUX.CT RATIO IS 0.91/0.577A. THE FULL LOAD SECONDARY CURRENT OF 315MVA AT/F IS 826.7A. BUT THE 220KV CTs RATIOs ARE AVAILABLE: 1200-800/1A. NEAREST VALUE TO FULL LOAD CURRENT IS 1200/1A. HENCE IT IS ADOPTED. HENCE AT FULL LOAD LV CURRENT i.e 826.7A,THEN SECONDARY OF CT CURRENT WILL BE 0.689A. SO LV SIDE AUX CT RATIO IS 0.689/0.577A. SPECIAL INFORMATION: LATEST NUMERICAL RELAYS NEED NOT REQUIRE AUX CTs. IN THESE RELAYS, CT RATIOS MATCHING CAN BE PROGRAMMED.

BACKUP PROTECTION FOR AT/F HV


(4 CT METHOD)
P2 P2 P2 3-CT
CTR: 2000-1000-500/1A

CT MB

CLASS: PS
3 CT METHOD : 3-CT & 2-CT 4 CT METHOD : 3-CT & 2-ACT 6 CT METHOD : 3-ACT & 2-ACT

2-ACT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-4

3 3 3
4S4 4S4 4S3 4S3 4S3 4S3 4S4 4S4

CORE-4

IR4 / C411 IY4 / C431 IB4 / C451


4S4 4S3

VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171

IN4 / C471 50Z

3 3 3
E172 E174
CT MB

3 3

CVT SELECTION BUS-1 CVT / BUS-2 CVT / LINE CVT CORE-1


VA : 200

4S3 4S4

IB4 / C451 IY4 / C431 IR4 / C411

CLASS: 3P

P2 P2 P2

BACKUP PROTECTION FOR AT/F HV


(5 CT METHOD)
VR11 / E111 VY11 / E131 VB11 / E151
P2 P2 P2 3-TCT
CTR: 2000-1000-500/1A

CT MB

CLASS: PS

3 3 3
4S4 4S4 4S3 4S3

CORE-4

IR4 / C411 IY4 / C431 IB4 / C451


4S4 4S3

VN11 / E171

3 3 3
E172 E174

3 3

IN4 / C471

CVT SELECTION BUS-1 CVT / BUS-2 CVT / LINE CVT CORE-1


VA : 200

CLASS: 3P

BACKUP PROTECTION FOR AT/F LV


P1 P1 P1 LV-CT
CTR: 1200 800 /1A

CT MB

CLASS: PS P2 P2 P2

3 3 3
4S2 4S2 4S1 4S1

CORE-4

IR4 / C411 IY4 / C431 IB4 / C451


4S2 4S1

VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171

IN4 / C471 50Z

3 3 3
E172 E174

3 3
VOLTAGE

SELECTION BUS-1 PT / BUS-2 PT CORE-1


VA : 200

CLASS: 3P

MISCELLENEOUS RELAYS & PROTECTIONS ADOPTED FOR AUTO TRANSFORMER IN ONE AND HALF CIRCUIT BREAKER SCHEME
(OVER FLUX & REF FUNCTIONS) PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

OVER EXCITATION/FLUX RELAY


{FOR AUTO TRANSFORMER HV & LV}
VOLTAGE SELECTION BUS-1 PT / BUS-2 PT CORE-1
VA : 200

99 T HV

CLASS: 3P

CVT SELECTION BUS-1 CVT / BUS-2 CVT / LINE CVT CORE-1


VA : 200

99 T LV

CLASS: 3P

315MVA, 400KV/220KV/33KV AT/F RESTRICTED EARTH FAULT RELAY P2 P2 P2


400KV HV CORE-1
CTR: 1000/1A

CLASS: PS P1 P1 P1 P1 P1 P1 NEUTRAL CORE-1


CTR: 1000/ 1A

CLASS: PS P2 P2 P2 P1 P1 P1 220KV LV CORE-1


CTR: 1000/1A

CLASS: PS

3 3 3

BUSHING CT

3 3 3

BUSHING CT

3 3 3
S1 S1 S1 S2 S1 S2 S1 S2 S1 S2

BUSHING CT

S2

S2

S2 S1

S1 S2

S1 S2

P2 P2 P2

315MVA, 400KV/220KV/33KV AT/F 3-PH HIGH IMPEDENCE DIFFERENTIAL RELAY


P2 P2 P2 400KV HV CORE-1
CTR: 1000/1A

CLASS: PS P1 P1 P1 P1 P1 P1 NEUTRAL CORE-1


CTR: 1000/ 1A

CLASS: PS P2 P2 P2 P1 P1 P1 220KV LV CORE-1


CTR: 1000/1A

CLASS: PS

3 3 3

BUSHING CT

3 3 3

BUSHING CT

3 3 3
S1 S1 S1 S1 S2 S2 S1 S1 S2 S2

BUSHING CT

S2

S2

S2 S1

S1 S2

S1

S2

P2 P2 P2

315MVA, 400KV/220KV AT/F VOLAGE SELECTION


BUS-1 1-52CB 2-52CB 3-52CB BUS-2

LINE1

AT/F-1

FEEDER HAVING LINE CVTs &BUSES ARE HAVING BUS CVTs BUT AT/Fs ARE NOT HAVING CVTs. FOR TRANSFORMER PANEL, PT SUPPLY IS SELECTED AS PER SELECTION DESCRIBED BELOW FOR METERING AND PROTECTION, WHICH IS FIRST SELECTED .

BUS-1 CVT BUS-2 CVT LINE CVT

If AT/F is feeding from Bus-1 and 1-52CB & 2-52CB is closed. Then Bus-1 CVT is selected and this supply is extended to Control & Relay Panels for Auto Transformer. If AT/F is feeding from Bus-2 and 3-52 CB is closed & 2-52CB is open. Then Bus-2 CVT is selected and this supply is extended to Control & Relay Panels for Auto Transformer. If AT/F is feeding from Direct Line and 2-52CB is closed & 1-52 CB & 3-52 CB is open and 389T ISO is Closed . Then line CVT is selected and this supply is extended to Control & Relay Panels for Auto Transformer.

1-PH UNITS OF 500 MVA TRANSFORMER ( EACH 167 MVA ) WITH CHANGE OVER FACILITY
R Y B R Y B

B
SPARE

MAIN-1 & MAIN-2 PROTECTION FOR SHUNT REACTOR ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

BASICS OF SHUNT REACTOR


1. TYPES OF REACTORS : A. BASED ON REACTOR CONNECTION i. SHUNT REACTOR. ii. SERIES REACTOR. B. BASED ON REACTOR LOCATION i. BUS REACTOR ii. LINE REACTOR C. BASED ON CONTROL i. 3-PH OIL IMMERSED REACTOR WITH GAPPED IRON CORE. ii. THYRISTOR CONTROLLED REACTOR (STATIC VAR COMPENSATOR) (APTRANSCO UTILISING SHUNT REACTORS FOR BUS & LINE IN 400KV NETWORK) 2. NEED OF SHUNT REACTOR: A. LINE REACTOR
SHUNT REACTORS ARE USED IN ORDER TO COMPENSATE FOR THE CAPACITIVE SHUNT REACTANCE OF TRANSMISSION LINES. THE REACTOR IS CONNECTED PARALLEL TO THE LINE. THE LOCATION OF REACTOR IS OUT GOING SIDE OF LINE i.e AFTER CIRCUIT BREAKER. LENGTH OF LINE IS MORE THERE MAY BE VOLTAGE IS RAISING DUE TO FARANTI EFFECT(CAPACITANCE) DURING CHARGING. IN CASE OF ZONE-2 (OPEN JUMPER) FAULT, THE FAULT CLEARED BY REMOTE END IS FAST, BUT THIS END IT WILL TAKE TIME DELAY DUE TO ZONE-2. DURING THIS TIME, VOLTAGE MAY RAISING. SO, LINE REACTOR IS USED FOR CONTROLLING THE SWITCHING OVER VOLTAGES AND SAFEGUARD THE OPERATING EQUIPMENT. NORMALLY IT IS ALWAYS IN SERVICE. NORMALLY BOTH ENDS LINE REACTORS ARE PROVIDED. THE ELECTRICAL INTERLOCK IS PROVIDED THAT IF REACTOR ISOLATOR CLOSSED POSITION ONLY WILL GIVE PERMIT TO CLOSE THE LINE ISOLATOR. SIMILARLY FOR OPENING REACTOR ISOLATOR THE LINE ISOLATOR SHOULD BE IN OPEN POSITION. NEUTRAL REACTOR CONNECTED BETWEEN THE STAR POINT OF EHV SHUNT REACTOR AND THE GROUND, LIMITS THE SECONDARY ARC CURRENT TO A LOW VALUE OF AROUND 10 AMPS TYPICALLY FOR 400KV SYSTEM TO ENSURE COMPLETE DE-IONISATION OF ARC PATH WHEN EHV SYSTEM DEVELOPS A SINGLE LINE TO GROUND FAULT. ARC EXTINCTION DURING LINE SINGLEPHASE AUTORECLOSE DEAD TIME IS ASSISTED BY THIS NEUTRAL REACTOR.

3.

4.

B. BUS REACTOR THE REACTOR IS CONNECTED PARALLEL TO THE BUS i.e LIKE A FEEDER/LINE. DURING LIGHTLY LOADED CONDITIONS THERE MAY BE POSSIBULITY OF RAISING BUS VOLTAGES. FOR SAFEGUARD THE OPERATING EQUIPMENT BUS REACTORS ARE UTILISING. NORMALLY IT IS NOT IN SERVICE. WHENEVER THE VOLTAGE RAISES TO 4%TO 5% MORE THAN THE RATED VOLTAGE THIS MAY BE KEPT IN SERVICE AND 2% TO 3% LESS THAN THE RATED VOLTAGE THIS MAY BE KEPT OUT OF SERVICE. SELECTION OF REACTOR A. LINE REACTOR NORMALLY LINE REACTORS ARE PROVIDED IF THE LINE IS MORE OR EQUAL TO 250KM. IN APTRANSCO NETWORK MAXIMUM LENTH OF LINE IS 350KM. AS PER SYSTEM STUDIES RECOMANDATIONS IF LINE LENGTH IS 250KM TO 300KM 50MVAR REACTOR IS TO BE USED. IF MORE THAN 300KM 63MVAR REACTOR IS TO BE USED. B. BUS REACTOR NORMALLY BUS REACTORS ARE PROVIDED IF THE SUBSTATION BUS VOLTAGE IS RAISING 5% MORE THAN THE RATED VOLTAGE DURING LIGHTLY LOADED CONDITION. BASED ON THE SYSTEM STUDIES RECOMANDATIONS BUS REACTORS ARE TO BE PROVIDED. CALCULATIONS ARE REQUIRED FOR PROVIDING BUS REACTOR. IN THIS THERE IS NO STANDARDISATION. LOCATION OF REACTORS WITH CAPACITY IN APTRANSCO A. LINE REACTOR 1. 400KV KALAPAKA-KHAMMAM 1 AT BOTH ENDS 63MVAR 2. 400KV KALAPAKA-KHAMMAM 2 AT BOTH ENDS 63MVAR B. BUS REACTOR 1. 400KV KALAPAKA SS 2 X 50 MVAR 2. 400KV NUNNA SS(PGCIL BAYS) 1 x 63 MVAR

5.

6.

7.

8.

9.

PURPOSE OF SHUNT REACTOR PROTECTION THE PURPOSE OF THE PROTECTION RELAYING IS TO DISCONNECT THE REACTOR AND LIMIT DAMAGE IN CASE OF INTERNAL SHORT CIRCUITS, EARTH FAULTS, INTERTURN FAULTS AND OVER VOLTAGE OR OVER LOAD.THE REACTOR FORMS CERTAIN IMPEDENCE FOR RATED FREQUENCY, AND AS IT IS SHUNT CONNECTED, AS OVER LOAD MAY BE CAUSED BY OVER VOLTAGE OR HARMONICS IN VOLTAGE AND CURRENT. PROTECTION DEVICES INBUILT OR MOUNTED ON REACTOR A. OIL IMMERSED REACTOR USUALLY HAVE A GAS DETECTOR AND OIL SURGE. DETECTOR (BUCHHOLZ ALARAM & TRIP DEVICES), WHICH ARE EXCELLENT FOR DETECTING INTERNAL FAULTS. B. TEMPARATURE MONITORS FOR OIL & WINDING PROVIDE GOOD OVER LOAD PROTECTION. C. PRESSURE RELIEF DEVICE IS PROVIDED TO SAFE GUARD THE REACTOR FROM HIGH PRESURES. REACTOR DIFFERENTIAL PROTECTION IT IS WIDELY USED AS INSTANTANEOUS PROTECTION FOR SHORT CIRCUIT FAULTS WITH IN THE DIFFERENTIAL ZONE. THIS IS TREATED AS MAIN-1 PROT FOR REACTOR. IT CAN BE OF HIGH IMPEDENCE TYPE OR OF A SENSITIVE CURRENT STABILISED TYPE. HIGH IMPEDENCE DIFFERENTIAL PROTECTION RELAYS REQUIRE AN EQUAL CT TURNS RATIO ON THE PHASE AND NEUTRAL SIDE. SENSITIVITY IS 5% OF NOMINAL REACTOR CT CURRENT. BACK-UP PROTECTION A VARIETY OF RELAYS ARE AVAILABLE. A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY COMBINATION OF THESE) B. UNDER IMPEDENCE / DISTANCE ( Z<)(21R). C. NEUTRAL DISPLACEMENT PROTECTION (Un>). RESTRICTED EARTH FAULT PROTECTION IF, FOR SOME REASON, A SENSITIVE DIFFERENTIAL PROTECTION NOT CHOOSEN A RESTRICTED EARTH FAULT PROTECTION CAN BE UTILISED.

SHUNT REACTOR (BUS & LINE)


(ONE AND HALF CIRCUIT BREAKER SYSTEM )
BUS-1
IL INTER LOCK FACILITY: WHEN 1-89R CLOSES ONLY PERMIT TO CLOSE 1-89L AND 1-89L OPENS ONLY PERMIT TO OPEN 1-89R.

BUS-2 3-89

1-89

1-52CB 1-CT 1-89A 1-89R


IL P2

3-52CB

P2

P1

P1

3 3-CT
3-89A

.
2-89A

2-CT
P1

P2

LINE SHUNT REACTOR


1-PH NEUTRAL GROUNDING REACTOR

2-52CB

2-89B 3-89R

U U U

1-89L

U U U

LINE 1

U U U U

BUS SHUNT REACTOR

REACTOR BUSHING CT INFORMATION


CAPACITY OF 400KV REACTORS : 50, 63, 80, 125 MVAR
Sr NO 1

SHUNT REACTOR ITEM


RATIO
400KV / LINE SIDE
CORE-1 CORE -2 CORE-3 CORE-4 CORE-5 CORE-1

STAR / NEUTRAL SIDE


CORE-2 CORE -3 CORE-4

LINE SIDE EARTH SIDE

NGR

CORE-1

CORE-2

2000- 2000200/1 200/1 200/1 1000- 1000- 200/1 WTI 200/1 200/1 500/1 500/1 NEUTRAN BUSHING CT : BEFORE STAR FORMATION IN RYB PHASES 200V 200V 1000500250V 1000500250V
Parameters of WTI CT for each winding shall be provided by the contractor

200/1

200/1

VKNEE FOR PS 2 & VA FOR 200V MET 3 RCT IN OHMS 1 OHM 4 5


CLASS OF ACURACY

1 OHM PS 64 R REF1

1.0 CL AND 10 5 10 5 BURDEN 2.5 10 VA 1 OHM 2.5

200V

200V

200V

200V

OHM PS

OHM PS

1 OHM PS 87 R DIFF

1 OHM PS 64 R REF1

1 OHM PS 64 R REF2

1 OHM PS 64 R REF1/2

PS 87 R DIFF

PS

PURPOSE

FOR 21L2 FOR 21L1 21 R /TEED-2 / /TEED-1 / MET IMP BBC BBM

SHUNT REACTOR PROTECTION


CORES 400KV SIDE CORE-1 CORE-2 CORE-3 87R 3Ph, 2Wdg REACTOR DIFFERENTIAL RELAY EITHER LOW or HIGH IMPEDANCE TYPE. 64R - REACTOR RESTRICTED EARTH FAULT PROTECTION OF1-POLE HIGH IMPEDANCE TYPE. (REF1) 21R 3Ph, REACTOR BACKUP IMPEDANCE RELAY OF SUITABLY SHAPED CHARECRESTICS EITHER SINGLE / DOUBLE ZONE TYPE. 21L2
(M_CT + T_CT R_CT)

ONE & HALF BREAKER SYSTEM LINE BUS

DOUBLE BUS & TRANSFER BUS SYSTEM LINE BUS

CORE-4 CORE-5

87 TEED-2
(M_CT, T_CT, R_CT)

21L2
(M_CT+T_CT R_CT)

87 BBC/BB-2 87 BBM/BB-1

21L1
(M_CT + T_CT R_CT)

87 TEED-1
(M_CT, T_CT, R_CT)

21L1
(M_CT + T_CT R_CT)

M_CT: Main CT, T_CT: Tie CT, R_CT: Reactor CT

SHUNT REACTOR PROTECTION


CORES ONE & HALF BREAKER SYSTEM LINE STAR / NEUTRAL SIDE CORE-1 CORE-2 CORE-3 CORE-4 METERING OF REACTOR WINDING TEMPARETURE OF REACTOR 87R 3Ph, 2Wdg REACTOR DIFFERENTIAL RELAY EITHER LOW / HIGH IMPEDANCE TYPE. 64R - REACTOR RESTRICTED EARTH FAULT PROTECTION OF1-POLE HIGH IMPEDANCE TYPE .(REF1) 64 REF1 64 REF1 --64 REF2 64 REF 1 / 2 --BUS DOUBLE BUS & TRANSFER BUS SYSTEM LINE BUS

NEUTRAL GROUNDING REACTOR SIDE CORE-1 CORE-2

REACTOR BUSHING CT INFORMATION

1-PH NEUTRAL GROUNDING REACTOR

U U U 3
CORE -2

3 3 3

LINE SHUNT REACTOR

U U U

U U U

U U U
CORE -1 CORE -2 CORE -3 CORE -4 CORE -1

3 3 3 3 3

3 3 3 3 3

3 3 3 3 3 3

CORE -1 CORE -2 CORE -3 CORE -4 CORE -5

REACTOR BUSHING CT INFORMATION

3 3 3

BUS SHUNT REACTOR

U U U

U U U

U U U
CORE -1 CORE -2 CORE -3 CORE -4

3 3 3 3 3

3 3 3 3 3

3 3 3 3 3 3

CORE -1 CORE -2 CORE -3 CORE -4 CORE -5

ONE & HALF BREAKER LINE & BUS SHUNT REACTOR PROTECTION SCHEME
87BB1 BUSBAR-1 79 CVT VBB1 VBB1 VL1 / VL2 OR VBB2 25 BF 87L 21M2 VL1 CVT VL1 FEEDER1 / LINE1 79 VL1 / VBB1 VL2 / VBB2 25 87R 21M1 VL1

VL1/VBB1/VBB2

BF

64R 21R

87R

TEED-1 BF VBB2 VL2 / VL1 OR VBB1 CVT VBB2 VBB1/VBB2 79 25 TEED-2

64R

PROTECTION OF BUS REACTOR 21R BUSBAR-2 FOR REACTOR PROTECTION & METERING VOLTAGE SELECTION RELAYS FOR BUS-1, BUS-2& LINE ARE PROVIDED .

87BB2

U U U
OR

U U U

U U U

LINE/BUS REACTOR DIFFERENTIAL PROTECTION


(LOW / HIGH IMPEDANCE DIFFERENTIAL PROTECTION)
CT MB

P2 P2 P2 R-CT CORE-1
CTR: 200/1A

CT MB

RET 670

3S1 3S2

3 3 3
3S2 3S2

3S1

3S1

CLASS: PS

IN CASE OF REACTOR BUSHING CT P2 IS AWAY FROM REACTOR & P1 IS TOWARDS REACTOR

3 3 3
1S2 1S2 1S1 1S1

HV BUSHING

1S2 1S1

ACTIVE

START

TRIP

P2 P2 P2 R-CT

DISPLAY C

STAR BUSHING CORE-3


CTR: 200/1A

CLASS: PS

NORMALLY LOW / HIGH IMPEDENCE DIFFERENTIAL RELAY IS USED FOR BUS / LINE REACTOR DIFFERENTIAL PROTECTION

LINE/BUS REACTOR DIFFERENTIAL PROTECTION


(HIGH IMPEDANCE DIFFERENTIAL PROTECTION)
P2 P2 P2 R-CT HV CORE-1
CTR: 200/1A

CLASS: PS P1 P1 P1

R-CT STAR CORE-3


CTR: 200/1A

CLASS: PS

3 3 3

BUSHING CT

3 3 3

BUSHING CT

RET 670
1S2 1S2 1S2 ACTIVE START TRIP 1S1 1S1 1S1

DISPLAY C E
NORMALLY LOW / HIGH IMPEDENCE DIFFERENTIAL RELAY IS USED FOR BUS / LINE REACTOR DIFFERENTIAL PROTECTION
IN CASE OF REACTOR BUSHING CT P2 IS AWAY FROM REACTOR & P1 IS TOWARDS REACTOR

P1 P1 P1

3S1 3S1 3S1

3S2 3S2 3S2

P2 P2 P2

LINE/BUS REACTOR REF PROTECTION


(NGR IS NOT AVAIALBLE)
P2 P2 P2 R-CT HV CORE-2
CTR: 200/1A

CLASS: PS P1 P1 P1

R-CT STAR CORE-4


CTR: 200/1A

CLASS: PS IN CASE OF REACTOR BUSHING CT P2 IS AWAY FROM REACTOR & P1 IS TOWARDS REACTOR

3 3 3

BUSHING CT

3 3 3

BUSHING CT

RET 670
2S2 2S2 2S2 ACTIVE START TRIP 2S1 2S1 2S1

DISPLAY C E

P1 P1 P1

NORMALLY HIGH IMPEDENCE VOLTAGE/CURRENT OPERATED SINGLE POLE RELAY IS USED FOR BUS / LINE REACTOR RESTRICTED EARTH FAULT PROTECTION. PRESENTLY NUMERICAL DIFFERENTIAL RELAYS HAVING IN BUILT FUNCTION OF 2 REF OR 2 SEF PROTECTIONS.

4S1 4S1 4S1 4S2 4S2 4S2

P2 P2 P2

LINE REACTOR REF PROTECTION


(NGR IS AVAIALBLE)
P2 P2 P2 R-CT HV CORE-2
CTR: 200/1A

CLASS: PS P1 P1 P1

NGR-CT EARTH CORE-2


CTR: 200/1A

CLASS: PS IN CASE OF REACTOR BUSHING CT P2 IS AWAY FROM REACTOR & P1 IS TOWARDS REACTOR

3 3 3

BUSHING CT

3 3 3

BUSHING CT

RET 670
2S2 2S2 2S2 ACTIVE START TRIP 2S1 2S1 2S1

DISPLAY C E

P1 P1 P1

NORMALLY HIGH IMPEDENCE VOLTAGE/CURRENT OPERATED SINGLE POLE RELAY IS USED FOR BUS / LINE REACTOR RESTRICTED EARTH FAULT PROTECTION. PRESENTLY NUMERICAL DIFFERENTIAL RELAYS HAVING IN BUILT FUNCTION OF 2 REF OR 2 SEF PROTECTIONS.

2S1 2S1 2S1 2S2 2S2 2S2

P2 P2 P2

LINE REACTOR 2 NOs REF PROTECTIONS


(NGR IS AVAIALBLE)
P2 P2 P2 CT MB R-CT HV CORE-2
CTR: 200/1A

P2 P2 P2

CLASS: PS P1 P1 P1

R-CT STAR CORE-4


CTR: 200/1A

CLASS: PS

3 3 3

BUSHING CT

3 3 3

BUSHING CT

RET 670
2S2 2S2 2S2 ACTIVE START TRIP 2S1 2S1 2S1
1S2 1S1

3 3 3
1S1 1S1

1S2

1S2

DISPLAY C E
NORMALLY HIGH IMPEDENCE VOLTAGE/CURRENT OPERATED SINGLE POLE RELAY IS USED FOR BUS / LINE REACTOR RESTRICTED EARTH FAULT PROTECTION. PRESENTLY NUMERICAL DIFFERENTIAL RELAYS HAVING IN BUILT FUNCTION OF 2 REF OR 2 SEF PROTECTIONS. P1 P1 P1 NGR-CT BUSHING CT CORE - 1 & 2
CTR: 200/1A

CLASS: PS

CT MB

P1 P1 P1

P1 P1 P1

4S1 4S1 4S1 4S2 4S2 4S2

2S1 2S2

3 3 3
2S2 2S2

2S1

2S1

P2 P2 P2

P2 P2 P2

LINE/BUS REACTOR B/U IMPEDANCE PROTECTION

P2 P2 P2 R-CT HV CORE-3
CTR: 200/1A

CT MB IR3 / A311 IY3 / A331 IB3 / A351 VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171 CVT SELECTION BUS-1 CVT / BUS-2 CVT / LINE CVT CORE-1
VA : 200

CLASS: PS

3 3 3
3S2 3S2 3S1 3S1

BUSHING CT

REL 670
ACTIVE START TRIP

3S2 3S1

IN3 / A371

DISPLAY C E

CLASS: 3P

LINE REACTOR PROTECTION FOR LINE


P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

CT MB

(MAIN-1 PROTECTION)
IR5 / A511 IY5 / A531 IB5 / A551

CLASS: PS

2-CT
CTR: 2000-1000-500/1A

CLASS: PS

LR-CT 400KV
CTR: 2000-1000-500/1A

CLASS: PS P1 P1 P1

3 3 3

CORE-5

3 3 3

CORE-5

3 3 3
5S4 5S4 5S2 5S2 5S2 5S2 5S4 5S4 5S4 5S4 5S2 5S2

CORE-5

REL 521
ACTIVE START TRIP

5S4 5S2

VR11 / E111 VY11 / E131 VB11 / E151 VN11 / E171 1-CVT

IN5 / A571

DISPLAY C
5S2 5S4

CORE 1 200VA CLASS: 3P

P2 P2 P2

5S4 5S2

LINE REACTOR PROTECTION FOR LINE


(MAIN-2 PROTECTION)
P2 P2 P2 1-CT
CTR: 2000-1000-500/1A

CT MB IR4 / A411 IY4 / A431 IB4 / A451 VR21 / E211 VY21 / E231 VB21 / E251 VN21 / E271 1-CVT

CLASS: PS

2-CT
CTR: 2000-1000-500/1A

CLASS: PS

LR-CT 400KV
CTR: 2000-1000-500/1A

CLASS: PS P1 P1 P1

3 3 3

CORE-4

3 3 3

CORE-4

3 3 3
4S4 4S4 4S2 4S2 4S2 4S2 4S4 4S4 4S4 4S4 4S2 4S2

CORE-4

REL 316
ACTIVE START TRIP

4S4 4S2

IN4 / A471

DISPLAY C
4S2 4S4

CORE 2 200VA CLASS: 3P

P2 P2 P2

4S4 4S2

BUS REACTOR TEED-1 PROTECTION


P2 P2 P2 3-CT
CTR: 2000-1000-500/1A

{BAY3&2} IR5 IY5 IB5

CLASS: PS P1 P1 P1 P2 P2 P2 2-CT
CTR: 2000-1000-500/1A

CLASS: PS

BR-LCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-5

3 3 3

CORE-1

3 3 3
5S4 5S4 5S2 5S2 1S4 1S4 1S2 1S2 4S4 4S4 4S2 4S2

CORE-5

5S4 5S2

IN5

RET 670
IR5 IY5 IB5 IN5
P1 P1 P1 P2 P2 P2
ACTIVE START TRIP

1S4 1S2

DISPLAY C E

IN1
4S4 4S2

IB1 IY1 IR1


P1 P1 P1

IT WORKS ON CIRCULATING CURRENT PRINCIPLE AND IT IS HIGH IMPEDENCE DIFFERENTIAL RELAY. TEED-1 PROTECTION FOR BAY 2&3 AND THE FOLLOWING CTs & CORES ARE USED 3-CT(CORE-5), 2-CT(CORE-1) & BR-CT (CORE-5) ARE STARRED AND CONNECTED TO TEED-1 PROTECTION

BUS REACTOR TEED-2 PROTECTION


{BAY3&2} RAICA LBB/BFR
P2 P2 P2 3-CT
CTR: 2000-1000-500/1A

CT MB

CT MB

P2 P2 P2

CLASS: PS

BR-CT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-4

3 3 3
4S4 4S4 4S2 4S2 4S4 4S4 4S2 4S2

CORE-4

4S4 4S2

RAICA LBB/BFR

RET 670
ACTIVE START TRIP

2S4 2S2

3 3 3
2S2 2S2

2S4

2S4

2-CT

DISPLAY
P2 P2 P2 CT MB

CORE-2
CTR: 2000-1000-500/1A

CLASS: PS

C
4S4 4S2

IT WORKS ON KIRCHOFFS CURRENT PRINCIPLE & IT IS PERCENTAGE BIASED LOW IMPEDENCE DIFFERENTIAL RELAY. TEED-2 PROTECTION FOR BAY 2&3 IS THE FOLLOWING CTs & CORES ARE USED. 3-CT(CORE-4), 2-CT(CORE-2) & BR-CT (CORE-4) ARE CONNECTED TO TEED-2 PROTECTION.

REACTOR MULTI FUNCTION PANEL METERING


P2 P2 P2 R-CT STAR CORE-2
CTR: 200/1A

CT MB IR2 / D211 IY2 / D231 IB2 / D251

CLASS: 0.2

3 3 3
2S2 2S2 2S1 2S1

BUSHING CT

2S2 2S1

IN2 / D271

VR31 / E311 VY31 / E331 VB31 / E351 VN31 / E371 BASED ON SELECTION LINE CVT / BUS-1 CVT / BUS-2 CVT CORE 3 100VA CLASS: 0.2

OVER EXCITATION/FLUX RELAY


{FOR LINE & BUS REACTORS}
VOLTAGE SELECTION BUS-1 PT / BUS-2 PT CORE-1
VA : 200

RATUB V/F RELAY LINE

CLASS: 3P

CVT SELECTION BUS-1 CVT / BUS-2 CVT / LINE CVT CORE-1


VA : 200

RATUB V/F RELAY BUS

CLASS: 3P

CARRIER INTERTRIPPING OF LINE SHUNT REACTOR


LINE SHUNT REACTOR PROTECTION TRIPPINGS WILL BE USED AS DIRECT TRIPPINGS OF LINE IN ADDITION TO OTHER TRIPPINGS. BUS SHUNT REACTOR NEED NOT REQUIRE CARRIER INTER TRIPPING FACILITY.
87R REACTOR DIFFERENTIAL RELAY RET 670 21R REACTOR IMPEDENCE RELAY REL 670
64R RESTRICTED EARTH FAULT RELAY

ABB NSD 50
DC +VE FROM PANEL

LINE PROTECTION COUPLER PANEL-1

RET 670 REACTORS INTERNAL FAULTS GROUP-1/A TRIPPINGS

G4AD V9LC 2 G4AD V9LC 1


DC VE FROM PANEL

87R REACTOR DIFFERENTIAL RELAY RET 670 21R REACTOR IMPEDENCE RELAY REL 670
64R RESTRICTED EARTH FAULT RELAY

ABB NSD 50
DC +VE FROM PANEL

LINE PROTECTION COUPLER PANEL-2

RET 670 REACTORS INTERNAL FAULTS GROUP-2/B TRIPPINGS

G4AD V9LC 2 G4AD V9LC 1


DC VE FROM PANEL

ADDITIONAL AND SPECIAL FUNCTIONS ADOPTED IN ONE AND HALF CIRCUIT BREAKER SCHEME
(EVENT LOGGER & DISTURBANCE RECORDER) PREPARED BY
GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

400KV SUBSTATION: MAMIDIPALLY


19 MAR 2004 13:00:00 A 13:09:37.090 # 195 A 13:09:37.096 # 188 A 13:09:37.097 # 187 A 13:09:37.100 # 181 A 13:09:37.104 # 162 A 13:09:37.110 # 196 A 13:09:37.110 # 170 A 13:09:37.111 # 161 A 13:09:37.111 # 163 A 13:09:37.111 # 169 A 13:09:37.112 # 168 A 13:09:37.113 # 182 A 13:09:37.126 # 199 A 13:09:37.140 # 185 N 13:09:37.147 # 195 N 13:09:37.148 # 196 N 13:09:37.175 # 187 N 13:09:37.176 # 181 N 13:09:37.176 # 188 N 13:09:37.185 # 182 N 13:09:37.257 # 199 N 13:09:37.279 # 185 19 MAR 2004 14:00:00 N 14:09:48.702 # 163 N 14:09:48.704 # 161 N 14:09:48.720 # 162 N 14:10:00.903 # 169 N 14:10:00.907 # 168 N 14:10:00.907 # 170 19 MAR 2004 15:00:00

EVENT LOGGER EVENTS INFORMATION

400KV SRISAILAM-2 MAIN-2 RAZFE PROT TRIP 400KV SRISAILAM-2 MAIN-1 REL100 PROT STARTY 400KV SRISAILAM-2 MAIN-1 REL100 PROT STARTR 400KV SRISAILAM-2 MAIN-1 REL100 PROT TRIP 400KV SRISAILAM-2 MAIN CB 752 Y-PH OPEN 400KV SRISAILAM-2 MAIN-2 RAZFE CARRIER SEND 400KV SRISAILAM-2 AT/F-2 TIE CB 852 B-PH OPEN 400KV SRISAILAM-2 MAIN CB 752 R-PH OPEN 400KV SRISAILAM-2 MAIN CB 752 B-PH OPEN 400KV SRISAILAM-2 AT/F-2 TIE CB 852 Y-PH OPEN 400KV SRISAILAM-2 AT/F-2 TIE CB 852 R-PH OPEN 400KV SRISAILAM-2 MAIN-1 REL100 CARRIER SEND 400KV SRISAILAM-2 CARRIER PROT CH-2 RECEIVED 400KV SRISAILAM-2 CARRIER PROT CH-1 RECEIVED 400KV SRISAILAM-2 MAIN-2 RAZFE PROT TRIP RESET 400KV SRISAILAM-2 MAIN-2 RAZFE CARRIER SEND RESET 400KV SRISAILAM-2 MAIN-1 REL100 START R RESET 400KV SRISAILAM-2 MAIN-1 REL100 PROT TRIP RESET 400KV SRISAILAM-2 MAIN-1 REL100 START Y RESET 400KV SRISAILAM-2 MAIN-1 REL100 CARRIER SEND RESET 400KV SRISAILAM-2 CARRIER PROT CH-2 RECEIVED RESET 400KV SRISAILAM-2 CARRIER PROT CH-1 RECEIVED RESET 400KV SRISAILAM-2 MAIN CB 752 B-PH CLOSE 400KV SRISAILAM-2 MAIN CB 752 R-PH CLOSE 400KV SRISAILAM-2 MAIN CB 752 Y-PH CLOSE 400KV SRISAILAM-2 AT/F-2 TIE CB 852 Y-PH CLOSE 400KV SRISAILAM-2 AT/F-2 TIE CB 852 R-PH CLOSE 400KV SRISAILAM-2 AT/F-2 TIE CB 852 B-PH CLOSE

DISTURBANCE RECORDER

R PH VOLTAGE Y PH VOLTAGE B PH VOLTAGE OPEN DELTA VOLTAGE R PH CURRENT Y PH CURRENT B PH CURRENT STAR/NEUTRAL CURRENT
MAIN CB R PH OPEN MAIN CB Y PH OPEN MAIN CB B PH OPEN TIE CB R PH OPEN TIE CB Y PH OPEN TIE CB B PH OPEN MAIN/TIE CB LBB OPTD DIRECT TRIP CH-1/2 OPTD BUSBAR PROT OPTD MAIN-1 PROT OPTD MAIN-2 PROT OPTD OVER VOLTAGE STAGE-1/2 OPTD STUB PROT-1/2 OPTD MAIN-1 PROT CARRIER RECEIVE MAIN-2 PROT CARRIER RECEIVE DF/DT OPTD EVENT NO NAME OF FEEDER DATE & TIME

PREFERRED DISTURBANCE RECORDER


400 KV LINES
ANALOG CHANNELS
1. 2. 3. 4. 5. 6. 7. 8. R-PH VOLTAGE Y-PH VOLTAGE B-PH VOLTAGE OPEN DELTA VOLTAGE R-PH CURRENT Y-PH CURRENT B-PH CURRENT NEUTRAL/STAR CURRENT

400 KV TRANSFORMER
ANALOG CHANNELS
1. HV 2. HV 3. HV 4. HV 5. LV 6. LV 7. LV 8. LV 9. HV 10. HV 11. HV 12. HV 13. LV 14. LV 15. LV 16. LV R-PH VOLTAGE Y-PH VOLTAGE B-PH VOLTAGE OPEN DELTA VOLTAGE R-PH VOLTAGE Y-PH VOLTAGE B-PH VOLTAGE OPEN DELTA VOLTAGE R-PH CURRENT Y-PH CURRENT B-PH CURRENT NEUTRAL/STAR CURRENT R-PH CURRENT Y-PH CURRENT B-PH CURRENT NEUTRAL/STAR CURRENT

DIGITAL CHANNELS
1. HV MAIN CB R-PH OPEN 2. HV MAIN CB Y-PH OPEN 3. HV MAIN CB B-PH OPEN 4. HV TIE CB R-PH OPEN 5. HV TIE CB Y-PH OPEN 6. HV TIE CB B-PH OPEN 7. LV 220 CB R-PH OPEN 8. LV 220 CB Y-PH OPEN 9. LV 220 CB B-PH OPEN 10 87 LZ DIFF RLY OPERATED 11. HV 67 ABCN OPERATED 12. LV 67 ABCN OPERATED 13. 51 O/L RLY OPERATED 14. 64 REF / 87 HZ RLY OPERATED 15. NDR RLY OPERATED 16. HV 99T OVER FLUX OPTD 17. LV 99T OVER FLUX OPTD 18. HV 400 BUSBAR OPERATED 19. LV 220 BUSBAR OPERATED 20. HV MAIN CB LBB OPERATED 21. HV TIE CB LBB OPERATED 22. LV 220 CB LBB OPERATED 23. HV 86 GR-A/B RELAY OPTD 24. LV 86 GR-A/B RELAY OPTD 25. AT/F 21T UZ RELAY OPERATED 26. OIL TEMP HIGH TRIP 27. WNDG TEMP HV/IV/LV TRIP 28. BUCHHOLZ MAIN/OLTC TRIP 29. PRD 1/ 2 TRIP 30. AT/F NEUTRAL CURRENT TRIP

DIGITAL CHANNELS
1. HV MAIN CB R-PH OPEN 2. HV MAIN CB Y-PH OPEN 3. HV MAIN CB B-PH OPEN 4. HV TIE CB R-PH OPEN 5. HV TIE CB Y-PH OPEN 6. HV TIE CB B-PH OPEN 7. 21 MAIN1 REL 521 OPERATED 8. 21 MAIN2 REL 316 OPERATED 9. 87 BUSBAR RELAY OPERATED 10. MAIN CB A/R OPERATED 11. TIE CB A/R OPERATED 12. PSB OPERATED 13. SOTF OPERATED 14. 27 O/V STG-1/2 OPERATED 15. 51 STUB-1/2 OPERATED 16. 87HZ / LZ TEED-1/2 OPERATED 17. MAIN CB LBB OPERATED 18. TIE CB LBB OPERATED 19. DIRECT TRIP CH-1/2 TRIP 20. 21M1 / 21M2 CARRIER RECEIVE 21. 86 GR-A/B RELAY OPERATED 22. 67N DEF/TEF RLY OPERATED 23. DF/DT RELAY OPERATED

CONFIGUARATION OF CONTROL & RELAY PANELS IN ONE AND HALF CIRCUIT BREAKER SCHEME

PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

CONFIGUARATION OF C & R PANEL


CONTROL PANEL 1. AMMETERS IN 3Phs 2. VOLTMETER WITH SEL. SWITCH 3. WATTMETER 4. VAR METER 5. 20W ANNUCIATION FACIA 6. CB CONTROL (TNC) SWITCH 7. ISO CONTROL (TNC) SWITCH 8. SEMAPHORE FOR EARTH SWITCH 9. INDICATING LAMPS FOR CB G&R 10. INDICATING LAMPS FOR ISO 11. INDICATING LAMPS FOR DC 12. INDICATING LAMPS FOR ISO I/L 13. PUSH BUTTON FOR ANNUNCIATION 14. SYNCHRONISING SOCKET FOR CB 15. SYNCHRONISING SEL.SWITCH 16. PROTECTION TRANSFER 17. MIMIC TO REPRESENT SLD 18. CUTOUT FOR RWTI WITH SEL .SWI. 19. PANEL INDICATING LABEL
* IN CASE OF ONE AND HALF CB SYSTEM CONTROL PANEL FOR FULL DIA IS TO BE AVAILABLE

CB RELAY PANEL 1. BREAKER FAILURE RELAY 2. AUTO RECLOSURE RELAY 3. CHECK SYNCHRONISING RELAY 4. CB ALARM RELAYS 5. CB TRIP CKT SUPERVISION RELAYS 6. 3-PH TRIP UNITS 86-GA & 86-GB 7. 1-PH TRIP RELAYS M1, M2 - 1 2 Nos 8. DIRECT TRIP RECEIVE RELAYS 9. DC SUPERVISION RELAYS 10. U/V RELAY E/S I/L 11. CB MULTIPLICATION RELAY 12. TEST TERMINAL BLOCK 13. ENERGY METER 14. AUX RELAYS 15. PANEL INDICATING LABEL

LINE PROTECTION PANEL


1. MAIN-1 NUM. DIST. PROT 2. MAIN-2 NUM. DIST. PROT. 3. O/V STAGE-1 (EXT/IN BUILT) 4. O/V STAGE-2 (EXT/IN BUILT) 5. DISTURBANCE RECORDER(EXT/INBUILT) 6. DISTANCE TO FAULT (EXT/ INBUILT) 7. DC SUPERVISION RELAYS 8. TEED-1 PROTECTION 9. TEED-2 PROTECTION 10. STUB-1/2 PROTECTION (EXT/ INBUILT) 11. AUXILIARY RELAYS 12. MAIN-1 CARRIER SEL.SWITCH 13. MAIN-2 CARRIER SEL.SWITCH 14. CARRIER RECEIVE RELAYS 15. FLAG RELAYS 16. TIMERS 17. PANEL INDICATING LABEL

CONFIGUARATION OF C & R PANEL


TRANSFORMER PROTECTION PANEL
HV PROTECTION PANEL MV PROTECTION PANEL

REACTOR PROTECTION PANEL


1. REACTOR DIFFERENTIAL PROTECTION 2. REF PROTECTION RELAY 3. REACTOR IMPEDENCE PROTECTION 4. CVT SELECTION RELAYS 5. FLAG RELAYS 6. AUX RELAYS 7. TIMERS 8. CIRCUIT LABEL

1. T/F DIFFERENTIAL PROTECTION 2. REF PROTECTION RELAY 3. DIRECTIONAL O/L E/F RELAYS 4. OVER FLUX PROTECTION 5. OVER LOAD PROTECTION 6. VOLTAGE SELECTION RELAYS 7. FUSE FAILURE RELAY 8. AUX RELAYS FOR T/F TROBLES 9. FLAG RELAYS 10. TIMERS 11. CIRCUIT LABEL

1. DIRECTIONAL O/L E/F RELAYS 2. OVER FLUX PROTECTION 3. NEUTRAL DISPALCEMENT RELAY 4. VOLTAGE SELECTION RELAYS 5. FUSE FAILURE RELAY 6. AUX RELAYS FOR T/F TROBLES 7. FLAG RELAYS 8. TIMERS 9. CIRCUIT LABEL

IN ADDITION TO THE ABOVE THE FOLLOWING PANELS WILL BE AVAILABLE 1. CONTROL PANELS FOR LINE, T/F, B/C, TBC, BUS REACTOR (AS & WHEN REQ) 2. COMMON CONTROL PANEL 3. BUS BAR PROTECTION PANELS 4. TRANSFER BUS COUPLER PROTECTION PANEL(IN CASE OF DMT/SMT SCHEME) 5. BUS COUPLER PROTECTION PANEL (IN CASE OF DMT/DB SCHEME) I. NOMINCLATURE FOR PANELS ARE NORMALLY MAIN CB PANEL RLA, TIE CB PANEL RTB, HV CB PANEL RTRA, LV CB PANEL RTRD LINE PROTECTION PANEL RLB, HV PROTECTION PANEL RTRB, LV PROTECTION PANEL RTRC, LINE REACTOR PROTECTION PANEL RLRC, BUS REACTOR PROTECTION PANEL RBRA, BUS BAR PANEL RBBA, CONTROL PANEL CP, KP, KT, KBC, KTBC,KL,CCP

400KV INTEGRATED CONTROL PANELS

400KV LINE CB RELAY & PROTN PANEL


4RLA
79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY) 50 Z (LBB / BFR) CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1 TSR TC-1I

4RLB

4RTB
79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY) 50 Z (LBB / BFR) CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1 TSR TC-1I

21 MAIN 1

DC I & II

DC I & II

21 MAIN 2
86 GR -A 1-PH TRIP RELAYS -6 FOR 21M1 1-PH TRIP RELAYS -6 FOR 21M2 D/T CH-2 RECEIVE RELAYS DC-1I DC-1 86 GR -A 1-PH TRIP RELAYS -6 FOR 21M1 1-PH TRIP RELAYS -6 FOR 21M2 D/T CH-2 RECEIVE RELAYS BREAKER MULTIPLICA TION RELAY

86 GR -B

86 GR -B

D/T CH-1 RECEIVE RELAYS

59 L1 59 L2 O/V STG-1 O/V STG-1i 21 MAIN 1 21 MAIN 1i AUX RELYS AUX RELYS

D/T CH-1 RECEIVE RELAYS

BREAKER UNDER VOLTAGE MULTIPLICA RELAY TION RELAY

87 HIGH TEED-1

87 LOW TEED-2

400KV LINE + R CB RELAY & PROTN PANEL


4RLA
79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY) 50 Z (LBB / BFR) CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1 TSR TC-1I

4RLRB
75 A 75 B 75 L

4RLC

4RTB
79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY)

87 MAIN HIGH IMP

21 MAIN 1

50 Z (LBB / BFR) CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1 TSR TC-1I

DC I & II

86 GR -A

1-PH TRIP RELAYS -6 FOR 21M1 1-PH TRIP RELAYS -6 FOR 21M2 DC-1

21 IMP DISTANCE

DC I & II

21 MAIN 2
86 GR -A 1-PH TRIP RELAYS -6 FOR 21M1 1-PH TRIP RELAYS -6 FOR 21M2 D/T CH-2 RECEIVE RELAYS BREAKER MULTIPLICA TION RELAY

DC-1I

86 GR -B

DC-1I

DC-1

86 GR -B

D/T CH-1 D/T CH-2 RECEIVE RECEIVE RELAYS RELAYS UNDER BREAKER VOLTAGE MULTIPLIC ATION RELAY RELAY

HIGH SPEED

64 REF AUX TRIP


RELAYS

59 L1 59 L2 O/V STG-1 O/V STG-1i 21 MAIN 1 21 MAIN 1i AUX RELYS AUX RELYS

D/T CH-1 RECEIVE RELAYS

87 HIGH TEED-1

87 LOW TEED-2

400KV ICT HV + IV CB RELAY & PROTN PANEL


4RTRA 4RTRB
75 A 75 B 75 L 50 Z (LBB / BFR) CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1 TSR TC-1I

4RTRC

75 A 75 B

87 MAIN 1 LOW IMP

50 Z (LBB / BFR) CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1 TSR TC-1I

DC I & II

87 MAIN 2 HIGH IMP

DC I & II

86 GR -A

86 GR -B

86 GR -A

86 GR -B

INTER TRIP INTER TRIP RECEIVE RECEIVE RELAYS RELAYS

HIGH SPEED AUX TRIP RELAYS

DC-1I

DC-1

67 HV

67 IV

AUX RLYS AUX RLYS INTER TRIP INTERTRIP RECEIVE RECEIVE BREAKER MULTIPLICA TION RELAY

BREAKER MULTIPLICA TION RELAY

99T HV O/F

99T IV O/F

ICT / ATF TROUBLES ALARAM & TRIP FLAG RELAYS AUX RLYS FOR HV 87 HIGH TEED-1 AUX RLYS FOR IV 87 LOW TEED-2

400KV BUS REACTOR CB RELAY & PROTN PANEL


4RBRA 4RBRB 4RTB
79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY) 75 A 75 B

50 Z (LBB / BFR) CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1 TSR TC-1I

87 MAIN HIGH IMP

50 Z (LBB / BFR) CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1 TSR TC-1I

DC I & II

21 IMP DISTANCE

DC I & II

86 GR -A

86 GR -B

86 GR -A

1-PH TRIP RELAYS -6 FOR 21M1 1-PH TRIP RELAYS -6 FOR 21M2 D/T CH-2 RECEIVE RELAYS BREAKER MULTIPLICA TION RELAY

DC-1I

DC-1

86 GR -B

64 REF
BREAKER MULTIPLICA TION RELAY 87 HIGH TEED-1

HIGH SPEED AUX TRIP RELAYS 87 LOW TEED-2

D/T CH-1 RECEIVE RELAYS

400KV BUSBAR PROTECTION & COMMON CONTROL PANEL


4RBB2 BBM1 + 96 UNITS 4RBB3 BBM2 + 96 UNITS

CONFIGUARATION OF C & R PANEL


BUSBAR PANEL 1. BCU-1 2. BCU-2 3. BUSBAR CENTRAL UNIT 4. BUS-1 ES CMR 5. BUS-2 ES CMR 6. DC-1 HEALTHY INDICATION 7. DC-2 HEALTHY INDICATION 8. BUSBAR PROT AUX RELAYS 9. CLOSING AUX RELAYS
* IN CASE OF DUPLICATE PROTECTION 2 NOS BUSBAR CENTRAL UNITS ARE AVAILABLE

CB RELAY PANEL 1. BAY CONTROL UNIT 2. BREAKER FAILURE RELAY 3. AUTO RECLOSURE RELAY 4. CHECK SYNCHRONISING RELAY 5. CB ALARM RELAYS 6. CB TRIP CKT SUPERVISION RELAYS 7. 3-PH TRIP UNITS 86-GA, 86-GB & 96/50Z 8. 1-PH TRIP RELAYS M1, M2 - 1 2 Nos 9. DIRECT TRIP RECEIVE RELAYS 10. DC SUPERVISION RELAYS 11. U/V RELAY E/S I/L 12. CB EMERGENCY TNC SWITCH 13. CLOSING AUX RELAYS 14. ENERGY METER WITH TTB 15. PANEL INDICATING LABEL

LINE PROTECTION PANEL


1. MAIN-1 NUM. DIST. PROT 2. MAIN-2 NUM. DIST. PROT. 3. O/V STAGE-1 (EXT/IN BUILT) 4. O/V STAGE-2 (EXT/IN BUILT) 5. DISTURBANCE RECORDER(EXT/INBUILT) 6. DISTANCE TO FAULT (EXT/ INBUILT) 7. DC SUPERVISION RELAYS 8. TEED-1 PROTECTION 9. TEED-2 PROTECTION 10. STUB-1/2 PROTECTION (EXT/ INBUILT) 11. MAIN-1 CARRIER SEL.SWITCH 12. MAIN-2 CARRIER SEL.SWITCH 13. CARRIER RECEIVE RELAYS 14.PANEL INDICATING LABEL

CONFIGUARATION OF C & R PANEL


TRANSFORMER PROTECTION PANEL 1. T/F DIFFERENTIAL PROTECTION-1 2. T/F DIFFERENTIAL PROTECTION-2 3. DIRECTIONAL O/L E/F RELAYS-HV 4. DIRECTIONAL O/L E/F RELAYS-LV 4. OVER FLUX PROTECTION-HV & LV 5. OVER LOAD PROTECTION 6. VOLTAGE SELECT RELAYS- HV & LV 7. FUSE FAILURE RELAY- HV & LV 8. AUX RELAYS FOR T/F TROBLES 9. CIRCUIT LABEL BUS REACTOR CB RELAY PANEL 1. BAY CONTROL UNIT 2. BREAKER FAILURE RELAY 3. CB ALARM RELAYS 4. CB TRIP CKT SUPERVISION RELAYS 5. 3-PH TRIP UNITS 86-GA, 86-GB & 96/50Z 6. DC SUPERVISION RELAYS 7. U/V RELAY E/S I/L 8. CB EMERGENCY TNC SWITCH 9. MFM WITH TTB 10. PANEL INDICATING LABEL LINE / BUS REACTOR PROTECTION PANEL 1. REACTOR DIFFERENTIAL PROT 2. REF PROTECTION RELAY 3. REACTOR IMPEDENCE PROTECTION 4. CVT SELECTION RELAYS 5. FLAG RELAYS 6. AUX RELAYS 7. TIMERS 8. CIRCUIT LABEL

IN ADDITION TO THE ABOVE THE FOLLOWING PANELS WILL BE AVAILABLE 1. CONTROL & RELAY PANEL B/C, B/S, TBC (AS & WHEN REQ) 2. COMMON CONTROL PANEL IS PART OF BUSBAR PANEL I. NOMINCLATURE FOR PANELS ARE NORMALLY MAIN CB C&RPANEL RLA, TIE CB C&R PANEL RTB, HV CB C&RPANEL RTRA, LV CB C&R PANEL RTRC, LINE PROTECTION PANEL RLB, ICT PROTECTION PANEL RTRB, LINE REACTOR PROTECTION PANEL RLRC, BUS REACTOR PROTECTION PANEL RBRA, BUS BAR PANEL RBB,

400KV & 220KV BUSBAR & COMMON CONTROL PANEL


4RBB 2 RBB

BCU1 BCU2

BCU2

BCU1

BCU3 BUSBAR CENTRAL UNIT BUSBAR CENTRAL UNIT


89BB1 AE CMR Bus Bar Aux relays 89BB1 AE CMR 89BB2 AE CMR
DC -1 DC -2

Bus Bar Aux relays

DC -1 DC -2

APTRANSCO IS FOLLOWING SINGLE BUS BAR PROTECTION. POWERGRID IS FOLLOWING DUPLICATE BUS BAR PROTECTION. ABB, AREVA, SIEMENS, TOSHIBA ARE HAVING DISTRIBUTED ARCHITECTURE. ABB, AREVA, GE, ER, ERL PHASE, SEL ARE HAVING CENTRALISED ARCHITECTURE. LBB IS THE PART OF BUSBAR IS LATEST CONCEPT. INCASE OF DISTRIBUTED ARCHITECTURE BAY/PERIPHERAL UNIT IS DATA AQUSITION UNIT AND COMMUNICATE TO CENTRAL UNIT THROUGH FIBER OPTIC CABLE. DICTRIBUTED/ CENTRALISED ARCHITECTURE - LBB IS INBUILT LOGIC. FINALLY THE CONCEPT AS FOLLOWS IN FUTURE FOR FEEDER : REDUNDANT DISTANCE PROTECTION. FOR ICT : REDUNDANT DIFFERENTIAL PROTECTION. FOR BUSBAR : REDUNDANT BUSBAR PROTECTION.

89BB2 AE CMR

400KV LINE + REACTOR CB RELAY & PROTN PANEL


4RLA 4RLB 4RLRC1/RBR3 4RTB2

75A,B,L

BAY1 BCU

21L1

87R

BAY2 BCU

A/R+SC 79+25

LBB/ BU 50Z TRIP COIL

A/R+SC 79+25

LBB/ BU 50Z TRIP COIL

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

21L2

64R

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

186 R1,Y1,B1 86 GR-A R2,Y2,B2 286 86 R1,Y1,B1 GR-B R2,Y2,B2 96 50Z

DC-1

DC-2

59-1&2
CB PB

21R

D/T-1 D/T-2 Receive Receive Relays Relays

50 ZT

CB PB

99R

DC-2

Reactor Trouble Alarms & Trips

186 86 R1,Y1,B1 GR-A R2,Y2,B2 286 86 R1,Y1,B1 GR-B R2,Y2,B2

DC-1

400KV ICT CB RELAY & PROTN PANEL


4RTB2 4RTRA3 4RTRB3 4RTRC3

75A,B,L

75A,B 87T1

BAY2 BCU

BAY3 BCU

LV BAY BCU

A/R+SC 79+25

LBB/ BU 50Z TRIP COIL

LBB/ BU 50Z
CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

LBB/ BU 50Z

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

TRIP COIL

87T2

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

TRIP COIL

186 86 R1,Y1,B1 GR-A R2,Y2,B2 286 86 R1,Y1,B1 GR-B R2,Y2,B2 50 ZT

DC-1

DC-1

86 GR-A 86 GR-B

DC-2

DC-2

67HV

67IV

86 GR-B 96/ 50Z

CB PB

Inter 96/ Trip 50Z Relays CB PB

99HV

99IV

Inter Trip Relays CB PB

MFM

MFM

DC-2

Transformer Trouble Alarms & Trips

86 GR-A

DC-1

220KV FEEDER CB RELAY & PROTN PANEL


2RLA1 2RLB1

75A 75B BAY1 BCU 21L1

A/R+SC 79+25

LBB/ BU 50Z TRIP COIL

21L2

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

186 86 R1,Y1,B1 GR-A R2,Y2,B2 286 86 R1,Y1,B1 GR-B R2,Y2,B2 96 / 50Z TTS

DC-2

DC-1

CB PB

D/T-1 D/T-2 Receive Receive Relays Relays

MFM

220KV BC, TBC & BS CB RELAY & PROTN PANELS


2RBC 2RTBC 2RBC

BC BCU

TBC BCU

BS BCU

LBB/ BU 50Z

LBB/ BU 50Z TRIP COIL

A/R+SC 79+25

LBB/ BU 50Z TRIP COIL

LBB/ BU 50Z

LBB/ BU 50Z TRIP COIL

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

86 GR-A 86 GR-B 96 50Z

186 86 R1,Y1,B1 GR-A R2,Y2,B2 286 86 R1,Y1,B1 GR-B R2,Y2,B2 96 50Z

DC-1

DC-1

86 GR-A 86 GR-B 96 50Z

DC-2

DC-2

CB PB

CB PB

CB PB

50/51 A,B C,N

50/51 A,B C,N

DC-2

DC-1

SUBSTATION AUXILIARIES & TERMINAL PANELS


SSAUX For AC 415V System-1 BCU1 For DC 220V System-1 BCU3 For DC 48V System-1 BCU5 For Air condition System BCU7 For Diesel Generator System BCU9
ABB Network Partner AG

For AC 415V System-2 BCU2 For DC 220V System-2 BCU4 For DC 48V System-2 BCU6 For Fire Fighting System BCU8 For fire & Smoke Detector BCU10
COM581

Base System Alarm Unit

Hot Standby Alarm Unit

Main Server
ABB Network Partner AG COM581

Redunt Server
ABB Network Partner AG COM581

C E

C E

Communication Gateway
Network Partner SSLTA 88 SERVICE RS232 SRS485M SRS485M SREDU/M RS485 RS485 1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

Router to ALDC/SLDC
Network Partner SSLTA 88 SERVICE RS232 SRS485M SRS485M SREDU/M RS485 RS485 1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

Ethernet Switch
C E

Ethernet Switch

Surveillance system

Line Printer for Alarm / Event

Metering Values DOT Matrix Printer

SUBSTATION AUTOMATION
Alarm/Event Line Printer DM Printer For 15 Min Metering & Trends Hardcopy Printer + MFD

2 Ports for RCC & 2 Ports for ALDC/SLDC COMMUNICATION GATEWAY TO RCC & ALDC
RCC LDC

Base System
Alarm Unit

Base System
Alarm Unit

GPS Meinberg
POWER V1 OVP ACQR LOCK GPS 166 SATELLITE CONTROLLED CLOCK NORMAL OPERATION WED 11.12.1996 MEZ 11.42.25 SV 24 > SYN MENU CLR NEXT INC ACK MEINBERG

Printer Server

Ethernet (TCP/IP)
Network Partner SSLTA 88 SRS485MSRS485MSREDU/M SERVICE RS232 RS485 RS485

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

Rugged Com/Equivalent Ethernet Switches forming Redundant Managed switched Ethernet LAN on fiber optic medium Interbay bus on IEC61850 Communication Gate way with hot standby for RCC and SLDC For Control and Protection Relays.

Network Partner

SSLTA 88 SRS485MSRS485MSREDU/M SERVICE RS232 RS485

RS485

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

LOCAL REMOTE

SET OPERATION

DIGITAL PLCC/ OLTE SYSTEM CARR PROT SYSTEM

ABB Network Partner AG

9 10 11 12 13 14 15 16

DIGITAL PLCC/ OLTE SYSTEM


C E
ABB Network Partner AG REL531

9 10 11 12 13 14 15 16

DIGITAL PLCC/ OLTE SYSTEM CARR PROT SYSTEM

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

LOCAL REMOTE

SET OPERATION

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

C E

CARR PROT SYSTEM

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

LOCAL REMOTE

SET OPERATION

CARR PROT SYSTEM

C E
9 10 11 12 13 14 15 16

C E

CARR PROT SYSTEM


ABB Network Partner AG REL531

9 10 11 12 13 14 15 16

CARR PROT SYSTEM

9 10 11 12 13 14 15 16

EM
LOCAL REMOTE SET OPERATION

HYD RAN

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

EM EM

HYD RAN AVR

EM EM EM

C E

C E C E

HYD RAN AVR

EM
LOCAL REMOTE SET OPERATION

AVR

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

C E

C E

EM
LOCAL REMOTE SET OPERATION

OTH

ABB Network PartnerREL511 AG

EM

OTH

OTH

C E

Auxiliary Alarm Annunciation

Service Modem

Engineering & DR work Station LAPTOP

TRIP LOGICS OF ONE AND HALF CIRCUIT BREAKER SCHEME


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

GROUP-A & GROUP-B TRIPPINGS


FOR 400KV STATIONS THERE SHALL BE TWO SEPARATE BATTERY SYSTEMS AVAILABLE FOR PROTECTION, CONTROL & TRIPPING/CLOSING OPERATIONS. TO OBTAIN REDUNDENCY AND TO BE ABLE TO TAKE PROTECTION OUT FOR MAINTANENCE, WHILE EQUIPMENT IS IN SERVICE, THE RELAYS ARE ELECTRICALLY AND PHYSICALLY SEGREGATED IN TO TWO GROUPS. GROUPING IS DONE TO THE EXTENT POSSIBLE IN SUCH A WAY THAT EACH GROUP CAN INDEPENDENTLY CARRYOUT PROTECTIVE FUNCTIONS WITH NEAR EQUAL REDUNDENCY. INTER CONNECTION OF THESE TWO GROUPS SHALL NOT BE GENERALLY BE ATTEMPTED. DISTRIBUTION OF DC SUPPLY SHALL BE DONE BAY WISE TO FEED THE FOLLOWING 1. PROTECTION 2. CB CONTROL 3. ISOLATOR / EARTH SWITCH CONTROL 4. ANNUNCIATION / INDICATION

LINE PROTECTION GROUP-A


MAIN-1 PROTECTION M1 BUILT IN FUNCTIONS TEED-1 PROTECTION OVER VOLTAGE STAGE-1 PROT DIRECT TRIP CHANNEL-1 RECEIVED

TRANSFORMER PROTECTION GROUP-A


T/F DIFFERENTIAL RELAY T/F HV BACKUP RELAY T/F IMP / 21T RELAY T/F HV OVERFLUX RELAY OIL TEMP HIGH TRIP PRESURE RELIEF TRIP TERITIARY DELTA WNDG NDR PROT

REACTOR PROTECTION GROUP-A


REACTOR DIFFERENTIAL RELAY REACTOR BACKUP / 21R RELAY OIL TEMP HIGH TRIP PRESURE RELIEF TRIP

GROUP-B
REACTOR REF RELAY BUCHHOLZ TRIP WINDING TEMP HIGH TRIP LOW/ HIGH OIL LEVEL TRIP FIRE PROTECTION TRIP

GROUP-B
MAIN-2 PROTCTION M2 BUILT IN FUNCTIONS TEED-2 PROTECTION OVER VOLTAGE STAGE-2 PROT LBB/BFR RELAY DIRECT TRIP CHANNEL-2 RECEIVED

GROUP-B
T/F REF / HIGH Z DIFF RELAY BUCHHOLZ TRIP T/F LV BACKUP RELAY T/F NEUTRAL CURRENT / 51 O/C RLY T/F LV OVERFLUX RELAY OVER LOAD PROT (ALARM ONLY) OLTC BUCHHOLZ TRIP WINDING TEMP HIGH TRIP LOW/ HIGH OIL LEVEL TRIP

MAIN CB FOR LINE (1-52CB)TRIPPING LOGICS


INITIATE M_CB 3PH TRIP UNIT GR-A INITIATE M_CB 1PH TRIP UNIT GR-A INITIATE M_CB 3PH TRIP UNIT GR-B INITIATE M_CB 1PH TRIP UNIT GR-B INITIATE T_CB 1PH TRIP UNIT GR-A INITIATE T_CB 3PH TRIP UNIT GR-A INITIATE T_CB 1PH TRIP UNIT GR-B INITIATE T_CB 3PH TRIP UNIT GR-B MAIN-1/MAIN-2 CARRIER SEND INITIATE 400KV B/B PROT START T_CB A/R RELAY INITIATE SCADA (DR & SOE)
X X X X X X X X X X

START M_CB A/R RELAY

MAIN-1 PROTECTION MAIN-2 PROTECTION SOTF, PSB OVER VOLTAGE STAGE-1 & STAGE-2 (BUILT IN 21 M1) OVER VOLTAGE STAGE-1 & STAGE-2 (BUILT IN 21 M2) STUB, TOC, BOC, TEF, DEF, (BUILT- IN 21M1) STUB, TOC, BOC, TEF, DEF, (BUILT- IN 21M2) TEED PROT-1 TEED PROT-2 DIRECT TRIP CH-1 RECD DIRECT TRIP CH-2 RECD M_CB BFR / LBB PROT T_CB BFR / LBB PROT

21 M1 21 M2

A B

1-PH 1-PH

X X

X X

X X

X X

X X

IN BUILT FUNCTIONS OF DISTANCE SCHEME 59 L1 & L2 A 3-PH X X X X X X

59 L1 & L2

3-PH

3-PH

B 87T HZ 87T LZ A B A B B B

3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH X X

X X X X X

X X

X X X

X X X

X X X X X

INITIATE ALARM
X X X X X X X X X

PROTECTION RELAY

DIRECT TRIP CARRIER SEND

BLOCK M_CB A/R RELAY

BLOCK T_CB A/R RELAY

SYMBOL

OUTPUT

GROUP

MAIN CB FOR LINE (1-52 CB) TRIPPING LOGICS

SYMBOL

OUTPUT

GROUP

INITIATE T_CB A/R PRIORITY

INITIATE M_C B TRIP COIL-2

INITIATE M_C B TRIP COIL-1

89LE C LOSE PERMISSION

START LBB/BFR M_C B

PROTECTION RELAY

AUTO RECLOSURE RELAY (BUILT IN 21M1 & 21M2) SYNC CHECK RELAY (BUILT IN 21M1 & 21M2) 1-PH TRIP UNIT GR-A 3-PH TRIP UNIT GR-A 1-PH TRIP UNIT GR-B 3-PH TRIP UNIT GR-B TRIP SIGNAL FROM 400KV BUSBAR PROTECTION LINE UNDER VOLTAGE RELAY

79 A/R

A&B

1-PH & 3PH

CLOSE MAIN CB

INITIATE ALARM
X X X X

25 SYNC

A&B

3-PH

186 86 GR A 286 86 GR B

A A B B

1-PH 3-PH 1-PH 3-PH

X X X X

X X X X

X X X X X X

96 BB

3-PH

27 UV

TO SCADA (DR & SOE)


X X

PROTECTION RELAY

SYNC CHECK RELAY

T_CB BFR / LBB PROT

M_CB BFR / LBB PROT (152 CB & 352 CB)

3-PH TRIP UNIT GR-B 1-PH TRIP UNIT GR-A 1-PH TRIP UNIT GR-B 3-PH TRIP UNIT GR-A

186

79 A/R

286

50 ZT

50 Z

86B

86A

152 INITIATE M_CB 1PH TRIP UNIT GR-A 152 INITIATE M_CB 3PH TRIP UNIT GR-A

152 INITIATE M_CB 1PH TRIP UNIT GR-B 152 INITIATE M_CB 3PH TRIP UNIT GR-B
X

252 INITIATE T_CB 1PH TRIP UNIT GR-A


X X X X X X X X X X X X X X X X X X X X X X X X X X X X

252 INITIATE T_CB 3PH TRIP UNIT GR-A 252 INITIATE T_CB 1PH TRIP UNIT GR-B 252 INITIATE T_CB 3PH TRIP UNIT GR-B 352 INITIATE M_CB 1PH TRIP UNIT GR-A 352 INITIATE M_CB 3PH TRIP UNIT GR-A 352 INITIATE M_CB 1PH TRIP UNIT GR-B 352 INITIATE M_CB 3PH TRIP UNIT GR-B 252 INITIATE T_CB TRIPCOIL-1 & COIL-2 252 START LBB/BFR OF T_CB 252 CLOSE T_CB DIRECT TRIP CARRIER SEND INITIATE ALARM INITIATE SCADA (DR & SOE)

SYMBOL

AUTO RECLOSURE RELAY

3-PH

3-PH

1-PH & 3-PH

3-PH

1-PH

3-PH

TIE CB TRIPPING LOGICS

3-PH 1-PH 3-PH 3-PH

OUTPUT

GROUP

DIRECT TRIP CH-2 RECD DIRECT TRIP CH-1 RECD 25 B B A & B B A B A A B

INITIATE LV_CB 3PH TRIP UNIT GR-A

MAIN CB FOR AT/F (3-52CB)TRIPPING LOGICS


INITIATE M_CB 3PH TRIP UNIT GR-A INITIATE T_CB 3PH TRIP UNIT GR-A INITIATE T_CB 3PH TRIP UNIT GR-B INITIATE LV_CB 3PH TRIP UNIT GR-B INITIATE M_CB 3PH TRIP UNIT GR-B START M_CB LBB/BFR RELAY INTER TRIP CIRCUIT HV & LV START LV_CB LBB/BFR RELAY INITIATE M_CB TRIP COIL-1 INITIATE M_CBTRIP COIL-2 INITIATE 400KV B/B PROT INITIATE 220KV B/B PROT INITIATE LV_CB TRIP COIL-1 INITIATE LV_CBTRIP COIL-2
SYMBOL OUTPUT

DIFFERENTIAL RELAY HV BACKUP PROTECTION HV OVER FLUX PROT OVER LOAD RELAY HV PROT TRIP UNIT GR-A & B REF PROTECTION TEED PROT-1 / 2 STUB PROT AT/F TROUBLE TRIP HV & LV AT/F TROUBLE ALRM M_CB BFR / LBB PROT T_CB BFR / LBB PROT LV_CB BFR / LBB PROT 400KV B/B PROT 220KV B/B PROT LV BACKUP PROTECTION LV OVER FLUX PROT TERI NEUTRAL DISP PROT LV PROT TRIP UNIT GR-A & B

87T(LZ) 67 ABCN 99T HV 51 O/L 86 GR-A/B 64T(HZ) 87T HZ/LZ 50 STUB 86 GR-A/B

A A A A A/B B A/B A A/B

3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH

X X X X X X X X X X X X

X X X X

X X X X X X X X X X X X X X X X

X X X X X X X X X

INITIATE ALARM
X X X X X X X X X X X X X X X X X X X

PROTECTION RELAY

X X X

50Z 50ZT 50Z 87 BB 87 BB 67 ABCN 99T LV 151N 86 GR-A/B

B B B 96 96 B B A A/B

3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH 3-PH X X X X X X

X X

X X X X X X X X X X X

X X X X X X

X X X X

X X

INITIATE SCADA ( SOE)


X X X X X X X X X X X X X X X X X X X

GROUP

PROTECTION TRIP SCHEME


ABB Network Partner AG ABB Network Partner AG REL531 REL531

21 MAIN 1

87 T LZ

86-A MTR/ HSTR

86-A MTR/ HSTR

86-A MTR/ HSTR

TRIP COIL-1 1-52CB TRIP COIL-2 BUS-1


1 2 3 4 5 6 7 8 ABB Network Partner AG REC 316*4

TRIP COIL-1 2-52CB TRIP COIL-2


ABB Network Partner AG REC 316*4

TRIP COIL-1 3-52CB TRIP COIL-2 BUS-2


1

21 MAIN 2
9

87 T HZ
9 10 11 12 13 14 15 16

86-B ABB REL521 MTR/ MAIN-1 HSTR

10 11 12 13 14 15 16

86-B MTR/ HSTR

2 3 4 5 6 7 8

86-B MTR/ HSTR

86-A : GROUP-A MASTER TRIP RELAY / HIGH SPEED TRIP RELAY 86-B : GROUP-B MASTER TRIP RELAY / HIGH SPEED TRIP RELAY

MAIN-1/ MAIN-2 ZONE-1 & SINGLE PHASE FAULT


INITIATE MAIN CB GR-A 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE )

REL 521
ACTIVE START TRIP

INITIATE TIE CB GR-A 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE ) START MAIN CB AUTO RECLOSURE START TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION

REL 316
ACTIVE START TRIP

INITIATE MAIN CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE ) INITIATE TIE CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE ) START MAIN CB AUTO RECLOSURE START TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER

TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION


1. 2. 3. 4. 5. 6. 7. 7. 8. 9.

AUTO RECLOSURE
CONDITIONS REQUIRED FOR A/R OPERATION
CB CLOSE CONDITION. TIME LAPSED MORE THAN RECLAIM TIME. OPERATING PRESSURE OF CB SUITABLE FOR AUTORECLOSURE OPERATION. DC SUPPLY TO AUTORECLOSURE SHOULD BE AVAILABLE. PREPARE 3-PH TRIP RELAY SHOULD BE RELEASED CONDITION. NO BLOCKING SIGNAL TO AUTORECLOSURE RELAY. POLE DISTURBANCE RELAY TIME SHOULD BE MORE THAN TWICE OF DEAD TIME OF AUTO RECLOSURE. CARRIER FAIL SIGNAL SHOULD NOT COME AT BOTH ENDS. CARRIER SWITCH SHOULD BE IN SERVICE CONDITION. SINGLE PHASE & ZONE-1 FAULT ONLY.

1. 2. 3. 4.

AUTO RECLOSURE OPERATION


TRIP MAIN CB SINGLE POLE. TRIP TIE CB SINGLE POLE. CLOSE MAIN CB AFTER DEAD TIME. IF A/R SUCCESS FOR MAIN CB THEN AFTER SUPPLEMENTARY TIME DELAY CLOSE TIE CB.(NORMALLY SUPPLEMENTARY TIME DELAY IS DEAD TIME) IF A/R UNSUCCESS THEN TRIP MAIN & TIE CBs. IF MAIN CB OPEN CONDITION, THEN NO SUPPLEMENTARY DELAY TIME FOR TIE A/R. IT WILL OPERATE ITs OWN DEAD TIME.

5. 6.

MAIN-1/ MAIN-2 ZONE-1 & TWO / THREE PHASE FAULT


INITIATE MAIN CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )

REL 521
ACTIVE START TRIP

INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION

REL 316
ACTIVE START TRIP

INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER

TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION

MAIN-1/ MAIN-2 ZONE-2 & 1 / 2 / 3 PHASE FAULT


INITIATE MAIN CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) CARRIER SIGNAL ACTIVE START RECEIVED & ZONE-2 STARTER IS PICKUP CONDITION

REL 521
TRIP

INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE TO LBB/BFR INITIATION INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION CAME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

DISPLAY

CARRIER SIGNAL RECEIVED & ZONE-2 STARTER IS PICKUP CONDITION

REL 316
ACTIVE START TRIP

INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND ( IF PUTT OR2 SCHEME SELECTED ) INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER

TO EVENT RECORDER ( SOE/ SCADA ) TO LBB/BFR INITIATION

MAIN-1/ MAIN-2 ZONE- 3/4/5 & 1 / 2 / 3 PHASE FAULT


INITIATE MAIN CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )

REL 521
ACTIVE START TRIP

INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

TO LBB/BFR INITIATION INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION CAME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

REL 316
ACTIVE START TRIP

INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DISPLAY

TO LBB/BFR INITIATION INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER

TO EVENT RECORDER ( SOE/ SCADA )

DISTANCE SCHEME TRIPPING OUTPUTS


MAIN CB
CO 186 R TO TRIP COIL-1 TO TRIP COIL-2 186 Y TO TRIP COIL-1 TO TRIP COIL-2 186 B TO TRIP COIL-1 TO TRIP COIL-2 CO 286 R TO TRIP COIL-1 TO TRIP COIL-2 286 Y TO TRIP COIL-1 TO TRIP COIL-2 286 B TO TRIP COIL-1 TO TRIP COIL-2 CO 186 R

TIE CB
REL 521
ACTIVE START TRIP

TO TRIP COIL-1 TO TRIP COIL-2 186 Y

DISPLAY

C
186 B

TO TRIP COIL-1 TO TRIP COIL-2

E
TO TRIP COIL-1 TO TRIP COIL-2 CO 286 R

REL 316
ACTIVE START TRIP

TO TRIP COIL-1 TO TRIP COIL-2 286 Y

DISPLAY

C
286 B

TO TRIP COIL-1 TO TRIP COIL-2

E
TO TRIP COIL-1 TO TRIP COIL-2

INITIATION
1-PH TRIP RELAYS OF MAIN-1 PROTECTION

MAIN LBB
INITIATE BUSBAR PROTECTION ( INTURN IT WILL TRIP CONNECTED BUS CBs)

RAICA
ACTIVE START TRIP

INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END

1-PH TRIP RELAYS OF MAIN-2 PROTECTION

DISPLAY
86-GR-A MASTER TRIP RELAY 86-GR-B MASTER TRIP RELAY 96 BB BUSBAR RELAY

CLOSE INTERLOCK OF MAIN CB & TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER

TO EVENT RECORDER ( SOE/ SCADA )

INITIATION
1-PH TRIP RELAYS OF MAIN-1 PROTECTION OF LINE-1(BAY1) & LINE-2 (BAY3) 1-PH TRIP RELAYS OF MAIN-2 PROTECTION OF LINE-1 (BAY1) & LINE-2 (BAY 3) 86-GR-A MASTER TRIP RELAY

TIE LBB
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )

RAICA
ACTIVE START TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES ) BLOCK MAIN CB OF BAY1 & BAY3 AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3 CLOSE INTERLOCK OF TIE CB

DISPLAY

DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES

C
86-GR-B MASTER TRIP RELAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (BAY1 & BAY3)

TO EVENT RECORDER ( SOE/ SCADA )

BUS BAR PROTECTION


INITIATE ALL CBs TRIP UNITS CONNECTED TO THIS BUS AND OPERATE. TO TRIP COIL-1 CONCERNED BAY CB

REB 500
ACTIVE START TRIP

TO TRIP COIL-2 CONCERNED BAY CB TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB DIRECT TRIP SEND CHANNEL-1 TO OTHER END DIRECT TRIP SEND CHANNEL-2 TO OTHER END

DISPLAY

TO LBB/BFR INITIATION FROM LBB/BFR TO BUS BAR TRIPPING

TO DISTURBANCE RECORDER OF MAIN-1 TO DISTURBANCE RECORDER OF MAIN-2

TO EVENT RECORDER ( SOE/ SCADA ) INITIATE ALARM (ANNUNCIATION COME)

INITIATE ALL CBs TRIP UNITS CONNECTED TO THIS BUS AND OPERATE. TO TRIP COIL-1 CONCERNED BAY CB

REB 670
ACTIVE START TRIP

TO TRIP COIL-2 CONCERNED BAY CB TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB DIRECT TRIP SEND CHANNEL-1 TO OTHER END DIRECT TRIP SEND CHANNEL-2 TO OTHER END

DISPLAY

TO LBB/BFR INITIATION FROM LBB/BFR TO BUS BAR TRIPPING

TO DISTURBANCE RECORDER OF MAIN-1 TO DISTURBANCE RECORDER OF MAIN-2

TO EVENT RECORDER ( SOE/ SCADA ) INITIATE ALARM (ANNUNCIATION COME)

STUB PROTECTION
INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

REL 521
ACTIVE START TRIP

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

LINE /AT/F ISOLATOR OPENS

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

REL 316
ACTIVE START TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

LINE /AT/F ISOLATOR OPENS

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

TEED PROTECTION
INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RET 521

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

87 T1
(HZ)

ACTIVE

START

TRIP

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

RET 670

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

87 T2
(LZ)

ACTIVE

START

TRIP

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

MAIN-1/ MAIN-2 OVER VOLTAGE STAGE-1


INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) 110% OF V 4 SECS FOR FEEDER-1 5 SECS FOR FEEDER-2

REL 521
ACTIVE START TRIP

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END

DISPLAY

DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END CLOSE INTERLOCK OF MAIN CB & TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

110% OF V ACTIVE START 4 SECS FOR FEEDER-1 5 SECS FOR FEEDER-2

REL 316
TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END CLOSE INTERLOCK OF MAIN CB & TIE CB

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

OVER VOLTAGE STAGE-2


INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

REU 521
ACTIVE START TRIP

INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB & TIE CB AUTO RECLOSURE DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END

120% OF V 20m SECS

DISPLAY

DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END CLOSE INTERLOCK OF MAIN CB & TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2) TO EVENT RECORDER ( SOE/ SCADA )

UNDER VOLTAGE RELAY


REU 521
ACTIVE START TRIP

1O% OF V

DISPLAY

LINE EARTH SWITCH CLOSE PERMISSION ONLY.

CARRIER TRIPPING SCHEMES(TELEPROTECTION)


DETAILS
CHANNEL-1 SEND

PERMISSIVE TRIPPING
MAIN-1 PROTECTION : IT SENDS SIGNAL PARALLEL VIA PLCC PROTECTION COUPLER PANEL-1 AS A MAIN CHANNEL & PLCC PROTECTION COUPLER PANEL-2 AS A ALTERNATE CHANNEL..

DIRECT TRIPPING

CHANNEL-2 SEND

HERE CHANNEL-1 & CHANNEL-2 SIGNALS ARE MAIN & ALTERNATE CHANNEL 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 87 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 87 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). MAIN-2 PROTECTION : 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. IT SENDS SIGNAL PARALLEL VIA PLCC PROTECTION COUPLER PANEL-2 AS A MAIN CHANNEL & 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED. PLCC PROTECTION COUPLER PANEL-1 AS A ALTERNATE 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED. 9. 87 TEED-1 PROTECTION OPERATED CHANNEL. 10. 87 TEED-2 PROTECTION OPERATED

CHANNEL-1 RECEIVE

MAIN-1 PROTECTION : 1. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB. IT RECEIVES SIGNAL PARALLEL VIA 2. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB. PLCC PROTECTION COUPLER PANEL-1 AS A MAIN CHANNEL & PLCC PROTECTION COUPLER PANEL-2 AS A ALTERNATE CHANNEL. MAIN-2 PROTECTION : 1. TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB. IT RECEIVES SIGNAL PARALLEL VIA PLCC PROTECTION COUPLER PANEL-2 AS A MAIN CHANNEL & 2. TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB. PLCC PROTECTION COUPLER PANEL-1 AS A ALTERNATE CHANNEL.

CHANNEL-2 RECEIVE

CARRIER TRIPPING SCHEMES(TELEPROTECTION)


21 M1 REL 521
ABB Network Partner AG REL531

CARRIER PROTECTION PANEL-1


PT SEND
C E

CARRIER PROTECTION PANEL-1


PT SEND PT RECEIVE PT SEND PT RECEIVE DT SEND DT RECEIVE

21 M1 REL 521
ABB Network Partner AG REL531

PT RECEIVE PT SEND

DIRECT TRIP SEND CH-1 MAIN CB 86-A TIE CB 86-A

PT RECEIVE DT SEND DT RECEIVE

DIRECT TRIP SEND CH-1 MAIN CB 86-A TIE CB 86-A

ONE END
CARRIER PROTECTION PANEL-2
PT SEND PT RECEIVE PT SEND

OTHER END
CARRIER PROTECTION PANEL-2
PT SEND PT RECEIVE PT SEND PT RECEIVE DT SEND DT RECEIVE

21 M2 REL 316
ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

21 M2 REL 316
ABB Network Partner AG REC 316*4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

DIRECT TRIP SEND CH-2 MAIN CB 86-B TIE CB 86-B

PT RECEIVE DT SEND DT RECEIVE

DIRECT TRIP SEND CH-2 MAIN CB 86-B TIE CB 86-B

PT : PERMISSIVE PROTECTION TRANSFER TRIP DT : DIRECT TRANSFER TRIP

DIRECT TRANSFER TRIP CHANNEL 1 / 2 RECEIVED


INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

85 LO X1
ACTIVE START TRIP

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DIRECT TRIP CHANNEL-1 RECEIVED

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

85 LO X2
ACTIVE START TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) BLOCK MAIN CB AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE

DIRECT TRIP CHANNEL-2 RECEIVED.

DISPLAY

CLOSE INTERLOCK OF MAIN CB CLOSE INTERLOCK OF TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO DISTURBANCE RECORDER TO EVENT RECORDER ( SOE/ SCADA )

86-GA & 86 GB MASTER TRIP / HIGH SPEED TRIP LOCKOUT RELAY OPERATION
TRIP COIL-1 TRIP COIL -1
86-GA MASTER TRIP / HIGH SPEED TRIP RELAY
OVER VOLTAGE STAGE-1 (INBUILT MAIN-1) DIRECT TRIP CHANNEL-1 RECEIVED SOTF PROTECTION (INBUILT MAIN-1) DEF,TOC, BOC, STUB (INBUILT MAIN-1) TEED-1 PROTECTION

86-GA MASTER TRIP / HIGH SPEED TRIP RELAY

TIE CB

MAIN CB

OVER VOLTAGE STAGE-1 ( IN BUILT MAIN-2 )

TRIP COIL-2

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

DIRECT TRIP CHANNEL-2 RECEIVED SOTF PROTECTION ( IN BUILT MAIN-2 ) OVER VOLTAGE STAGE-2 DEF, TOC, BOC, STUB ( IN BUILT MAIN-2 ) MAIN LBB OPERATED TIE LBB OPERATED TEED-2 PROTECTION

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

TRIP COIL -2

MASTER TRIP RELAYS HIGH SPEED TRIP RELAYS LOCKOUT RELAYS


PUSH BUTTON FOR RESETTING. TO CLOSING INTERLOCK OF CONCERNED BAY CB

86-GA MASTER TRIP / HIGH SPEED TRIP RELAY

TO INITIATE LBB/BFR OF CONCERNED BAY BLOCK AUTO RECLOSURE OF CONCERNED BAY TO TRIP COIL-1 CONCERNED BAY CB TO TRIP COIL-2 CONCERNED BAY CB INITIATE FLAG RELAY (FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2) TO EVENT RECORDER ( SOE/ SCADA )

PUSH BUTTON FOR RESETTING.

TO CLOSING INTERLOCK OF CONCERNED BAY CB

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

TO INITIATE LBB/BFR OF CONCERNED BAY BLOCK AUTO RECLOSURE OF CONCERNED BAY TO TRIP COIL-1 CONCERNED BAY CB TO TRIP COIL-2 CONCERNED BAY CB INITIATE FLAG RELAY (FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2) TO EVENT RECORDER ( SOE/ SCADA )

TRANSFORMER PROTECTION
(DIFFERENCIAL & REF / 3-PH HZ DIFF PROTECTION)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RET 670
ACTIVE START TRIP

INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

87 T1
(LZ)

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )

RET 521

INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

64 T2
REF (HZ)

ACTIVE

START

TRIP

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TRANSFORMER PROTECTION
( BACKUP DIRECTIONAL O/L & E/F PROTECTION FOR HV & LV)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

REF 610

INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

67 HV ABCN

ACTIVE

START

TRIP

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )

REX 521
ACTIVE START TRIP

INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

67 LV ABCN

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TRANSFORMER PROTECTION
( OVER FLUX PROTECTION FOR HV & LV)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RALK

INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

99T HV

ACTIVE

START

TRIP

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )

RATUB
ACTIVE START TRIP

INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

99T LV
DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

OVER VOLTAGE (LINE) AND OVER FLUX(TRANSFORMER ) PROTECTION TRIP SCHEME


86-A MTR/ HSTR ABB O/V 1 O/V 2
(BAY 1&2)

86-A MTR/ HSTR

ABB RALK O/F- HV


(BAY 2&3 / HV)

86-A MTR/ HSTR

TRIP COIL-1 1-52CB TRIP COIL-2 BUS-1 86-B ABB REL521 MTR/ MAIN-1 HSTR
(BAY 1&2)

TRIP COIL-1 2-52CB TRIP COIL-2

TRIP COIL-1 3-52CB TRIP COIL-2 BUS-2 86-B MTR/ HSTR

ABB O/V 1 O/V 2

86-B MTR/ HSTR

OVER VOLTAGE STAGE-1 & STAGE-2 ARE IN BUILT FUNCTIONS OF MAIN-1 & MAIN-2 NUMERICAL RELAYS. IF EXTERNAL RELAYS ARE UTILISED THEN STAGE-1 IS GR-A & STAGE-2 IS GR-B TRIPPING IS TO UTILISED.

TRIP COIL-2

86-B MTR/ HSTR

LV - CB
(BAY LV)

TRIP COIL-1

ABB RATUB O/F- LV

86-A MTR/ HSTR

TRANSFORMER PROTECTION
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RXIG 21

INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

51 O/L

ACTIVE

START

TRIP

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO EVENT RECORDER ( SOE/ SCADA )

RAEDK1
ACTIVE START TRIP

INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

NDR
DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

INITIATION
86-GR-A MASTER TRIP RELAY 86-GR-B MASTER TRIP RELAY 96 BB BUSBAR RELAY

MAIN LBB
INITIATE BUSBAR PROTECTION ( INTURN IT WILL TRIP CONNECTED BUS CBs)

RAICA
ACTIVE START TRIP

INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES ) INTER TRIP TO 220KV LV MAIN CB INTER TRIP TO 220KV LV TBC CB CLOSE INTERLOCK OF MAIN CB & TIE CB

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

INITIATION
1-PH TRIP RELAYS OF MAIN-1 PROTECTION OF LINE-1(BAY1)

TIE LBB
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )

RAICA
ACTIVE START TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES ) BLOCK MAIN CB OF BAY1 AUTO RECLOSURE BLOCK TIE CB AUTO RECLOSURE CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3 CLOSE INTERLOCK OF TIE CB

1-PH TRIP RELAYS OF MAIN-2 PROTECTION OF LINE-1 (BAY1)

DISPLAY
86-GR-A MASTER TRIP RELAY

DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES

C
86-GR-B MASTER TRIP RELAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES) INITIATE ALARM (ANNUNCIATION COME) TO DISTURBANCE RECORDER (BAY1)

TO EVENT RECORDER ( SOE/ SCADA )

86-GA & 86 GB MASTER TRIP / HIGH SPEED TRIP LOCKOUT RELAY OPERATION
TRIP COIL-1 TRIP COIL -1
86-GA MASTER TRIP / HIGH SPEED TRIP RELAY
T/F DIFFERENTIAL RELAY 87 T B/U O/C & E/F PROTN RLY 67 ABCN INTER TRIP FROM LV SIDE ICT TROUBLES GR-A PROTECTION TRIP ICT HV OVER FLUX RELAY

86-GA MASTER TRIP / HIGH SPEED TRIP RELAY

TIE CB

MAIN CB

RESTRICTED EARTH FAULT RELAY 64 REF/T

TRIP COIL-2

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

INTER TRIP FROM LV SIDE ICT TROUBLES GR-B PROTECTION TRIP STUB RELAY 50ST MAIN LBB OPERATED TIE LBB OPERATED ICT LV OVER FLUX RELAY INTER TRIP FROM TBC LBB & MANUAL TRIP OF 220KV

86-GB MASTER TRIP / HIGH SPEED TRIP RELAY

TRIP COIL -2

AUTO TRANSFORMER INTER TRIP CIRCUITS


HV INTER TRIP CIRCUITS(TO LV) FOR LV MASTER TRIP RELAY 86 GR-A 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. 7. 87 TEED-1 PROTECTION OPERATED 8. 87 TEED-2 PROTECTION OPERATED. FOR LV MASTER TRIP RELAY 86 GR-B 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN. 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN. 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY). 5. MAIN CB 50 LBB/BFR OPERATED. 6. TIE CB 50 LBB/BFR OPERATED. 7. 87 TEED-1 PROTECTION OPERATED 8. 87 TEED-2 PROTECTION OPERATED. LV INTER TRIP CIRCUIT(TO HV)

FOR HV M-CB MASTER TRIP RELAY 86 GR-A 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. 3. LV CB 50 LBB/BFR OPERATED. FOR HV M-CB MASTER TRIP RELAY 86 GR-B 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. 3. LV CB 50 LBB/BFR OPERATED. FOR HV T-CB MASTER TRIP RELAY 86 GR-A 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. 3. LV CB 50 LBB/BFR OPERATED. FOR HV T-CB MASTER TRIP RELAY 86 GR-B 1. LV CB REMOTE HAND TRIP GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION) OPERATED. 3. LV CB 50 LBB/BFR OPERATED.

TRANSFORMER TROUBLES TRIPPING GR-A


86 AX OIL TEMP TRIP
TO 3PH GR-A 400KV MAIN CB TO 3PH GR-A 400KV TIE CB

DIFF RELAY 87T BUCHHOLZ TRIP

TO 3PH GR-A 220KV MAIN CB TO 3PH GR-A 220KV TBC CB

OL RELAY 51OL PRD-1 TRIP 86 AY

HV O/L+E/F PROT 67 PRD-2 TRIP

NDR RELAY 151N

HV O/F RELAY 99T

TRANSFORMER TROUBLES TRIPPING GR-B


86 BX OLTC BUCHHOLZ-R TRIP
TO 3PH GR-B 400KV MAIN CB TO 3PH GR-B 400KV TIE CB

OLTC BUCHHOLZ-Y TRIP

REF RELAY 64REF

TO 3PH GR-B 220KV MAIN CB TO 3PH GR-B 220KV TBC CB

STUB RELAY 50ST OLTC BUCHHOLZ B TRIP

LV O/L+E/F PROT 67 WNDG TEMP-HV TRIP

86 BY

LV O/F RELAY 99T WNDG TEMP-LV TRIP

WNDG TEMP-IV TRIP

TRIP COIL-1 CIRCUITS


TRIP COIL-1
186R1 186Y1 186B1

186R2

186Y2

186B2
186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2 ARE CB 1-PH TRIP UNIT OF GR-A. THESE ARE SELF RESETING. 286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2 ARE CB 1-PH TRIP UNIT OF GR-B. THESE ARE SELF RESETING. THE BELOW ARE HAND RESETING. 86GR-A, 86GR-B ARE 3-PH TRIP UNITS. 96 BB IS BUSBAR TRIPPING RELAY

286R1

286Y1

286B1

286R2

286Y2

286B2

86GR-A

. .

. .

. .

86GR-B

96BB

TRIP COIL 2 CIRCUITS


TRIP COIL-2
186R1 186Y1 186B1

186R2

186Y2

186B2
186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2 ARE CB 1-PH TRIP UNIT OF GR-A. THESE ARE SELF RESETING. 286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2 ARE CB 1-PH TRIP UNIT OF GR-B. THESE ARE SELF RESETING. THE BELOW ARE HAND RESETING. 86GR-A, 86GR-B ARE 3-PH TRIP UNITS. 96 BB IS BUSBAR TRIPPING RELAY

286R1

286Y1

286B1

286R2

286Y2

286B2

86GR-A

. .

. .

. .

86GR-B

96BB

ISOLATOR INTERLOCKS

S.NO BAY - 1 1 2 3 4 5 6 BAY - 2 7 8 9 10 BAY - 3 11 12 13 14 15 16

ISOLATOR OPEN/CLOSE

EQUIPMENT-1

EQUIPMENT-2

EQUIPMENT-3

EQUIPMENT-4

INTERLOCKS REQUIRED FOR CONCERNED ISOLATOR / EARTH SWITCH OPEN OR CLOSE BB189 E 189 A 189 AE 189 A 189 LE 189 L 289 BE 289 B 289 BE 289 B BB289 E 389 A 389 AE 389 A LV89 E2 389 T O O O O O O O O O O O O O O O O 189 AE 189 189 E 189 152 CB UV RELAY 289 AE 289 A 289 AE 289 A 389 AE 389 389 E 389 389 TE LV89 T O O O O O A O O O O O O O O O O 189 E -152 CB -252 CB -252 CB -252 CB -389 E -352 CB -252 CB -O O O O O O O O 152 CB ---------352 CB ---352 CB -O O O -

1 - 89 1 89 E 1 89 A 1 89 AE 1 89 L 1 89 LE 2 89 A 2 89 AE 2 89 B 2 89 BE 3 89 3 89 E 3 89 A 3 89 AE 3 89 T 3 89 TE

ISO ES ISO ES ISO ES ISO ES ISO ES ISO ES ISO ES ISO ES

NOTE: All Earth Switches in the Bay are towards Circuit Breaker side only. The Line and Transformer Earth Switches are towards Line & Transformer. O: OPEN C: CLOSE A: ACTED

BB189E : BUSBAR-1 EARTH SWITCH . BB289E : BUSBAR-2EARTH SWITCH . UV RELAY: UNDER VOLTAGE RELAY.

BB189E 1-89AE 1-89E 1-52CB 1-52CB 1-89AE 1-89E

OPEN OPEN OPEN OPEN OPEN OPEN OPEN

ISOLATOR & CB INTERLOCKS


& OPERATION
1-89 1-89E 1-89AE 2-89AE CLOSE CLOSE CLOSE CLOSE CLOSE CLOSE RESET RESET RESET RESET RESET RESET RESET RESET

OPEN OPEN

BB289E 3-89AE 3-89E 3-52CB 3-52CB 3-89AE 3-89E 3-52CB 3-89TE 2-52CB LV89E2 3-89 3-89A 3-89 3-89A 3-89T LV89T

& 1-52CB & 2-52CB & 3-52CB & 1-52CB & 2-52CB &
REMOTE CLOSE REMOTE CLOSE REMOTE CLOSE LOCAL CLOSE LOCAL CLOSE

LOCAL CLOSE

3-89

OPERATION

&

OPEN OPEN OPEN

& OPERATION

1-89A

2-89BE 3-89E

3-89A

OPERATION

&

OPEN OPEN OPEN

1-52CB 1-89LE 2-52CB 1-89 1-89A 1-89 1-89A 1-89L U/V RLY

OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN ACTED

3-89AE

& OPERATION

1-89L

86GR-A 86GR-B 96BB

3-89T

OPERATION

OPEN

&

OPEN OPEN OPEN

& & &

OPERATION

1-89E

86GR-A 86GR-B

3-89E

OPERATION

& & &

OPEN OPEN

OPERATION

1-89AE

86GR-A 86GR-B 96BB

3-89AE

OPERATION

OPEN OPEN OPEN

OPERATION

1-89LE

3-52CB 3-89TE

OPERATION

2-89A 2-52CB 2-89AE 2-89BE OPEN OPEN OPEN 2-89B

OPEN OPEN OPEN OPEN

& OPERATION 2-89AE & OPERATION 2-89BE

2-52CB 2-89AE 2-89BE

OPEN OPEN OPEN

& OPERATION
2-89A

2-89A 2-89B

& OPERATION
2-89B

CLOSING INTERLOCK OF MAIN & TIE CB


96 BB 86 GR-A 86 GR-B + VE T N C MAIN CB +ve
SYN SOCKET

-ve

CB REMOTE CLOSE

21M1 AR

CB AUTO RECLOSE

21M2 AR

86 GR-A

86 GR-B + VE T N C TIE CB +ve


SYN SOCKET

-ve

CB REMOTE CLOSE

TIE

AR

CB AUTO RECLOSE

ADVANTAGES & DISADVANTAGES OF ONE & HALF BREAKER SYSTEM


A.
1. 2. 3. 4.

ADVANTAGES:
THREE CIRCUIT BREAKERS IN A FULL DIA ARE ALWAYS IN CLOSED POSITION. IF MAIN CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD THE FEEDER IS FEEDING FROM TIE CB & OTHER BUS . NEED NOT REQUIRE TRANSFER THE FEEDER. IF TIE CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD THE FEEDER IS FEEDING FROM MAIN CB & CONNECTED BUS. EVEN IF BOTH MAIN BREAKERS UNDER TROUBLE, DURING THAT PERIOD ONE FEEDER WORKS AS INCOMING AND OTHER FEEDER WORKS AS OUTGOING VIA TIE CB. (WITHOUT INTERUPTION TO FEEDERS) IF BUSBAR-1 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN BREAKERS CONNECTED TO BUSBAR-1 WILL TRIP. DURING THAT PERIOD THE FEEDERS CONNECTED TO BUS-1 ARE FEEDING VIA TIE CB FROM BUS-2. IF BUSBAR-2 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN BREAKERS CONNECTED TO BUSBAR-2 WILL TRIP. DURING THAT PERIOD THE FEEDERS CONNECTED TO BUS-2 ARE FEEDING VIA TIE CB FROM BUS-1. IN THIS BUSBAR PROTECTION IS SIMPLE AND NEED NOT REQUIRE SELECTION OF ISOLATOR. IT IS MORE RELIABLE SYSTEM FOR OPERATION & MAINTANENCE POINT OF VIEW.

5.

6.

7. 8.

B.
1. 2. 3. 4.

DISADVANTAGES
CT CONNECTIONS & PROTECTION TRIP LOGICS ARE SOME WHAT COMPLICATED. COMPLEX CONTROL & PROTECTION PHILOSOPHY COST TOWARDS CTs, CIRCUIT BREAKERS & PANELS ARE TO BE INCREASED DUE TO EXTRA BAY. THE COST COMPARISION TABLE SHOWN IN NEXT PRESENTATION. THE OPERATIONS FOR OPERATOR POINT OF VIEW IS LITTLE BIT COMPLICATED WHEN COMPARED TO CONVENTIONAL SYSTEM. SPACE OCUPATION FOR BAY IS MORE i.e COST OF LAND IS INCREASE.

COST COMPARISION BETWEEN CONVENTIONAL SYSTEM & ONE AND HALF BREAKER SYSTEM FOR FEEDER
S.No
1.

EQUIPMENT
CIRCUIT BREAKERS CURRENT TRANSFORMERS 3 CT METHOD

CONVENTIONAL SYSTEM
1 No

ONE & HALF BREAKER SYSTEM FULL DIA (FOR 2 FEEDERS)


3 Nos

% INCREASE IN COST
50%

HALF DIA % INCREASE (FOR 1 FEEDER) IN COST


2 Nos 100%

INCLUDES THE COST OF CT MARSHELLING BOXES. 3 Sets 1 Set 4 Sets 5 Sets 6 Sets I SET 3 SETS 50% 100% 125% 200% 30% 2 Sets 2 Sets 3 Sets 3 Sets 2 SETS 100% 100% 200% 200% 30%

2.

4 CT METHOD 5 CT METHOD 6 CT METHOD

3.

CONTROL & RELAY PANELS BAY MARSHALLING BOXES CONTROL CABLES

NORMALLY EXTRA PANEL IS TIE BAY PANEL. IT IS ARROUND 30% COST OF MAIN PANEL. BECAUSE IT IS NOT HAVING PROTECTION RELAYS ( M-1 & M-2 AND OTHER RELAYS) . ONLY TIE CB TRIPPING RELAYS & ASSOCIATED RELAYS(A/R +LBB).

4.

1 No

3 Nos

50%

2 Nos

30%

5.

8 KM

30 KM

100%

20 KM

150%

OTHER INFORMATION REGARDING RELAYS AND TESTING EQUIPMENT


PREPARED BY GOPALA KRISHNA PALEPU ADE/MRT(PROTECTION)

ABB RELAYS
ABB Network Partner AG

ABB Network Partner AG

REL 521

ABB Network Partner AG

REL 316*4

10

11

12

13

14

15

16

E E

C E

ABB Relays
ABB Network Partner AG

REL 512

c
E

AREVA RELAYS

P443

P445

P437

E-PAC

P442

GE MULTILIN RELAYS

B90 87BB C60 BCU D60 21L D90 21L

L60 87L L90 87L T60 87T D25 BCU

F90 67/51 G60 GEN M60 MOTOR N90 NETWORK

SIEMENS RELAYS

SEL RELAYS
ENABLED

IA =250.10 A IB =250.10 A IC =250.10 A VAB =400.0 KV VBC =400.0 KV VCA =400.0 KV


ESC ENT

TRIP

TARGET RESET

SPT ENABLED COMM ENABLED ALT SETTINGS

MC ENABLED RECLOSE ENABLED CB CLOSED

SEL- 421
PROTECTION AUTOMATION CONTROL

INST TIME COMM SOTF ZONE 1 ZONE 2 ZONE 3 ZONE 4

PH - A PH - B PH - C GND
50 51 79 RESET 79 LOCKOUT

RELAY TEST

CB OPEN

SEL

INST TIME COMM SOTF TRIP EN A B C

2ENABLED 3
TRIP

TARGET RESET

SEL- 321- 5 - 2
PROTECTION AUTOMATION CONTROL

ZONE G Q 51 50 O/C

FAULT TYPE

TARGET TARGET FAULT SET RESET NO / YES / CANCEL SELECT

METER STATUS OTHER GROUP EXIT

SEL

VA TECH REYROLLE RELAYS

ERL PHASE RELAYS

RELAY HARDWARE
16 / 32 BIT

PC MODEM

IRIG-B RE/CC

NORMALLY 400KV RELAYS SUPPLIED WITH CONFIGUARATION/HARDWARE 1. MIN 4Nos MAX 8Nos COMMAND/TRIP OUTPUTS 2. MIN 24Nos SIGNAL OUTPUTS 3. MIN 14 LED INDICATIONS 4. MIN 24 BINARY INPUTS

FOLLOWING

RELAY SIGNAL DATA FLOW

FUNCTIONS AVAILABLE NUMERICAL DISTANCE RELAYS


1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 4 TO 6 SETTING IMPEDENCE ZONES WITH 4 TO 6 SETTING GROUPS (21 + 21N). DIR / INST / TIME OVERCURRENT & EARTH FAULT FUNCTION( 50 / 51 / 67 P+G). EIGHT COMMUNICATION SCHEMES. SWITCH ON TO FAULT PROTECTION(21 SOTF). PHASE SELECTION(R,Y,B). POWER SWING BLOCKING(PSB)(68 + 68T). FUSE FAILURE SUPERVISION(PT FFR). AUTO RECLOSER WITH CHECK SYNCHRNISATION & VOLTAGE CHECK(79 + 25 +86). WEEK END INFEED LOGIC(27 WI). SYSTEM SUPERVISION. STUB PROTECTION(STUB). OVER VOLTAGE/ UNDER VOLTAGE FUNCTION(27+ 59). LBB/BFR FUNCTION(50 BF). DISTANCE TO FAULT LOCATOR(21 FL).(SHOWS IN 1. %, 2. KM 3. MILES & 4. R+JX ) 16 PROGRAMABLE SIGNALLING RELAYS WITH LEDs. RECORDABLE 10Nos LATEST DISTRUBANCES WITH BASIC EVALUATION DISTURBANCE RECORDER. EVENT RECORDER RELATED TO RELAY EVENTS. PRE-FAULT, FAULT & POST-FAULT VALUES OF ANALOG POINTS WITH IMPEDENCE DETAILS. USER CAN BE CONFIGUARED PROGRAMABLE LOGIC FUNCTIONS. TELE / CARRIER INTER TRIPPING SCHEMES(85 +21)(PUTT, POTT). TRIP CIRCUIT MONITORING(74 TC). METERING FUNCTION (INSTANTANEOUS VALUES DISPLAY FUNCTION). 4 QUADRANT ENERGY METER FUNCTION (KWH,KVAH,KVARH)(KYZ PULSE OUTPUT). MINIMUM 8 COMMOND/ TRIP RELAYS, 24 SIGNAL RELAYS MINIMUM 20 BINARY INPUTS, 14 LEDs

DISTANCE RELAYS CHARACTERESTICS


( MHO CIRCULAR )

DISTANCE RELAYS CHARACTERESTICS


( QUADRILATERAL-1 )

DISTANCE RELAYS CHARACTERESTICS


( QUADRILATERAL-2 )

DISTANCE RELAYS CHARACTERESTICS


( BULLET )

DISTANCE RELAYS CHARACTERESTICS


( TRIANGLER )

DISTANCE RELAYS CHARACTERESTICS


( LENS / OPTICAL )

DISTANCE RELAYS CHARACTERESTICS


( TOMATO )

DISTANCE RELAYS CHARACTERESTICS


( PEANUT )

RELAY MODELS OF LINE (DISTANCE) & TRANSFORMER( M & B ) OF DIFFERENT MANUFACTURERS


MANUFACTURERS ABB AREVA (ALSTOM) SIEMENS ( SIPROTEC ) SEL GE MULTILIN EASUN REYROLL NXT PHASE VA TECH REYROLL TRANSMISSION LINE PROTECTION MAIN-1 REL 521 REL 670 MICOM P443/P444/ P442/P445 SIPROTEC 7SA62/3 SEL 421 D-60, ALPS THR 4 PE 24 L-PRO OHMEGA 402
CURVES
QUAD

T/F PROTECTION DIFFERENTIAL RET 521 / 670 RET 316 MICOM P633 KBCH/ MBCH 7UT 613/ 2 7UT 513/ 2 SEL 387 T-35 / T-60 SR 7465 --T-PRO DUOBIAS M DIR O/L,E/F REL 505 REX 521 MICOM P141 MICOM P127
7SJ 62/3/4/5 7SJ 52/3/4/5

QUAD/ MHO QUAD/ MHO QUAD/ MHO QUAD/ MHO MHO QUAD/ MHO QUAD/ MHO

MAIN-2 REL 316 REL 512 MICOM P437 E-PAC 3000, OPTIMHO SIPROTEC 7SA522 SEL 321 SEL 311C L-60/L-90 D-30 THR 4 PE 16

CURVES
QUAD/
BULLET

QUAD/ MHO QUAD/ MHO QUAD/ MHO QUAD/ MHO MHO

SEL 351 F-60 SR 750/60 MIT


F-PRO ARGUS

THR 3 PE 18
L-PRO OHMEGA 311/308

LENS/ TOMAT0 QUAD/ MHO

IEC 61850 RELAY MODELS OF DIFFERENT MANUFACTURERS


MANUFACTURERS BCU CB CONTROL FEEDER 67 DISTANCE 21 LINE DIFFERENTIAL DIFFERENTIAL 87 T 87 L BUSBAR 87 BB

ABB AREVA

REC 670 MICOM C264

REX 610 MICOM P141 F 60 SIPROTEC


7SJ 62/3/4

REL 670 MICOM


P44 2/3/4

RED 670 MICOM P543/547 L 60, L 90 SIPROTEC


7SD 522/61_

RET 670 MICOM P633/P643 T 60 SIPROTEC


7UT 633/13/2

REB 670 REB 500 MICOM P74 1/3/6 B 90, B 30 SIPROTEC


7 SS 52

GE D 25 MULTILIN SIEMENS SIPROTEC


( SIPROTEC )

D 60, D 90 SIPROTEC
7SA 522/6..

6MD66/3

SEL TOSHIBA

SEL 451-4 GRD 150

SEL 451 GRD 140

SEL 421/321 GRZ 100

SEL 387L GRL 100 / 150

SEL 487E GRT 100

SEL 487B GRB 100/150

RELAY TESTING EQUIPMENTS


1. PROGRAMA_GE (MODEL: FREEJA-300) 3. OMICRON (MODEL: CMC 256-6) 2. MANTA TEST SYSTEMS (MODEL: MTS 4000) 4. DOBLE ( MODEL: F 6150)

RELAY TESTING EQUIPMENTS


1. MEEGER_AVO (MODEL: MPRT 8430) 3. KOCOS (MODEL: ARTES 440 II) 2. RES (MODEL: APTS 3) 4. EURO SMC ( MODEL: TRES)

400KV SUBSTATIONS IN APTRANSCO


S.No
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.

400KV SUBSTATION
MAMIDIPALLY (HYDERABAD) NURNOOR (KURNOOL) KALAPAKA (VISHAKHAPATNAM) VEMAGIRI (RAJHAMUNDRY) VELTUR (MB NAGAR) CHITTOR(VEPANJIR) NELLORE(MANUBOLU) DICHPALLY (NIZAMABAD) GAJWEL (MEDAK) MALKARAM* (SECUNDRABAD) YEDDUMAILARAM** (RR, SHANKARPALLY) NARASARAOPETA**(GUNTUR) SURYAPETA** (NALGONDA)

CAPACITY
3 X 315 MVA (2 + 1**) X 315 MVA 2 X 315 MVA 2 X 315 MVA (1 + 2**) X 315 MVA (1 + 1**) X 315 MVA 2 X 315 MVA 2 X 315 MVA 2 X 315 MVA 2 X 315 MVA 3 X 315 MVA 2 X 315 MVA 2 X 315 MVA
1. RAMAGUNDAM 1. RAMAGUNDAM 3. BTPS 1&2** 1. RAMAGUNDAM 3. VTPS**1&2 1. GAJWEL 1&2 1. SRISAILAM 1&2 2. NUNNA 1&2 (VTPS*) 1. VTPS 1&2 1. SRISAILAM 1&2 2. GHANAPUR (PGCIL) 1. SRISAILAM 2. GHANAPUR (PGCIL)

FEEDERS
3. KHAMMAM 1&2(PGCIL) 4. YEDDUMAILARAM 1&2** 3. GOOTY (PGCIL) 4. KURNOOL**(PGCIL765) 3. KHAMMAM 1&2 (PGCIL) 4. VEMAGIRI 1&2 5. GVK EXTN 1&2 (IPP) 6. GOWTHAMI 1&2 (IPP) 7. KONASEEMA 1&2 (IPP) 8. GMR VASAVI 1&2 (IPP) 2. RAICHUR

1. SIMHADRI 1,2,3&4 (NTPC) 2. GAJUWAKA 1&2 (PGCIL) 1. KALAPAKA 1&2 2. GAJUWAKA 1&2 (PGCIL) 3. NUNNA 1&2 (PGCIL) 4. NUNNA 3&4 (NRPT** 1&2) 1. TALLAPALLY

1. CHENNAI RED HILLS 3. KRISHNAPATNAM**1&2

2. KADAPA

2. GHANAPUR 4. YEDDUMAILARAM 1&2** 2. GHANAPUR 2. MAMIDIPALLY 1&2 3. VEMAGIRI 1&2 2. MALKARAM 1&2

400KV SUBSTATIONS OF PGCIL IN AP


S.No
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

400KV SUBSTATION
RAMAGUNDAM(NTPC) GHANAPUR (HYDERABAD) GAJUWAKA (VISHAKHAPATNAM) NUNNA (VIJAYAWADA) TALLAPALLY (NAGARJUNA SAGAR) BUDIDAMPADU (KHAMMAM) GOOTY CHINAKAMPALLY NELLORE(MANUBOLU) MULUGU* (WARANGAL)

CAPACITY
2 X 200 MVA 2 X 250 MVA 1 X 315 MVA 3 X 315 MVA 2 X315 MVA 2 X315 MVA 3 X 315 MVA 2 X 315 MVA 2 X 315 MVA 2 X 315 MVA 2 X 315 MVA
1. GHANAPUR 1&2 2. GAJWEL(GHNP3) 3. MALKARAM(GHNP4)

FEEDERS
4. TALLAPALLY 1&2 5. DICHPALLY 6. KHAMMAM (WRNGL) 7. CHANDRAPUR 1&2 4. NAGARJUNA SAGAR 5. KURNOOL 6. MALKARAM (RMGNDM4) 3. VEMAGIRI 1&2 4. JAIPUR(HVDC) 4. VEMAGIRI 3&4 (#) 5. KHAMMAM 6. NELLORE 1&2 7. KONDAPALLY*1&2 4. GOOTY(KNL765*) 5. CHINAKAMPALLY 1&2 4. MAMIDIPALLY 1&2 5. KALAPAKA 1&2 4. NEELAMANGALA 5. RAICHUR 1&2 3. KOLAR 4. CHITTOR 2. ALAMATHI 1&2 (NLR765**) 3. BTPS(KTPS)* 1&2

1. RAMAGUNDAM 1&2 2. MAMIDIPALLY 3. GAJWEL(RMGNDM3) 1. NUNNA 2. KALAPAKA1&2 5. SIMHADRI**1&2 1. GAJUWAKA 2. SRISAILAM 1&2 (VTPS) 3. VEMAGIRI 1&2 1. RAMAGUNDAM 1&2 2. GHANAPUR 3. MAHABOOBNAGAR 1. RAMAGUNDAM (WGL) 2. NUNNA 5. KTPS**1&2 1. TALLAPALLY 2. SOMANAHALLY 3. KURNOOL 1. TALLAPALLY 1&2 2. SOMANAHALLY 1. NUNNA 1&2 1. RAMAGUNDAM 2. KHAMMAM

1. RAMAGUNDAM TO GHANAPUR CKT-2 IS PROPOSED TO TAKE LILO AT MALKARAM (APTRANSCO) SS. 2. RAMAGUNDAM TO KHAMMAM CKT IS PROPOSED TO TAKE LILO AT WARANGAL SS. 3. 765KV KURNOOL IS ABOUT TO START, 765KV DC TO RAICHUR & 400KV KUMPP-DC, KNL 400-DC, LILO TLPLY-GOOTY. 4. 765KV NELLORE IS UNDER FORMULATION STAGE. 5. 765KV EITHER EAST GODAVARI OR SRIKAKULAM IS UNDER FORMULATION STAGE.

400KV NETWORK IN AP
GAJUWAKA
HVDC

SIMHADRI WARANGAL

RAMAGUNDAM BTPS DICHPALLY CHANDRAPUR TALLAPALLY (MAHARASTRA) GAJWEL KTPS


MALKARAM

JAIPUR

KALAPAKA

IPP3 VEMAGIRI

IPP4

IPP1

IPP2
YEDDUMAILARAM

MBNGR

NUNNA KPPTS NELLORE VTPS


SURYAPETA

KRNL 765

GHANAPUR

KPPTS KADAPA

KURNOOL KRNL 765

KHAMMAM GUNTUR(NRPT)

GOOTY CHITTOR BANGALORE


BANGALORE

MALKARAM NLR**765 ALAMETHI / CHENNAI

SRISAILAM MAMIDIPALLY

RAICHUR

CHENNAI

KOLAR

VEMAGIRI SUBSTATION DISPLAY


NUNNA I (PGCIL) NUNNA II (PGCIL) KALAPAKA I KALAPAKA II GAJUWAKA I GAJUWAKA II GOWTHAMI I GOWTHAMI II FUTURE I (PGCIL) (PGCIL) PHES FUTURE II PHES

315MVA, 400/220KV AUTO TRANSFORMER-I

315MVA, 400/220KV AUTO TRANSFORMER-II

GUNTUR I

GUNTUR II

KOPCL II VPGCL I VPGCL II KOPCL I GMR VASAVI GMR VASAVI KONASEEMA KONASEEMA

GVK EXT I

GVK EXT II

DISPLAY

You might also like