The document is a 15-page one-line diagram showing the electrical infrastructure for an existing switch room and area, including transformers, switchgear, medium voltage cables, low voltage cables, motor control centers, and other equipment. Key equipment includes five 2500 kVA transformers, two 630 kVA transformers, and a 200 MVA transformer feeding various low voltage switchboards and motor control centers powering loads such as dehumidifiers and a scrapper.

Uploaded by

achniajosi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views16 pages

Ubs-Iib & Cs System

The document is a 15-page one-line diagram showing the electrical infrastructure for an existing switch room and area, including transformers, switchgear, medium voltage cables, low voltage cables, motor control centers, and other equipment. Key equipment includes five 2500 kVA transformers, two 630 kVA transformers, and a 200 MVA transformer feeding various low voltage switchboards and motor control centers powering loads such as dehumidifiers and a scrapper.

Uploaded by

achniajosi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 1

SWITCH ROOM ( EXISTING )


5000 MVAsc

AREA - K ( EXISTING )
5000 MVAsc

1-3/C 50
1-3/C 50

630 A
LBS 01
13.8 kV

630 A

630 A
LBS 02
2.4 kV

DS

630 A

630 A

630 A

T1
2500 kVA
13.8/0.48 kV

DS

T9
2500 kVA
2.4/0.48 kV

1-3/C 50
10-3/C 240

10-3/C 240

3-1/C 50

3200 A

3200 A
MCC 01
0.48 kV
0 A

0 A

0 A

1-3/C 95 1-3/C 120 1-3/C 50

0 A

0 A

0 A

1-3/C 70 1-3/C 95 1-3/C 35

0 A

0 A

0 A

0 A

0 A

1-3/C 50 1-3/C 185 1-3/C 95 1-3/C 6

0 A

0 A

0 A

0 A

0 A

0 A

0 A

0 A

0 A

0 A

0 A

0 A

0 A

1-3/C 150 1-3/C 70 1-3/C 150 1-3/C 70 2-3/C 120 2-3/C 120 2-3/C 120 2-3/C 120 2-3/C 120 2-3/C 120 2-3/C 120 2-3/C 120 2-3/C 120
DS

T15
200 MVA
0.48/0.4 kV

2-3/C 120

55-6901-V
75 kW

55-6903-V
22 kW
55-6902-V
75 kW

55-6805-V
55-6905-V
55-6807-V
55-6810-V1
55-6810-V2
30 kW
55-6806-V 30 kW
22 kW 55-68010-V1TR 22 kW55-68010-V2 TR
55-6904-V 30 kW
55-6804-V
Dehumidifier 2
Dehumidifier 4
Dehumidifier 6
Dehumidifier 8
55-6807-VL
37 kW
90 kW
22 kW
2.2 kW
4.4 kW
4.4 kW
110 kVA
110 kVA
110 kVA
110 kVA
MDB 01
Dehumidifier 1
Dehumidifier 3
Dehumidifier 5
Dehumidifier 7
110 kVA
110 kVA
110 kVA
110 kVA
Portal Scrapper
191 kVA

T14
630 kVA
13.8/0.48 kV

DS

T4
630 kVA
2.4/0.48 kV

DS

10-3/C 6
1250 A

1250 A
MCC 02
0.48 kV
0 A

0 A

1-3/C 95 1-3/C 95

0 A

0 A

0 A

0 A

1-3/C 95 1-3/C 95 1-3/C 95 1-3/C 95

0 A

0 A

1-3/C 95 1-3/C 95

0 A

0 A

1-3/C 95 1-3/C 95

0 A

DS

T18
100 kVA
0.48/0.4 kV

1-3/C 95

2805-V2
45 kW
2805-V1
55 kW

16:48:10

Jun 24, 2013

Project File: PUSRI

55-6801-V
55 kW

55-6802-V
55-6906-V
55-6908-V
55-6910-V
55 kW
30 kW
37 kW 55-6909-V
22 kW
55-6803-V
55-6907-V
55 kW
3 kW
30 kW

MDB 02

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 2

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 3

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 4

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 5

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 6

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 7

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 8

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 9

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 10

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 11

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 12

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 13

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 14

16:48:10

Jun 24, 2013

Project File: PUSRI

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)

page 15

0 A

DS

16:48:10

Jun 24, 2013

Project File: PUSRI

T17
200 MVA
0.48/0.38 kV

One-Line Diagram - UBS-IIB & CS SYSTEM (Edit Mode)