0% found this document useful (0 votes)
1K views

System Fault Level Calculation 15MW AA

This document summarizes the system fault level calculation for a 15MW cogeneration power plant project for TNEB in Arignar Anna. It details the input data used, calculation methodology, and results. The key findings are that the fault current at the 415V bus is 41.89kA which is below the safe limit of 50kA, and the fault current at the 11kV bus is 12.85kA which is below the safe limit of 40kA. Therefore, the system fault levels were found to be safe.

Uploaded by

erkamlakar2234
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

System Fault Level Calculation 15MW AA

This document summarizes the system fault level calculation for a 15MW cogeneration power plant project for TNEB in Arignar Anna. It details the input data used, calculation methodology, and results. The key findings are that the fault current at the 415V bus is 41.89kA which is below the safe limit of 50kA, and the fault current at the 11kV bus is 12.85kA which is below the safe limit of 40kA. Therefore, the system fault levels were found to be safe.

Uploaded by

erkamlakar2234
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

IKE ELECTRIC PVT. LTD.

Title : System Fault Level Calculation Client : M/s TNEB Project : 15MW COGEN POWER PLANT ARIGNAR DOC No. :TNEB-WILIKE-A94 DATE : 21 - 4 - 2011

ANNA,TNEB.

OBJECTIVE: SYSTEM FAULT LEVEL CALCULATION FOR 15MW ARIGNAR ANNA A/c TNEB Project. INPUT DATA AVAILABLE: 1. Alternator Data Sheet : 18.75 MVA , 15MW , 984 A synchronous speed = 1500rpm , p.f 0.8 lag , voltage 11kV +-10% , reactance Xd 26% = 0.26 2. Generator transformer data: As per GTP of M/s Indo Tech Transformers Ltd 15/20 MVA ,11/110kV star / delta , YNd1, Percentage impedance (%Z) 12.5 % with tolerance as per IS (+- 10 % considered). Distribution transformer data: As per GTP of M/s Tech Transformer Ltd. 1.6 MVA , 11/0.433kV ,star / delta , Dyn11, percentage impedance (%Z) 6.25 % No negative tolerance. (Two transformer never operate in parallel, we have considered one transformer for this fault level calculations) 4. DOCUMENT REFERED AT THE TIME OF CALCULATION: AS per electrical load list No. TNEB-WIL-IKE-A11.

3.

CALCULATION AS FOLLOWS: 1. Equivalent impedance diagram (Attached) Calculation Base MVA Generator Fault MVA = 1.6 = MVA 18.75/26 x 100 = Therefore Zg (Gen. Impedance) = 72.115 MVA MVA

1.6 x 100 / 72.115

Page 1

= 110 kV system Fault MVA

2.2186 % = kA x 3 x kV

IKE ELECTRIC PVT. LTD.


Title : System Fault Level Calculation Client : M/s TNEB Project : 15MW COGEN POWER PLANT ARIGNAR DOC No. :TNEB-WILIKE-A94 DATE : 21 - 4 - 2011

ANNA,TNEB.

= = Therefore Zs (system Impedance) = Generator Trafo Impedance Zgt = Generator Trafo Impedance Zgt 1.6 MVA base

31.5 x 1.732 x 110 6001.38 = 1.6 x 100/6001.38

0.02666 % = 12.5 - 1.25 (-10 % Tolerance)

11.25 % = = 11.25 x 1.6 / 20 0.9 %

A)

Fault MVA at 415 V bus at 1.6 MVA base = = = 1.6 / Z eq 1.6 x 100 / 6.903 23.17 MVA

B) Motor contribution for fault Above 37 KW non VFD motor load as per electrical load list No. TNEB-WIL-IKE-A11.

1) 37kW x 3 Nos (2 Working + 1 Standby ) 2) Total kW = 111

= 111 kW

kW

Page 2

3) Therefore kVA at 0.8 p.f lag & Efficiency 0.9 = 154

kVA

Motor contribution for fault

= kVA x 5 times = 154 x 5 kVA

kVA

IKE ELECTRIC PVT. LTD.


Title : System Fault Level Calculation Client : M/s TNEB Project: 15MW COGEN POWER PLANT ARIGNAR DOC No. :TNEB-WILIKE-A94 DATE : 21 4 - 2011

ANNA,TNEB.

= 770 = 0.770

kVA MVA

Therefore total fault MVA bus + Motor contribution = =

Fault MVA at 415V MVA MVA

29.34 + 0.770 30.11

Fault at 415V Bus

= =

30.11 / 3 x 0.415 41.89 KA

As per the above value against 50kA Conclusion found is SAFE.

C)

Fault MVA at 11kV Bus considering Base kV 0.433V = 1.6 x 100 / (ZB) As per equivalent impedance diagram ZB = 0.6533 Fault MVA at 11kV = 1.6 x 100 / 0.6533 = 244.91 MVA

Page 3

Fault current on 11kV Bus

= 244.91 / ( 3 x 11 ) = 12.85 kA

As per the above value against 40kA Conclusion found is SAFE.

IKE ELECTRIC PVT. LTD.


Title : System Fault Level Calculation Client : M/s TNEB Project : 15MW COGEN POWER PLANT ARIGNAR DOC No. :TNEB-WILIKE-A94 DATE : 21 - 4 - 2011

ANNA,TNEB.

Project: 18MW COGENERATION PLANT AT ARIGNAR ANNA A/c TNEB. READ WITH SYSTEM FAULT LEVEL CALCULATION, DOC NO: TNEB-WIL-IKE-A94 EQUIVALENT IMPEDANCE DIAGRAM Zs = 0.0266 %

Zg = 2.2186 % Zgt = 0.9 % 11kV Bus Zdt = 6.25 % 0.415 kV Bus

ZA = Zs + Zgt =0.9266 11kV Bus Zdt = 6.25 % 0.415kV Bus

Page 4

ZB = ZA l l Zg 0.6533 11kV Bus Zdt = 6.25 % 0.415 kV Bus

IKE ELECTRIC PVT. LTD.


Title : System Fault Level Calculation Client : M/s TNEB DOC No. :TNEB-WILIKE-A94 DATE : 21 - 4 - 2011

Project : 15MW COGEN POWER PLANT ARIGNAR

ANNA,TNEB.

Zeq = ZB + Zdt = 6.903 Reactance

MOTOR transformer Impedance

M M M m M m m
MOTOR

0.415 kV Bus

Zg = Generator Zs = System Impedance Zgt = Generator Zdt = Distribution transformer

Impedance