Structure Above The Ground 66 Days Mon 7/8/13 Mon

The document outlines a project schedule to construct the structure above ground and the ground and first floors of a building over 66 days. It details 34 separate tasks involving transporting materials, manufacturing and mounting reinforcements, forming concrete, pouring concrete, and removing forms. The critical path runs through tasks for reinforcing and pouring concrete for columns on both floors and girders/plates on the first floor.

Uploaded by

George Lazar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views1 page

Structure Above The Ground 66 Days Mon 7/8/13 Mon

The document outlines a project schedule to construct the structure above ground and the ground and first floors of a building over 66 days. It details 34 separate tasks involving transporting materials, manufacturing and mounting reinforcements, forming concrete, pouring concrete, and removing forms. The critical path runs through tasks for reinforcing and pouring concrete for columns on both floors and girders/plates on the first floor.

Uploaded by

George Lazar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID

Task Mode Name


0
1

Duration

Start

Finish

Successors
6/23

StructureAbovetheground
GroundFloor

66days

Mon7/8/13

35days

Mon7/8/13

Mon
/
/
Fri8/23/13
Mon7/8/13 3,11,13

A1Cranetransporting

1day

Mon7/8/13

A2Craneassembling

4days

Tue7/9/13

A3Columnreinforcementtransportationwithtruck

1day

A4Reinforcementmanufacturingforcolumns

4days

A5Reinforcementmountingforcolumns

2days

Mon7/22/13 Tue7/23/13 7

A6Formworkforcolumns

1day

Wed7/24/13 Wed7/24/13 8

A7C20/25pumpedconcretepouring

1day

Thu7/25/13 Thu7/25/13 9

A8Waittimeforconcretetoharden

3days

10

A9Columnformworkstriking

1day

11

A10Girdersandpoststransportation

1day

Tue7/9/13

Tue7/9/13 12

12

A11Girderandpostssustains

2days

Thu8/1/13

Fri8/2/13 14

13

A12Reinforcementsmanufacturingforgirdersandplates

6days

Tue7/9/13 Tue7/16/13 15

14

A13Concreteformworksforgirdersandplates

5days

15

A14Reinforcementmountingforgirdersandplates

4days

16

A15C20/25pumpedconcretepouring

1day

17

A16Waittimeforconcretetoharden

3days

18

A17Formworkstriking

2days

19

FirstFloor

July
6/30

7/7

7/14

7/21

August
7/28 8/4

8/11

8/18

8/25

September
9/1
9/8

9/15

9/22

October
9/29 10/6 10/13

Fri7/12/13 4

Mon7/15/13 Mon7/15/13 5
Tue7/16/13

Fri7/19/13 6

Fri7/26/13 Tue7/30/13 10
Wed7/31/13 Wed7/31/13 12

Mon8/5/13

16 days
18 days

Fri8/9/13 15

Mon8/12/13 Thu8/15/13 16
Fri8/16/13

Fri8/16/13 17

Mon8/19/13 Wed8/21/13 18
Thu8/22/13

Fri8/23/13 19

31days

Mon8/26/13 Mon10/7/13
Mon8/26/13 Mon8/26/13 29,21

20

A18Columnreinforcementtransportationwithtruck

1day

21

A19Reinforcementmanufacturingforcolumns

4days

Tue8/27/13

Fri8/30/13 22

22

A20Reinforcementmountingforcolumns

2days

Mon9/2/13

Tue9/3/13 23

23

A21Formworkforcolumns

1day

Wed9/4/13

Wed9/4/13 24

24

A22C20/25pumpedconcretepouring

1day

Thu9/5/13

Thu9/5/13 25

25

A23Waittimeforconcretetoharden

3days

26

A24Columnformworkstriking

1day

Wed9/11/13 Wed9/11/13 27

27

A25Girdersandpoststransportation

1day

Thu9/12/13 Thu9/12/13 28

28

A26Girderandpostssustains

2days

Fri9/13/13 Mon9/16/13 30

29

A27Reinforcementsmanufacturingforgirdersandplates

6days

Tue8/27/13

30

A28Concreteformworksforgirdersandplates

5days

Tue9/17/13 Mon9/23/13 31

31

A29Reinforcementmountingforgirdersandplates

4days

Tue9/24/13

32

A30C20/25pumpedconcretepouring

1day

Mon9/30/13 Mon9/30/13 33

33

A31Waittimeforconcretetoharden

3days

Tue10/1/13 Thu10/3/13 34

34

A32Formworkstriking

2days

Fri9/6/13 Tue9/10/13 26

14 days

Tue9/3/13 31
Fri9/27/13 32

Fri10/4/13 Mon10/7/13

Critical

Slack

Rolled Up Critical Split

Duration-only

External Tasks

Critical Split

Slippage

Inactive Task

Manual Summary Rollup

External Milestone

Task

Summary

Inactive Milestone

Manual Summary

Deadline

Split

Project Summary

Inactive Summary

Start-only

Progress

Milestone

Rolled Up Critical

Manual Task

Finish-only

You might also like