The document is a quality control form for the Dung Quat Refinery Project in Vietnam. It provides inspection details for painting done by subcontractors, including the location, sub-location, sub-contractor name, contract number, item inspected, specification number, system code, completion number, drawing number, description, and notes from visual inspection of thickness, color, and holidays. Signatures are included from the subcontractor, contractor, and client to sign off on the inspection.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
514 views
QCF325 Painting Inspection Release Note
The document is a quality control form for the Dung Quat Refinery Project in Vietnam. It provides inspection details for painting done by subcontractors, including the location, sub-location, sub-contractor name, contract number, item inspected, specification number, system code, completion number, drawing number, description, and notes from visual inspection of thickness, color, and holidays. Signatures are included from the subcontractor, contractor, and client to sign off on the inspection.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1
PROJECT
DUNG QUAT REFINERY (DQR) PROJECT
PROJECT NO
8474L QCF 325
CLIENT
VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM)
QUALITY CONTROL FORM
PAINTING INSPECTION RELEASE NOTE
LOCATION SUB - LOCATION SUB-CONTRACTOR CONTRACT NO. INSPECTED ITEM REPORT NO. SHEET NO. DATE SPECIFICATION NO. SYSTEM CODE COMPLETION NO DRAWING NUMBER DESCRIPTION DATE VISUAL INSPECTION D.F.T COLOR HOLIDAY