__________________________________ M.F. Groves Director, Division of Power System Maintenance __________________________________ Date
12/14/90
Disclaimer
The information contained in this manual regarding commercial products or firms may not be used for advertising or promotional purposes and is not to be construed as an endorsement of any product or firm by the Western Area Power Administration (Western). The information contained in this manual was developed for Western; no warranty as to the accuracy, usefulness, or completeness is expressed or implied when used by other entities.
Preface
This guide is issued by the Western Area Power Administration (Western) and is designed to provide specific guidelines, instructions, procedures, and criteria for performing insulating liquids testing in Westerns electrical facilities. Procedures and guidelines are in accordance with established industry standards and current industry practices. Any corrections or comments concerning this guide may be addressed to the Western Area Power Administration, Division of Power System Maintenance, A6200, Golden, Colorado.
Interpretations
The stated interpretations for the following words shall be applied throughout this chapter:
q
May - Permissive choice. Shall or Must - Mandatory under normal conditions. Will - Mandatory, but allowing the responsible employee or party some discretion as to when, where, and how. Should - Advisory. Should statements represent the best advice available at the time of printing. Male pronouns and related terms are used in reference to both male and female employees.
-i-
Table of Contents
Page
PURPOSE AND SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Part 1 - MINERAL INSULATING OIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1. CHARACTERISTICS OF INSULATING OIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 1.1 Refining of Insulating Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 1.2 Specifications for Insulating Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 2. DETERIORATION OF INSULATING OIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 2.1 Effect of Oxygen on Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 2.2 Moisture in Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 2.3 Oil Deterioration in Transformers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 2.4 Oil Deterioration in Circuit Breakers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7 3. TESTING OF INSULATING OIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 3.1 Types of Oil Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 3.2 Interpretation of Test Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11 3.3 Periodic Testing Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11 4. RECONDITIONING USED INSULATING OIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 4.1 Natural Precipitation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 4.2 Filter Presses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 4.3 Cartridge Filters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 4.4 Centrifuges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 4.5 Coalescers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 4.6 Vacuum Dehydrators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 4.7 Electrostatic Oil Filters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 4.8 Treatment of Circuit Breaker Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 4.9 Treatment of Tap Changer Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 4.10 Inservice Oil Filtering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 4.11 Limited Interchangeability of Oils . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15
4.12 Disposal of Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 5. RECLAIMING USED INSULATING OIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 5.1 Fullers Earth Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 5.2 Activated Alumina Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
-ii-
Contents (Continued)
6. OXIDATION INHIBITORS FOR INSULATING OIL . . . . . . . . . . . . . . . . . . . . . . . . . .17 6.1 Natural Inhibitors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 6.2 Inhibitor Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
6.3 The DBPC Inhibitor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 7. TESTING FOR COMBUSTIBLE GASES IN POWER TRANSFORMERS AND REGULATORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 7.1 Combustible Gas Analyzers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 7.2 Dissolved Gas-In-Oil Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20 Part II - SYNTHETIC INSULATING LIQUIDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 8. SILICONE OIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 9. RETROFILLING TRANSFORMERS WITH SILICONE OIL . . . . . . . . . . . . . . . . . . . .23 10. REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24 Appendix A Sampling Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Appendix B Dielectric Test: Equipment and Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31 Appendix C Oil Acidity Test: Equipment and Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35 Appendix D Interfacial Tension (IFT) Test: Equipment and Methods for Field Use . . . . . . . . . . .37 Appendix E Doble Tests of Liquid Insulation With MH and M2H Test Sets . . . . . . . . . . . . . . . . . .47
-iii-
List of Figures
Page Figure 1 Relation Between Dielectric Strength and Amount of Emulsified Water in Mineral Oil .........................................................................................................5 Maximum Amount of Water Dissolved in Mineral Oil as Affected by Temperature ......................................................................................................6 Relation Between Service Life, Interfacial Tension and Acidity in Mineral Oil .....................................................................................................................9 A Photovolt Aquatest-IV Determines Water Content ......................................11 Dissolved Gas-In-Oil Extraction Apparatus.....................................................21 Oil Sampling of Electrical Equipment..............................................................28 A Hipotronics Dielectric Test Setup .................................................................32 A Commercial Test Kit With Titration Solution, Three Glass Mixing Cylinders, and a KOH Solution ........................................................................................36 A Fisher Surface Tensiometer .........................................................................38 The Model 6 PTA Interfacial Tensiometer Mounted in Support Stand ............39 Dismantled Tensiometer .................................................................................40 Tensiometer With 50-mL Beaker Under the Tubing Orifice ............................41 Technique for Filling Tensiometer Barrel With Distilled Water .........................43 Liquid-Insulation Cell With Metal Carrying Pail ..............................................48 Liquid-Insulation Cell Connected for Testing ..................................................49
Figure 2
Figure 3
Figure D.1 Figure D.2 Figure D.3 Figure D.4 Figure D.5 Figure E.1 Figure E.2
iv
List of Tables
Table 1 Table 2 Page Chemical and Physical Characteristics of Mineral Insulating Oil .....................3 Effective DBPC Antioxidant Concentration of IMPRUVOL 20 (Koppers Co.) ..................................................................................................18 Quantitative Testing for Total Combustible Gas ..............................................19
Table 3
Nomenclature
cubic feet per gallon cubic meters per liter degree Celsius degree Fahrenheit dyne per centimeter feet gallon gallon per hour gallon per minute gallon per pound gram hour inch kilogram kilogram per cubic meter kilopascal kilovolt kilovolt per second liter liter per hour liter per kilogram liter per minute meter micrometer (micron - obsolete) milligram milliliter millimeter newton per meter ounce parts per million potassium hydroxide pound pound per gallon pound per square inch quart root mean square Saybolt universal second square meters per second ft3/gal m3/L C F dyn/cm ft gal gal/h gal/min gal/lb g h in kg kg/m3 kPa kV kV/s L L/h L/kg L/min m m mg mL mm N/m oz p/m KOH lb lb/gal lb/in2 qt rms Sus m2/s
vi
Table 1 is revised periodically to keep it current; therefore, the most current revision should be obtained from Headquarters, Division of Power System Maintenance, Lines and Substations Branch, A6210. Makeup oil must be compatible with the existing oil when the two are mixed, and this requirement should be included in the specifications. An example would be the mixing of naphthenic and paraffinic oils as stated in the 1988 Doble Conference minutes.
Acidity
D-974-87
0.05 mg of KOH/g 0.5 Pass 30 kV 35 kV 145C 45 dyn/cm - 40C 0.3% 0.05% 0.865-0.910 32.0-24.0
D-1500-87 D-1275-86 D-877-87 D-1816-84 D-92-85 D-2285-85 D-97-87 D-924-82 D-924-82 D-1298-85 D-287-82
MAX
Flash Point Interfacial Tension Pour Point Power Factor at 100 C Power Factor at 25 C Specific Gravity at 15.6 C or API Gravity at 15.6 C Viscosity at 37.8 C Kinematic Saybolt Oxidation or sludge, Choice of: Oxidation life Sludge at 72 hours Oxidation stability Inorganic Chlorides and Sulfates Water 2,6 - Ditertiary Butyl Paracresol (DBPC) Polychlorinated Biphenyl (PCB) analysis
MAX MAX
12 m2/s 65 Sus
12 m2/s 65 Sus
MAX
35 p/m
D-2668-87
MIN
0.15%
---
N/A
None
None
35
DIELECTRIC STRENGTH - KV [2.54mm (0.1 IN) GAP BETWEEN 25.4mm (1.0 IN) DISKS}
30
25
20
15
10
10
20
30
40
50
60
Figure 1 Relation Between Dielectric Strength and Amount of Emulsified Water in Mineral Oil.
Source: Instruction Book of Insulating Oil for Electrical Apparatus, Westinghouse Electric and Manufacturing Company No. I.B. 5336-D.
240
200
160
120
80
40
0 0 10 20 30 40 50 TEMPERATURE -C
2.3 Oil Deterioration in Transformers. In transformers, sludge sticks to the surfaces through which heat is dissipated; the sludge forms a barrier to the flow of heat from the oil to the coolant and from the core and coils to the oil. If allowed to continue, the sludge may block off the flow of oil through the cooling ducts. As a result, the transformer insulating oil becomes hotter and the transformer could be damaged, particularly between the coil turns of the windings. Deterioration of the coil-turn insulation may eventually lead to short circuits between coil turns and the breakdown of the transformer. When oxidation progresses to the point where sludge is being precipitated, the first step should be to remove the sludge from the transformer by a high-pressure stream of oil and to either replace the sludged oil or treat it with activated clay to remove the acid and sludge precursors. Complete treatment of the oil is normally less costly than replacing it with new oil. Methods of treatment are described in section 4. 2.3.1 Absorption of Moisture by Insulating Materials. Solid insulation in transformers is very porous and absorbs much water. Some of the water that is dissolved in the oil is absorbed from the oil by the insulation. As more water is dissolved in the oil, more water is absorbed by the insulation. Once the water is absorbed by the insulation, it is difficult to remove. The most effective method for drying out the insulation in transformers is with heat and vacuum. Sometimes a vacuum cannot be applied in the field. In this case, the transformer insulation must be dried by circulation of hot, dry oil. This oil should then be cooled and dried. Since the dielectric strength of insulation is reduced by moisture, it is important that steps are taken to prevent the introduction of moisture. 2.3.2 Absorption of Nitrogen by Oil. Special precaution should be taken when operating nitrogen-blanketed transformers to avoid bubbling the oil, due to the release of dissolved nitrogen when the pressure drops. Experience has shown that the automatic gas-pressure regulating system should be adjusted to limit the nitrogen pressure range from plus 3.4- to plus 21-kPa (plus 1/2- to plus 3-lb/in2) gauge to avoid formation of these bubbles and subsequent troubles due to corona deterioration. 2.4 Oil Deterioration in Circuit Breakers. In circuit breakers, a spark flashes through the insulating oil during electrical interruption. If oxygen is available in any form, water and carbon dioxide will be formed. When the oxygen supply runs out, carbon particles and hydrogen are formed. The hydrogen is dissipated as gas. Carbon particles can be seen visually. The presence of carbon particles generally leads to trouble long before oxidative deterioration becomes significant.
0.06
0.05
0.8
Ac idi t
0.04
0.6
0.03
0.02
0.2
0.01
9 YEARS IN SERVICE
12
15
0 18
Figure 3 Relation Between Service Life, Interfacial Tension, and Acidity in Mineral Oil.
Source: AIEE Transactions, 1955, page 774.
Tests have been made which indicate that acidity is proportional to the amount of oxygen absorbed by the oil. It is estimated that 0.0015 m3/L (0.2 ft3/gal) of oxygen absorbed in oil will cause an acidity of about 0.4 mg of KOH, which is the approximate acidity number at which sludging is assumed to start. Based on this assumption and equal loading test cycles, the following table has been developed.
Transformer Type
Approximate Time Period Before Sludging Begins 10 years 15 years 50 years 67 years
Transformers with free air access Transformers with conservators Transformers bolted tight (sealed) with no nitrogen Transformers with nitrogen over oil
While the above periods may not correspond to actual field examples due to different load conditions than those assumed, they do illustrate the relative periods of serviceability for the different types of transformers. 3.1.3 Power Factor Test. The power factor of an insulating oil equals the cosine of the phase angle between an alternating-current (ac) voltage applied to an oil and the resulting current. Power factor indicates the dielectric loss of an oil and, thus, its insulating value. The power factor test is widely used as an acceptance and preventive maintenance test for insulating oil. Oil power factor testing in the field is usually done with the Doble type MH or M2H test set in conjunction with power factor tests of the oil-filled equipment. Test procedures for the Doble instruments are given in appendix E. The power factor of new oil should not exceed 0.05 percent at 25C. A high power factor in used oil indicates deterioration or contamination or both with moisture, carbon, varnish, Glyptal, sodium soaps, or deterioration products. Used oil with a power factor in excess of 0.5 percent should be further analyzed in a laboratory to determine the cause of the high power factor. Oil with a power factor in excess of 2.0 percent may constitute an operational hazard. It should be further investigated and either reconditioned or replaced. 3.1.4 Interfacial Tension (IFT) Test. The acidity test determines conditions under which sludge may form, but does not necessarily indicate that actual sludging conditions exist. The IFT test is employed as an indication of the sludging characteristics of power transformer insulating oil. It is a test of interfacial tension of water against oil, which is different from the surface tension of oil against air. The attraction between the water molecules at the interface is influenced by the presence of polar molecules in the oil in such a way that the presence of more polar compounds causes lower interfacial tension. The test measures the concentration of polar molecules in suspension and in solution in the oil and thus gives an accurate measurement of dissolved sludge precursors in the oil long before any sludge is precipitated. It has been established that an interfacial tension of less the 0.015 N/m (15 dyn/cm) almost invariably shows sludging. An IFT of 0.015 to 0.022 N/m (15 to 22 dyn/cm) shows an uncertain condition, and an IFT value of more than 0.022 N/m (22 dyn/cm) is generally indicative of no sludging. Transformer oils whose IFT is in the range of 0.015 to 0.022 N/m (15 to 22 dyn/cm) should be scheduled for reclaiming, regardless of acidity values. Appendix D contains a discussion of field IFT test equipment and methods. 3.1.5 Water Content Test. A low water content in insulating oils is desirable in order to achieve an adequate electrical strength and low dielectric losses. Low water content maximizes the life of the insulation system and minimizes metal corrosion. ASTM test method D-1533-88, Test for Water in Insulating Liquids (Karl Fischer Method), is based on the reduction of iodine by water and sulfur dioxide (figure 4). Water content in transformer oil is of greater concern than water content in breaker oil, simply because of the effects.
10
Indicate abnormal conditions in oil-filled equipment. Provide information regarding deterioration trends. Reveal incipient problems which can be detected early enough to avoid an unscheduled outage.
Therefore, it is recommended that the inservice oil in transformers and breakers be tested annually.
11
The condition of the oil and the load conditions should determine whether a more frequent schedule should be followed. Normally, acidity, IFT, power factor, water content, and dielectric tests should be made on oil in transformers, and power factor and dielectric tests should be made on oil in circuit breakers at least once a year. Permanent records should be kept of all test results. Whenever the test results show that accelerated deterioration is occurring, more frequent oil tests should be made to further assess the conditions and determine the appropriate corrective action. For example, when the IFT reaches a value of 0.025 N/m (25 dyn/cm), more frequent testing is required to determine when the IFT value is approaching 0.022 N/m (22 dyn/cm) and the oil should be scheduled for reconditioning. Idle, oil-filled equipment may also accumulate moisture and should be tested at least once a year. The cooling coils of water-cooled transformers sometimes develop leaks, and water may enter the oil so fast that even weekly dielectric tests would not catch the trouble. A rise in the transformer oil level is the best indicator for this condition. Most water-cooled transformers are equipped with cooling tubes of double-wall construction. The intent of this construction is to bleed off any leaking water or oil into the space between the two walls of the tube to avoid contamination. Usually, the oil pressure is maintained higher than the water pressure, and a double-wall leak causes oil to be lost into the cooling system discharge. The loss would be indicated by low oil level in the transformer. Hence, change of oil level is an important indication and should be checked frequently. Distribution transformers need not be tested. However, station service transformers of larger capacity need to be tested as frequently as once a year. The presence of carbon in circuit breakers and step-voltage regulator oil introduces a hazard due to the tendency of the carbon to lower the dielectric strength of the oil and also to form deposits on insulating surfaces, reducing the insulation resistance. Carbonized oil is more vulnerable to moisture than clean oil. The quantity of carbon is proportional to the number and severity of the arcs interrupted. Samples of oil for dielectric test should be obtained from both types of equipment (circuit breakers and step-voltage regulators) annually during the partial service and from oil circuit breakers after a heavy fault or series of faults. If an oil sample is black from suspended carbon, the oil should be filtered or centrifuged even though the dielectric test is good. 3.3.2 Laboratory Testing. The decision to remove moisture to increase dielectric strength of oil by standard reconditioning methods should be made by field personnel. A sample of oil which appears to be in poor or questionable condition due to contamination other than moisture should be examined by a laboratory. The decision to reclaim, replace, or order additional laboratory tests will be made by field personnel. Appendix A contains sampling procedures.
12
13
completely as a filter press. Consequently, the centrifuge is generally used for rough-bulk cleaning where large amounts of contaminated oil are to be handled. Frequently, the output of the centrifuge is put through a filter press for the final purifying. The centrifuge cannot remove dissolved water from oil since the centrifuge is sealed with water, the oil leaving the centrifuge may be saturated at the temperature of operation and conceivably could contain more dissolved water than when it entered. Neither the centrifuge nor the filter press is designed to treat oil chemically. 4.5 Coalescers. Coalescers are used to remove free water from both lubricating and insulating oils. Coalescing filtration is a relatively new technique that has been borrowed from the aviation fueling field. Fiberglass cartridges trap small water particles. Increasing differential pressure across the filter media forces the particles of water together, and the large water drops are extruded at the outer surface of the fiberglass element. Large water drops are retained within a water-repellent separator screen and collect, by gravity, at the bottom of the filter while dry oil passes through the separator screen. This method is quite similar to centrifuging with respect to performance and limitations. Coalescing filters have no moving parts, and therefore, are simpler in operation and maintenance than centrifuges; however, any particulate matter in the oil will clog a coalescer and render it useless. 4.6 Vacuum Dehydrators. The vacuum dehydrator is efficient in reducing the water content of an insulating oil to a very low value. In this apparatus, the oil is exposed to a vacuum and heat for a short interval of time. Vacuum dehydrators can be used to treat oil without removing associated equipment from service. In addition to removing water, vacuum dehydrators will degas the oil and remove the more volatile acids. Vacuum dehydrators are frequently used by the manufacturer during initial filling of new transformers. 4.7 Electrostatic Oil Filters. Electrostatic oil filters are lightweight and portable. These systems remove water, particulates, and polar contaminants from insulating oil by a unique nonionizing-electrostatic filtration method. One manufacturer states that the filter is capable of dehydrating oil below 10 p/m absolute, and removing salt and submicronic particulates without affecting the concentration of additives in the oil. Particles are entrapped within the electrostatic filter in three distinct ways: (1) electrostatic attraction and containment of particles to the grid elements, (2) mechanical bonding (impaction) of particles to the grid elements, and (3) entrapment of contaminants between grid elements. When contaminated, the grids are removed as a unit, rinsed in solvent, and reinstalled. For oil containing a substantial quantity of free water, a coalescing filter should be used upstream of the electrostatic filter. A combination of these filters is claimed to achieve an oil dielectric strength in excess of 40 kV in a single pass. 4.8 Treatment of Circuit Breaker Oil. Although it is customary to recondition circuit breaker oil in much the same manner as transformer oil, the contamination is somewhat different. Whereas sludging is, or may be, the principal problem in transformer oil, this is not the case with circuit breaker oil. Conditions conducive to sludge formation and other deleterious effects produced in transformers do not normally occur in circuit breakers. Aside from being a dielectric, the chief function of transformer oil is to dissipate heat, but, in a circuit breaker it is to quench the arc. Extinguishing arcs can result in chemical breakdown and the formation of minute particles of carbon which reduces the dielectric strength of the oil. If present in sufficient quantity, these particles will deposit or settle onto insulating members until a short circuit results. Testing methods for circuit breaker oils are the same as those used for transformer oils. The chief problem in circuit breaker oil maintenance is to keep the oil free of water, conducting products, and other contaminants. A filter press or cartridge filter is the accepted method of reconditioning. The presence of carbon in oil increases the susceptibility of the oil to deterioration due to moisture, thereby increasing the rate at which the oil loses dielectric strength. For certain oil-poor circuit breakers where the carbonizing effects are severe and frequent treatment is required, it is more practical to replace the oil than try to filter it since the quantity of oil lost is relatively small. 4.9 Treatment of Tap Changer Oil. The oil used in load-tap changing compartments or in step-voltage regulators is usually the same type as that used in transformers. The maintenance of this oil is fundamentally the same as that used in circuit breakers. However, there is a contaminant sometimes present in oil exposed to this type of service that does not exist to any great extent in circuit breaker oil. The comparatively large number of
14
operations of the contacts in this type of device is quite likely to produce a considerable amount of very fine copper dust. This can be removed by the same filtering methods used on circuit breaker oils, however, precautions should be taken if the presence of these fine copper particles in the oil will harm reconditioning equipment. Rotary pumps with close clearances can be seriously damaged if copper particles are allowed to pass through them. Also, copper is an oxidation catalyst which increases the rate of oil deterioration. Due to this oxidizing characteristic and the difficulty involved in removing these copper particles prior to entrance into the pump, it is usually desirable to replace the oil with new oil. However, it is possible to reclaim the contaminated oil if necessary. 4.10 Inservice Oil Filtering. Several electric utilities have successfully utilized inservice oil-filtering systems on transformer tap changers and oil circuit breakers used for capacitor and reactor switching. Inservice filtering is reported to remove many of the carbon and copper particles from the oil and thus greatly extend the interval for oil reconditioning and equipment maintenance. A typical installation consists of a permanently mounted pump of 11.4-L/min (3-gal/min) capacity and truck-type oil filter of 19-L (20-qt) capacity using 2-m filter elements. Daily filtering periods may be controlled with a time switch or be interconnected with the switching operation. 4.11 Limited Interchangeability of Oils. As a normal practice, used or reclaimed circuit breaker oil must not be used in a transformer. The primary reason is the difficulty involved in removing arc and oxidation products while maintaining resistance to sludging. On the other hand, oil used in a transformer can be transferred to a breaker, in which case, the oil should pass tests for circuit breaker oil, as previously outlined. 4.12 Disposal of Oil. It is recommended that all insulating oil which is excess or is no longer suitable for use in electrical apparatus be tested for PCB contamination prior to disposal. Its disposal must be in accordance with Federal and state rules and regulations.
15
16
17
1 2
Density of typical transformer oil - 876 kg/m3 (7.31 lb/gal). Density of IMPRUVOL 20 - 896 kg/m3 (7.48 lb/gal).
6.3.1.2 To Use Flake DBPC Antioxidant. To compute the amount of flake DBPC antioxidant needed, take 2.6-kg DBPC antioxidant per 1,000-L (2.2-lb DBPC antioxidant per 100 gal) transformer oil, from table 2, which corresponds to a level of 0.3 percent DBPC antioxidant inhibition. Multiply this figure by 800 L/1,000 L (211 gal/100 gal). The result is 2.08-kg (4.64-lb) DBPC antioxidant for the transformer. The volume of transformer oil required to prepare a 20-percent by mass DBPC antioxidant oil solution for adding 2.10 kg (4.64 lb) of DBPC antioxidant to the transformer is obtained by multiplying 2.10 kg (4.64 lb) by the factor 4.57 L/kg (0.55 gal/lb) to give 9.6 L (2.55 gal). If the mass of transformer oil for preparing this solution is required, multiply 2.10-kg (4.64-lb) DBPC antioxidant by the factor 4 to give 8.42 kg (18.6 lb) of oil.
18
Check each transformer or regulator every 12 months. Equipment shows some indication of contamination or slight incipient fault. Readings in this range should be followed immediately with a dissolved gas analysis. Take readings at 3- to 6-month intervals to establish a trend. Take readings at monthly intervals. If trend continues upward, prepare to investigate cause, preferably by internal inspection. Remove equipment from service as soon as possible. Investigate by internal inspection. Prepare to move equipment to service shop.
2-5
Greater than 5
19
7.2 Dissolved Gas-In-Oil Analysis. Western has been conducting gas-in-oil analysis of insulating oils by gas chromatography and has had excellent results with this testing program. The gas-in-oil analysis is more sensitive than the total combustible gas analyzer and can detect transformer problems earlier because of the following:
q
The combustible gases are all very soluble in oil, and there is little tendency for them to migrate into the gas space if the concentration is low. Normal oil circulation dilutes the gases as they are formed and there is no appreciable release into the nitrogen gas blanket until the gases saturate the oil. Certain important gases (for example, acetylene) exhibit such high affinities for oil that they are not easily released. Therefore, an analysis of free gas from transformers may be quite misleading in terms of the actual decomposition products.
The dissolved gas-in-oil analysis test procedure (figure 5) has proven to be predictive and valuable. Therefore, it is recommended that gas-in-oil analysis tests be performed on all Western transformers containing insulating oil. The frequency of testing transformer oil using the DGA technique is an essential part of Westerns preventative maintenance program and should follow the testing schedule listed below: (1) (2) (3) (4) (5) (6) (7) As soon as possible after installation, preferably before initial energization. One week after initial energization. Three weeks after initial energization. Two months after initial energization. Six months after initial energization. Every year as a normal routine sampling cycle. If, however, a malfunction is suspected, the interval should be shortened as appropriate.
20
21
22
23
10. References
American Institute of Electrical Engineers Transactions, 1955, page 774. Guide for the Reclamation of Insulating Oil and Criteria for Its Use, ANSI/IEEE Std. 637-1985, November 1985. Instruction Book on Insulating for Electrical Apparatus, Westinghouse Electric and Manufacturing Company, No. I.B. 5336-D. Maintenance of Liquid Insulation-Mineral Oils and Askarels, Bureau of Reclamation; Power O&M Bulletin No. 11, Revised July 1980. Practice for Conversion of Kinematic Viscosity to Saybolt Universal Viscosity or to Saybolt Furol Viscosity, ASTM Std. D-2161-87. Specification for Mineral Insulating Oil Used in Electrical Apparatus, ASTM Std. D-3487-88. Test Method for 2,6-Ditertiary-Butyl Para-Cresol and 2,6-Ditertiary-Butyl Phenol in Electrical Insulating Oil by Infrared Absorption, ASTM Std. D-2668-87. Test Method for A-C Loss Characteristics and Relative Permittivity (Dielectric Constant) of Electrical Insulating Liquids, ASTM Std. D-924-82. Test Method for Acid and Base Number by Color-Indicator Titration, ASTM Std. D-974-87. Test Method for API Gravity of Crude Petroleum and Petroleum Products (Hydrometer Method), ASTM Std. D-287-82. Test Method for ASTM Color of Petroleum Products (ASTM Color Scale), ASTM Std. D-1500-87. Test Method for Corrosive Sulfur in Electrical Insulating Oils, ASTM Std. D-1275-86. Test Method for Density, Relative Density (Specific Gravity), or API Gravity of Crude Petroleum and Liquid Petroleum Products by Hydrometer Method, ASTM Std. D-1298-85. Test Method for Dielectric Breakdown Voltage of Insulating Liquids Using Disk Electrodes, ASTM Std. D-877-87. Test Method for Dielectric Breakdown Voltage of Insulating Oils of Petroleum Origin Using VDE Electrodes, ASTM Std. D-1816-84. Test Method for Flash Points by Cleveland Open Cup, ASTM Std. D-92-85. Test Method for Inorganic Chlorides and Sulfates in Insulating Oils, ASTM Std. D-878-86. Test Method for Interfacial Tension of Electrical Insulating Oils of Petroleum Origin Against Water by the Drop-Weight Method, ASTM Std. D-2285-85. Test Method for Interfacial Tension of Oil Against Water by the Ring Method, ASTM Std. D-971-82. Test Method for Kinematic Viscosity of Transparent and Opaque Liquids and the Calculation of Dynamic Viscosity, ASTM Std. D-445-88. Test Method for Oxidation Characteristics of Inhibited Mineral Oils, ASTM Std. D-943-81.
24
Test Method for Oxidation Stability of Inhibited Mineral Insulating Oil by Rotating Bomb, ASTM Std. D-2112-86. Test Method for Oxidation Stability of Mineral Insulating Oil, ASTM Std. D-2440-88. Test Method for Pour Point of Petroleum Oils, ASTM Std. D-97-87. Test Method for Saybolt Viscosity, ASTM Std. D-88-81. Test Method for Surface and Interfacial Tension of Solutions of Surface-Active Agents, ASTM Std. D-1331-89. Test Method for Water in Insulating Liquids (Karl Fischer Reaction Method), ASTM Std. D-1533-88. Water Solution in High-Voltage Dielectric Liquids, Electrical Engineering, Clark, F.M., General Electric Company, August 1940.
25
(2)
(3)
(4) (5)
(6)
(7)
A.2 Taking Oil Samples for Gas-In-Oil Analysis. This procedure has been developed to maintain uniformity of all oil samples taken in the field for a laboratory gas-in-oil analysis. Special stainless steel containers should be
26
used for collecting samples of oil for gas-in-oil analysis using the gas chromatograph. These stainless steel containers are NOT to be used for any other purpose. Normally, the laboratory performing the required testing services cleans these containers to eliminate all contaminants and purges them with dry air for shipment to the field. A.2.1 Preparation for Sampling. (1) Obtain a can to catch overflow oil from the stainless steel container. (2) Obtain two lengths of clear plastic tubing and attach one to each end of the stainless steel container. Make certain that the tubing between transformer and container is as short as possible.
A.2.2 Sampling Procedure. Modification of the transformer sampling valve may be necessary before a sample can be obtained (figure A.1). (1) Connect the shortest enclosed plastic tube to valve #3 and fasten the connector sleeve for a tight seal. Do not connect to the cylinder. Open valve #3 and purge about 1 L (1 qt) of oil or until oil is clear and free of bubbles. Close valve #3. With the tube still full of oil, connect it to valve #2 on the cylinder. Connect the longer clear plastic tube to valve #1 on the cylinder. Hold the cylinder in a vertical position for filling. During filling, it should be tipped gently back and forth to vent any trapped bubbles. The assembly should be as shown in figure A.1. To fill the cylinder, open valves in the following order: 1, 2, and then 3. Allow at least 4 L (1 gal) of oil to flow through the cylinder before closing the valves. Close valves in the same order (i.e., 1, 2, and 3). This sample size may not be practical for all transformers. For disassembly: (a) Remove and drain tubing. (b) Pack cylinders and tubing in shipping box, as received. (c) Fill out data sheets for all samples and seal them in the oil proof plastic envelope. A.3 Taking Gas Samples for Gas Chromatograph Analysis. This procedure has been developed to maintain uniformity of all gas samples taken in the field while maintaining the principal objective of obtaining a representative sample that is free of all contaminants. Special stainless steel or glass cylinders are to be used for collecting samples of gas for use with the gas chromatograph. These containers are NOT to be used for any other purpose. If a laboratory performs the required testing, they normally clean the container to eliminate all contaminants. Special care should be taken to avoid getting moisture in the sample since moisture can damage the analyzing equipment. A.3.1 Sampling Procedure. If the gas system is under positive pressure, the following procedure applies; but, if the gas system is at atmospheric or negative pressure, refer to part II.
(2)
(6) (7)
(8)
27
Valve
Tube Connector
Sleeve
Tubing
#1 Valve
Oil
Flo w
Cylinder
28
Part I
(1) Attach a minimum length, approximately 152 mm (6 in), of clear plastic sample tubing to the transformer sampling valve. Open the transformer sampling valve and purge the plastic sampling tube for 15 seconds. Close the sampling valve. Connect the sampling cylinder, with both valves closed, while the plastic sampling tube is still exhausting. Open the valve on transformer end of sampling cylinder. Open the valve on outlet end of cylinder for 2 or 3 seconds. Close the valve off. Repeat this step five times. Close both valves on sampling cylinder (outlet end first, then transformer end). Close the transformer sampling valve and remove the sample cylinder and connecting tube. DO NOT wrap ANY kind of tape around valves or filling nozzles of sample cylinders. Identify samples. List air temperature at sampling time and approximate elevation.
(2)
(3)
(4) (5)
(6)
(7) (8)
Part II
This procedure should be followed if the gas sample is at atmospheric or negative pressure. (1) Attach a minimum length, approximately 152 mm (6 in), of clear plastic sample tubing to the transformer sampling valve. With both valves closed, connect the sampling cylinder to the plastic sampling tube. The sample must be drawn with a vacuum pump or a hand aspirator bulb with a one-way valve connected to the outlet end of the container instead of the bladder. Open valve on outlet end of sampling cylinder while the vacuum pump (or hand aspirator) is in operation. With the sampling cylinder completely evacuated, close the valve on outlet end of sampling cylinder. Open transformer sampling valve for 2 or 3 seconds, then shut off. Repeat this step five times. Close valve on transformer end of sampling cylinder. With all valves closed, remove sample cylinder and connecting tubing. DO NOT wrap ANY kind of tape around valves or filling nozzles of the sample cylinders. Fill in tag attached to container and put container in shipping box.
(2) (3)
(4)
(5) (6)
(7) (8)
A.4 Sampling Oil from Drums or Shipping Containers. The oil drum should remain undisturbed for several hours before drawing the sample. (1) A glass or Pyrex thief is recommended for sampling, because it can be easily inspected for cleanliness. A glass tube approximately 910 mm (36 in) long, 25 mm (1 in) in diameter, and tapered at both ends is recommended for the sampling thief. A glass tube may also be used in place of the thief.
29
(2)
The thief should be cleaned before and after sampling in the same manner as cleaning sample containers. When not being used, the thief should be corked at both ends. Discard the first full thief of oil. Draw the sample in the following manner. (a) With the top end covered with your thumb, lower the tube to within approximately one-eighth inch from the bottom of the drum. Remove your thumb from the top opening until the thief is filled with oil. Replace thumb over top of thief and remove thief full of oil to the sample container. Release thumb to permit oil to run into the container.
(3) (4)
(b) (c)
A.5 Shipping. The shipping of the samples for testing should be sent in accordance with requirements specified by the testing laboratory.
30
31
32
after agitating, the test cup shall be filled with oil to a height of not less than 20 mm (0.787 in) above the top of the electrodes. In order to permit the escape of entrapped air, the container shall be gently rocked a few times and the oil allowed to stand in the cup for 3 minutes before voltage is applied. (3) NOTE: It is impracticable to handle oils having viscosities ranging between 60 and 100 Sus at 99C (210F) according to the procedure in section B.2.3 (1). When testing high-viscosity oils in this range, the sample should be allowed to stand until it reaches room temperature, which should not be less than 20C (68F). The sample container should not be tilted or swirled as prescribed in section B.2.3 (1), and it should be opened only when the sample is ready for testing. (2) Test Temperature. The temperature of the sample when tested shall be the same as that of the room, but shall not be less than 20C (68F). Testing of oil at a temperature lower than that of the room is likely to give variable results which may be misleading. (3) Application of Voltage. Voltage shall be applied and increased at a uniform rate of 3 kV/s from zero until breakdown occurs as indicated by a continuous discharge across the gap. Occasional momentary discharges which do not result in a permanent arc may occur; they should be disregarded. B.2.4 Number of Tests. (1) Reference Testing. When it is desired to determine the dielectric breakdown voltage of a new liquid for reference purposes, one breakdown shall be made on each of five successive fillings of the test cup. The breakdown voltage thus obtained shall be subjected to the criterion for statistical consistency as specified in section B.2.4 (4). If the five values meet this criterion, their average shall be reported as the dielectric breakdown voltage of the sample. If they do not meet this criterion, one breakdown on each of five additional cup fillings shall be made, and the average of the 10 breakdowns shall be reported as the dielectric breakdown voltage of the sample. No breakdown shall be discarded. (2) Routine Testing. When it is desired to determine the dielectric breakdown voltage of a liquid on a routine basis, one breakdown may be made on each of two fillings of the test cup. If no value is below the specified acceptance value, the oil may be considered satisfactory, and no further tests shall be required. If either of the values is less than the specified value, a breakdown shall be made on each of three additional cup fillings, and the test results analyzed in accordance with section B.2.4 (1). (3) Routine Testing (Alternative Method). When it is desired to determine the dielectric breakdown voltage of a liquid on a routine basis, five breakdowns may be made on one cup filling with 1-minute intervals between breakdowns. The average of the five breakdowns shall be considered the dielectric breakdown voltage of the sample provided the breakdown values meet the criterion for statistical consistency as specified in section B.2.4 (4). If the breakdown voltages do not meet this criterion, the contents of the cup shall be discarded, the sample container again gently inverted and swirled, the cup again filled, and five breakdowns made on this second cup filling. The average of the 10 breakdowns shall be considered as the dielectric breakdown voltage of the sample. No breakdown shall be discarded. (4) Criterion for Statistical Consistency. Compute the range of the five breakdowns (maximum breakdown voltage minus minimum breakdown voltage), and multiply this range by three. If the value obtained is greater than the next to the lowest breakdown voltage, it is probable that the standard deviation of the five breakdowns is excessive, and therefore the probable error of their average is also excessive.
The procedure used, The voltage (rms value) at each breakdown and the average of all of the breakdowns (5 to 10). All results shall be reported to the nearest kilovolt, and The approximate temperature of the oil at the time of the test.
q q
33
B.3 Dielectric Test. ASTM D-1816-84 (VDE Electrode). The present ASTM D-877-87 gap consists of a 25.4 mm (1 in) diameter disk, square-edged electrodes spaced at 2.54 mm (0.1 in). Use of this test gap results in a uniform electrostatic field at the centerline of the test disks, and a highly nonuniform field at the edges of the disks. To attain a uniform field strength at all points, spherical electrodes would have to be used. Between these extremes of a highly distorted field and an ideal uniform field, a third gap configuration, designated as VDE or ASTM D-1816-84, has been used. The VDE gap specifications call for a sector diameter of 36 mm (1.4 in) and a 25-mm (1-in) radius of curvature for the spherically capped electrodes. A gap of about 2 mm (0.08 in) between electrodes has been found to give about the same breakdown voltage relationships in the 25- to 30-kV range as the ASTM D-877-87 configuration. Tests have shown that:
q q
The VDE configuration depicts more accurately the average electric strength and scatter of the oil as the transformer sees it, The VDE gap is relatively sensitive to oil quality; the ASTM D-877-87 gap is less sensitive, and Point electrodes are almost completely insensitive to oil quality.
The VDE cell, in which a quart of oil is tested between VDE electrodes, while being mildly circulated, realistically measures changes in oil strength which determine the electrical strength of typical transformer construction. This test method (ASTM D-1816-84) is presently used only as a laboratory test and research tool by industry.
34
35
Figure C.1 A Commercial Test Kit With Titration Solution, Three Glass Mixing Cylinders, and a KOH Solution.
Courtesy of Sierra Nevada Region
36
Appendix D - Interfacial Tension (IFT) Test: Equipment and Methods for Field Use
D.1 The IFT Test of Oil by the Drop-Weight Method (ASTM D-2285-85). D.1.1 Scope. This method describes a comparatively rapid procedure more applicable to field use than laboratory use, for measuring, under nonequilibrium conditions, the IFT of electrical insulating oils of petroleum origin against water. D.1.2 Summary of Method. The IFT is determined by measuring the volume of a drop of water that the oil will support. The larger the drop of water, the higher the IFT of the oil. The instrument used to measure the volume of the drop of water is calibrated in newtons per meter to indicate the approximate IFT. This method is based on the use of PTA (Professional Technical Associates) (P.O. Box 123, Signal Mountain, Tenn.) tensiometers, model V1a or V2. Other equivalent-type tensiometers may be used with appropriate modifications in procedure. Examples are the Fisher Surface tensiometer (figure D.1) and CSC-DuNovy tensiometer which are used for acceptance purposes (ASTM D-971-82 and ASTM D-1331-89). D.2 Detailed Explanation of PTA Model 6 Tensiometer. D.2.1 Apparatus. The PTA model 6 interfacial tensiometer (figure D.2) has been accepted by ASTM as a suitable substitute for the models V1a and V2. The primary features have been preserved; no changes in the method used in ASTM D-2285-85 are involved. The model 6 features an almost unbreakable dial (figure D.3) made of poly-carbonate (Lexan). The dial has 50 calibrations and two number scales. Each small calibration line represents 0.001 N/m (1 dyn/cm) therefore, with the double scale, each number represents 60.01 N/m (10 dyn/cm) and should be considered as 0.01, 0.02, 0.03, etc. Values from 0 to 0.0499 N/m (0 to 49.9 dyn/cm) are read from the lower scale. Values from 0.05 to 0.0999 N/m (50 to 99.9 dyn/cm) are read on the upper scale. The vacuum base permits the tensiometer to firmly grip any smooth surface. The tensiometer is extremely stable and is lightweight; it weighs 850 g (30 ounces). The orifices of the model 6 have the same dimensions as previous models but are machined with a Luerlock (figure D.4) which permits easy filling of the barrel; a spare orifice is provided; and a syringe, (B) in figure D.2 provides for easy filling of the tensiometer barrel.
37
38
Figure D.2 The Model 6 PTA Interfacial Tensiometer Mounted in Support Stand.
The tubing orifice cover (A) is shown on the left side of the support stand. The cover should be placed over the orifice needle when the instrument is not in use. The syringe (B) with bent needle is used for filling the tensiometer barrel. Source: Bureau of Reclamation, Bulletin No. 11, Photo P801-D-74917, July 1990.
39
40
Figure D.4 Tensiometer With 50-mL Beaker Under the Tubing Orifice.
Handle in front operates the section base. Orifice with Luerlock is attached to bottom of barrel and extends into beaker. Source: Bureau of Reclamation, Bulletin No. 11, Photo P801-D-74919, July 1990.
41
D.2.2 Operation Problems and Solutions. Prior to using the tensiometer for the first time, dismantle the instrument as shown in figure D.3. Be certain that the white Teflon nut on the top of the barrel, (C) of figure D.3 is screwed tightly into the barrel. Check the top of the nut for sufficient Vaseline for sealing. If Vaseline is present, reassemble the unit, if not, add sufficient Vaseline to form a good seal when (B) and (C) are fastened tightly together.
q
Problems and Corrective Measures to be Taken Water dripping from orifice. - Check Vaseline seal (between Teflon plug and lead nut). Micrometer screw turns but will not advance. - Dismantle tensiometer and tighten packing nut (B) and white Teflon nut on top of tensiometer barrel (C). Excessive deviations in scale readings during calibration. Check orifice for dirt and lint; check Vaseline seal.
q q
D.2.3 Filling Tensiometer Barrel with Water. The orifice (A) and pointer (B) (figure D.5) are removed, the micrometer screw is backed out to maximum position, the tensiometer is inverted, and the barrel is filled to overflowing with approximately 25C (77F) distilled water using the filler syringe which has a bent needle for this purpose. At this point, inspect the interior of the barrel for air bubbles. (It is rare that no bubbles are present.) To remove these small air bubbles: Push the plunger of the filler syringe into the syringe barrel as far as it will go. Place the tensiometer in the inverted position, insert the needle of the filler syringe into the tensiometer barrel, then using the plunger of the syringe, remove about 5 to 10 percent of the water. Place the tensiometer in a horizontal position and by tilting the tensiometer barrel, pick up the small air bubbles by passing the large air bubble (formed by removing the water from the barrel) over the small bubbles. Place the tensiometer in the inverted position. Fill the filler syringe with water and expel air bubbles. Place the end of the bent needle of the filler syringe under the surface of the water in the tensiometer and fill the tensiometer to overflowing and withdraw needle. Attach pointer and orifice, (A) and (B) of figure D.5. Turn dial until nothing but water is expelled from the orifice. The tensiometer should now be free of air. Place in holder. D.2.4 Calibration of Tensiometer. The tensiometer full of distilled water at 25C (77F) and void of air is placed in the mounting stand (figure D.2). The 50 mL beaker containing at least one-half inch of distilled water is placed on the beaker platform of the mounting stand. The tensiometer is lowered until the tip of the orifice is within 6.4 mm (0.25 in) of the surface of the water (figure D.4). The temperature of the water in the orifice may differ from that of the water in the tensiometer; therefore, replace the water in the orifice by turning the dial clockwise until five drops of water have been expelled. Stop all movement of the dial immediately as the last drop leaves the orifice tip. Record the reading on the scale, then expel a single drop of water and record scale reading. Second reading minus first reading equals the volume, in terms of divisions on the scale, of a drop of water expelled in air. The average of 10 such drops in air is taken as the orifice calibration water in air. Any reading deviating as much as 0.20 from the average is discarded, and if any reading is as much as 0.40 from the average, the whole series is discarded and the cause of such deviation determined. Leakage of air is the usual source of variation, with dirt and lint on the orifice also a possible cause.
42
Figure D.5 Technique for Filling Tensiometer Barrel With Distilled Water.
Source: Bureau of Reclamation, Bulletin No. 11, Photo P801-D-74920, July 1990.
43
The calibration drop should be checked once each day that the tensiometer is to be used in order to assure accurate results. The calibration drop should be determined prior to starting the days testing program because the calibration procedure not only obtains the drop volume, in terms of divisions on the scale, but also is an indicator as to the performance of the instrument. An instrument that is not functioning properly will not produce drops within the following specification limits of the test procedure. An example of determining the calibration drop follows: A = Dial reading before expelling drop. B = Dial reading after expelling drop. C = B - A (Scale divisions per drop of water in air. Average of 10 drops equals the calibration of tensiometer.)
B
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 40.0 49.0 58.2 67.1 76.1 85.3 94.5 53.6 62.8 71.8
A
31.2 40.0 49.0 58.2 67.1 76.1 85.3 44.5 53.6 62.8
=
= = = = = = = = = =
C
8.8 9.0 9.2 8.9 9.0 9.2 9.2 9.1 9.2 9.0 90.6
Dividing the total by 10 (the number of drops), the resulting number (9.06) represents the average of the 10 readings which is the calibration value of the tensiometer. Subtracting reading No. 1 (8.8) from the average (9.06) the difference (0.26) is greater than the specified 0.20 and the 8.8 reading should be discarded. Another drop was measured and the value of this drop (9.1) replaced the 8.8 drop. The final total for 10 drops was 90.9, raising the new calibration value from 9.06 to 9.09.
q
Important instruction. Review the tensiometer settings from the above example for drops 7 and 8. It is evident that the A and B settings for drop 7 are a continuation of the settings of preceding drops; however, the A and B settings for drop 8 are decidedly different. Tensiometer readings under 100 divisions are desirable. It was evident that an additional nine divisions added to the B setting (94.5 divisions) for drop 7 would give a value of 103.5 divisions. An examination of the tensiometer will show that 94.5 on the upper scale of the dial corresponds to 44.5 on the lower scale. This is the technique used in order to avoid tensiometer readings in excess of 100 divisions. Reviewing the data listed above, it will be noted that values for drops 1 and 2 were taken from the lower scale, whereas, for drops 3, 4, 5, 6, and 7 the upper scale was used. The value for 8A was taken from the lower scale, the remaining values 8B through 10B were from the upper scale.
D.2.5 Apparatus Preparation Prior to Testing Oil Samples. Place the tensiometer with orifice attached (the unit should be full of water and free of air bubbles) in the holder. Wipe the tensiometer tubing orifice free of oil with clean lint-free paper, avoiding any upward motion which may embed a bit of fiber on the sharp orifice. CAUTION: Do not use an oil solvent on the orifice or barrel.
44
Force a few drops of water through the orifice by turning the polycarbonate dial (figure D.3). This will clean the orifice. Contamination in the barrel or orifice can be removed by dismantling the tensiometer and flushing the parts with distilled water. Do not use detergents to clean the barrel. Dry thoroughly and reassemble. Be sure to replace the Vaseline seal. Clean the sample container (beaker) removing any residual oil by flushing with Chlorothene. (Benzene or petroleum naphtha can be used, however, they are flammable.) Allow solvent to evaporate, then wash in detergent, and rinse thoroughly in cold tap water followed by distilled water. Place beakers in an inverted position over a clean dry towel. D.2.6 Test Procedure. Apparatus, sample, and distilled water should be at a preferred common temperature of 25C (77F) plus or minus 1C (1.8F). Absolute control at this temperature usually is not possible in the field; however, test as close to this temperature as possible. Definitely avoid large temperature changes particularly when testing comparison samples taken at specified time intervals. This method is a comparatively rapid procedure particularly applicable for field use. Therefore, filtration adds an undesirable extra step. Also, it is anticipated that oil samples drawn from electrical equipment in the field will not contain heavy oil sludge, such as may be found in samples taken at the end of laboratory oxidation tests, which would interfere with the determination of IFT. (1) Replace the 50-mL beaker used to establish the volume of the calibration drop with a beaker of the same capacity. Pour the unfiltered oil sample into this beaker to a depth of at least 25.4 mm (1 in). Place beaker containing oil sample on the tensiometer table, lower tensiometer until the orifice tip is immersed about 12.7 mm (0.5 in) into the oil. Record the dial reading. Expel one drop of water. Record the dial reading. Subtract the first reading from the second reading and record the difference (volume). Expel about three fourths of the volume of water found in the paragraph above and allow this drop to age for 30 seconds. Expel, slowly, enough water to cause the drop to fall so that the total time is between 45 and 60 seconds. Note the volume of water in the drop in terms of divisions on the scale. This reading gives the IFT of an oil of average density.
(2)
(3)
(4)
(5)
Example: Scale reading before expelling drop of water = 40.0 divisions Scale reading after expelling drop of water = 86.6 divisions Volume of water in drop, 86.6 - 40.0 = 46.6 divisions Approximately three-fourths of 46.6 = 35.0 divisions
45
The scale reading after expelling the trial drop was 86.6 divisions on the upper scale. This corresponds to 36.6 divisions on the lower scale. Add 35 divisions (approximately 3/4 of the volume of the trial drop) to the scale reading (36.6 divisions). Turn dial to 71.6 and allow drop to age 30 seconds. Then turn dial slowly until drop of water falls into oil. The total elapsed time from the time the drop starts to form on the orifice tip until it drops from the tip should not exceed 60 seconds. Scale setting at 60 seconds = 83.0 divisions Minus scale setting at 0 seconds = 36.6 divisions Equals volume of water in drop = 46.4 divisions Volume x 0.001 equals IFT of the oil = 0.0464 N/m If more accurate test results are desired or if the field IFT of an oil is 0.02 N/m (20 dyn/cm) or less, a sample of the oil should be sent to the laboratory for a more accurate and detailed analysis.
46
Appendix E - Doble Tests of Liquid Insulation With MH and M2H Test Sets
E.1 General. In order that samples of liquid insulation may be tested with the Doble Engineering Company test sets, a special cell has been constructed which is essentially a capacitor utilizing oil as the dielectric. Provided with the cell is a container in which the cell may be housed and carried when not in use. Figure E.1 shows the cell and the metal carrying pail. The cell holds approximately 1 L (1 qt) and should be filled until there is about 19.0 mm (0.75 in) of liquid above the top of the cylinder inside the cell. The cell should be set on a reasonably level base so that the surface of the liquid will be approximately level. The cover should be properly seated. The test connections are made as shown in figure E.2. The hook of the high-voltage cable should be connected to the handle on the cover. The high voltage guard ring on the cable pothead should be connected to the guard ring of the cell which is fastened to the cover. The outer cylinder should be connected to the ungrounded specimen tester (UST). A clearance of at least 25.4 mm (1 in) should be maintained between the cable hook and the cell guard ring so that flashover will not occur between these parts. The test voltage should be gradually raised to 10 kV. As the spacing between the plates of the cell is about 4.8 mm (3/16 in), the sample should not break down at these voltages unless it is in very poor condition. Meter readings should be taken and the power factor calculated. When drawing a sample of liquid insulation from a transformer or circuit breaker, care should be taken to obtain a representative sample. Let sufficient liquid drain through the pipe and valve so that any dirt or water lodged in the pipe will be drained before filling the test cell. Air bubbles, water, and other foreign material are the usual cause of breakdown in the cell. If the sample is allowed to stand in the cell for a short time before the test is made, the entrapped air will have a chance to work out and foreign particles to settle to the bottom. If there is an insufficient amount of liquid in the cell, sparkover will take place above the liquid level. Immediately after the sample has been tested, its temperature should be taken while still in the cell. The power factor should then be corrected to 20C (68F) using the multipliers in the column headed Oil and Oil-Filled Power Transformers in the table titled Table of Multipliers for Use in Converting Power Factors at Test Temperatures to Power Factors at 20C in the Doble Manual titled Type M2H Instruction Manual, Electrical Insulation Testing. Obviously, the test cell should be cleaned thoroughly every time a different sample is tested. Generally speaking, so long as the same type of liquid is to be tested, the cell is cleaned adequately by washing it with a good, new sample or a portion of the sample to be tested. It is better not to wipe out the container with rags, as cotton fibers, etc., may be left in the cell and consequently may affect the breakdown voltage of the sample. When transporting the cell, it should be packed carefully to prevent damage. The packing in which the cell is shipped may be utilized for this purpose.
47
48
High Voltage
Guard
To UST
yyy yyy
Insulation
49
E.2 Oil. Good, new oil has a power factor of 0.05 percent or less at 20C. Higher power factors indicate deterioration or contamination with moisture, carbon or other conducting matter, varnish, Glyptal, sodium soaps, asphalt compounds, or deterioration products. Carbon or asphalt in oil can cause discoloration. Carbon in oil will not necessarily increase the power factor of the oil unless moisture is also present. It is suggested that the following serve as guides for grading oil by power factor tests.
q
Oil having a power factor of less than 0.5 percent at 20C is usually considered satisfactory for service. Oil having a power factor between 0.5 and 2 percent at 20C should be considered as being in doubtful condition, and at least some type of investigation should be made. Oil having a power factor of over 2 percent at 20C should be investigated and either reconditioned or replaced. The above-mentioned guides may be elaborated upon by saying that good, new oil has a power factor of approximately 0.05 percent or less at 20C and that the power factor can gradually increase in service to a value as high as 0.5 percent at 209C without, in most cases, indicating deterioration to warrant investigation. When the power factor exceeds 0.5 percent, an investigation is indicated. The question of what decision to make regarding disposition of the oil depends on what is causing the high power factor. Dielectric strength tests should be made to determine the presence of moisture. The necessity for further tests will depend to a large extent on the magnitude of the power factor, the importance of the apparatus in which the oil is used, its rating, and the quantity of oil involved.
50