0% found this document useful (0 votes)
38 views

Problem

The document lists plumbing issues in different areas of a building, including leaky bathroom pipes on the 1st floor left side, a jammed bathroom on the 1st floor left side, an improperly working water valve in the ground floor left back side, a problem with a butterfly valve in the back side, and a leaky pipeline in the 1st floor kitchen hall. Additional issues noted are a fan problem in ground floor room 103, an ill-fitting alldrop in the ground floor left side bathroom, and a improperly fitting bathroom door on the ground floor right side.

Uploaded by

Vee Thiru
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views

Problem

The document lists plumbing issues in different areas of a building, including leaky bathroom pipes on the 1st floor left side, a jammed bathroom on the 1st floor left side, an improperly working water valve in the ground floor left back side, a problem with a butterfly valve in the back side, and a leaky pipeline in the 1st floor kitchen hall. Additional issues noted are a fan problem in ground floor room 103, an ill-fitting alldrop in the ground floor left side bathroom, and a improperly fitting bathroom door on the ground floor right side.

Uploaded by

Vee Thiru
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

DM-1 :1) 1st floor left side bathroom pipe line licage.

2) 1st floor left side 1st bathroom jam 3) Ground floor left back side HDB inlet water vall not proper working. 4) Back side Butterfly vall problem. 5) 1st floor kitchen hall pipeline licage.

DM-3 :-

1) Ground floor R. no. 103 fan problem. 2) Ground floor left side bathroom alldrop not fitting. 3) Ground floor Right side bathroom door not fitting properly. 4)

You might also like