0% found this document useful (0 votes)
12 views

Chapter 4

The methodology section outlines the steps taken for the project which included problem analysis, research, simulation, component collection, development, implementation, debugging and maintenance. A Gantt chart was also created to plan the project timeline.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Chapter 4

The methodology section outlines the steps taken for the project which included problem analysis, research, simulation, component collection, development, implementation, debugging and maintenance. A Gantt chart was also created to plan the project timeline.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

4.

1 Methodology:
We have followed following methodology for our project:

Problem analysis Research Design and Simulation Component collection Hardware and Software development Implementation and Fabrication Debugging and Maintenance

24

4.2 GANTT CHART:


We have our project as per the Gantt chart as below:

25