Trial Pile Design Excel
Trial Pile Design Excel
ms_office
Summary
Summary Sheet
INPUT DATA
Bridge NO
Proposed Span
Loading
Project Name
1x
DPCL
30.5
m PSC
H.M.Loading
Common Level
Description
Level ( m )
19.444
13.400
10.192
11.700
0.016
-11.000
SLAB
11521
Between Stn.
Km
Chainage
River
Individual Level
Description
Abt
Bottom Of Slab
Top of Bed Block
Bottom of Bed Block
Top of Foundation
Bottom of Foundation
Thickness of Bed Block
Observed Scour Level
18.857
18.841
18.091
10.000
-10.000
0.750
11.700
10.000
Abt
Unit
Clear Span
Effective Span
Overall Span
Thickness of Slab/ Girder
Dead Wt. of Girder
Wt of Track / m run
Ballast Cushion
Live Load (OSL)
Long Load (OSL )
Live Load ( TSL )
Long Load ( TSL )
30.5
31.93
32.89
0.845
65.3
0.45
0
460.9
120
-
m
m
m
m
t
t/m
m
t
t
t
t
Reference / Remarks
C/C of Bearing as per Data Given in RDSO Drg.
O/A Length of Girder as per Data Given in RDSO Drg.
Thickness of Super Str with Wearing Coat
As per RDSO Drg.
Unballasted Deck
As per Cl . 2 .2 . 2 Br Rule
As per Appendix -II Br Rule
As per Appendix -VII Br Rule
As per Appendix -II Br Rule
As per Appendix -VII Br Rule
Coff. Of Friction
Safe Bearing Capacity
Seismic Zone
Zone Factor
Soil Coff.
Importance Factor
Velocity of Flow
a=
b=
I
Value
35
11.7
0.5
15
III
0.04
1.5
1
0.63
Unit
deg
deg
Refrence / Remarks
As per table " I " of Sub Str. Code ( As per Soil report for back fill not available)
1/3 of Phi (Angle of repose
As per Soil report or tan () at base of Foundation
t/m
m/s
Maretial Specification
Description
Abt
Pier 1
1
Compressive =
NA
Permissible Stress :- ( t/m ) without Over stressing
Tensile
=
NA
Permissible Stress :- ( t/m2 ) with Over stressing in Normal Compressive =
Tensile
=
Condition
Permissible Stress :- ( t/m2 ) with Over stressing in Seismic / Compressive =
Tensile
=
Wind
3
Density of Masonary
2.5 t/m
Grade of Mass CC ( If Provided)
Grade of RCC ( If Provided ) M 35 mPa
Grade of Steel to be Used fe-
Pier 2 Well
As per Cl 5.16.3.3
20
415
DPCL
mPa
mPa
2
2
175980462.xls.ms_office
1
2
Bridge No
3
4
5
6
Prop. Span
Project
Std. Of Loading
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
23
24
25
26
27
28
30
33
34
35
36
31
32
33
37
38
34
39
40
41
42
35
43
44
45
46
47
DPCL
36
RCC Abutment
DESIGN OF ABUTMENT ( RCC )
8
Prop Formation Level
Top of Foundation
1x
30.500
+0x
0.000
PSC
Top of Bed Block
DPCL
Bed Level
H.M.Loading
First Checking Level
Prop 2nd Chk Level
Clear Span
30.500
Effective Span
31.926
Loaded Length of Girder/SLAB.
32.886
2
Surcharge
Dead Load=
6.200 t/m
Live Load
17.000
Total Load of Girder/SLAB
65.300
Dead Load of p.way per Running Metre
0.500
Total Live load on Girder
460.850
Total Long. load on Girder
120.000
Barrel Length of Abutment
7.000
Top Width of abutment
1.520
Dist From C/c of Bearing To Front of ABT.
0.713
Height From Formation To Bed Block...=
0.603
Thk of Pedestal = 0.400m
Bearing = 0.065 m Cap = 0.750
Height form bottom of Cap to TOP of FOUNDATION
8.091
Width of Bed Block
3.660
Dead Load Surcharge
6.200
Density of back fill
1.800
Width of Live Load Distribution
3.000
phi (radian)
f =
35.000 Deg
0.611
del (radian)
d =
11.667 Deg
0.204
Height of Passive from Top of Foundation
1.700
Coeff. of friction for phi soil
0.500
DEGREE OF CURVE
0.000
SLAB ( CUSHION = 1 , CUSHION LESS = 2 )
2.000
Seismic Parameter :Zone =
III
a =
0.040 b =
1.500
I =
Weight of Approach Slab =
0.000
Length of Approach Slab
0.000
Eccentricity of Approach Slab from C/L of Abt
-0.760
Abutment Cap Detail
Top width of cap =
1.695 m
Top Length of Cap =6.850
Thickness at End =
0.750 m
Thickness at Face =0.750
Detail of Dirt Wall :Length of Dirt Wall
=
6.850
Thickness of Dirt Wall =
0.300
Height of Dirt Wall =
2.210
Load from Straight Return :Load of Straight Return Wall ( 1 Return )
0.000
Eccentricity from back of Abt
1.700
Type Of Bearing ( 1 = Fixed , 2 = Free )
1
19.444
10.000
18.841
11.700
18.006
14.586
m
m
m
t/m2
t
t/m
t
t
m
m
m
m
m
m
t/m2
t/m3
m
radian
radian
m
Degree
1.000
t
m
m
m
m
m
m
m
t
m
175980462.xls.ms_office
48
RCC Abutment
Distribution Diagram
49
7.000
50
51
18.841
52
3.660
53
55
56
54
Width of Distri.
5.330
18.006
1st chk lvl
57
1.670
58
17.171
59
60
61
62
63
64
65
Width of Distri.
7.000
14.586
2nd chklvl
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
10.000
81
TOF
82
83
84
85
86
87
88
89
90
91
92
93
DPCL
175980462.xls.ms_office
RCC Abutment
Formation 19.444 F.L
Level
94
97
98
2210
95
96
300
Bottom of
19.306
Girder
Top of 18.841
Cap
99
102
750
100
101
1695
103
105
104
106
Bottom of 18.091
Cap
107
108
109
110
111
112
1520
113
114
115
1st chk
LVL
116
117
18.006
118
119
120
121
122
123
124
125
126
127
Top of 10.000
Foundation
128
129
130
131
132
133
134
135
136
137
DPCL
2
1.520 m
3
0.385 m
175980462.xls.ms_office
RCC Abutment
138
139
140
141
142
143
144
145
146
147
148
149
150
DESIGN OF ABUTMENT
BRIDGE NO =
8
PROJECT =
DPCL
1.000 DEAD LOAD ( SIDL )
(i)
Loaded length of Girder / Slab =
32.886 m
DL @ 1stCHK LVL
(ii)
Weight of Track
=
0.500 t/m
81.743 / ( 2 x 5.33 )
(iii)
Weight of Slab / Girder
=
65.300 t
=
7.668 t/m (WIDTH)
(iv)
Total weight of Track
=
DL @ 2nd CHK LVL
0.500
X
32.886 =
16.443 t
81.743 / ( 2 x 7 )
Total Dead Load
=
81.743 t
=
5.839 t/m (WIDTH)
Dead Load on Each Abutment / m width ( At Top of Foundation)
81.743 /
(2X
7.000 ) =
5.839t/m (WIDTH)
2.000
LIVE LOAD
L :10
L :13
L :12
151
Standard Of Loading
=
H.M.Loading
Loaded length of Girder / Slab =
32.886 m
Live Load without Impact
= 460.850 t
Coff . Of Dynamic Augment as per Bridge Rule Clause No 2.4.1.1
152
153
154
155
L :14
156
157
159
8
6+L
Dynamic Augment At First Checking Level
CDA =
158
(i)
0.150
= 0.15 +
0.356
6 + 32.886
160
161
0.356
162
163
(ii)
164
165
0.356
166
167
(iii)
168
169
0.356
170
171
172
2.(a).
(i)
(ii)
=460.850
(2X
(iii)
=460.850
(2X
173
174
175
176
X (1 +
0.356
5.330 ) =
=
624.788 t
58.611 t/m
=
624.788 t
44.628 t/m
=
624.788 t
44.628 t/m
L :56
177
178
179
180
X (1 +
0.356
7.000 ) =
L :65
181
182
183
L :16
184
185
X (1 +
0.356
7.000 ) =
3.000
186
187
188
189
190
191
L :10
L :15
192
193
(i)
194
195
(ii)
196
197
198
DPCL
(ii)
175980462.xls.ms_office
199
RCC Abutment
4.000
200
201
202
203
Cos^2(f - a)
Ka =
204
205
Sin(f + d) Sin(f - I ]) ^2
Cos(a+ d) Cos (a - I)
Fallowing values are taken for calculating the active earth pressure
a =
0.000 Radians
f =
0.611 Radians
a =
0.000 Radians
d =
0.204 Radians
i =
0.000 Radians
Hence Ka
=
0.251
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
a-
223
224
225
226
227
228
l =
tan -1
a (h)
1 +a (v)
x
/
tan -1
1+
=
=
0.060
0.030
Sub Str
0.060
0.030
=
=
0.058
With ( + )
0.774
0.628
( 1 + a v ) Cos2(f - a - l)
" +" Value
222
221
5.12.6.1
I =
1.00
2
Ca =
Ca =
Sin(f + d) Sin(f - i - l )
Cos(a+ d + l) Cos (a - i)
1 +
0.292
229
230
b-
233
234
235
236
237
238
l =
tan -1
a (h)
1 -a (v)
tan -1
1-
0.030
0.000
=
=
0.030
With ( - )
0.719
0.640
( 1 - a v ) Cos2(f - a - l)
" -" Value
232
231
Ca =
Ca =
Sin(f + d) Sin(f - i - l )
Cos(a+ d + l) Cos (a - i)
1 +
0.267
239
Final Ca =
240
241
Dynamic Increment = Ca - Ka =
242
0.292
0.251
0.041
243
244
245
(i)
246
247
248
(ii)
249
250
251
252
(i)
253
254
255
256
257
258
94&116
X (
0.204
/3=
1.438
)
0.479
)2
259
260
261
262
263
264
265
266
(ii)
2&7
)2
267
DPCL
175980462.xls.ms_office
(iii)
268
269
270
271
272
273
274
RCC Abutment
2&3
X (
9.444
)2
0.204
/3 =
)
3.148
275
276
5.000
277
(i)
278
279
280
281
L :11
1.438
7.000
3.000
282
L :25
283
Since
m
m
m
t/m^2
t/m^2
L :11
<
(L-B)
284
Case no =
285
286
P1 =
P1 =
287
288
1
Will be Used
(S+V) X Ka x H
(B+H)
1.887 t/m
Will act at
H/2
289
Horizontal Component
P1h
=
1.887 X COS(
P1h
=
1.848 t/m
290
291
292
0.000
+
0.204
Will act at 0.719
)
m
293
294
P2 =
295
(S+V)XKa X H^2
2 X B X (B+H)
296
P2 =
0.452 t/m
Y2 =
0.959 Metre
Horizontal Component
P2h
=
0.452 X COS(
=
0.443 t/m
297
298
299
300
301
0.000
+
0.204
Will Act at 0.959
)
Metre
302
303
(ii)
304
305
306
307
308
L :261
L :16
L :25
(L-B)
309
P1 =
(S+V) X Ka x H
L
P1 =
4.042 t/m
Horizontal Component
P1h =
4.042 X COS(
0.000
WILL ACTING AT
2.429 Metre
310
311
312
313
314
315
0.204
) =
3.959
t/m
3.525
2.173
t/m
316
P2 =
(S+V) X Ka X (L-B)^2
2XB X
L
P2 =
2.219 t/M(WIDTH), ACTING AT = [H-(L-B)/3)]
Horizontal Component
P2h =
2.219 X COS(
0.000 +
0.204 )
WILL ACT AT Y2 = 3.525 Metre
317
318
319
320
321
322
323
324
325
326
327
.(iii)
328
329
CASE NO.=
9.444 m
7.000 m
3.000 m
Since
H
2 will be used
L :269
>
(L-B)
330
331
332
P1 =
333
334
335
336
337
(S+V) X Ka
L
P1 =
7.857 t/m
Horizontal Component
P1h =
7.857 X COS(
WILL ACT AT Y1= (H1)/2 =
XH
Will act at
H/2
0.204
7.695
t/m
(S+V)XKa X
(L-B)^2
2XBX
L
P2 =
2.219 t/m
Will act at
= [H-(L-B)/3)] =
Horizontal Component
P2h =
2.219 X COS(
0.000 +
0.204
) =
8.111
2.173
t/m
338
339
340
341
342
343
DPCL
P2 =
175980462.xls.ms_office
RCC Abutment
WILL ACT AT =
344
8.111 Metre
345
346
6.000
347
348
350
0.000 /
7.000
2 =
0.000
7.000 =
0.000
t-m
7.000 =
0.000
t-m
0.000
L :34
349
7.000
351
352
0.000
0.000
2.000
353
354
355
356
-1.700 m
357
358
Total Moment =
0.000 t-m
Moment / m width
359
360
0.000
361
362
8.000
363
Considering 1 m Width
364
365
366
367
368
369
370
371
372
373
Eccentricity form
L
( b ( Vert. Density
Centre of Abt ( Moment
Weight ( t )
3)
( t-m )
Item
Horz.) )
( t /m
m)
Dirt Wall
0.300
2.210
2.500 1.658
-0.610
-1.011
Bed block
1.695
0.750
2.500 3.178
0.088
0.278
Lower Rec portion
1.520
0.000
2.500 0.000
0.000
0.000
Lower Triangle Portion
0.175
0.000
2.500 0.000
0.818
0.000
From bott of BB to 1st chk lvl 1.520
0.085
2.500 0.323
0.000
0.000
from 1st chk lvl to 2nd lvl
1.520
3.421
2.500 12.998
0.000
0.000
from 2nd chk lvl to top of Fnd 1.520
4.586
2.500 17.425
0.000
0.000
374
375
376
377
378
Levels
Weight Moment
Load up 1st chk LVL
5.159
-0.733
Load up to 2nd chk lvl
18.157 -0.733
Load up to top of Foundation 35.581 -0.733
379
380
9.000
SEISMIC FORCE
381
382
383
0.060
0.030
384
385
386
387
388
389
390
391
392
393
a
c
e
f
I
j
k
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
DPCL
a
c
e
f
I
j
k
175980462.xls.ms_office
RCC Abutment
410
411
a
c
e
f
I
j
k
412
413
414
415
416
417
418
419
420
421
Top Of Foundation
DESCRIPTION
FORCE L.A
Moment
SFH1= DUE TO Live Load
1.339
8.091 10.832
SFV1= DUE TO Live Load
0.669
0.713
0.477
SHF3= DUE TO D.L OF SUPER STR.
0.350
4.256
1.491
SFV3= DUE TO D.L OF SUPER STR.
0.175
0.713
0.125
SFH5= DUE TO SELF WT. OF Abutment
2.135
2.128
4.543
SFV5= DUE TO SELF WT. OF Abutment
1.067
0.000
0.000
2
Due to Dynamic increment in Earth Pressure ( 0.5*(Ca-Ka)*w*h )
3.28
4.72 = 15.48
Total Ver Load =
1.243 t
Ignoring the Seismic Effect of Live
Total Horz Load =
5.764 t
Load in Perpendicular Direction
Total Moment =
21.642 t-m
422
423
424
425
19.444
11.700
426
427
428
8.314
429
430
18.006
431
1.0
0.5
432
433
434
14.586
11.130
435
436
437
438
439
440
441
1.130
442
443
444
10.000
45
26.491
445
3.400
446
447
448
3.400 - X
= 2.270
449
450
451
Y =
452
453
0.498
3.400 - X
ah =
av =
a =
Density
0.060
0.030
0.000
3
1.200 t/m
X =
=
=
=
=
0.062
0.204
0.611
0.000
1.130 m
454
455
456
457
458
l
d
f
I
459
460
Cp =
461
(1 - av ) cos2 ( f +a - l )
Cos l Cos2 a Cos(d - a + l )
1 -
462
1.000
Sin ( f + d ) Sin ( f + I + l )
Cos ( a - I ) Cos ( d- a + l)
2.000
1/2
463
464
465
Cp =
466
0.706
0.929
1.000
0.373
2.000
5.458
467
468
Taking FOS =
3.000
469
470
Cp =
471
Horz.
472
473
Level
474
475
476
477
1.819
1st
2nd
TOF
Horz.
Ht
of Ht
of Force of Leaver Force of Leaver
Passive Surchar Passive Arm
Surcharge Arm
m
m
t
m
t
m
0.000 0.000
0.000
0.000
0.000
0.000
0.000 0.000
0.000
0.000
0.000
0.000
1.130 8.314
1.395
0.377
2.468
5.487
Moment
t-m
0.000
0.000
14.066
478
DPCL
175980462.xls.ms_office
RCC Abutment
10
479
480
481
0.603 m
482
(i)
483
484
485
486
487
488
489
X (
0.000
/3=
0.603
)
0.201
)2
490
(ii)
491
492
493
494
495
496
(L-B)
497
P1 =
(S+V) X Ka x H
(B+H)
P1 =
0.975 t/m
Horizontal Component
P1h =
0.975 X COS(
0.000
WILL ACTING AT
0.301 Metre
498
499
500
501
502
503
0.204
) =
0.955
t/m
0.402
0.096
t/m
0.017
0.288
0.039
0.343
x
t-m
kN-m
t-m
t-m
t-m
t-m
1.700
504
P2 =
(S+V) X Ka X H^2
2XB X
(B+H)
P2 =
0.098 t/M(WIDTH), ACTING AT = 2H/3
Horizontal Component
P2h =
0.098 X COS(
0.000 +
0.204
WILL ACT AT Y2 = 0.402 Metre
505
506
507
508
509
510
511
512
513
Active Er Pr
Surcharge
514
515
=
=
516
517
518
519
520
0.082
0.955
0.096
x
x
x
0.201 =
0.301 =
0.402 =
Total =
Ultimate Moment = 0.343
=
0.583
=
5.829
521
522
DESCRIPTION OF LOAD
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
SNO
1
2
3
4
a
5
a
b
6
7
8
MOMEN
T
(T-M)
0.360
2.755
21.951
Fac
2.000
2.000
2.000
33.771
Mu
0.721
5.509
43.902
0.479
0.219
1.700
0.778
0.373
0.719
0.959
1.700
1.700
1.400
2.000
2.000
1.700
3.142
0.753
71.437
-0.330
1.329
0.425
-0.733
0.000
0.000
0.000
26.306
0.736
53.464
71.437
20.332
26.306
5.159
0.000
0.000
0.000
542
Ultimate Load
1.600
Puh
Puv
15.336
117.221
2.259
0.722
7.222
-1.026
0.000
0.000
0.000
0.000
0.000
38.444 139.779 52.460
1.177
-0.528
1.177
39.621 139.252 53.638
39.621 139.779 53.638
Pu
Vu
Mu
543
544
545
Pmax
546
=
=
71.437
1.520
26.306
0.385
=
=
71.437
1.520
26.306
0.385
2
115.31 t/m
2
-21.32 t/m
547
548
549
Pmin
550
DPCL
175980462.xls.ms_office
RCC Abutment
551
DESCRIPTION OF LOAD
552
553
554
555
556
557
558
559
560
561
562
563
564
SNO
1
2
3
4
a
5
a
b
6
7
8
565
566
567
568
569
570
11
Ultimate Load
Fac
2.000
2.000
2.000
Puh
25.714
Mu
0.549
4.195
121.384
14.380
1.620
8.459
1.700
8.879
2.429
3.525
9.617
7.660
-0.733
0.000
0.000
0.000
88.067
6.042
1.700
1.700
1.400
2.000
2.000
1.700
6.730
3.694
0.000
1.600
70.758
88.067
Puv
11.678
89.255
16.349
13.022
25.419 -1.026
0.000
0.000
0.000
0.000
0.000
45.018 126.352 168.853
3.692
-1.152
9.667
48.710 125.200 178.520
48.710 126.352 178.520
Pu
Vu
Mu
571
572
Pmax
573
574
=
=
68.623
1.520
88.067
0.385
=
=
68.623
1.520
88.067
0.385
2
273.85 t/m
2
-183.56 t/m
575
Pmin
576
577
578
579
580
DESCRIPTION OF LOAD
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
SNO
1
2
3
4
a
5
a
b
6
7
8
Ultimate Load
Fac
2.000
2.000
2.000
25.714
Mu
0.549
4.195
227.340
62.125
1.700
33.549
105.613
36.337
17.624
-0.733
0.000
0.000
0.000
-14.066
231.395
21.642
1.700
1.700
1.400
2.000
2.000
1.700
13.082
3.694
3.148
4.722
8.111
190.254
231.395
1619.77
601
1.600
Puh
Puv
11.678
89.255
61.773
29.960
49.814 -1.026
0.000
0.000
0.000
0.000
-23.913
76.040 150.747 404.492
9.223
1.988 34.627
85.262 152.735 439.119
85.262 152.735 439.119
596.84 1069.15 3073.83
Pu
Vu
Mu
602
603
Pmax
604
=
=
86.048
1.520
231.395
0.385
=
=
86.048
1.520
231.395
0.385
2
657.533 t/m
2
-544.31 t/m
605
606
607
Pmin
608
609
RCC Design :-
610
width of Section = b =
611
612
Clear cover
d'
=
d
=
613
614
=
50
1520
1000 mm
35
50 mm
+
13
=
63
=
1520 mm
415
25 mm
615
616
617
618
1000 x
1520 / 1000
5320
619
620
621
622
623
DPCL
175980462.xls.ms_office
624
RCC Abutment
12
As per Cl 15-4-2-2-1
625
626
627
628
d =
Mu
0.15 x b x fck
629
630
631
Ast =
.5 fck
0.15 x
632
536375751
35
x 1000
319.635
mm
633
634
1 -
4.6 Mu
1-
bd
fck bd2
fy
635
636
637
638
Here :fck =
35 N /mm2
415 N /mm2
1000 mm
1457 mm
fy =
b =
d =
639
640
641
Mu =
536.38 KN - m
Ast =
1029 mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = #
32
20
mm
mm
642
643
804
x
1029
1000
mm
x
x
< 3d =
100
1457
OK
4371
644
781
mm
645
646
647
So Provide Spacing =
% of Steel Provided = p =
180
4466
1000
>
648
649
0.307
0.200
O.K
650
651
652
653
Leaver Arm = z
1.000
1.1 fy Ast
fck b d
1457
1399
654
655
656
z =
2038628
50995000
1-
657
0.95 d =
1384
658
659
final z
1384 mm
660
661
Mur =
0.87 * fy *As * z
662
0.87 *
663
415
4466 *
1384 =
2231760644
N-mm
664
665
666
2232 kN-m
>
536 kN-m
OK
667
668
669
670
0.120
100
1748
314
671
672
673
=
Required Spacing =
674
180
180
675
676
Provide Spacing
X
mm2
x
1748
mm
mm
1000
1457
1000
677
678
679
680
681
682
Ultimate Shear = Vu =
b
=
d
=
396 kN
1000 mm
1457 mm
As per Clause 15.4.3.1 of CBC
683
684
Shear stress =
v =
685
686
687
Depth factor =
688
s =
396 * 1000
1000*
1457
500
d
1/4
0.272
N/mm2
<
4.437
0.75 fck =
OK
0.765
689
DPCL
175980462.xls.ms_office
RCC Abutment
0.27
Ym
690
691
13
100 As
bd
1/3
fck
1/3
( Cl 15-4-3-2-1)
692
693
694
As =
Ym =
mm2
4466
1.25
vc =
0.270
1.25
0.476
vc =
695
1/3
446578
35
1/3
1457000
696
697
698
s * vc
v
=
=
1
*
0.272 N/mm2
0.476
0.364
N/mm2
699
700
701
702
314 mm
Asv =
703
704
705
706
As
<
s vc
707
708
Sv =
113370
400
283
709
710
711
712
So provide Sv
180 mm
713
714
715
716
717
As per Cl 15-4-2-2-1
718
719
720
721
d =
Mu
0.15 x b x fck
722
723
724
Ast =
.5 fck
0.15 x
725
1785197061
35
x 1000
583
mm
726
727
1 -
4.6 Mu
1-
bd
fck bd2
fy
728
729
730
731
Here :fck =
35 N /mm2
415 N /mm2
1000 mm
1457 mm
fy =
b =
d =
732
733
734
Mu =
1785 KN - m
Ast =
3495
mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = # =
32
20
mm
mm
735
736
737
804
1000
3495
mm
x
x
< 3d =
100
1457
OK
230
mm
738
739
740
So Provide Spacing =
% of Steel Provided = p =
741
742
0.307
180
4466
1000
>
0.200
4371
O.K
743
744
745
746
Leaver Arm = z
1457
747
1.1 fy Ast
fck b d
748
749
z =
1-
750
2038628
50995000
1399
0.95 d =
1384
751
752
final z
1384 mm
Mu =
0.87 * fy *As * z
753
754
755
0.87 *
756
415
4466 *
>
1785 kN-m
1384 =
2231760644
N-mm
757
758
2232 kN-m
OK
759
DPCL
175980462.xls.ms_office
760
RCC Abutment
14
761
762
0.120
1000
100
=
Required Spacing =
1748
314
Provide Spacing
180
180
mm2
x
1748
mm
mm
763
764
765
766
767
768
1457
1000
769
770
771
772
773
774
Ultimate Shear = Vu =
b
=
d
=
487 kN
1000 mm
1457 mm
775
776
Shear stress =
v =
487 * 1000
1000*
1457
777
0.334
N/mm2
<
0.75 fck =
4.437
OK
778
779
Depth factor =
s =
500
d
780
1/4
0.765
781
782
0.270
Ym
783
100 As
bd
1/3
fck
1/3
( Cl 15-4-3-2-1)
784
785
786
As =
Ym =
4466
1
mm2
vc =
0.270
1.250
0.476
vc =
787
446578
1457000
1/3
35
1/3
788
789
790
s * vc
v
=
=
0.765
*
0.334 N/mm2
0.476
0.364
N/mm2
791
792
793
794
Asv =
2
314 mm
795
796
797
798
As
<
s vc
799
800
Sv =
113370
400
283
801
802
803
804
So provide Sv
180 mm
805
806
807
808
809
As per Cl 15-4-2-2-1
810
811
812
813
d =
Mu
0.15 x b x fck
814
815
816
Ast =
.5 fck
817
0.15 x
4391190790
35
x 1000
915
mm
818
819
1 -
fy
820
4.6 Mu
1-
fck bd2
bd
821
822
823
824
825
826
Here :fck =
fy =
b =
d =
35 N /mm2
415 N /mm2
1000 mm
1457 mm
Mu =
4391 KN - m
Ast =
9013
mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = # =
32
20
mm
mm
827
828
829
804
1000
9013
89
mm
830
DPCL
175980462.xls.ms_office
831
832
RCC Abutment
So Provide Spacing =
% of Steel Provided = p =
833
834
0.613
90
8932
1000
>
mm
x
x
0.200
15
< 3d =
100
1457
OK
4371
O.K
835
836
837
838
Leaver Arm = z
1457
1.1 fy Ast
fck b d
839
840
841
z =
4077255
50995000
1-
842
1341
0.95 d =
1384
843
844
final z
1341 mm
Mu =
0.87 * fy *As * z
845
846
847
0.87 *
848
415
8932 *
1341 =
<
4391 kN-m
4322784031
N-mm
849
850
4323 kN-m
Revise
851
852
853
854
855
0.12
1000
100
856
857
858
=
Required Spacing =
1748
314
Provide Spacing
180
180
mm
x
1748
mm
mm
859
860
861
1457
1000
862
863
864
865
866
867
Ultimate Shear = Vu =
b
=
d
=
853 kN
1000 mm
1457 mm
868
869
Shear stress =
v =
853 * 1000
1000*
1457
870
0.585
N/mm2
<
0.75 fck =
4.437
OK
871
872
Depth factor =
s =
500
d
873
1/4
874
875
0.270
Ym
876
100 As
bd
1/3
fck
1/3
( Cl 15-4-3-2-1)
877
878
879
As =
Ym =
8932
1.250
mm2
vc =
0.270
1
0.600
vc =
880
893156
1457000
1/3
35
1/3
881
882
883
s * vc
v
=
=
0.765
*
0.585 N/mm2
0.600
0.459
N/mm2
884
885
886
887
Asv =
2
314 mm
888
889
890
891
As
>
s vc
892
893
Sv =
113370
526
215
894
895
896
897
So provide Sv
180 mm
898
DPCL
175980462.xls.ms_office
899
900
RCC Abutment
16
901
902
As per Cl 15-4-2-2-1
903
904
905
906
d =
Mu
0.15 x b x fck
907
908
909
0.15 x
910
5829149
35
x 1000
33
mm
911
912
300 mm
300
913
914
30 =
270 mm
915
916
Ast =
.5 fck
1 -
4.6 Mu
1-
bd
fck bd2
fy
917
918
919
920
921
922
923
Here :fck =
fy =
b =
d =
35 N /mm2
415 N /mm2
1000 mm
270 mm
Mu =
6 KN - m
Ast =
60
mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = # =
16
8
mm
mm
924
925
926
201
1000
60
3350
mm
927
928
929
So Provide Spacing =
% of Steel Provided = p =
810
O.K
< 3d =
100
270
OK
1000
100
=
Required Spacing =
324
50
Provide Spacing
155
150
mm2
x
324
mm
mm
930
931
130
1546
1000
>
mm
x
x
932
933
Distribution Steel
934
935
936
937
938
939
940
941
DPCL
270
1000
175980462.xls.ms_office
17
1.200
25
2250
kN
8.5
8.5
1.8
3.5
3.5
PILE CAP
Material
1 Grade of Concrete
35
2 Grade of Steel
415
60
External Load
Ultimate Load
mm
Actual Load
1 Vertical Load
Pu =
12829.754
P=
7228.026 kN
Mux =
36886.003
Mx=
19437.21 kN-m
Muy =
0.000
My=
Vuy =
7162.0447
Vy=
0.000
kN-m
3566.661 kN
Abutment
1 Length of Abutment at Top of Cap
7000
mm
1520.0
mm
2 Weight Calculation :-
Note :-
Load Carrying Capacity of Pile will be check on Actual Load Basis & RCC Design
on Ultimate Load Basis
8.50 x
1.4
8.50 x
1.80 x
3251.25
25 =
=
4551.75 kN
7228.0 kN
=M =
19437.21 kN-m
3251.25 kN
7228.0 +
3251.25
3251.25 kN
10479.3 kN
175980462.xls.ms_office
8500
18
8500
990
3500
1520
#REF!
750
3500
r1
Checking of Load Carrying Capacity of Pile With Actual Load
Load on Each Pile due to P =
10479.3
1164.4
kN
M
=
Spacing of outer pile x Nos of Pile in a row
19437.21
=
7
1164.36
925.6
925.6
=
<
2089.9 kN
2250
OK
Actual Capacity
1164.36
925.6 =
238.78 kN
>
0
No uplift
OK
kN
175980462.xls.ms_office
19
12829.8
1425.5
kN
Mu
Spacing of pile x Nos of Pile in a row
36886.0
Load due to Mx =
=
7
1425.5
1425.5
1756.476
kN
+
-
1756.48
3182.00 kN
1756.48
-330.95 kN
1520
900=D/2
3320
1840
3182.0
-330.96
3500
3182.00
3x
1.84
17564.66 kN-m
Muy
175980462.xls.ms_office
20
35
N /mm
17564.66
Muy =
8.5
2066.43
KN - m
2066.43
2066.43
10
1000
0.15
Minimum Depth Required =
627
mm
712
mm
1800
mm
1715
mm
4.6 Mu
.5 fck
1 -
1-
fy
fck bd
bd
Here :fck
fy
35 N /mm2
415 N /mm2
1000 mm
d =
1715 mm
Muy =
Ast =
2066.43
KN - m
3419.78 mm
= #
Muy
25
mm
490.625
1000
3419.78
=
143
mm
So Provide Spacing =
140
mm
< 3d =
5145
3504.4643
100
% of Steel Provided = p =
0.204
1000
1715
>
0.20%
kN-m/m width
O.K
O.K
35
175980462.xls.ms_office
21
= #
25
So Provide Spacing =
140
% of Steel Provided = p =
mm
mm
< 3d =
O.K
0.20%
O.K
9546.0 kN
8500 mm
1715 mm
Shear
stress = v
=
9546.0 * 1000
8500 x
Depth factor =
0.6548457
N/mm2
<
1/4
500
Ym =
OK
100*As/ b d =
fck =
4.4370598
1715
s =
Ultimate
Shear
Resistance
of
Concrete = vc =
0.75
0.735
0.27
100 As
Ym
bd
1/3
1/3
fck
( Cl 15-4-3-2-1)
0.204
1.25
vc =
0.27
0.20
1/3
35
0.416
1/3
1.25
vc =
0.416
s * vc
0.7348124
0.6548457
N/mm2
12
0.3056004
N/mm2
2826 mm
Asv =
Hence
legged in 1m width
As
Sv =
>
s vc
1020327.3
6369
So provide Sv
140 mm
160.21256 mm c/ c
175980462.xls.ms_office
22
16 mm
0.12
1000
1715
100
2058
mm
Required Spacing =
200.96
1000
2058.00
=
Provide Spacing
195
mm
140
mm
(For 9- Piles)
1-
25 #
140
mm c/c
2-
25 #
140
mm c/c
3-
16 #
140
mm c/c
4-
Shear Reinforcement=
=
3 legged
12
# Stirrups @
140 mm
3182.00 N
1200 mm
hence
Medium Sand
k1 =
0.525
2
31 kN/mm =
Modulus of Elasticity = E =
Dia of Pile
=D=
0.0490625
1/5
310000
k1
L1 =
10173600 cm
EI
2
310000 kg/cm
207360000
10173600
0 cm
1/5
359.53 cm
0.525
L1 /T =
= 3.60 m
359.53
For L1 /T
120 cm
Moment of Inertia = I = p D2 / 64 =
T =
0.00
Lf / T =
0.00
175980462.xls.ms_office
Hence Lf
359.53
25
23
719.06 cm
7.19
Lf =
Depth of Scour =
L1 =
7.19 m
17.81 m
> 4T
Length of Fixity =
14.38 OK
7.191 m
0 m
7.191
0.000
3566.7
7.191 m
9
396.30 kN
Y (cm) =
Q (L1 + Lf )3
39629.57
12 E I
12 x
719.1
310000 x
10173600
0.3893 cm
396.30
7.19
1424.80 kN-m
2
Assuming effective Cover d' =
d' / D =
60
Mu / fck D3
Pu / fck D2
p / fck =
p =
As =
56
60 mm
1200
0.10
of SP 16
1.425E+09
238782.71
6.048E+10
0.024
50400000
0.005
0.02
35
p p D2 / 400
0.02
0.7 %
2
7912.8 mm
2
5338 mm
7912.8
5338
175980462.xls.ms_office
Dia of Bar
24
2
2574.8 mm
12.8125 Say
16 Nos
16 mm
So Provide
Asc min
4521.6 mm
4521.6 mm
20 mm
=
14.4
17
5338 mm
Periphery of Core
Spacing Between Bars
1100 mm
3454 mm
203.17647 mm
>
100 mm
Okay
As per Cl 26.5.3.2
Horizontal Ties
Dia
of Ties
8
20
1200
mm
320
mm
c)
300
mm
So Provide ties of
of IS-456
300 mm
200 mm
175980462.xls.ms_office
Wing Wall
25
Wing Wall
Bridge No
Standard of Loading
H.M.Loading
Level (m)
Top of Wing Wall
Formation Level
19.444
Top of Foundation
R.L of Bed Level
11.100
Bottom of Foundation
Deepest Scour Level
9.100
1
Height of Wall From Top of Foundation
2
Proposed Top Width
3
Back Batter (Equivalent for existing ) (1H:?V) (1000 = For Vertical Face )
4
Intermediate Front Batter (1H:?V) ( 1000 = For Vertical face )
5
Second Front Batter (1H:?V) ( 1000 = for Vertical face )
6
Sloping Thickness of Toe
7
Length of Toe Projection.
8
End Thickness of Foundation
9
Heel Projection
10
Angle of Friction of Wall with Soil (d)
11.67 Deg
11
Height of Second Batter (Intermediate Level) above Top of Foundation
12
Front Offset in Wall
13
Passive Height from Bottom of Foundation
14
Coefficient of Friction (m)
15
Distance form C/L of track to Back Face of Wall
16
Width of Sleeper
17
Depth of Ballast Cushion
18
Depth From Formation Level to Top of Wall
19
Live Load Surcharge
20
Dead Load Surcharge
21
Angle of Repose of Soil (f)
35.00 Deg
22
Angle of Surcharge (i)
23
Cohesion (c)
24
Angle of internal friction of Soil (f)
11.67 Deg
25
Density of Front Soil
26
Density of Back Fill
Seismic Parameter
27
Zone = III
a =
0.04
b =
1.5
28
Density of Masonry
29
Density of Submerged Soil
30
F.O.S. for Passive Earth Pressure
31
Front Delta
32
Angle of Back Batter (a)
33
Safe Bearing Capacity
34
Grade of Concrete fck =
35
Grade of Steel = 415
CHECK
Max
Min
14.9
7.5
Foundation Pressure
t/m2
Stability Check
DPCL
19.444
11.700
10.192
8.344
0.450
12
1000
1000
0.90
4.800
0.500
4.800
0.204
4.172
0.000
2.600
0.500
3.500
2.750
0.300
0.000
17.000
6.200
0.611
6.000
1.500
0.204
1.000
1.800
i
=
2.500
1.000
3
0.210
0.083
15.0
m
m
m
m
m
rad
m
m
m
m
m
m
m
t/m2
t/m2
rad
rad
t/m2
rad
t/m2
t/m2
1
t/m2
t/m2
rad
rad
t/m2
OK
OK
175980462.xls.ms_office
Wing Wall
26
450
TOP
19.444
Formation Level
20 # @ 200
BACK SIDE
7744
4172
16 # @ 200
19.444
Curtailment Section
16 # @ 100
25 # @ 100
4172
11.700
16 # @ 100
32 # @ 100
TOF =
10.500
BOF =
9.100
500
1400
900
1200
Bed Level
20 # @ 100
32 # @ 100
4800
DPCL
1145
4800
175980462.xls.ms_office
Wing Wall
27
DETAIL CALCULATION
1.0
0.5Kawh h
Where :Ka =
Coeff. of Active Earth Pressure
h =
Height of Soil
w =
Unit Weight of Soil
Ka =
Cos (a)Cos(a + d)
2
Cos2(f - a)
Sin(f - d)Sin(f - i)
1 +
Cos(a+ d)Cos (a - i)
5.7.1
Sub Str
Following values are taken for calculating the active earth pressure.
Level
Int. Chk & TOF
a=
Slope of Batter with Vert.
0.083
f=
Coff. of internal friction of Soil
0.611
d=
Angle of friction bet. Wall & earth
0.204
i=
Angle of slope of fill with Horz.
0.000
Ka =
0.284
BOF
rad
rad
rad
rad
(Effect of sloping Surcharge has been taken as per CL 5.8.4 of Sub Str. Code, So " i " is taken = 0 for calculation of K a )
a
Vertical Component Of Active Earth Pressure
Pav
Pa Sin(a + d)
=
Pah
Y1 =h/3
f
Pav
1.1
FL
h3 =
4.071 m
4.071 x 4.07083
0.000 m
Horizontal Component
Pah =
4.238 x Cos( 0.083+
0.204 )
Will act at Y1
Vertical Component
Pav =
4.238 x
1.2
=
4.071 / 3
1.357 m
BOF
Sin( 0.083+
Will act at X1 = Y1Cot(90-a) =
0.204 )
1.357 x Cot(90 -
At Top of Foundation
Height from Formation Level, h
=
Pa =
0.5 x 0.284 x 1.800 x
8.142 x 8.14165
0.083 )
8.142 m
0.113 m
h3 =
0.000 m
Horizontal Component
Pah =
16.951 x Cos( 0.083+
0.204 )
=
Will act at Y2 8.14165 / 3 =
1.3
Vertical Component
Pav =
16.951 x Sin( 0.083+
Will act at X2 = Y2Cot(90-a) =
2.714 x Cot(90 -
At Bottom of Foundation
Height from Formation Level, h
=
Pa =
0.5 x 0.284 x 1.800 x
8.745 x 8.74482
0.204 )
8.745 m
0.226 m
h3 =
0.000 m
Horizontal Component
Pah =
19.556 x Cos( 0.083+
0.204 )
=
Will act at Y2 8.74482 / 3 =
Vertical Component
Pav =
19.556 x Sin( 0.083+
Will act at X2 = Y2Cot(90-a)
DPCL
TOF
0.204 )
2.915 x Cot(90 -
0.083 )
0.243
175980462.xls.ms_office
2.0
Wing Wall
28
(S + V) x h1 x Ka
(B + 2D)
2
17.000 t/m
2
6.200 t/m
2.750 m
3.500
1.777
0.348
2.750
B
Formation Level
1.777
h1
2.695
4.172
45
Checking Level
Height, h1 =
Depth of Dispersion, D =
P1 =
2.2
17.000+
2.695 m
1.777 m
6.200 2.695 x
2.750+
3.555
0.284
2.817 t/m
1.347 m
At Top of Foundation
3.500
1.430
0.695
2.750
B
Formation Level
1.430
h1
7.214
8.344
450
Top of Foundation
Height, h1 =
Width of Distribution, B =
Depth of Dispersion, D =
P1 =
2.3
17.000+
7.214 m
2.750 m
1.430 m
6.200 7.214 x
2.750+
2.859
0.284
8.478 t/m
3.607 m
At Bottom of Foundation
3.500
0.000
5.495
2.750
B
Formation Level
0.000
h1
10.644
10.344
45
Bottom of Foundation
Height, h1 =
Depth of Dispersion, D =
P1 =
DPCL
17.000+
6.200 10.644 x
2.750+
0.000
10.644 m
0.000 m
0.284
25.515 t/m
5.322 m
175980462.xls.ms_office
3.0
Wing Wall
29
0.5 Kp w h2
Kp=
Cos2(f+ a)
Sin(f + d) Sin(f + i)
1Cos(a- d) Cos (a - i)
Cos a Cos(a - d)
2
f =
Kp=
Pph
0.204 rad
d=
0.210 rad
1.936
Pp Cos(d - a) Acting at (h/3) above section.
a =
Ppv
i=
0.000 rad
0.000 rad
Factor of Safety for Passive =
Pp Sin(d - a) Acting at X=Y Cot(90 - a)
At Top of Foundation
Passive Height = Bed Lvl or Scour Lvl TOF =
Pp =
0.5 x 1.936 x 1.000 x
0.000 2
Safe Passive Pressure =
0.000
/
Ph =
0.000 x Cos( 0.2100.000 )
Resisting Moment =
0.000 x 0.000 =
3.2
0.000 m
0.000 t/m
11.100 =
3
=
0.000 t/m
=
0.000 t/m
Will act @ h/3 =
0.000 t-m
At Bottom of Foundation
Passive Height = Bed Lvl or Scour Lvl BOF =
Pp =
0.5 x 1.936 x 1.000 x
1.092 2
Safe Passive Pressure =
1.154
/3
Ph =
0.385 x Cos( 0.2100.000 )
Resisting Moment =
0.376 x 0.364 =
4.0
10.192-
10.192-
0.000 m
1.092 m
1.154 t/m
9.100 =
=
0.385 t/m
=
0.376 t/m
0.137 t-m
0.364 m
SELF WEIGHT
4.1
Top of Wall
0.450
Back Fill
0.000
1
Passive 4.172
6
3
A
0.348
No.
0.000
0.000
Shape
Factor
1.0 x
0.5 x
0.5 x
0.5 x
0.5 x
0.5 x
Vert.
(m)
Density Weight
W(t)
(t/m3)
4.172 x
4.172 x
4.172 x
4.172 x
-0.10 x
0.000 x
Sum
CG of Total Mass from A = Moment/Weight =
CG of Total Mass above Intermediate Level =
Ac
t
iv
e
Fi
ll
W1
W2
W3
W4
W5
Passive W6
Horz.
(m)
FL
0.450 x
0.000 x
0.348 x
0.348 x
0.348 x
0.000 x
0.000
11
Back Fill
2.500 =
2.500 =
2.500 =
1.800 =
1.800 =
1.000 =
4.694
0.000
1.813
1.305
-0.032
0.000
7.780
WX /W =
WY /W =
Top of Wall
0.450
10
Passive
0.000
L.A.
Moment L.A.
Moment
from A W X
above A W Y
(m)
(tm)
(m)
(tm)
0.573
2.688
2.086
9.791
0.798
0.000
1.391
0.000
0.232
0.420
1.391
2.521
0.116
0.151
2.781
3.631
0.116 -0.004
4.138 -0.131
0.798
0.000
3.256
15.812
3.256 /7.780
=
0.418 m
15.812 /7.780
=
2.032 m
0.000
4.172
1
2
13
15
0.000
0.000
5
1.200
14
4.172
1.200
B
4.800
11.100
0.695
0.000
6
DPCL
5.945
10.745
7
8
16
0.900
1.400
0.500
9.100
4.800
175980462.xls.ms_office
4.2
Wing Wall
At Top of Foundation
Pa
ss
e iv
Fi
ll
Ac
t
iv
e
Fi
ll
No.
W1
W2
W3
W4
W5
W9
W11
W12
W13
W14
Shape
1.0 x
0.5 x
1.0 x
0.5 x
0.5 x
0.5 x
0.5 x
0.5 x
1.0 x
0.5 x
Horz.
(m)
Vert.
(m)
0.450 x
0.000 x
0.000 x
0.000 x
0.695 x
0.695 x
0.695 x
0.000 x
0.000 x
0.001 x
8.344 x
4.172 x
4.172 x
4.172 x
8.344 x
8.344 x
-0.20 x
0.000 x
0.000 x
1.200 x
Density Weight
W(t)
(t/m3)
2.500 =
9.387
2.500 =
0.000
2.500 =
0.000
2.500 =
0.000
2.500 =
7.252
1.800 =
5.222
1.800 =
-0.127
1.000 =
0.000
1.000 =
0.000
1.000 =
0.001
Sum
21.735
WX /W =
WY /W =
(tm)
(m)
(tm)
8.639
4.172 39.163
0.000
5.563
0.000
0.000
2.086
0.000
0.000
1.391
0.000
3.362
2.781 20.171
1.210
5.563 29.046
-0.029
8.277 -1.048
0.000
0.000
0.004
13.186
87.332
13.186 /21.735
=
0.607 m
87.332 /21.735
=
4.018 m
0.920
1.145
1.145
1.145
0.464
0.232
0.232
1.145
1.145
5.945
At Bottom of Foundation
No.
Fi
ll
iv
e
Fi
ll
Ac
t
ve
Pa
ss
i
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
Shape
1.0 x
0.5 x
1.0 x
0.5 x
0.5 x
1.0 x
0.5 x
1.0 x
0.5 x
1.0 x
1.0 x
0.5 x
1.0 x
0.5 x
1.0 x
0.5 x
Horz.
(m)
Vert.
(m)
0.450 x
0.000 x
0.000 x
0.000 x
0.695 x
5.945 x
4.800 x
4.800 x
0.695 x
4.800 x
5.495 x
0.000 x
0.000 x
0.001 x
4.800 x
4.800 x
Density Weight
W(t)
(t/m3)
2.500 =
2.500 =
2.500 =
2.500 =
2.500 =
2.500 =
2.500 =
2.500 =
1.800 =
1.800 =
1.800 =
1.000 =
1.000 =
1.000 =
1.000 =
1.000 =
Sum
C.G. of mass from C =
Moment/Weight =
WX
C.G. of Total Mass above Bott of Foundation =
WY
5.0
30
8.344 x
4.172 x
4.172 x
4.172 x
8.344 x
1.400 x
0.900 x
0.500 x
8.344 x
8.344 x
-1.599 x
0.000 x
0.000 x
1.200 x
1.200 x
0.900 x
(tm)
(m)
9.387
5.720 53.697
5.572
0.000
5.945
0.000
6.963
0.000
5.945
0.000
3.486
0.000
5.945
0.000
2.791
7.252
5.264 38.173
4.181
20.809
2.973 61.857
0.700
5.400
7.545 40.745
0.800
6.000
8.345 50.072
0.250
5.222
5.032 26.274
6.963
72.092
2.400 173.021
5.572
-15.818
1.832 -28.976
9.211
0.000
5.945
0.000
0.000
5.945
0.000
0.001 10.745
0.008
5.760
8.345 48.069
2.160
9.145 19.754
118.264
482.694
/W =
482.694 /118.264 =
/W =
395.367 /118.264 =
395.367
4.081 m
3.343 m
SEISMIC FORCE
Earth Pressure Due to Seismic Effect
bx
Ix
ah =
ao
ah =
0.0 x
1.0 x
5.12.6.1
1.500 =
Level
Slope of Batter with Vert.
Coff. of internal friction of Soil
Angle of friction bet. Wall & earth
Angle of slope of fill with Horz.
Case I: With
"+" & "+"
value
l =
Ca =
tan-1a h
1+av
5.1
tan-1 0.060
1 + 0.030
tan-1a h
1-av
av =
0.06
a=
f=
d=
i=
(1 + a v) Cos2(f - a - l)
1 +
tan-1 0.060
1 - 0.030
(1 + a v) Cos (f - a - l)
Ca =
1 +
Int. Chk & TOF
0.329
Ka =
0.284
0.045
0.06 / 2 =
Sub Str
0.03
BOF
rad
rad
rad
rad
Pt I
TOF
0.878
Pt II
0.638
With (+)
0.058
1
2
Sin(f + d)Sin(f - i - l)
Cos(a+ d + l)Cos(a - i)
With (-)
0.062
1
Sin(f + d)Sin(f - i - l)
Cos(a+ d + l)Cos(a - i)
0.327
=
Pt I
0.882
Pt II
0.637
2
=
0.329
BOF
(Max Value of above, i.e., a and b)
DPCL
(tm)
52.304
0.000
0.000
0.000
30.324
14.566
4.320
1.500
36.357
401.698
-145.70
FORCE L.A.
Moment
0.467
2.032
0.949
0.233
0.000
0.000
0.710
2.086
1.481
175980462.xls.ms_office
5.2
Wing Wall
At Top of Foundation
DESCRIPTION
SFH 1 to 5 = DUE TO SELF WT. OF Wall
SFV 1 to 5 = DUE TO SELF WT. OF Wall
Increment in Earth Pressure [0.5gh2(Ca-Ka)]
Total Ver Load =
0.652 t
Total Horz Load =
4.143 t
Total Moment =
17.084 t-m
5.3
FORCE L.A.
Moment
1.304
4.018
5.240
0.652
0.000
0.000
2.839
4.172 11.844
At Bottom of Foundation
DESCRIPTION
SFH 1 to 5 = DUE TO SELF WT. OF Wall
SFV 1 to 5 = DUE TO SELF WT. OF Wall
Increment in Earth Pressure [0.5gh2(Ca-Ka)]
Total Ver Load =
3.310 t
Total Horz Load = 10.984 t
Total Moment =
44.699 t-m
6.0
31
FORCE L.A.
Moment
6.621
3.343 22.133
3.310
0.000
0.000
4.363
5.172 22.565
STRESS CALCULATION
6.1
S.No.
1
LOAD
L.A. (m) Moment
VERT HORZ.
(t-m)
DESCRIPTION OF LOAD
Active Earth Pressure
Horizontal Component Pah
4.065
1.199
2
Earth Pressure due to Surcharge Ph
3
Self Weight & Back Fill
TOTAL
Due to seismic Effect
Combined Load with Seismic
2.817
Fac
Ultimate Load
Puh
Mu
1.357
5.515
1.70
6.90968
9.38
0.113
0.136
1.70
0.23
1.347
3.796
3.256
12.703
2.429
15.132
1.70
1.40
4.78975
0
11.699
7.780
8.980
-0.233
8.746
6.91
Pu
Width of the section =
798 mm
Cover
=
70 mm
( Effective )
Effective Depthj =
798 Checking at first Level
Mu
=
230.5 kN-m
Ast =
.5 fck
0.15 x
209.5
mm
bd
fck bd2
Mu =
230.5 KN - m
Ast =
890.6 mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = #
So Provide Spacing =
% of Steel Provided = p =
=
728 mm
4.6 Mu
1-
35 N /mm2
415 N /mm2
1000 mm
728 mm
fy =
b =
d =
0.216
23.05
Mu
Mu
0.15 x b x fck
230471262
35
x 1000
1 -
d =
fy
Here :fck =
70
6.45
4.56
20.618
2.429
200
1570
1000
>
314
x
890.6
1000
mm
x
x
< 3d =
100
727.667
OK
2183
0.20%
20
16
=
=
353
mm
mm
mm
O.K
z =
final z
1=
0.87 * fy *As * z
0.87 *
DPCL
716705
25468333
1.1 fy Ast
fck b d
728
707
0.95 d =
691
691 mm
Mur =
415
391.853 kN-m
*
>
=
1570 *
230 kN-m
691 =
391852920.6
N-mm
OK
175980462.xls.ms_office
Wing Wall
32
0.12
100
873.2
200.96
=
Required Spacing =
Provide Spacing
230
200
1000
727.7
<
0.75 fck =
mm
x
873
mm
mm
1000
Ultimate Shear = Vu =
b
=
d
=
Shear stress =
69.1 kN
1000 mm
728 mm
v =
Depth factor =
69.1 * 1000
1000*
728
s =
500
d
1/4
0.27
Ym
mm2
1570
1.25
vc =
vc =
s * vc
v
=
=
0.91046
*
0.09496 N/mm2
0.09496 N/mm2
0.423
0.27
1.25
0.423
100 As
bd
1/3
4.43706
OK
0.91046
fck
1/3
1/3
157000
( Cl 15-4-3-2-1)
35
1/3
727667
0.38557 N/mm2
6.2
At Top of Foundation
S.No.
1
LOAD
L.A. (m) Moment
VERT HORZ.
(t-m)
DESCRIPTION OF LOAD
Active Earth Pressure
Horizontal Component Pah
16.258
4.798
2
Earth Pressure due to Surcharge Ph
3
Passive Earth Pressure
4
Self Weight & Back Fill
TOTAL
Due to seismic Effect
Combined Load with Seismic
2.714
44.123
1.70
27.6387
75.01
0.226
1.085
1.70
1.84
3.607
0.000
0.607
30.582
0.000
13.186
88.976
17.084
106.060
1.70
1.70
1.40
25
16
mm
mm
14.413
51.99
0
0.00
0
18.46
42.052 128.843
17.084
27.64
145.93
Pu
Mu
1075 mm
Ast =
.5 fck
0.15 x
d =
Mu
0.15 x b x fck
1459267476
35
x 1000
1 -
1-
4.6 Mu
fck bd2
fy
35 N /mm2
415 N /mm2
1000 mm
1075 mm
So Provide Spacing =
% of Steel Provided = p =
=
0.456
527.2
mm
bd
Mu =
1459.3 KN - m
Ast =
3930.8 mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = #
DPCL
Ultimate Load
Puh
Mu
1459.3 kN-m
fy =
b =
d =
21.735
26.533
-0.652
25.881
1.145 m =
1145 mm
70 mm
( Effective )
1145 70 =
Here :fck =
8.478
0.000
Fac
100
4906.25
1000
>
490.625
x
3930.8
1000
mm
x
x
< 3d =
100
1075.33
OK
3226
0.20%
=
=
125
mm
O.K
175980462.xls.ms_office
Wing Wall
33
z =
2239703
37636667
1-
final z
1011 mm
Mur =
415
1791.49 kN-m
1.1 fy Ast
fck b d
1075
1011
0.95 d =
1022
( Min of above )
0.87 * fy *As * z
0.87 *
4906.25 *
>
1011 =
1459 kN-m
1791492472
N-mm
OK
0.12
100
1290.4
200.96
=
Required Spacing =
Provide Spacing
156
100
1000
1075.3
<
0.75 fck =
mm
x
1290
mm
mm
1000
Ultimate Shear = Vu =
b
=
d
=
Shear stress =
276.4 kN
1000 mm
1075 mm
v =
Depth factor =
276.4 * 1000
1000*
1075
s =
500
d
1/4
0.27
Ym
2
4906.25 mm
1.25
vc =
vc =
s * vc
v
=
=
0.82577
*
0.25702 N/mm2
0.25702 N/mm2
0.543
0.27
1.25
0.543
100 As
bd
1/3
4.43706
OK
0.82577
fck
1/3
1/3
490625
( Cl 15-4-3-2-1)
35
1/3
1075333
0.44875 N/mm2
6.3
At Bottom of Foundation
S.No.
1
LOAD
Moment (t-m)
L.A. (m) Moment
(t-m) Front L.A.
Ms
VERT HORZ.
DESCRIPTION OF LOAD
Active Earth Pressure
Horizontal Component Pah
18.756
5.535
2
Earth Pressure due to Surcharge Ph
3
Passive Earth Pressure
4
Self Weight & Back Fill
TOTAL
Due to seismic Effect
Combined Load with Seismic
6.2.1
118.264
123.799
-3.310
120.489
54.673
0.243
1.345
5.322 135.790
0.364 -0.137
4.081 482.694
674.365
44.699
719.064
10.502
58.130
6.664 788.093
846.224
846.224
Case
Without Seismic
With Seismic
DPCL
25.515
0.376
2.915
Vert.
Load (t)
W
123.799
120.489
Moment
(t-m)
M
674.365
719.064
Z (m)
e (m)
B (m)
M/W
Z-B/2
5.447
0.075
10.745
5.968
0.595
Pmax (t/m2)
Pmin (t/m2)
W/B(1+6e/B)
12.00
14.94
W/B(1-6e/B)
11.04
7.49
175980462.xls.ms_office
Wing Wall
34
4.800
On safer side Taking Max Foundation Pressure as UDL ( Though it will be Trapezoidal )
Max Pressure =
149.399 kN/m
149.399
Max Moment =
Ultimate Moment
Mu
x
2
4.800
1.700
1721.08
1721.08
2925.84 kN-m
2925.8 kN-m
Ast =
.5 fck
0.15 x
d =
2925837307
35
x 1000
1 -
mm
Mu =
2925.8 KN - m
Ast =
6469.1 mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = #
So Provide Spacing =
% of Steel Provided = p =
=
746.5
bd
fck bd2
35 N /mm2
415 N /mm2
1000 mm
1330 mm
fy =
b =
d =
4.6 Mu
1-
fy
Here :fck =
Mu
0.15 x b x fck
0.604
803.84
x
6469.1
1000
mm
x
x
< 3d =
100
1330
OK
3990
O.K
1000
100
8038.4
1000
>
0.20%
32
16
=
=
124
mm
mm
mm
0.12
100
1596
200.96
=
Required Spacing =
Provide Spacing
126
100
1330.0
mm
x
1596
mm
mm
1000
Ultimate Moment
Mu
150.192
234.974 kN/m
Max Moment =
234.974
Ast =
.5 fck
0.15 x
1 -
fy
fy =
b =
d =
DPCL
18.000
84.782
150.192 kN/m
234.974 kN/m
x
2
4.800
1.700
2706.90
2706.90
4601.74 kN-m
4601.7 kN-m
Here :fck =
8.344 x
Surcharge =
Vertical UDL
4.800
35 N /mm2
415 N /mm2
1000 mm
1930 mm
d =
Mu
0.15 x b x fck
4601738200
35
x 1000
1-
4.6 Mu
fck bd2
936.2
mm
bd
Mu =
4601.7 KN - m
Ast =
6899.6 mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = #
32
20
mm
mm
175980462.xls.ms_office
Wing Wall
So Provide Spacing =
% of Steel Provided = p =
=
0.416
35
803.84
x
6899.6
1000
mm
x
x
< 3d =
100
1930
OK
5790
O.K
1000
100
8038.4
1000
>
0.20%
117
mm
7.0
=
Required Spacing =
0.12
100
2316
314
Provide Spacing
136
100
1930.0
mm
x
2316
mm
mm
1000
STABILITY CALCULATION
7.1
Without seismic,
Mo =
54.673 +
135.790 =
190.463 t-m
With seismic,
Mo =
54.673 +
135.790 +
44.699 =
235.162 t-m
Ms =
Ms =
846.224 t-m
FOS (Reqd.)
2.0
1.5
18.756
0.376 =
43.895 t
123.799
Coff of Friction, m =
Base Width =
Cohesion, c =
Passive Force, Pp =
0.500
10.745 m
2
1.500 t/m
0.376 (Ref. 9.2 )
m W+Bc+P p
61.900
=
Factor of Safety =
25.515
16.118
0.376
78.394
Resisting Force
Horz. Force
78.394
43.895
1.786
>
1.500
OK
DPCL
175980462.xls.ms_office
Return Wall
36
Return Wall
Bridge No
Standard of Loading
Level (m)
Top of Wing Wall
Formation Level
13.200
Top of Foundation
R.L of Bed Level
11.100
Bottom of Foundation
Deepest Scour Level
9.100
1
Height of Wall From Top of Foundation
2
Proposed Top Width
3
Back Batter (Equivalent for existing ) (1H:?V) (1000 = For Vertical Face )
4
Intermediate Front Batter (1H:?V) ( 1000 = For Vertical face )
5
Second Front Batter (1H:?V) ( 1000 = for Vertical face )
6
Sloping Thickness of Toe
7
Length of Toe Projection.
8
End Thickness of Foundation
9
Heel Projection
10
Angle of Friction of Wall with Soil (d)
11.67 Deg
11
Height of Second Batter (Intermediate Level) above Top of Foundation
12
Front Offset in Wall
13
Passive Height from Bottom of Foundation
14
Coefficient of Friction (m)
15
Distance form C/L of track to Back Face of Wall
16
Width of Sleeper
17
Depth of Ballast Cushion
18
Depth From Formation Level to Top of Wall
19
Live Load Surcharge
20
Dead Load Surcharge
21
Angle of Repose of Soil (f)
35.00 Deg
22
Angle of Surcharge (i)
23
Cohesion (c)
24
Angle of internal friction of Soil (f)
11.67 Deg
25
Density of Front Soil
26
Density of Back Fill
Seismic Parameter
27
Zone = III
a =
0.04
b =
1.5
28
Density of Masonry
29
Density of Submerged Soil
30
F.O.S. for Passive Earth Pressure
31
Front Delta
32
Angle of Back Batter (a)
33
Safe Bearing Capacity
34
Grade of Concrete fck =
35
Grade of Steel = 415
CHECK
Max
Min
8.4
1.6
Foundation Pressure
t/m2
Stability Check
DPCL
19.444
11.700
10.192
2.100
0.450
12
1000
1000
0.20
1.100
0.500
1.000
0.204
1.050
0.000
2.600
0.500
16.000
2.750
0.300
6.244
17.000
6.200
0.611
6.000
1.500
0.204
1.000
1.800
i
=
2.500
1.000
3
0.210
0.083
15.0
m
m
m
m
m
rad
m
m
m
m
m
m
m
t/m2
t/m2
rad
rad
t/m2
rad
t/m2
t/m2
1
t/m2
t/m2
rad
rad
t/m2
OK
OK
175980462.xls.ms_office
Return Wall
37
Formation Level
19.444
450
TOP
13.200
16 # @ 140
BACK SIDE
1500
1050
12 # @ 140
Curtailment Section
12 # @ 140
16 # @ 140
1050
11.700
12 # @ 140
16 # @ 140
TOF =
9.800
BOF =
9.100
500
700
200
1900
Bed Level
12 # @ 140
16 # @ 140
1100
DPCL
625
1000
175980462.xls.ms_office
Return Wall
38
DETAIL CALCULATION
1.0
0.5Kawh (h+2h3)
Where :Ka =
Coeff. of Active Earth Pressure
h =
Height of Soil
w =
Unit Weight of Soil
Ka =
Cos (a)Cos(a + d)
2
Cos2(f - a)
Sin(f - d)Sin(f - i)
1 +
Cos(a+ d)Cos (a - i)
5.7.1
Sub Str
Following values are taken for calculating the active earth pressure.
Level
Int. Chk & TOF
a=
Slope of Batter with Vert.
0.083
f=
Coff. of internal friction of Soil
0.611
d=
Angle of friction bet. Wall & earth
0.204
i=
Angle of slope of fill with Horz.
0.000
Ka =
0.284
BOF
rad
rad
rad
rad
(Effect of sloping Surcharge has been taken as per CL 5.8.4 of Sub Str. Code, So " i " is taken = 0 for calculation of K a )
a
Vertical Component Of Active Earth Pressure
Pav
Pa Sin(a + d)
=
Pah
Y1 =h/3
f
Pav
1.1
FL
h3 =
1.025 m
1.025 x 1.0245
0.000 m
Int. Lvl
Horizontal Component
Pah =
0.268 x Cos( 0.083+
0.204 )
=
Will act at Y1
1.025 / 3 =
Vertical Component
Pav =
0.268 x
1.2
1.3
0.342 m
TOF
BOF
Sin( 0.083+
Will act at X1 = Y1Cot(90-a) =
0.204 )
0.342 x Cot(90 -
At Top of Foundation
Height from Formation Level, h
=
Pa =
0.5 x 0.284 x 1.800 x
2.049 x 2.0491
h3 =
2.049 m
0.000 m
Horizontal Component
Pah =
1.074 x Cos( 0.083+
0.204 )
=
Will act at Y2 2.0491 / 3 =
Vertical Component
Pav =
1.074 x Sin( 0.083+
Will act at X2 = Y2Cot(90-a) =
0.683 x Cot(90 -
At Bottom of Foundation
Height from Formation Level, h
=
Pa =
0.5 x 0.284 x 1.800 x
3.758 x 3.7581
0.204 )
Vertical Component
Pav =
3.612 x Sin(
0.083+
0.083 )
3.758 m
0.204 )
0.683 m
Horizontal Component
Pah =
3.612 x Cos( 0.083+
0.204 )
=
Will act at Y2 3.7581 / 3 =
DPCL
0.057 m
h3 =
0.000 m
175980462.xls.ms_office
Return Wall
Will act at X2 = Y2Cot(90-a)
2.0
1.253 x Cot(90 -
0.083 )
39
=
0.104
(S + V) x h1 x Ka
(B + 2D)
17.000 t/m
2
6.200 t/m
2.750 m
16.000
14.538
0.088
2.750
B
Formation Level
14.538
h1
0.000
7.294
450
Checking Level
Height, h1 =
Depth of Dispersion, D =
P1 =
2.2
17.000+
0.000 m
14.538 m
6.200 0.000 x
2.750+ 29.075
0.284
0.000 t/m
0.000 m
At Top of Foundation
16.000
14.450
0.175
2.750
B
Formation Level
14.450
h1
0.000
8.344
45
Top of Foundation
Height, h1 =
Width of Distribution, B =
Depth of Dispersion, D =
P1 =
2.3
17.000+
0.000 m
2.750 m
14.450 m
6.200 0.000 x
2.750+ 28.900
0.284
0.000 t/m
0.000 m
At Bottom of Foundation
16.000
13.450
1.175
2.750
B
Formation Level
13.450
h1
0.000
10.344
450
Bottom of Foundation
Height, h1 =
DPCL
0.000 m
175980462.xls.ms_office
Return Wall
Depth of Dispersion, D =
17.000+
P1 =
3.0
40
13.450 m
6.200 0.000 x
2.750+ 26.900
0.284
0.000 t/m
0.000 m
0.5 Kp w h
Cos (f+ a)
Sin(f + d) Sin(f + i)
1Cos(a- d) Cos (a - i)
2
Kp=
Cos2a Cos(a - d)
f =
0.204 rad
d=
0.210 rad
1.936
= Pp Cos(d - a) Acting at (h/3) above section.
Kp=
Pph
2
i=
0.000 rad
0.000 rad
Factor of Safety for Passive =
= Pp Sin(d - a) Acting at X=Y Cot(90 - a)
a =
Ppv
At Top of Foundation
Passive Height = Bed Lvl or Scour Lvl TOF =
Pp =
0.5 x 1.936 x 1.000 x
0.000 2
10.192-
0.000 m
0.000 t/m
11.100 =
At Bottom of Foundation
Passive Height = Bed Lvl or Scour Lvl BOF =
Pp =
0.5 x 1.936 x 1.000 x
1.092 2
10.192-
1.092 m
1.154 t/m
9.100 =
0.000 m
0.364 m
SELF WEIGHT
4.1
Top of Wall
0.450
Back Fill
0.001
1
Passive 1.050
6
3
A
0.088
No.
0.850
0.000
Shape
Factor
1.0 x
0.5 x
0.5 x
0.5 x
0.5 x
0.5 x
Vert.
(m)
Ac
tiv
e
FL
0.450 x
0.000 x
0.088 x
0.088 x
0.088 x
0.001 x
Density Weight
W(t)
(t/m3)
1.050 x
1.050 x
1.050 x
1.050 x
-0.03 x
0.850 x
Sum
CG of Total Mass from A = Moment/Weight =
CG of Total Mass above Intermediate Level =
Fi
ll
W1
W2
W3
W4
W5
Passive W6
Horz.
(m)
6.244
11
Back Fill
2.500 =
2.500 =
2.500 =
1.800 =
1.800 =
1.000 =
1.181
0.000
0.115
0.083
-0.002
0.000
1.377
WX /W =
WY /W =
Top of Wall
0.450
10
L.A.
Moment L.A.
Moment
from A W X
above A W Y
(m)
(tm)
(m)
(tm)
0.313
0.369
0.525
0.620
0.538
0.000
0.350
0.000
0.058
0.007
0.350
0.040
0.029
0.002
0.700
0.058
0.029
0.000
1.042 -0.002
0.537
0.000
0.378
0.716
0.378 /1.377
=
0.275 m
0.716 /1.377
=
0.520 m
Passive
0.001
0.000
1.050
1
2
13
15
0.850
2
0.000
5
DPCL
14
1.900
175980462.xls.ms_office
Return Wall
14
3
41
1.050
1.050
4
B
11.100
1.000
0.175
0.000
6
4.2
16
0.200
7
8
1.625
2.725
0.700
0.500
At Top of Foundation
No.
Fi
ll
tiv
Ac
Pa
ss
e iv
Fi
ll
4.3
W1
W2
W3
W4
W5
W9
W11
W12
W13
W14
Shape
Horz.
(m)
Vert.
(m)
Density Weight
3
W(t)
(t/m )
1.0 x
0.5 x
1.0 x
0.5 x
0.5 x
0.5 x
0.5 x
0.5 x
1.0 x
0.5 x
(tm)
(m)
(tm)
0.945
1.050
2.481
0.000
1.400
0.000
0.000
0.525
0.000
0.000
0.350
0.000
0.054
0.700
0.322
0.019
1.400
0.463
0.000
2.083 -0.017
0.000
0.000
0.001
1.019
3.249
1.019 /3.146
=
0.324 m
3.249 /3.146
=
1.033 m
0.400
0.625
0.625
0.625
0.117
0.058
0.058
0.625
0.625
1.625
At Bottom of Foundation
No.
Fi
ll
tiv
Fi
ll
Ac
iv
Pa
ss
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
Shape
1.0 x
0.5 x
1.0 x
0.5 x
0.5 x
1.0 x
0.5 x
1.0 x
0.5 x
1.0 x
1.0 x
0.5 x
1.0 x
0.5 x
1.0 x
0.5 x
Horz.
(m)
Vert.
(m)
0.450 x
0.000 x
0.000 x
0.000 x
0.175 x
1.625 x
1.100 x
1.100 x
0.175 x
1.000 x
1.175 x
0.001 x
0.000 x
0.001 x
1.100 x
1.100 x
Density Weight
W(t)
(t/m3)
2.500 =
2.363
2.500 =
0.000
2.500 =
0.000
2.500 =
0.000
2.500 =
0.459
2.500 =
2.844
2.500 =
0.275
2.500 =
1.375
1.800 =
0.331
1.800 =
3.780
1.800 =
-0.723
1.000 =
0.000
1.000 =
0.000
1.000 =
0.001
1.000 =
2.090
1.000 =
0.110
Sum
12.904
C.G. of mass from C =
Moment/Weight =
WX /W =
C.G. of Total Mass above Bott of Foundation =
WY /W =
5.0
9.100
1.100
2.100 x
1.050 x
1.050 x
1.050 x
2.100 x
0.700 x
0.200 x
0.500 x
2.100 x
2.100 x
-0.342 x
0.850 x
0.850 x
1.050 x
1.900 x
0.200 x
(tm)
(m)
(tm)
3.308
1.750
4.134
0.000
2.100
0.000
0.000
1.225
0.000
0.000
1.050
0.000
0.513
1.400
0.643
2.311
0.350
0.995
0.548
0.567
0.156
2.991
0.250
0.344
0.350
2.100
0.695
1.890
1.750
6.615
-0.283
2.686
-1.94
0.001
0.000
0.001
4.546
0.259
16.433
11.639
16.433 /12.904
=
1.273 m
11.639 /12.904
=
0.902 m
1.400
1.625
1.625
1.625
1.117
0.813
1.992
2.175
1.058
0.500
0.392
1.625
1.625
2.625
2.175
2.358
SEISMIC FORCE
Earth Pressure Due to Seismic Effect
bx
Ix
ah =
ao
ah =
0.0 x
1.0 x
5.12.6.1
1.500 =
Level
Slope of Batter with Vert.
Coff. of internal friction of Soil
Angle of friction bet. Wall & earth
Angle of slope of fill with Horz.
Case I: With
"+" & "+"
value
DPCL
l =
Ca =
tan-1a h
1+av
a=
f=
d=
i=
tan-1 0.060
1 + 0.030
(1 + a v) Cos2(f - a - l)
Ca =
tan-1a h
1-av
av =
0.06
1 +
tan-1 0.060
1 - 0.030
(1 + a v) Cos2(f - a - l)
Cosl Cos2a Cos(a + d + l)
x
1 +
0.058
0.06 / 2 =
0.03
BOF
rad
rad
rad
rad
Pt I
TOF
0.878
Pt II
0.638
With (+)
1
2
Sin(f + d)Sin(f - i - l)
Cos(a+ d + l)Cos(a - i)
With (-)
0.062
1
Sin(f + d)Sin(f - i - l)
Sub Str
0.327
=
Pt I
0.882
Pt II
0.637
2
=
0.329
175980462.xls.ms_office
Return Wall
Cosl Cos a Cos(a + d + l)
2
At
Final Ca =
5.1
1 +
Int. Chk & TOF
0.329
Ka =
0.284
0.045
Cos(a+ d + l)Cos(a - i)
BOF
5.2
FORCE L.A.
Moment
0.083
0.520
0.043
0.041
0.000
0.000
0.045
0.525
0.024
At Top of Foundation
DESCRIPTION
SFH 1 to 5 = DUE TO SELF WT. OF Wall
SFV 1 to 5 = DUE TO SELF WT. OF Wall
2
Increment in Earth Pressure [0.5gh (Ca-Ka)]
Total Ver Load =
0.094 t
Total Horz Load =
0.368 t
Total Moment =
0.384 t-m
5.3
FORCE L.A.
Moment
0.189
1.033
0.195
0.094
0.000
0.000
0.180
1.050
0.189
At Bottom of Foundation
DESCRIPTION
SFH 1 to 5 = DUE TO SELF WT. OF Wall
SFV 1 to 5 = DUE TO SELF WT. OF Wall
Increment in Earth Pressure [0.5gh2(Ca-Ka)]
Total Ver Load =
0.321 t
Total Horz Load =
1.328 t
Total Moment =
1.984 t-m
6.0
42
=
FORCE L.A.
Moment
0.642
0.902
0.579
0.321
0.000
0.000
0.685
2.050
1.405
STRESS CALCULATION
6.1
S.No.
1
LOAD
L.A. (m) Moment
VERT HORZ.
(t-m)
DESCRIPTION OF LOAD
Active Earth Pressure
Horizontal Component Pah
0.257
0.076
2
Earth Pressure due to Surcharge Ph
3
Self Weight & Back Fill
TOTAL
Due to seismic Effect
Combined Load with Seismic
0.000
Fac
Ultimate Load
Puh
Mu
0.342
0.088
1.70
0.4377
0.15
0.028
0.002
1.70
0.00
0.000
0.000
0.378
0.468
0.067
0.535
1.70
1.40
1.377
1.453
-0.041
1.412
0
0
0.438
0.44
Pu
Width of the section =
538 mm
Cover
=
70 mm
( Effective )
Effective Depthj =
538 Checking at first Level
Mu
=
7.5 kN-m
Ast =
.5 fck
0.15 x
1 -
fy =
b =
d =
1-
35 N /mm2
415 N /mm2
1000 mm
468 mm
0.75
Mu
468 mm
Mu
0.15 x b x fck
7494469
35
x 1000
DPCL
d =
fy
Here :fck =
70
0.00
0.53
0.683
0.067
4.6 Mu
fck bd2
37.8
bd
Mu =
7.5 KN - m
Ast =
44.5 mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = #
200.96
mm
x
44.5
1000
16
12
=
=
4519
mm
mm
mm
175980462.xls.ms_office
Return Wall
So Provide Spacing =
% of Steel Provided = p =
=
0.307
140
1435.4
1000
>
mm
x
x
< 3d =
100
467.5
OK
0.20%
43
1402.5
O.K
z =
final z
655273
16362500
1=
1.1 fy Ast
fck b d
468
449
0.95 d =
444
444 mm
Mur =
0.87 * fy *As * z
0.87 *
415
230.17 kN-m
1435.4 *
>
444 =
7 kN-m
230172882.3
N-mm
OK
0.12
100
561
113.04
=
Required Spacing =
Provide Spacing
X
mm
x
561
mm
mm
201
140
1000
467.5
<
0.75 fck =
1000
Ultimate Shear = Vu =
b
=
d
=
Shear stress =
Depth factor =
v =
4.4 kN
1000 mm
468 mm
4.4 * 1000
1000*
468
s =
500
d
1/4
0.0094
0.27
Ym
2
1435.4 mm
1.25
vc =
0.27
1.25
0.476
vc =
s * vc
v
=
=
1.0169
*
0.0094 N/mm2
N/mm2
0.476
0.4844
100 As
bd
1/3
4.4371
OK
1.0169
fck
1/3
1/3
143543
( Cl 15-4-3-2-1)
35
1/3
467500
N/mm2
6.2
At Top of Foundation
S.No.
1
LOAD
L.A. (m) Moment
VERT HORZ.
(t-m)
DESCRIPTION OF LOAD
Active Earth Pressure
Horizontal Component Pah
1.030
0.304
2
Earth Pressure due to Surcharge Ph
3
Passive Earth Pressure
4
Self Weight & Back Fill
TOTAL
Due to seismic Effect
Combined Load with Seismic
DPCL
0.625 m =
70 mm
( Effective )
625 -
0.000
0.000
3.146
3.449
-0.094
3.355
Fac
Ultimate Load
Puh
Mu
0.683
0.703
1.70
1.7507
1.20
0.057
0.017
1.70
0.03
0.000
0.000
0.324
0.000
0.000
1.019
1.739
0.384
2.123
1.70
1.70
1.40
0
0
0
1.751
1.75
Pu
0.00
0.00
1.43
1.225
0.384
1.61
Mu
625 mm
70
555 mm
175980462.xls.ms_office
Mu
Return Wall
16.1 kN-m
Ast =
.5 fck
0.15 x
d =
Mu
0.15 x b x fck
16088356
35
x 1000
1 -
mm
Mu =
16.1 KN - m
Ast =
80.5 mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = #
So Provide Spacing =
% of Steel Provided = p =
=
55.4
bd
fck bd
35 N /mm2
415 N /mm2
1000 mm
555 mm
fy =
b =
d =
4.6 Mu
1-
fy
Here :fck =
44
0.259
140
1435.4
1000
>
200.96
x
80.5
1000
mm
x
x
< 3d =
100
555
OK
1665
0.20%
16
12
=
=
2497
mm
mm
mm
O.K
z =
final z
655273
19425000
1=
527 mm
Mur =
415
273.25 kN-m
1.1 fy Ast
fck b d
555
536
0.95 d =
527
( Min of above )
0.87 * fy *As * z
0.87 *
=
1435.4 *
>
527 =
16 kN-m
273253368.3
N-mm
OK
0.12
100
666
113.04
=
Required Spacing =
Provide Spacing
170
140
1000
555.0
<
0.75 fck =
mm
x
666
mm
mm
1000
Ultimate Shear = Vu =
b
=
d
=
Shear stress =
Depth factor =
v =
s =
17.5 kN
1000 mm
555 mm
17.5 * 1000
1000*
555
500
d
1/4
2
1435.4 mm
1.25
0.27
Ym
vc =
vc =
s * vc
v
=
=
0.9742
*
0.0315 N/mm2
0.450
N/mm
0.0315
0.27
1.25
0.450
0.4383
100 As
bd
x
1/3
4.4371
OK
0.9742
fck
143543
1/3
1/3
( Cl 15-4-3-2-1)
35
1/3
555000
N/mm2
DPCL
175980462.xls.ms_office
6.3
Return Wall
45
At Bottom of Foundation
S.No.
LOAD
Moment (t-m)
L.A. (m) Moment
(t-m) Front L.A.
Ms
VERT HORZ.
DESCRIPTION OF LOAD
Active Earth Pressure
Horizontal Component Pah
3.464
1.022
2
Earth Pressure due to Surcharge Ph
3
Passive Earth Pressure
4
Self Weight & Back Fill
TOTAL
Due to seismic Effect
Combined Load with Seismic
6.2.1
0.000
0.376
12.904
13.926
-0.321
13.605
1.253
4.339
0.104
0.107
0.000
0.364
1.273
0.000
-0.137
16.433
20.742
1.984
22.727
2.621
2.679
1.452
18.730
21.409
21.409
Case
Moment
(t-m)
W
13.926
13.605
Without Seismic
With Seismic
M
20.742
22.727
Z (m)
e (m)
B (m)
M/W
1.489
1.670
2.725
Z-B/2
0.127
0.308
Pmax (t/m )
Pmin (t/m )
W/B(1+6e/B)
6.54
8.38
W/B(1-6e/B)
3.68
1.61
1.100
On safer side Taking Max Foundation Pressure as UDL ( Though it will be Trapezoidal )
Max Pressure =
83.781 kN/m
83.781
Max Moment =
Ultimate Moment
Mu
x
2
1.100
1.700
Ast =
.5 fck
=
50.69
50.69
86.17 kN-m
0.15 x
1 -
d =
Mu
0.15 x b x fck
86168398
35
x 1000
4.6 Mu
1-
35 N /mm2
415 N /mm2
1000 mm
630 mm
So Provide Spacing =
% of Steel Provided = p =
0.228
mm
Mu =
86.2 KN - m
Ast =
381.8 mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = #
128.1
bd
fck bd2
fy
fy =
b =
d =
86.2 kN-m
Here :fck =
140
1435.4
1000
>
200.96
x
381.8
1000
mm
x
x
< 3d =
100
630
OK
1890
O.K
1000
0.20%
16
12
=
=
526
mm
mm
mm
0.12
100
756
113.04
=
Required Spacing =
Provide Spacing
150
140
mm2
x
756
mm
mm
630.0
1000
DPCL
1.000
175980462.xls.ms_office
Return Wall
8.344 x
Vertical UDL
150.192
150.192 kN/m
150.192
Max Moment =
127.7 kN-m
Ast =
.5 fck
fy =
b =
d =
75.10
75.10
127.66 kN-m
Mu
0.15 x b x fck
=
4.6 Mu
1-
35 N /mm2
415 N /mm2
1000 mm
630 mm
155.9
mm
bd
fck bd
Mu =
127.7 KN - m
Ast =
567.6 mm2
Dia Of Main Bar = # =
Dia Of Bar on Comp Side = #
So Provide Spacing =
% of Steel Provided = p =
=
150.192 kN/m
127663200
35
x 1000
1 -
d =
fy
Here :fck =
150.192 kN/m
1.700
Mu
0.15 x
0.000
1.000
x
2
Ultimate Moment
0.000 kN/m
18.000
46
0.228
200.96
x
567.6
1000
mm
x
x
< 3d =
100
630
OK
1890
O.K
1000
140
1435.4
1000
>
0.20%
16
12
=
=
354
mm
mm
mm
0.12
100
756
113.04
=
Required Spacing =
Provide Spacing
7.0
mm2
x
756
mm
mm
150
140
630.0
1000
STABILITY CALCULATION
7.1
Without seismic,
Mo =
4.339 +
0.000 =
4.339 t-m
With seismic,
Mo =
4.339 +
0.000 +
1.984 =
6.324 t-m
Ms =
Ms =
FOS (Reqd.)
2.0
1.5
DPCL
21.409 t-m
3.464
0.000
0.376 =
3.088 t
13.926
0.500
2.725 m
2
1.500 t/m
0.376 (Ref. 9.2 )
175980462.xls.ms_office
Return Wall
m W+Bc+P p
6.963
=
Factor of Safety =
47
4.088
0.376
11.427
Resisting Force
Horz. Force
11.427
3.088
3.701
>
1.500
OK
DPCL
175980462.xls.ms_office
Detailing
1000
Fromation Level 19.44
Dirt Wall
5000
48
1000
300
16 # @ 130 mm c/c
8 # @ 150 mm c/c
9444
Top ofAbutment
18.84
32 # @ 90 mm c/c
32 # @ 90 mm c/c
20 # @ 180 mm c/c
20 # @ 180 mm c/c
X
16 # @ 140mm c/c
Top of Cap
10.00
1800
25 # @ 140 mm c/c
25 # @ 140mm c/c
12 # 3 Legged
Stirrups @ 140
1200 mm Dia Pile
25000
Y
1200
20 # 17 Nos
8 # dia Ring @ 200
mm c/c
####
3500
3500
####
8 # dia Ring @ 200 mm c/c
20 # 17 Nos
Section at Y-Y
8500
20 # @ 180 mm c/c
7000
20 # 8 nos
3500
8500
750
Details of Abutment
1520
10 # 4 Leg @
180 mm c/c
Bridge NO 8
Section @ X-X
DPCL
32 # @ 90 mm c/c