Preliminary Detail Abstrct (PDA)

This document provides a 3-sentence summary of a preliminary detailed abstract for a construction project: It includes a total provision amount and breakdown of preliminary cost estimates for construction of multiple buildings and internal/external services; it also lists contingencies, supervision costs, professional fees, and the total cost of the project. The document is signed off by estimating officers, state directors of works, and portfolio branch directors of works.

Uploaded by

farhana1992
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (7 votes)
10K views2 pages

Preliminary Detail Abstrct (PDA)

This document provides a 3-sentence summary of a preliminary detailed abstract for a construction project: It includes a total provision amount and breakdown of preliminary cost estimates for construction of multiple buildings and internal/external services; it also lists contingencies, supervision costs, professional fees, and the total cost of the project. The document is signed off by estimating officers, state directors of works, and portfolio branch directors of works.

Uploaded by

farhana1992
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

(PWD 142A - Rev.

`91)

JABATAN KERJA RAYA PRELIMINARY DETAILED ABSTRACT FOR

HEAD

SUBHEAD

YEAR

TOTAL PROVISION

PROVISION FOR CONSTRUCTION $ BRIEF DESCRIPTION OF BUILDINGS BUILDING a b c d e f g h j k BREAKDOWN OF PRELIMINARY COST ESTIMATE 1 2 a b c 3 a b c d e f g h j k g 4 a b c d e f g h j k h BUILDING Drawing No. Floor Area m2 Cost/m2 PRELIMINARIES PILING/SPECIAL FOUNDATION Type and Size COST $ Frame Wall Roof Floor Ceiling Window Standard

INTERNAL SERVICES Plumbing Installation Sanitary Appliances Electrical Installation Fire Protection Installation Air Conditioning Installation Lift & Conveyor Installation Communication Installation

SUBTOTAL carried forward

5 a b c d e f g h i j k 6 7 a b c 8 a b c 9

BREAKDOWN OF PRELIMINARY COST ESTIMATE SUBTOTAL brought forward EXTERNAL WORKS i) Site Preparation ii) Earthwork Roads,Hardstanding, Footpaths & Paving Fencing & Gates Turfing & Soft Landscaping Surface Drainage Sewerage External Electrical Installation External Water Supply Installation External Telephone Installation

(CONT'D)

COST $

VARIATION OF PRICES CONTRIBUTION FEE TO LOCAL & UTILITY AUTHORITY Tenaga Elektrik Nasional MISCELLANEOUS Advertisement Documentation CONTINGENCIES TOTAL (items 1 to 9)

ALL IN UNIT RATES (of Total items 1 to 9) Total Floor Area m2 : Cost/m2 : 10 SUPERVISION 11 PROFESSIONAL FEES a Architect b Civil & Structural Engineer c Mechanical Engineer d Electrical Engineer e Quantity Surveyor f TOTAL COST OF PROJECT Quantity Surveyor / Estimating Officer State Director of Works

Portfolio Branch Director of Works

Date:

Date:

Date:

* Only necessary if PDA is prepared at JKR State level