2.

Required Development and Testing Environment

(a) Hardware requirements (processor, RAM, storage capacity etc.), Software requirements ( OS, Language versions, libraries etc.), Special requirements (if any): Hardware Environment : RAM Router Pentium Free Hard Disk

Software Environment: Windows 7 Microsoft Office

(b) How do you intend to obtain access for these facilities? Indicate the location, frequency of access to use these facilities and its approximate durations on Monthly / weekly / daily basis. Only for an authorized person can accessed this system.

(c) How do you intend to demonstrate your project work? Indicate success to software, hardware data required for the demonstration. To demonstrate our project work must be demonstrated through computer it should be connected to local area network to access the server database.

(d) Will the final system be tested / evaluated by real users: No

(e) State the way of generating test data/test cases: Using easy eclipse application.

(f) State the way of determining the acceptability/success of final system: We can say that our system is under developing, because until now we under negotiate for the company of SULU HOTEL.

(g) The procedure to evaluate the performance of the system. The procedure to evaluate the system, we find some expert in this aspect to help to help us and give some knowledge if it correct or we need something to improve and we a sign a person to focused for developing the system come up some idea news and new trends.

3. The Work Plan

Use a project management tool such as Microsoft Project. Include each schedule in a separate sheet. A schedule should fit into a single A4 page. (a) The production schedule (using a Gant chart); (b) The production schedule for the project study (using a Gant Chart)

Activities June July Aug Week 1 2 3 4 1 2 3 4 1

Sep 2 3 4 1

Oct Nov Dec 2 3 4 1 2 3 4 1

Jan Feb Mar 2 3 4 1 2 3 4 1