0% found this document useful (0 votes)
60 views

Balanced Cement Plug - Metres: Class "A" 5.2 Gal/sk Yields 1.18

This document provides input parameters and calculated outputs for designing a balanced cement plug. It lists input values like the height and diameter of the plug interval, drill pipe dimensions, depth to bottom of plug, spacer volumes before and after the plug, and mud volumes. It then calculates the required plug slurry volume in cubic feet, number of 94 lb cement sacks needed, and mix water volume based on different cement classes and their yields.

Uploaded by

Dian Sikumbang
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views

Balanced Cement Plug - Metres: Class "A" 5.2 Gal/sk Yields 1.18

This document provides input parameters and calculated outputs for designing a balanced cement plug. It lists input values like the height and diameter of the plug interval, drill pipe dimensions, depth to bottom of plug, spacer volumes before and after the plug, and mud volumes. It then calculates the required plug slurry volume in cubic feet, number of 94 lb cement sacks needed, and mix water volume based on different cement classes and their yields.

Uploaded by

Dian Sikumbang
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

BALANCED CEMENT PLUG - METRES

DATA INPUT:HEIGHT OF PLUG (M) Avg. HOLE SIZE OVER PLUG INTERVAL (ins) DRILL PIPE OD (ins) DRILL PIPE ID (ins) (4.5" 16.6# = 3.826") (3.5" 13.3# = 2.764") DEPTH TO BOTTOM OF PLUG (Metres) SPACER (or WATER) BEFORE PLUG (BBLS) YIELD (cu.ft./sack) MIX WATER (gal/sk) 10 1.52 6.05 2400 TOTAL VOLUME OF DISPLACMENT FLUID (Bbls) SPACER (or WATER) AFTER PLUG (Bbls) MUD VOLUME AFTER SPACER (Bbls) 124.5 1.3 125.8 12.3 5 4.1 50 PLUG SLURRY VOLUME REQUIRED (cu. ft) 94 lb SACKS CEMENT REQUIRED MIX WATER (bbls) 12.7
Class "A" 5.2 gal/sk yields 1.18 Class "G" 5.0 gal/sk yields 1.15 HTB 4.9 gal/sk yeilds 1.16

CALCULATED OUTPUT:-

134

88