0% found this document useful (0 votes)
27 views

Dhaka Area Total: #2 (26/4/10) Unknown

Power Grid Company of Bangladesh Ltd provided a summary of daily electricity generation for March 1, 2013. Total probable maximum generation was 4,250 MW, while actual generation was 3,656 MW. The Dhaka area generated the most with 1,556 MW through various gas, oil and diesel power plants. The Chittagong area generated 874 MW and the Ashuganj area generated 1,145 MW from numerous gas and oil plants. Several plants had limited generation or were shut down due to maintenance issues.

Uploaded by

Amin Al Shuvo
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Dhaka Area Total: #2 (26/4/10) Unknown

Power Grid Company of Bangladesh Ltd provided a summary of daily electricity generation for March 1, 2013. Total probable maximum generation was 4,250 MW, while actual generation was 3,656 MW. The Dhaka area generated the most with 1,556 MW through various gas, oil and diesel power plants. The Chittagong area generated 874 MW and the Ashuganj area generated 1,145 MW from numerous gas and oil plants. Several plants had limited generation or were shut down due to maintenance issues.

Uploaded by

Amin Al Shuvo
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

QF-LDC-07

POWER GRID COMPANY OF BANGLADESH LTD.


SUMMARY OF DAILY ELECTRICITY GENERATION

Month :

Mar-2013

Probable Maximum Generation :


Water Level of Kaptai Lake at 06:00 AM
Name of the Power Station
Fuel

Sl.

(a) At Day Peak Hour :


(a) Yesterdayft :
Instslled Capacity

Friday

Date :

MW
ft
Actual Generation
On 28-Feb-13
Day Peak
Ev. Peak
MW
MW

(b) At Evening Peak Hour :


(b) Today:
95.09
ft
Available Geneneration
On 1-Mar-13
Day Peak
Ev. Peak
MW
MW

1a Ghorasal ST 1 & 2

Gas

PDB

2X55

MW
110

Derated/
Present
Capacity
MW
78

42

40

40

40

1b Ghorasal ST 3,4,5& 6

Gas

PDB

4X210

840

740

280

330

330

330

2 Ghorashal 100 MW
3 Ghorashal 45 MW
4 Ghorashal MAX

Gas

QRPP 3yrs

128X0.85

Gas

QRPP 3yrs

50X0.85

Gas

RPP

4x19.6

100
45
78

100
45
78

5 Haripur SBU GT 1, 2 & 3

Gas

SBU,PDB

3x32

96

60

Haripur NEPC
Haripur P. Ltd CCPP
Meghnaghat P.Ltd CCPP
Meghnaghat IEL
Madanganj 102 MW
Keraniganj
Narshingdi
Siddhirgonj ST
Siddhirgonj GT-1, 2
Siddhirganj 100MW
Dutch Bangla 100 MW
DPA Power 50MW

HFO

IPP

8x15

IPP

235+125

Summit Power (Dhaka)


Gazipur RPCL

110
360
450
100
102
100
22
210
210
96
100
50
146
52
105
3482
420

110
360
450
100
100
100
22
150
210
96
100
50
146
52
105
3252
360

103
46
79
40
13
0
228
92
75
94
16
110
44
50
101
0
108
0
0

104
46
79
40
110
0
229
92
92
96
16
110
82
90
101
51
113
53
40

102
45
80
40
55
0
232
92
92
45
16
110
69
0
100
0
108
0
0

100
45
78
40
110
0
230
100
95
100
16
110
45
91
100
50
113
52
40

1521

1914

1556

1885

230
60
150
55
98
102
100
22

220
40
150
53
98
102
100
22

0
0
212
0
50
22
0
0
108
12
1

0
0
212
0
75
8
97
102
107
12
26

0
0
118
0
100
8
0
0
108
12
28

0
0
212
0
75
26
98
102
100
12
20

1237
128
450
146
53
55
80
53
70
52
163
22
11
33
25
1341
210
22
232
97
104
51
44
11
70
86
50
142
20
50
10
735
60
105
110
60
110
115
54
109
101
40
40
55
959

1145
110
430
91
53
55
80
51
70
52
163
22
11
33
25
1246
197
22
219
90
104
51
44
11
66
86
50
142
20
50
10
724
46
105
55
30
110
115
54
109
101
40
40
55
860

405

639

374

645

55
412
73
33
14
42
20
70
0
91
14
11
25
14

55
412
73
33
13
42
20
71
42
91
14
11
33
16

55
412
90
33
13
42
20
70
0
92
17
11
32
18

55
412
90
33
13
42
20
70
42
91
14
11
33
16

874

926

905

942

133
17

150
17

152
17

150
17

150

167

169

167

42
62
45
44
11
58
80
40
99
0
38
0

40
65
48
47
11
63
80
40
88
0
46
0

42
62
45
47
11
62
80
39
100
0
44
0

40
65
48
47
11
63
80
42
88
0
46
0

519

528

532

530

0
0
0
0
90
56
0
0
4
41
0
0

46
47
0
0
110
102
46
93
33
41
41
37

0
0
0
0
29
0
0
0
7
40
0
0

46
50
0
0
110
115
46
93
33
40
40
40

191

596

76

613

0
0
0
11

0
0
14
32

0
0
0
21

0
0
14
32

11

46

21

46

68
97
0
24
0
46
7
0
100
0
21
12
11

69
101
50
25
71
47
50
42
120
0
20
14
11

70
100
0
27
0
7
8
0
140
0
21
15
11

70
100
50
27
71
47
50
42
120
0
20
14
11

6
7
8
9
10
11
12
11a
11b
12
13
14
15
16
17

Tongi GT
Dhaka Area Total
1 Chittagong Raozan ST 1 & 2
2 Raozan 25 MW

3
4
4b
5
6
7
8
9
10

Gas
Gas

IPP

3X150

HFO

RPP

12x8.9

HFO

QRPP 3yrs

6x17.08

HFO

RPP

8x14.4

Gas

SIPP,REB

8X2.90

Gas

PDB

1x210

Gas

EGCB

2x120

HSD

QRPP 3yrs

96x1.2

HFO

RPP

12x8.9

HSD

QRPP 3yrs

100X0.5

Gas

SIPP,REB

HFO

IPP

6x8.9

Gas

PDB

1X 105

Gas

PDB

1x210,1x180

FO

RPCL

Kaptai Hydro unit 1,2,3,4 & 5

Sikalbaha ST
Sikalbaha GT
Sikalbaha
Hathazari
Dohazari
Juldah
Barabkunda
Malancha,Ctg EPZ

Producer

Day :
4250
95.33 ft

PDB
Gas

PDB

2X40+3X50
1X60

Gas

PDB

1x150

HFO

RPP 3yrs

4X12.5+2X11.9+1X3+1

HFO

PDB

HFO

PDB

6x17

HFO

RPP

8x13.45

Gas

SIPP,PDB

8X2.90

11x8.9

Gas

Chittagong area Total


1a
1b
1c
1d
2
3
4
5
6
7
8
9
10
11

Ashuganj ST 1,2
Ashuganj ST 3,4,5
Ashuganj CCPP
Ashuganj 50 MW
Ashuganj
Ashuganj Aggrekko
Ashuganj UP-53 MW
Brahmanbaria 70MW
Daudkandi 50 MW
Chandpur CCPP
Feni
Mahipal,Feni
Jangalia

Gas

APSCL

2x64

Gas

APSCL

3x150

Gas

SIPP,PDB

4X8.73

Summit Power (Comilla)

Gas

SIPP,REB

3x3.67+2x6.97

Gas

IPP

4X35+1x70

Gas

SIPP,PDB

8X2.90

Gas

PDB

2x32+1x33

Gas

PDB

2x35+1x35

Gas

RPP 15yrs

19X2.90

Gas

RPP

12x3.3+5x2

Gas

APSCL

2x56+34

Gas

APSCL

16x3.35

Gas

RPP 3yrs

15x4

Gas

RPP

82x1.1

Gas

RPP

14x4

Gas

QRPP 3yrs

72x1

PDB

6x8.92

Gas

PDB

1x106+1x57

Gas

FO

SIPP,PDB

8X2.90

Gas

SIPP,REB

4X2.90

Comilla Area Total


1 RPCL CCPP,Mymensing
2 Tangail
1a
1b
2
3
4
5
6
7
8
9
10
11
1
2
3a
3b
4
5
6
7
8
9
10
11
1
2
3
4

1a
1b
2
3
4
5
6
7
8
9
10
11
12

Mymensing Area Total


Fenchugonj CCPP (old)
Fenchugonj CCPP (new)
Fenchugonj
Fenchuganj Prima 50 MW
Hobiganj
Shahjibazar GT 8,9
Shahjibazar 86 MW
Shahjibazar 50 MW
Sylhet 150 MW
Sylhet GT
Sylhet 50MW
Sylhet 11 MW
Sylhet Area Total
Bheramara GT 1, 2 & 3
Bheramara
Khulna ST 110MW
Khulna ST 60MW
KPCL ,Khulna.
KPCL ,Khulna.(new)
Faridpur
Gopalganj 110 MW
Noapara (105 MW) Quantam
Noapara (40 MW),KZA
Khulna 40 MW
Khulna 55 MW
Khulna Area Total
Barisal Diesel
Bhola Diesel
Barisal GT 1 & 2
Bhola
Barisal Area Total
Baghabari GT 1
Baghabari GT 2
Baghabari 50 MW
Baghabari Westmont
Bera 70 MW
Amnura 50 MW
Katakhali NPS 50 MW
Katakhali PPP 50 MW
Sirajganj 150 MW
Santahar 50 MW
Bogra GBB
Bogra 20MW
Summit Power (Ullapara)

Gas

SIPP,REB

4X2.90

Gas

PDB

2X35

Gas

RPP 15yrs

32X2.90

Gas

RPP 3yrs

27X2.0

Gas

PDB

1x150

Gas

PDB

1X20

Gas

RPP 3yrs

29x1.95

Gas

RPP 15yrs

6X1.95

HSD

PDB

3X20

HSD

RPP 3yrs

12X8.5+2X6+2X13

FO

PDB

1X110

FO

PDB

1X60

HFO

IPP

19x6.5

HFO

IPP

7x17

FO

PDB

8x6.89

HFO

PDB

16x6.98

HFO

RPP

9.9x5+9.5x6+9.2x2

HFO

RPP

5x8

HSD

RPP 3yrs

50X0.80

HSD

QRPP 3yrs

71X0.85

HSD

PDB

2X1.4+2X1.35

HSD

PDB

HSD

PDB

2X20

Gas

RPP 3yrs

1X34.50

Gas

SBU,PDB

1X71

32
33
65
71
100
52
70
71
50
50

Gas

SBU,PDB

1X100

HFO

PDB

6x8.9

Gas

IPP

2X45

HFO

PDB

9x8.29

HFO

RPP

7x7.79

RPP

6x8.92

71
100
52
90
71
50
50

1x150

150

150

20
20
11
685

22
20
11
667

386

620

399

622

250
20
20
47

200
20
20
47

195
0
0
0

198
20
18
44

198
0
0
20

198
20
18
44

HFO
HFO

PDB

Gas

NWPGCL

HFO

PDB

Gas

RPP 15yrs

6X4

Gas

RPP 3yrs

5x3.3+5x2

Gas

SIPP,REB

4X2.90

Rajshahi Area Total


1
2
3
4

40
33
73

Barapukuria ST 1 & 2

Coal

PDB

2x125

Rangpur GT
Sayadpur GT
Thakurgaon

HSD

PDB

1X20

HSD

PDB

1X20

HSD

RPP 3yrs

20X1.5+21X1.1

Rangpur Area Total

Total

93.00 ft
Plants under
for Plants S/D Shut down (Date) /
or M/C prob.
Remarks
MW
#2(26/4/10)
35

for Fuel
Limitation
MW

380

20
360
225
8
8
6
40
128

#6(18/07/10),

Unknown

#5(27/2/13)

Unknown

#3(18/06/09)

Unknown

01/02/13.

10/3/2013

GT2(13/1/13)

GT2(1/3/13)

1 M/C

Synchronized at 33KV, 2 M/C


1 M/C

4 M/C
Synchronized at 33KV
Synchronized at 33KV

65
193
360

1087

40
75

475

#2(8/8/12),#1(17/2/13)
On test

Unknown

6/2/13.

Unknown

45

7 M/C

10

Synchronized at 33KV,3 M/C

55
55

#1(14/1/13)

20

5 M/C

42
38

Unknown

10 M/C
35 M/C
8 M/C

8
72
8

1 M/C
1 M/C
2 M/C
Synchronized at 33KV
Synchronized at 33KV

152
47
47

9
100

Synchronized at 33KV,2 M/C

5
5
50
39

Synchronized at 33KV,1 M/C


1 M/C

Unknown

1 M/C

Synchronized at 33KV

6
10

2 M/C

20
4
4
133

1 M/C

61
55
30

8 M/C

3 M/C

54

54

2 M/C
Synchronized at 33KV,2 M/C

Unknown
Unknown

21/6/12

29/11/12

1 M/C

68

2 M/C
8 M/C

Synchronized at 33KV,20 M/C

214

1 M/C

35

#1(1/5/12)

Unknown

On test
On test
On test

30

Synchronized at 33KV

2 M/C
Synchronized at 33KV

30

41

2 M/C

287

195

280

218

280

8465

4252

5716.0

4250

5730

951

1635

3870

5203

3869

5216

Thursday
11 Evening Peak Hour
:
hrs
hrs
12 Max. Demand (Generation end) at evening peak hour :
hrs
13 Max. Demand (Substation end) at evening peak hour :
hrs
14 Load Shed (Substation end) at evening peak hour
:
15. Area wise Demand ( S/S end), Supply( S/S end) &
Load Shed (S/S end) at Evening peak hour in MW :
MKWHr
Area
Demand
Supply
Loadshed (Duration)
MKWHr
MW
Dhaka
1914
1914
0
MW
Chittagong
549
549
0
MW
Khulna
616
616
0
(18:10-20:30)
Rajshahi
650
617
33
270490143
(18:10-20:30)
Comilla
383
363
20
393
393
0
354942026 Mymensing
Sylhet
262
262
0
MKWHr.
hrs
Barisal
122
122
0
(18:10-20:30)
hrs
Rangpur
390
367
23
Total
5279
5203
76
Friday
Probable max. temperature in Dhaka
29 C

5:00

Probable
Start up
Date

Synchronized at 33KV

337

28-Feb-13 (Yesterday)
Highest Generation
:
5716.0
MW at
20:00
Minimum Generation
:
3767.0
MW at
4:00
Day peak Generation
:
4252.0
MW at
12:00
Evening peak Generation :
5716.0
MW at
20:00
MW
Total Energy Generation :
105.59
MKWHr
MW
MKWHr
By Gas:
75.16
By Oil:
22.32
MW
MKWHr
By Coal:
4.60
By Hydro:
3.51
MW
6 Generation Shortfall : For Gas:
668
For Oil:
358
MW
0
For Water Shortage:
1635
For Plants S/D or M/C prob:
7 Total Gas Supplied :
822.03 MMCFD
8 Fuel Cost :
i) Gas :
Taka 65642375
ii) Oil
: Taka
iii) Coal :
Taka 18809508
Total
Taka
9 Export Through E-W Interconnectors :
10.440
i) Energy
ii) During Peak Demand :
330
MW at
20:00
iii) Maximum :
630
MW at
7:00
10 Maximum Temperature in Dhaka was
33 C
B.
1-Mar-13
(Today)
Forecast
1 Maximum Demand (Generation end)
5650
MW
2 Maximum Generation (Generation end)
5730
MW
3 Shortage (Generation end)
-80
MW
4 Total Energy Generation
106
MKWHr
5 Actual Minimum Generation up to 8:00 hrs.
3758
MW at

MW

(c) Rule Curve:

Ev. Peak Gen.Shortfall

9081

Useable load at Substation end after deducting Auxiliary use & Transmission loss

A.
1
2
3
4
5

ft

1-Mar-13
5730

6 Total Load Shed forecast (Substation end) :


7 Area wise Load Shed forecast (Substation end) :
Chittagong
Khulna
Rajshahi Comilla
Dhaka
MW
MW
MW
MW
MW
0
0
0
0
0

20:00 hrs.
5800
MW
5279
MW
76
MW
16 Hourly Load Shed during
Evening Peak hours :
Time
Loadshed
Hour
MW
18:00
108
18:30
155
19:00
83
19:30
62
20:00
76
21:00
0
22:00
0
23:00
0

MW

Mymensing Sylhet
MW
MW

Barisal
MW

Rangpur
MW

You might also like