156.1MW CCPP, GSEG Site, Surat-Hazira Road, Surat-394510: F/CHKL/06. Report No.: /09-10 Date

The document provides a report on the micom relay readings from the tripping of two transmission lines, KIM line-1 and KIM line-2, at a 156.1MW combined cycle power plant. It includes details such as the active protection group, starting and tripping phases, initiating and tripping elements, date and time of fault alarm, system frequency, fault duration, relay tripping time, and fault location and resistance readings. The report was checked by the shift engineer and reviewed by the shift in-charge.

Uploaded by

rms_sivam
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

156.1MW CCPP, GSEG Site, Surat-Hazira Road, Surat-394510: F/CHKL/06. Report No.: /09-10 Date

The document provides a report on the micom relay readings from the tripping of two transmission lines, KIM line-1 and KIM line-2, at a 156.1MW combined cycle power plant. It includes details such as the active protection group, starting and tripping phases, initiating and tripping elements, date and time of fault alarm, system frequency, fault duration, relay tripping time, and fault location and resistance readings. The report was checked by the shift engineer and reviewed by the shift in-charge.

Uploaded by

rms_sivam
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

156.

1MW CCPP, GSEG Site, Surat-Hazira Road, Surat-394510


Report No. : /09-10

Operation Dept.
F/CHKL/06. Date:

MICOM RELAY READINGS ON TRIPPING OF LINE KIM line 1 KIM line 2 Active group Start phase Trip phase Start element Over current Trip ELTS Earth fault Aided DEF Distance trip Date& Time Fault alarm System freq. Fault duration Relay trip time Fault location IA IB IC VAN VBN VCN Fault in resistance Fault in zone Others Alarm at Kim SS: Line -1 IN Previous After Diff Line -2 IN Previous After Diff Remarks: CMD -1 OUT IN CMD -2 OUT IN CMD -3 OUT IN CMD -4 OUT CMD -1 OUT IN CMD -2 OUT IN CMD -3 OUT IN CMD -4 OUT Active group Start phase Trip phase Start element Over current Trip ELTS Earth fault Aided DEF Distance trip Date& Time Fault alarm System freq. Fault duration Relay trip time Fault location IA IB IC VAN VBN VCN Fault in resistance fault in zone Others

Checked by: Name & Signature of Shift Engineer

Reviewed by: Name & Signature of Shift In-charge