Purpose:: Subject Safe Handling of Tubular's Reference: TUB07 Page No: 1 of 2

The document outlines safe work practices for handling tubulars during laying out and strapping. Key steps include: (1) wearing proper safety gear, (2) preparing the pipe deck and removing tripping hazards, (3) lifting bundles of tubing from the boat or main deck using tag lines, (4) lowering slings and removing them carefully from the tubing, (5) rolling the tubing into position on the stack while avoiding gaps. The maximum recommended stack height is limited to 12 meters for safety.

Uploaded by

Dian Sikumbang
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views

Purpose:: Subject Safe Handling of Tubular's Reference: TUB07 Page No: 1 of 2

The document outlines safe work practices for handling tubulars during laying out and strapping. Key steps include: (1) wearing proper safety gear, (2) preparing the pipe deck and removing tripping hazards, (3) lifting bundles of tubing from the boat or main deck using tag lines, (4) lowering slings and removing them carefully from the tubing, (5) rolling the tubing into position on the stack while avoiding gaps. The maximum recommended stack height is limited to 12 meters for safety.

Uploaded by

Dian Sikumbang
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

SUBJECT Safe Handling of Tubulars

Reference: TUB07 age !o: " of #

- Laying Out -

Purpose: T$e %ur%ose of t$is %rocedure is to outline safe &or' %ractices for $andling of tubulars &$ilst laying out and stra%%ing( Procedure: "( Ensure correct safety gear is &orn: #( 0( 1( Hard Hat( Safety )lasses( Safety Boots( )lo*es(

re%are %i%e dec'( +nstall Sa,%son %osts and re,o*e all tri%%ing $a-ards( Ensure ade.uate su%%ly of dunnage/ and a s,all bas'et for t$e %rotectors( ic' u% bundle of tubing fro, boat or ,ain dec'/ using tag lines eit$er end( lace bundle on %i%e rac' and %osition load against Sa,%son %ost so t$at %i%e rolls a&ay fro, crane $oo'( Hold a little &eig$t &it$ t$e crane &$ilst de-,ousing slings( Cut ,ousing a&ay fro, your body( Re,o*e tag lines(

2( Lo&er slings and re,o*e fro, bundle of tubing/ ta'ing care &$en re,o*ing slings of %i%e rolling and tra%%ing fingers and feet( 3( Roll tubing to correct %osition on stac'/ %us$ing tubing one at a ti,e fro, be$ind( 4o not stand on %i%e &$ic$ $as not been rolled out %ro%erly/ and dont lea*e ga%s(

OR+)+!5TOR 120 Tool%us$er

OR+)+!5L 45TE

E66ECT+7E 45TE

RE7+S+O! !o(

SUBJECT Safe Handling of Tubulars

Reference: TUB07 age !o: # of #

- Laying Out -

8( Re,o*e %rotectors/ %in and bo9( Bundle u% loose slings before access &ays are restricted( :ee% all loose %rotectors in s,all bas'et or container( ;( <$en a ro& is co,%leted stra% t$e %i%e =&$en stac' $eig$t increases/ 'neel do&n at ends to stabilise %osition &$ilst stra%%ing %i%e>/ record t$e ,easure,ents/ and %aint and nu,ber t$e tubing( Lay out dunnage on to% of tubing for ne9t ro& fitting end sto%s to %re*ent tubing rolling off stac'( ?( Re%eat ste%s 0 - ;( "@( 5s stac' of tubing gets $ig$er it s$ould ta%er in&ards slig$tly to eli,inate %i%e ,o*e,ent( Stac' $eig$t s$ould be li,ited to "(; ,etres/ as $eig$t safety is re.uired(

OR+)+!5TOR 120 Tool%us$er

OR+)+!5L 45TE

E66ECT+7E 45TE

RE7+S+O! !o(