7.2.3
Stubs
Stubs for the standard height tower, tower body and leg extensions shall be of the same design. Unless specified to the contrary only one design of stub shall be permitted for each type of tower and the stubs shall be identical for all four legs. For details of the cleat design, reference shall be made to Clause 6.2.4. The thickness of the stub leg members shall not be less than the conesponding tower leg members. 7.2.4 Assumed SysteIll Loading Criteria
The assumed system loading criteria based on detenninistic principles for the ultimate limit states of climatic, security (broken wire) and construction and maintenance shall be in accordance with the clauses and para1neters specified in Appendix 7A3.
7.2.5
Wind Loading
The wind loadings on the conductors and insulators shall be calculated using the following expressions: (a) Conductors Fe Where qdes
Note:
qdes Cf A Cos 2 a Design wind pressure including height and spatial effects = 981 N/sq.m Cf Force coefficient 1.0 for Conductors 1.1 for Earth wire A Full projected area perpendicular to the wind a Yaw angle of wind The effective force is perpendicular to the conductor.
(N)
(N/m 2 )
(m2)
(b)
~QA
Design wind pressure including height and spatial effects = 981 N/sq.m Force coefficient = 1.1 Area of insulator set perpendicular to the wind
(N/m 2 )
(m2 )
(c)
Tower wind acting on tower at 1600 N/Sq.m on one and half times the proj ected area of the members of the tower on one side. Construction and Maintenance Loading
7.2.6
The specified construction and maintenance loading shall be applied to all phase conductor and earthwire attachment points in the combinations stated. Where appropriate these loadings and lor their individual components shall also be applied to the corresponding maintenance points ego the vetiical component shall be applied to vertical maintenance attachment points, whilst the longitudinal is applied to the horizontal maintenance plates.
Construction of 132kV Overhead line between Awqad GSS & SFZ GSS and Associated Works (Package-1) Volume 2 Overhead Line Specification Section 7 Supports