Bonald: Dhofar Power Company SAOG

The document lists notification points and hold points for the construction of overhead power lines. Some key points include excess spans on towers, fabrication drawings, damaged galvanizing, welding procedures, non-destructive testing procedures, prototype support erection, and prototype support testing. The overhead lines are being constructed between Awqad GSS and SFZ GSS substations as part of a 132kV transmission line project.

Uploaded by

54045114
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Bonald: Dhofar Power Company SAOG

The document lists notification points and hold points for the construction of overhead power lines. Some key points include excess spans on towers, fabrication drawings, damaged galvanizing, welding procedures, non-destructive testing procedures, prototype support erection, and prototype support testing. The overhead lines are being constructed between Awqad GSS and SFZ GSS substations as part of a 132kV transmission line project.

Uploaded by

54045114
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Dhofar Power Company SAOG

Appendix 7Cl
Notification Points and Hold Points
]111
Clause Reference Notification Points Hold Points
7.1.5 Excess Spans
7.2.21 Danger & Identification plates
7.2.24 Design Calculations
7.2.25 Fabrication Drawings
7.4.3 Misplaced Holes
7.4.4 Formation of Bends
7.4.6 Erection Marks
7.5.2 Cleaning of tower parts for painting
7.6.1 Method Statement
7.6.5 Damaged Galvanising
7.7.1 Ultrasonic Testing
7.7.2 Welding Procedure
7.7.2 NDT Organisation
7.7.2 NDT Procedures
7.7.6 Prototype Support Erection
7.7.6 Prototype Support Test Programme
7.7.6 Prototype support test
Construction of 132kV Overhead line between Awqad GSS &SFZ GSS
Rev. No. :A
and Associated Works (Package-1)
Volume 2 Overhead Line Specification Date : December 2010
Section 7 Supports Page :Page 36 of 38