ISSUE NUMBER 001: DREDGING AND SAND PROCUREMENT STATUS: Quantity on 3rd April=261, 00 cft Up to 03/04/2011, Cumulative Quantity=348,800 cft WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 002: PVD DRIVING STATUS: !" #n$tallation on pro%re$$& WORK DONE: Up to 3rd April2011, total !" point = 186'0 (o$& WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 003: INTERLOCKING BLOCK PRODUCTION STATUS: roduction on 31$t )arc*2011+3'00 (o$ Cumulative Quantity =2 8,,000 (o$& WORK DONE: WORK TOBE DONE IN COMING DAYSACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 004a: RAILWAY RELOCATION STATUS: Admini$trative ermi$$ion on ro%re$$& WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 004b: ELECTRIC HT LINE RELOCATION STATUS: "ra.in% approval and Admini$trative permi$$ion on pro%re$$& WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: ISSUE NUMBER 004 : WASA RELOCATION STATUS: Admini$trative permi$$ion on pro%re$$& WORK DONE: /e0uired pipe$ for relocation %at*ered on $ite& ipe $ample *a$ $ent to 1U23 for 3e$t& WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 00!: ELECTRICAL WORK ON THE NCT PRO"ECT STATUS: WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 00#: DRAIN WORK STATUS: "rain .or4 on pro%re$$ in 5ot* $ide 6.e$tern and $out* $ide7 2art* 28cavation on pro%re$$ at 9e$tern end& WORK DONE: C A :urvey team vi$ited t*e $ite and t*ey locate t*e drain ali%nment& (o. ;pen "rain .or4$ on pro%re$$ at .e$tern end& WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:
ISSUE NUMBER 00$: COMMENTS FROM BRTC% BUET&CPA ;n 31$t )arc*2011, a team of 1/3C, 1U23 vi$ited t*e $ite& 3*e <ey er$onnel are 17 "r&#$tia0 27 "r&:*am$ul =o0ue& 3*ey e8pre$$ed t*eir deci$ion a5out $ome i$$ue$ .*ic* are17 #n$tead of 1o8 Culvert at $u5$tation $ide, open drain alon% $u5$tation perip*ery .ill con$truct& 27 3*ey al$o advi$ed to improve #>1 $*ape and outloo4&
ISSUES NUMBER 00': RCC D(a)*a+, P)-, STATUS: Cumulative Quantity =316 (o$& 62ac* 6ft7 WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: 3o accelerate production of /CC "raina%e pipe, .e need more mould 61000mm ? 300mm dia&7 ISSUE NUMBER 00.: GROUND IMPROVEMENT STATUS: :urc*ar%e material fillin% at $e%ment+1A on pro%re$$ :and 1a%%in% and placement alon% perip*ery of :e%&1A on pro%re$$&