0% found this document useful (0 votes)
18 views

PM Report.3rd April2011

The daily report summarized the status of various issues for the NCT Back-up Project as of April 3, 2011. Dredging had procured 261,000 cubic feet of material. 186 piles had been installed for the PVD system. Interlocking block production was at 38,000 cubic feet. Administrative permission was in progress for railway and electric line relocation. Drain work was ongoing at the western end. RCC drainage pipe production was at 316 cubic feet. Ground improvement involved surcharge filling and sand bagging along the periphery of Segment 1A.

Uploaded by

Mahibul Hasan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

PM Report.3rd April2011

The daily report summarized the status of various issues for the NCT Back-up Project as of April 3, 2011. Dredging had procured 261,000 cubic feet of material. 186 piles had been installed for the PVD system. Interlocking block production was at 38,000 cubic feet. Administrative permission was in progress for railway and electric line relocation. Drain work was ongoing at the western end. RCC drainage pipe production was at 316 cubic feet. Ground improvement involved surcharge filling and sand bagging along the periphery of Segment 1A.

Uploaded by

Mahibul Hasan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Daily Report of NCT Back-up Project April 3, 2011

ISSUE NUMBER 001: DREDGING AND SAND PROCUREMENT STATUS: Quantity on 3rd April=261, 00 cft Up to 03/04/2011, Cumulative Quantity=348,800 cft WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 002: PVD DRIVING STATUS: !" #n$tallation on pro%re$$& WORK DONE: Up to 3rd April2011, total !" point = 186'0 (o$& WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 003: INTERLOCKING BLOCK PRODUCTION STATUS: roduction on 31$t )arc*2011+3'00 (o$ Cumulative Quantity =2 8,,000 (o$& WORK DONE: WORK TOBE DONE IN COMING DAYSACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 004a: RAILWAY RELOCATION STATUS: Admini$trative ermi$$ion on ro%re$$& WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

Daily Report of NCT Back-up Project April 3, 2011

ISSUE NUMBER 004b: ELECTRIC HT LINE RELOCATION STATUS: "ra.in% approval and Admini$trative permi$$ion on pro%re$$& WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: ISSUE NUMBER 004 : WASA RELOCATION STATUS: Admini$trative permi$$ion on pro%re$$& WORK DONE: /e0uired pipe$ for relocation %at*ered on $ite& ipe $ample *a$ $ent to 1U23 for 3e$t& WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 00!: ELECTRICAL WORK ON THE NCT PRO"ECT STATUS: WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 00#: DRAIN WORK STATUS: "rain .or4 on pro%re$$ in 5ot* $ide 6.e$tern and $out* $ide7 2art* 28cavation on pro%re$$ at 9e$tern end& WORK DONE: C A :urvey team vi$ited t*e $ite and t*ey locate t*e drain ali%nment& (o. ;pen "rain .or4$ on pro%re$$ at .e$tern end& WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

Daily Report of NCT Back-up Project April 3, 2011

ISSUE NUMBER 00$: COMMENTS FROM BRTC% BUET&CPA ;n 31$t )arc*2011, a team of 1/3C, 1U23 vi$ited t*e $ite& 3*e <ey er$onnel are 17 "r&#$tia0 27 "r&:*am$ul =o0ue& 3*ey e8pre$$ed t*eir deci$ion a5out $ome i$$ue$ .*ic* are17 #n$tead of 1o8 Culvert at $u5$tation $ide, open drain alon% $u5$tation perip*ery .ill con$truct& 27 3*ey al$o advi$ed to improve #>1 $*ape and outloo4&

ISSUES NUMBER 00': RCC D(a)*a+, P)-, STATUS: Cumulative Quantity =316 (o$& 62ac* 6ft7 WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: 3o accelerate production of /CC "raina%e pipe, .e need more mould 61000mm ? 300mm dia&7 ISSUE NUMBER 00.: GROUND IMPROVEMENT STATUS: :urc*ar%e material fillin% at $e%ment+1A on pro%re$$ :and 1a%%in% and placement alon% perip*ery of :e%&1A on pro%re$$&