PM Report.11th Mayl2011

The daily report summarizes the status of various work streams for the NCT Back-up Project as of May 11, 2011. Dredging and sand procurement were ongoing. PVD installation was in progress with a total of 2135 points installed so far. Interlocking block production was ongoing with 3350 blocks produced on April 11. Railway and utility relocation were ongoing as was electrical, drain, and preloading work. Comments were received from BRTC and an immediate test report was needed for RCC drainage work.

Uploaded by

Mahibul Hasan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

PM Report.11th Mayl2011

The daily report summarizes the status of various work streams for the NCT Back-up Project as of May 11, 2011. Dredging and sand procurement were ongoing. PVD installation was in progress with a total of 2135 points installed so far. Interlocking block production was ongoing with 3350 blocks produced on April 11. Railway and utility relocation were ongoing as was electrical, drain, and preloading work. Comments were received from BRTC and an immediate test report was needed for RCC drainage work.

Uploaded by

Mahibul Hasan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Daily Report of NCT Back-up Project May 11, 2011

ISSUE NUMBER 001: DREDGING AND SAND PROCUREMENT STATUS: Quantity on 10th May PSP Marine: 25,100 cft - Tabassum: 27,37 cft - Tabassum: WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: ,23,7(0 cft !" to 10#05#2011, $umu%ati&e Quantity PSP Marine: 7,3',500 cft

ISSUE NUMBER 002: PVD DRIVING STATUS: P)* +nsta%%ation on "ro,ressWORK DONE: !" to 11th May 2011, Tota% P)* . 2135/ "ointWORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 003: INTERLOCKING BLOCK PRODUCTION STATUS: Pro0uction on 11 1"ri% 2011.3350 2os $umu%ati&e Quantity .3,/7,'70 2osWORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 004a: RAILWAY RELOCATION STATUS: 3o4 $u%&ert *esi,n has a""ro&e0WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

Daily Report of NCT Back-up Project May 11, 2011


ISSUE NUMBER 004b: ELECTRIC HT LINE RELOCATION STATUS: WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE: ISSUE NUMBER 004 : WASA RELOCATION STATUS: 10ministrati&e "ermission on "ro,ressWORK DONE: 5e6uire0 "i"es for re%ocation ,athere0 on siteWORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 00!: ELECTRICAL WORK ON THE NCT PRO"ECT STATUS: WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

ISSUE NUMBER 00#: DRAIN WORK STATUS: *rain 7or8 in "ro,ress 97estern en0: WORK DONE: WORK TOBE DONE IN COMING DAYS: ACTION NEEDED FROM HEAD OFFICE:

Daily Report of NCT Back-up Project May 11, 2011


ISSUE NUMBER 00$: COMMENTS FROM BRTC% BUET&CPA

ISSUES NUMBER 00': RCC D(a)*a+, P)-, STATUS: $umu%ati&e Quantity .(0' 2os- 9;ach (ft: WORK DONE: WORK TOBE DONE IN COMING DAYS: +mme0iate%y nee0 Test 5e"ort to submit $P1ACTION NEEDED FROM HEAD OFFICE: ISSUE NUMBER 00.: PRELOADING STATUS: Surchar,e materia% fi%%in, at se,ment-11 in "ro,ressSan0 3a,,in, an0 "%acement a%on, "eri"hery of Se,-11 in "ro,ress-