0% found this document useful (0 votes)
186 views

Braking Resistor Unit

This document is a circuit diagram for the braking resistor unit of the Noble JU3000 #1 drilling rig. It was prepared by ABB and is for approval by Jurong Shipyard Pte Ltd. The diagram shows the main 690V low voltage switchboards, 480V switchboard/MCC, transformers, and drilling VFD switchboard. It is the first page of an 11 page document.

Uploaded by

pwmvsi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
186 views

Braking Resistor Unit

This document is a circuit diagram for the braking resistor unit of the Noble JU3000 #1 drilling rig. It was prepared by ABB and is for approval by Jurong Shipyard Pte Ltd. The diagram shows the main 690V low voltage switchboards, 480V switchboard/MCC, transformers, and drilling VFD switchboard. It is the first page of an 11 page document.

Uploaded by

pwmvsi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

JSL

JURONG SHIPYARD PTE LTD


(A Subsidiary Of SembCorp Marine Ltd)

TYPE OF DOC.:

PD 11-1103 Noble JU3000 #1 Circuit Diagram,Braking Resistor Unit NE1-VCD5-E-001-ABB-PD-602 Rev A 3BTG611019-0602 11-1103-007 NE1-VCD5E-001 877-ER-001
PACKAGE DESCRIPTION:

JSPL DOC. NO.:

NE1-VCD5-E-001-ABBPD-602
SHEET:

JOB:

1 of 11

DOC TITLE:

FILE NO.:

VENDORS DOC. NO.

PURCHASE ORDER NO.:

ABB
REV
A For Approval

PACKAGE ID:

Main 690V LV Swbds,480V Switchboard/MCC, Transformers, Drilling VFD Swbd

EQUIPMENT TAG(S):

REVISION INDEX DESCRIPTION AND / OR REVISED SHEETS

THE REVIEW OF THIS DOCUMENT DOES NOT RELIEVE OF THE SUPPLIERS RESPONSIBILITY FOR THE DESIGN, FABRICATION AND PERFORMANCE OF THE EQUIPMENT OR ANY CONTRACTUAL OBLIGATIONS A B C D E F Name: Date: REV. A DATE PREPARE CHECKER APPROVAL REV. B REV. C REV. D REV. 0 REV. 1 REV. 2 REV. 3 NO COMMENTS. Send certified drawings. WITH COMMENTS. Revise and re-submit for comments. WITH MINOR COMMENTS. Send certified drawings with comments incorporated. REJECTED. Reissue for comments. CERTIFIED DOCUMENT. Accepted. FOR INFORMATION. Signature:

2012-03-29 Rohani Andre Darshan

THE INFORMAITON CONTAINED IN THIS DOCUMENT IS JURONG SHIPYARD PTE LTDS CONTROLLED DOCUMENT AND MAY NOT BE USED FOR PURPOSES OTHER THAN THOSE SPECIFICALLY INDICATED HEREIN.

You might also like